Post earthquake rockfall protection resilience for a lifeline transmission pylon in Christchurch

Similar documents
Laurie Richards. Rock Engineering Consultant. Project Memo #2 to: Date: 18 June 2012

Risk and Rockfall: Observations on the Implementation of Rockfall Mitigation at Residential Properties in the Port Hills

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE

Canterbury Earthquakes 2010/11 Port Hills Slope Stability: Pilot study for assessing life-safety risk from rockfalls (boulder rolls)

London Borough of Barnet Traffic & Development Design Team

Rockfall Protection TREK ROUTE TO SHRI MATA VAISHNO DEVI SHRINE (1), IN

Lake Dunstan Trail Project - Geotechnical Review

e. Artificial avalanche release. This usually consists of delivering explosives to avalanche starting 2.5 AVALANCHE MITIGATION

SH73 Route Security Strategic Study Project Summary

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

VISITOR RISK MANAGEMENT APPLIED TO AVALANCHES IN NEW ZEALAND

Rockfall Protection SAMPHIRE HOE IN DOVER, GB

Aeronautical Studies (Safety Risk Assessment)

Estimating the Risk of a New Launch Vehicle Using Historical Design Element Data

CAA Safety Investigation Report Ozone Fazer 2 Speed Wing Controlled flight into terrain Port Hills Christchurch 18 April 2017

Report to COMMUNITY DEVELOPMENT & SERVICES Committee for

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

Historic Columbia River Highway. Rockfall Hazard Study

Protection contre les chutes de pierres

Avalanche Protection. Safety without Compromise

Proceedings, International Snow Science Workshop, Banff, 2014

Technical Design Manual

DESIGN-MAGNITUDE AVALANCHE MAPPING AND MITIGATION ANALYSIS KIRKWOOD RESORT, CALIFORNIA -- AN UPDATED STUDY. Prepared For. Mr.

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Guidelines for Snow Avalanche Risk Determination and Mapping. David McClung University of British Columbia

INTERACTION OF FLEXIBLE ROCKFALL BARRIERS WITH AVALANCHES AND SNOW PRESSURE. Stefan Margreth* 1 and Andrea Roth 2

along a transportation corridor in

HOME OWNER PRE- DELIVERY INSTRUCTIONS

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Advanced Flight Control System Failure States Airworthiness Requirements and Verification

Specification for Grip blocking using Peat Dams

STRONGER CHRISTCHURCH INFRASTRUCTURE REBUILD TEAM (SCIRT) REAAA

SRT system stabilizes levee at power plant

Effect of Support Conditions on Static Behavior of 1400m main span and 700m side span Cable-stayed Bridge

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

helicopter? Fixed wing 4p58 HINDSIGHT SITUATIONAL EXAMPLE

The Potentially Dangerous Glacial Lakes

An archaeological watching brief on land adjacent to 50 Rosebery Avenue, Colchester, Essex May/June 2003

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Update on the Thameslink programme

RESEARCH AND DEVELOPMENT PERTAINING TO STEEL WIRE ROPE NET SYSTEMS FOR THE PREVENTION OF SNOW AVALANCHES1. Robert A. Thommen, Jr.

ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT

Submitted to: NYX CAPITAL CORP. 1131a Leslie Street, Suite 201 Toronto, Ontario M3C 3L8 Attention: Mr. Tim Jessop Development Manager

Flying Banners. Shape & Size. Material & Pole Sleeve. Mounting Accessories PROJECTING SIGNS & FLAGS

WAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Glasgow Street Traffic Review

SH6 Route Security Strategic Study Project Summary

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

Archaeological Monitoring at Ham Farm, Ham Road, Faversham, Kent

Excelsior Pass Avalanche Accident January 1, 2008

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand

International Snow Science Workshop

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

The Board concluded its investigation and released report A11H0002 on 25 March 2014.

