Kit Carson-Challenger Ridge Trail Project

Similar documents
Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014

Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016

Bear Creek Habitat Improvement Project

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015

Bear Creek Watershed Restoration Project Final Project Report December 21, 2016

South Colony Basin Recreation Fee Proposal

Volunteer Project Trip Report Yosemite National Park May 16-20, 2012

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Non-motorized Trail Plan & Proposal. August 8, 2014

American Conservation Experience

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project

Volunteer Project Report for May 14-20, 2017 Yosemite National Park Volunteer Trip. Executive Summary

Colorado Mountain Club 2015 Stewardship Team Program Accomplishments

COLORADO FOURTEENERS INITIATIVE 2009 ANNUAL REPORT

2019 Work Week Crew. Schedule and Descriptions

Route #1) Mt. of the Holy Cross - North Ridge

Trail Assessment Report

Youth Corps Project Report BUREAU OF LAND MANAGEMENT COLORADO STATE OFFICE

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

HIKING IN THE CANADIAN ROCKIES

Understanding user expectations And planning for long term sustainability 1

ROAD AND TRAIL PROJECT APPROVAL

Bear Creek Watershed Restoration Project Final Project Report December 21, 2017

Sierra National Forest 2015 Wilderness Program Accomplishment Report

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Acadia National Park. Waterman Fund Grant Report 2016 Cadillac Mountain South Ridge Trail Rehabilitation. Acadia National Park

SEGMENT ASSESSMENT REPORT

USDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto

Mission. Purpose. Idaho Trails Association promotes the continued enjoyment of Idaho s hiking trails.

STONE MOUNTAIN PROVINCIAL PARK Purpose Statement and Zoning Plan

Exhibit A Section 2 Large Application Selection Criteria

Trail Beginning Elevation: 7553 ft The Poison Creek Trailhead is located at the end of National Forest Road 646E (NF-646E).

April 19-21, See below for Course Descriptions. Columbia Cascades Trail Skills College Cascades Locks, Oregon.

Stein Valley Nlaka pamux Heritage Park

USDA TRAILS STRATEGY PROGRAM

Restore and implement protected status that is equivalent, or better than what was lost during the mid-1990 s

Itinerary Overview. Sangre de Cristo Alpine Backpacking 22 days Ages Course Description

US Forest Service Bears Ears Trail - NFST 1144 California Park to Hole in Wall Creek. Good (1) 2 3

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

Adopt a Trail Blue Ridge Parkway

GOLDEN EARS PROVINCIAL PARK

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

CIEC 9 PEAKS AWARD SUPPLEMENT POSSIBLE ROUTES FOR THE 9 PEAKS AWARD TRIP

Finn Creek Park. Management Direction Statement Amendment

Rocky Mountain Field Institute City of Colorado Springs Open Space Stewardship Services (TOPS) Contract #C Annual Project Report

Rocky Mountain Field Institute

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

Coast to Crest Trail Corridor Hike

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown

Port Gamble Shoreline Area Conceptual Trail Proposal

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2015 Annual Project Report

Rocky Mountain Youth Corps Garfield County Conservation Corps Crews Final Report 2013

Recreation News. Welcome. Chris Jackson. In this Issue: O S U C o l l e ge F o r e s t s

Itinerary Overview. Colorado San Juan Mountaineering 15-days

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands

Four Fourteeners in One Day

Itinerary Overview: What you will be doing Maroon Bells Alpine Backpacking 22 days

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

Bob Marshall Wilderness Foundation

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

PROPOSED PARK ALTERNATIVES

PRESS RELEASE VIOLET CROWN TRAIL OPENS, RALLYING COMMUNITY TO TAKE ACTION

2.0 PARK VISION AND ROLES

GREENWOOD VEGETATION MANAGEMENT

Fixed Anchors. Non-Wilderness Management Areas

Willow Creek Horse Camp Reconstruction

Stephens State Park Trails

LEAVE NO TRACE CENTER FOR OUTDOOR ETHICS CONSULTING SERVICES

National Forests and Grasslands in Texas

Route Combo) Mt. Bierstadt - Bierstadt, Sawtooth, Evans

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Photopoint Monitoring in the Adirondack Alpine Zone

playwinterpark.com Off The Beaten Path Hikes Hiking Recommendations for the Adventurous Hiker

Itinerary Overview. Maroon Bells Mountaineering 22-days. Course Description

Route #2) Mt. Massive - Southwest Slopes

Course 102. Tread and Drainage

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

Assessing Your Trails, Keeping Them Safe and Enjoyable

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement

Outdoor Recreation Opportunities Management

Bibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring

BACKGROUND DECISION. Decision Memo Page 1 of 6

Project Report Yosemite National Park Volunteer Trip September 9-15, 2018

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

Opportunities for Solitude in Salt Lake Ranger District Wilderness Areas; Uinta-Wasatch-Cache National Forest

Appendix A. Tenderfoot Mountain Motorcycle Trail System. Maintenance and Construction Plan (6/13/13)

2016 Trails Maintenance and Operating Costs

Franklin Falls. NFCT Waterway Work Trip July Introduction: Driving directions and meeting location: Camping and lodging: Food:

L U N C H C R E E K T R A I L GLACIER NATIONAL PARK

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2017 Annual Project Report

colorado fourteeners initiative annual report 2012

Itinerary Overview. Continental Divide Alpine Backpacking 22 days Ages Course Description

