MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

Similar documents
Sudan PBN Implementation Plan PBN SG/3

REPORTS FROM REGIONS

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

From local to regional to global ATFM

MID Region Air Navigation Strategy

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

ATFM/CDM ICAO s Perspective

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

International Civil Aviation Organization. Air Traffic Services Route Network Task Force (ARN TF) Sixth Meeting (Cairo, Egypt April 2013)

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

ASBU-Bloc0 Moroccan achievements and planned activities

Russian Federation ATM modernization program

Bits to Blocks Aviation System Block Upgrades (ASBU)

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

Sudan PBN Implementation Plan PBN SG/2

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Continuous Improvement of the Global Air Traffic Management System

PBN Airspace Concept. ATS requirements

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

- Establish criteria and procedures providing for the creation and use of adjustable lateral and vertical limits of the airspace

UK Implementation of PBN

SESAR Solutions. Display Options

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

ATC automation: facts and steps ahead

2012 Performance Framework AFI

MEDUSA & NANSC, Egypt

TWELFTH AIR NAVIGATION CONFERENCE

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Agenda Item 6-ATM Coordination (ATM Contingency Plan- Level 1 and Level 2)

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

NORTH ATLANTIC VISION

DSNA NAVIGATION STRATEGY

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Asia/Pacific Air Traffic Management Perspectives

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

Concept of Ops: A Strawman

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

Air Traffic Control National Control Authority Liability Insurance Questionnaire Applicant: HungaroControl Hungarian Air Navigation Services

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018)

Civil and military integration in the same workspace

ORGANISER HOST LEAD SPONSOR

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

ACAC. Air Traffic Flow Management & IFPS. Where we are?

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

(Presented by United States) EXECUTIVE SUMMARY

PBN/TF/7 DRAFT Appendix D to the Report D-1

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Morocco ASBU Implementation

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

Considerations for Facility Consolidation

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

PBN and Procedure Design training

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

INTERNATIONAL CIVIL AVIATION ORGANIZATION REPORT OF THE FIRST MEETING OF THE MIDANPIRG ATM SUB-GROUP ATM SG/1. (Cairo, Egypt, 9 12 June 2014)

Air Navigation Bureau ICAO Headquarters, Montreal

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Presented by: Trinidad and Tobago

TWELFTH AIR NAVIGATION CONFERENCE

Airspace Organization and Management

Learning Objectives. By the end of this presentation you should understand:

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

Preparation for ASBU B1 (PBN)

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

TWELFTH AIR NAVIGATION CONFERENCE

(RN R A N V A V & & RN R P N

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Performance Based Navigation Operational End-State 2023

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

CONTROLLED AIRSPACE CONTAINMENT POLICY

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

PBN Implementation Plan Tonga

CANSO ATFM Data Exchange Network for the Americas (CADENA) (Presented by ALTA, CANSO, COCESNA and IATA)

PBN Implementation Plan - Fiji Version 1 19 January 2010

PBN and airspace concept

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

Transcription:

Bahrain FIR Presented by Dash Dulabh on behalf of Director Air Traffic Management Bahrain Civil Aviation Affairs 1

Presentation Outline ATS Routes improvements Additional ATS Routes Implemented or planned ATM Operational Improvements Ongoing ATM projects/initiatives Lessons Learned 2

ATS Routes improvements Bahrain ATC is now fully RNAV 1 compliant achieving maximum route efficiency. Bahrain accepts traffic 10 MIT from all adjacent FIRs. Contingency Routes developed in 2014 to avoid areas of military conflict have been successful in providing alternate routing and efficiency to all users. (As per ASBU Module B0-FRTO Flexible Routing Concept) Due to restructuring in Baghdad FIR it was found that these contingency routes are no longer required by all customers for southbound traffic. Safety assessments indicated that LONOS / RABAP route could not co-exist with the KUVER contingency route. ( see next slide) In conjunction with neighboring FIR s the KUVER route was gradually closed via FLAS implementation as the LONOS/RABAP routes were gradually re-opened. Northbound traffic still has the option to utilize either UL602 DAVUS or UT602 ROTOX. 3

This is why southbound Traffic via KUVER is no longer accepted. Use of FLAS not an option due to the volume of traffic utilizing RABAP/LONOS UAE N UAE S DOH/ ATM SG/3 Cairo, 22-25 May 2017 BAH 4

Additional ATS Routes Contingency routes have been developed for Qatar registered aircraft to facilitate such traffic facing restrictions. UT800 available via DASUT to Tehran FIR UT430 available via RAGAS to Tehran FIR PATOM TOKMA route joins UL602 DAVUS or UT602 ROTOX - Note that this route saves several miles per flight over the previous required routing. Other FIR Routings have been altered in order to safely facilitate these contingency routes Contingency routes have been developed for customers requesting or required to avoid OTR52 and OTR53. UY856 developed because UP699 and OBBI STAR SOGAT1 arrival is effectively blocked for use due to OTR53 upper limit being recently raised UY604 developed for aircraft to avoid OTR52 UZ622 and numerous other routings developed to connect neighboring FIRs through Bahrain have been established. 5

Additional Contingency Routes Yellow = A7 Routes Blue= Other avoiding ATM SG/3 Cairo, 22-25 May 2017 6

Implemented or planned ATM Operational Improvements OLDI implementation with UAE ACC fully functional 02 July 2017. Revised LOA on 07 December 2017 with UAE-ACC to support UAE airspace restructuring and improve cross FIR traffic flow with particular emphasis on west bound traffic. Bahrain is fully ready to implement OLDI with other States Selected Level Alert (SLA) in ATC Display system has reduced the potential for level busts and reduced the impact of callsign confusion. ASMGCS level 2 implementation including ADSB vehicle tracking Expanding current MLAT coverage into a larger WAM environment Implementation of Multi-constellation ADSB surveillance for increased capacity and operational efficiency 7

Ongoing ATM Projects/Initiatives New Bahrain FIC facility including new ATM systems are currently under development Ricochet ATC system recording project has been successfully implemented OBBI Take off and Landing CCTV monitoring system with full recording New NAVAIDS ILS 12L, ILS30R, DVOR, fully implemented 26 April 2018 ILS CAT II procedures currently under development planned implementation Q3 2018 RNAV GNSS Approaches with Vertical guidance fully implemented 26 April 2018 Revised OBBI STAR and new SIDs have been developed and pending publication Bahrain IFPS expecting to expand to GCC IFPS, revised action plan and draft States SLA in progress Flow Management Data ( DXB AMAN data) display on BAH ACC East sectors is under development 8

Lessons Learned The region has experienced significant challenges in the past few years, in traffic demand and political pressures. Bahrain and its neighbors have maintained high levels of safety and satisfaction to their stakeholders This is only possible due to the high level of cooperation received by all parties and it is clearly evident that each party is dedicated to ensuring the delivery of the highest levels of safety and efficiency to its airspace users. To that end Bahrain would like to extend their thanks and gratitude to all the States and Airspace users for their cooperation, patience and understanding. We will endeavor to work with customers, adjacent units, ICAO and IATA to manage current and future challenges. 9

Thank you! We appreciate your attention and kind feedback 10