Project Management Institute Melbourne Chapter Root Causes of Hotel Opening Delays Thursday 30 August 2018

Proposed Arthurs Point Special Housing Area. Housing Accords and Special Housing Areas Act Expression of Interest

Performance and Efficiency Evaluation of Airports. The Balance Between DEA and MCDA Tools. J.Braz, E.Baltazar, J.Jardim, J.Silva, M.

AERODROME SAFETY COORDINATION

REPORT IN-038/2010 DATA SUMMARY

Wicking Geosynthetic Used for Frost Heave Prevention Pioneer Mountain Scenic Byway

ABOUT HOSPITALITY NEW ZEALAND

AVIATION INVESTIGATION REPORT A05P0032 SETTLING WITH POWER ROLL-OVER

INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS

Appendix 8: Coding of Interchanges for PTSS

Property access tracks

BLASTING GLACIAL ICE AND SNOW ABSTRACT

Remote Sensing into the Study of Ancient Beiting City in North-Western China

Dallas Executive Airport

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech

Economic Impact of Kalamazoo-Battle Creek International Airport

Optimising throughput of rail dump stations, via simulation and control system changes. Rob Angus BMT WBM Pty Ltd Brisbane 5 June 2013

A carbon offsetting and reduction scheme for international aviation

Proceedings, 2012 International Snow Science Workshop, Anchorage, Alaska

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

Analysing the performance of New Zealand universities in the 2010 Academic Ranking of World Universities. Tertiary education occasional paper 2010/07

Cooloolabin Dam Recreation Management Discussion Paper. November 2013

CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN. 28 March 2014 V10

Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes

Energex Loganlea to Jimboomba Network Upgrade Response to Supplementary IAR. Closes 8 April Submission by

TIFFANY TOP HUNG SLIDERS

TWELFTH AIR NAVIGATION CONFERENCE

FOR LARGE DESIGN WAVE HEIGHTS

HERNE BAY AREA MEMBER PANEL 16 TH JANUARY This report is open to the public.

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

2010 International Snow Science Workshop

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:

GEOSPATIAL ANALYSIS OF GLACIAL HAZARDS PRONE AREAS OF SHIGAR AND SHAYOK BASINS OF PAKISTAN. By Syed Naseem Abbas Gilany

Indoor Operation of Unmanned Aircraft Systems (UAS)

Week 2: Is tourism still important in the UK? (AQA 13.3/13.4) Week 5: How can tourism become more sustainable? (AQA 13.7)

DOW Number: Survey ID Date: 08/21/2018. Windom Southern

2015 Travel Survey. for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 2015

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

ACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia)

Important! You need to print out the 2 page worksheet you find by clicking on this link and take it with you to your lab session.

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

Unstable Slope Management Program for FLMAs. Presented by: Douglas A. Anderson, LG, LEG FHWA - WFL - Engineering Geologist

SUBJECT: Business Plan Update for Reid Hillview and San Martin Airports

Transcription:

Riding, J.P & Woods, D.J (2017) Post earthquake rockfall protection resilience for a lifeline transmission pylon in Christchurch Proc. 20 th NZGS Geotechnical Symposium. Eds. GJ Alexander & CY Chin, Napier Post earthquake rockfall protection resilience for a lifeline transmission pylon in Christchurch J P Riding GHD Ltd, Christchurch, NZ. (Corresponding author) Member NZGS, Affiliate IPENZ julia.riding@ghd.com D J Woods GHD Ltd, Christchurch, NZ darren.woods@ghd.com Keywords: rockfall, resilience, lifeline structure, geotechnical engineering ABSTRACT Following the 2010 to 2012 Canterbury Earthquake Sequence, a number a lifeline structures were noted to be at risk from damage from rockfall. An electrical transmission pylon, serving as a lifeline to a coastal suburban community of approximately 5000 residents, had been hit by rockfall triggered during the earthquakes. Due to the pylon design, damage had been limited and the structure was fit to remain in operation. The structure was assessed to have a high risk of damage in future rockfall events. Rebuilding of the structure to provide resilience was considered uneconomic. It was therefore decided that to maintain security of supply to the electrical network, rock protection measures would be used instead to safe guard against possible future damage. The pylon is situated on steeply sloping terrain approximately 75 m above sea level. Outcrops of Port Hills volcanic rocks are located approximately 180 m upslope of the pylon. The slope beneath the rock outcrops comprises predominately loess colluvium (reworked windblown silt) with scattered rock at the near surface along with boulders from previous rockfall events. This paper describes the process of assessing and designing resilient rock fall protection to a lifeline structure. Work has included: Rockfall modelling Rockfall protection optioneering Removal of source material Design of rock fall protection fence The assessments and modelling resulted in the construction of a rockfall protection fence. 1 INTRODUCTION The Canterbury Earthquake Sequence (CES), between 2010 and 2012, caused rockfall events on the Port Hills damaging residential properties and infrastructure. While some infrastructure such as roads were closed due to risk to life some structures such as lifeline infrastructure (e.g. overhead power, telecommunications etc.) had to continue to operate. This paper describes the process of providing protection to a lifeline structure to provide resilience against future rockfall events. 1.1 Background During the CES a transmission pylon on the Heathcote to Barnett Park sub transmission tower line was damaged by multiple rock strikes. This created a significant risk to the electricity supply to Sumner, Redcliffs and the surrounding area. 1

The pylon is situated on sloping terrain approximately 75 m above sea level, see Figure 1. Outcrops of volcanic rocks from the Lyttleton Volcanic Group are located approximately 180 m upslope of the pylon. The slope beneath the rock outcrops comprise predominately loess colluvium (reworked windblown silt) with scattered outcrops of exposed rock at the near surface and boulders from previous rockfall events. Figure 1: Transmission pylon prior to works Figure 2: Examples of rock damage to pylon 2 INVESTIGATION 2.1 Field Mapping Field mapping was undertaken by GHD staff to map and quantify; the number, type / size of fallen boulders as well as, potential source boulders from both rock outcrops and the slope around the pylon. Bounce height data at the pylon location was measured from impact marks on the pylon, see Figure 2. Field mapping, see Figures 3 to 5, identified two types of potential rockfall boulders: 2

1. Boulders formed by defects in the bluffs (i.e. not yet released); 2. Boulders that had previously released from a bluff onto the slope below and were now supported by soil. Figure 3: Precarious source rocks identified during walkover Pylon Figure 4: Looking upslope with pylon to the left. 3

Pylon 3 RISK ASSESSMENT 3.1 Rockfall Modelling Figure 5: Mapped precarious boulders Existing rockfall data collected by GNS Sciences (GNS) and the Port Hills Geotechnical Group (PHGG) following the earthquakes of the CES was obtained from Christchurch City Council (CCC). This data comprised the details and locations of mapped boulders that had moved in the CES and several attributes logged during field mapping of fallen boulders. Volumes of individual boulders were calculated by using a volume reduction factor of 30% to take into account the boulders shape. The mass was calculated using a boulder unit weight of 27 kn/m 3 as per GNS Science Consultancy Report CR2011/311. LS1 LS3 LS2 Pylon Figure 6: Boulder Runouts For Selected Sources 2-Dimensional rockfall modelling was undertaken using the rockfall modelling software RocFallTM (by Rocscience). 4

The rockfall modelling process, project settings and initial material parameters, were undertaken / selected in accordance with Appendix F (Rockfall Modelling Methodology for Field Verification) of GNS Science Consultancy Report CR2011/311. Three transects (LS1 to LS3) were run downslope from the bluffs through the pylon, see Figure 6. Two boulder sizes were considered for the modelling of potential rockfall risk: 1. The 95 percentile boulder from the data collected during GHD s field assessment was 85,000 kg. This was revised to 7,300 kg following boulder deconstruction works undertaken subsequent to the field mapping. 2. The GNS Port Hills 95 percentile boulder size of 8,250 kg. The GNS Port Hills 95 percentile boulder size was used for the modelling. This was considered the most conservative boulder size and removes any potential bias created by a limited field survey. Through back analysis, the GNS guideline material parameters were modified to achieve similar bounce heights to those observed on the pylon. Run out distances from the modified parameters ran further than the furthest boulder recorded in the GNS dataset. However this boulder and all other boulders in the area appear to have been stopped prematurely by vegetation. From field mapping of potential boulders, a Super Ellipse^4 (5:6) boulder shape was used in the modelling due to the somewhat tabular nature of the boulders. The rockfall modelling results are provided in Table 1. Table 1: Rockfall model input parameters and results Layout Transect 1 Transect 2 Transect 4 Boulder Mass (kg) 8250 8250 8250 Pylon Location on Section 235 186 283 (m) No. Boulders Past Pylon 191 561 248 Max Runout Distance 77 86 95 (m past Pylon) Bounce Height at Pylon (m) 1.11 0.7 1.1 Total Kinetic Energy at Pylon (kj) 646 516 584 The results were in line with observed data captured during the field inspection. 4 MITIGATION OPTIONS DISCUSSION A variety of mitigation options to reduce the rockfall risk were considered with different advantages and disadvantages and cost implications and are discussed in the following sections. 4.1 Deconstruction and scaling of potential boulders Deconstruction and scaling of individual boulders can be used as a targeted approach to eliminate high risk boulders. As the quantity of potential boulders increases this method becomes less economical. The method can be used to target specific large boulders and those that have a higher probability of detachment. This option results in a solution that does not produce a fixed asset that requires maintenance but would require ongoing re-assessment. In this case, it was considered uneconomical to deconstruct all potential boulders and completely remove the hazards. In addition, the incorrect deconstruction of boulders could trigger further weathering, instability and rockfall. Boulder No. 16 was identified as needing deconstruction immediately, as it posed an immediate significant risk. It was estimated that a further five large boulders (>24,000 kg) and several smaller boulders would require varying degrees of source treatment at some stage in the 5

future, as the soil support may erode and cause instability. This work was subsequently carried out by Solutions 2 Access Ltd. 4.2 Rock bolting of potential boulders Rock bolting can be used as a targeted approach to reduce the probability of detachment of high risk boulders. This method is only suitable where boulders are supported by near surface bedrock for rock bolt installation, which was not the case in this situation. In addition rock bolts would become an asset with a limited lifespan and would require ongoing maintenance. 4.3 Reinforced concrete support/buttress of potential boulders A reinforced concrete support or buttress of the boulder can be used as a targeted approach to reduce the probability of detachment of high risk boulders. However, this method can become uneconomical to treat many potential boulders and completely reduce the hazard. In this instance it was not suitable for all boulders due to the steep underlying terrain. Also it would become an asset with a limited lifespan that will require ongoing checking and maintenance. 4.4 Rockfall netting mesh/drapery system A rockfall netting of mesh or a drapery system can cover large areas with suitable anchor points typically installed in rock. This method arrests boulder fall and prevents roll and bounce of boulders hitting the structure. The netting becomes an asset with a limited lifespan that requires maintenance and removal of rocks that fall within the mesh. It was not considered suitable due to the sheer scale of the area requiring cover. 4.5 Earth or Rock Embankment Earth embankments are able to divert and catch large volumes of rock and can absorb impacts from boulders with large energies. This technique is also relatively easily repaired and cleared out after each large event. It can also be greened to reduce the visual effect. However, it requires significant earthworks which can destabilise the slope if not undertaken carefully. 4.6 Concrete Deflection Barrier Concrete deflection barriers are able to divert and catch large volumes of rock and withstand multiple boulder strikes. However they require deep embedment into the slope and may act as a dam, causing detrimental effect to water flows. This type of barrier in such a location was also considered to not to be aesthetically pleasing. It would require greater excavation and earthworks, and thus have greater environmental impact than a rockfall protection fence. 4.7 Rockfall Catch Fence/ Barrier System A rockfall fence does not require significant earthworks and the structure can be small and targeted. Theses fences can withstand over two strikes from boulders. A fence will have to be emptied following boulder strike and will require ongoing maintenance. 5 SELECTED SOLUTION - PROTECTION TO STRUCTURE 5.1 Design Approach Installation of a rockfall catch fence was recommended in conjunction with source treatment. A catch fence is considered an appropriate protection structure as total kinetic energies are within the limits of rockfall catch fence design and bounce heights are relatively low (~1 m) at the pylon. A rockfall catch fence required the least amount of earthworks and the modelled total kinetic energy (at the pylon) for the 95 percentile boulder is within its capability. Modelled bounce heights and observed bounce heights are approximately 1 m above ground level, indicating a 2 m 6

high rockfall catch fence is a realistic and feasible height. As the source treatment had been undertaken on the larger boulders, this significantly reduced the demand on the rockfall catch fence. In addition, construction of a rockfall catch fence directly upslope of the pylon minimised the length of the fence required. The design approach needed to include consideration of the planning and consent process. As the pylon is located on land owned by the CCC, consultation was necessary to determine a mutually agreeable design. 5.2 Investigation A 15 m deep machine borehole was drilled by McMillan Drilling to understand the depth of Loess and volcanic rock, and to provide soil and rock parameters for the design of the rockfall barrier anchoring and foundations. The investigation found up to 15 m of stiff Loess, with no bedrock encountered. 5.3 Detailed Design The total kinetic energy of 95 th percentile boulder strike was in the range of 600 to 800 KJ. Using a factor of safety of two, a catch fence with a maximum impact energy level of 1500KJ was identified as the most appropriate protection structure for this project. The proposed fence was designed to be 30 m wide, with post spacings of 10 m and with post heights of 4 m. The post height of 4 m was chosen to account for a conservative bounce height of 2 m, with a factor of safety of two. The embedment of the piles / anchors was based on the presence of weak loess soils and in consultation with Geofabrics. Allowing for a factor of safety of two the anchors are adequate for an 800 KJ boulder strike. The anchor type and length were specifically designed for the site. 6 CONSTRUCTION The rockfall protection fence was constructed by Solutions 2 Access Ltd with a rockfall protection fence provided by Geofabrics. Figure 7 shows the site during construction. Figure 8 shows the completed fence. Figure 7: Construction 7

7 CONCLUSIONS Figure 8: Completed fence A transmission power pylon had been struck by multiple boulder rolls following earthquakes of the Canterbury Earthquake Sequence (2010-2012). A field assessment of the area upslope of the pylon identified many potential boulders which could present future risk to the pylon (a lifeline structure). The potential boulders varied in both size and risk posed to the pylon. From this data set, a 95th percentile boulder was able to be determined and applied to 2-Dimensional rockfall modelling. The modelling was undertaken to determine parameters for the design of potential rockfall mitigation techniques. The modelling results indicated the bounce height to be low (<2 m), which agrees with observations of previous boulder strikes on the pylon. The calculated total kinetic energy of a 95th percentile boulder strike was in the range of 600 to 800 kj. There are a variety of rockfall protection techniques that could broadly be classified into two types; source treatment and protection structures. These were considered and a combined approach using both source treatment of the larger boulders as well as construction of a rockfall protection structure. The construction of the rockfall protection fence reduces the risk of boulder strike to the pylon. To date a small amount of rock has been caught by the fence, see Figure 8. 8 ACKNOWLEDGEMENTS Eric Ewe - Geofabrics New Zealand Ltd Martin Freemen - Solutions 2 Access Ltd Jeff Price Orion New Zealand Ltd Richard Wise McMillan Drilling Ltd REFERENCES Massey, C.I.; McSaveney, M.J.; Heron, D.; Lukovic, B. (2012a) Canterbury Earthquakes 2010/11 Port-Hills Slope Stability: Pilot study for assessing life-safety risk from rockfalls (boulder rolls). GNS Science Consultancy Report 2011/311. Rocscience Version 5, RocFallTM 8