Map 1.1 Wenatchee Watershed Land Ownership

Margaret N. Rees University of Nevada, Las Vegas,

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

Recreational Trails Program funded 32 projects equaling $1,282,737 in 2016

Transcription:

Kit Carson-Challenger Ridge Trail Project Project Accomplishments Report-USFS December 15, 2015 Photo courtesy of Justin Peterson 815 South 25 th Street, Suite 101 Colorado Springs, CO 80904 Dedicated to the conservation and stewardship of public lands in Southern Colorado

2 Background The Rocky Mountain Field Institute completed year 2 of the 3-year Kit Carson-Challenger Ridge Trail Project in the summer months of 2015. The project is designed to manage the high-use impacts of Willow Lake Basin in the Sangre de Cristo Mountain Range in Southern Colorado. The fourth highest mountain in the Sangres, Kit Carson Peak (elevation 14,165 ) towers over 6,000 feet above the San Luis Valley floor. Kit Carson generally refers to the three main summits that make up the massif: Kit Carson Peak, Challenger Point, and Columbia Point (informally known as Kat Carson). These peaks and Willow Lake Basin situated below the glacial-formed cirque are a popular recreation spot for hikers, climbers, anglers, and other backcountry enthusiasts. The Basin is particularly popular with residents of the town of Crestone and nearby Baca Grande subdivision, both of which sit at the foot of the mountain. The trail project is designed to reduce visitor impacts to the area and enhance the quality of the climbing and hiking recreational experience. Upon completion of the three-phase project, a sustainable trail will provide access from the Willow Creek Trailhead to the ridge of Challenger Point, approximately 7.25 miles in total. From that point, the existing summit trail to Kit Carson generally follows natural contours or crosses talus fields, causing little damage to the sensitive alpine environment. The current user-created social trail is in very poor condition from the east side of Willow Lake to the talus field below the notch of the ridge. The trail is gullied, unsafe, and unpleasant for hikers. The current trail also crosses environmentally fragile areas including populations of sensitive alpine plants and an alpine wetland east of Willow Lake. The focus of Phase 1 of the project is to re-route the current social trail to a more durable and sustainable location, and to reconstruct and stabilize usable sections of the existing alignment with proper structures including rock steps and retaining walls, thus protecting the surrounding environment by defining a single trail corridor. All phases of the project also include substantial social trail closure and restoration including erosion control and revegetation work. In Phase 1 of the project (spanning the 2014-16 field seasons), RMFI will construct approximately 2,795 feet of new trail and improve approximately 2,760 feet of existing trail. Beginning in 2017, RMFI will build off the success of Phase 1 of the project and continue to improve the summit trail in Phase 2. This report details the accomplishments of the project during the 2015 field season. Summary of Work 2015 Field Season Utilizing financial support from various funders, the Rocky Mountain Field Institute (RMFI) leveraged the use of a paid youth corps crew and a volunteer collegiate class to make significant progress on Phase 1-Year 2 of the Kit Carson Peak- Challenger Ridge Trail Project. RMFI utilized a new partnership with the Southwest Conservation Corps (SCC) as well as the efforts of 10 college students who participated in the 13 th edition of the RMFI Earth Corps field studies program to accomplish 2015 project objectives. Phase 1-Year 2 project accomplishments can be broken down into three primary tasks: trail reconstruction, new trail construction, and trail maintenance. A late spring snowmelt at the project site as well as unanticipated challenges with project logistics and implementation resulted in original project accomplishments not being fully met. However, the amount of work contributed toward overall project goals was not affected and the project is still on track to accomplish Phase 1 in the initial timeline. The following is a breakdown of project objectives.

3 1. Trail Reconstruction: 1,874 linear feet Construct rock steps, rock risers, drainage structures, cairns, and rock retaining walls; clear loose rock; rearrange rock to create tread in talus field Trail reconstruction goals were met during Phase 1-Year 2. Approximately 1,844 linear feet of existing social trail was improved to meet U.S. Forest Service standards for backcountry hiking trails (Photo #1). Starting at an elevation of approximately 11,500 feet, work crews brushed willow and Krummholtz from the trail corridor (12+82 to 24+90), cleared boulders that were causing trail braiding, reinforced the water crossing with installation of stepping stones (24+90), and improved the existing trail through the talus by adding an aggregate layer of rock that provided a more stable and accommodating tread surface (12+56 to 16+17, Photo #1). This work was started in the talus to the north of Willow Lake at 12+56 (where the 2014 work left off) and ended at the start of the new trail alignment at 31+30. Over the past two field seasons, the summit trail has been re-constructed from 0+00 to 31+30. This section is now complete, aside from some willow brushing that may need to occur on a seasonal basis. This section was of particular concern because it contains habitat of the Smith s draba (Draba smithii), a species of concern as identified by the U.S. Fish and Wildlife Service. 2. New Trail Construction: 1,050 linear feet Cut 24 full bench tread into hillslope, clear branches and logs from trail corridor. Construct rock steps, drainage structures, cairns, and rock retaining walls. Approximately 1,050 linear feet of new trail was constructed during Phase 1-Year 2 of the project (Photos #2, 4-6). New trail construction at an elevation of approximately 12,000 feet is extremely taxing and equally rewarding. Work crews cut a 24 bench into the alpine tundra and rearranged rocks from talus fields in order to establish a sustainable trail tread. For areas where the trail crossed talus, rubble retaining walls were constructed on both the inslope and outslope in order to prevent additional rock from sliding into the trail. In places where the trail gained elevation through a steep gradient, rock steps and risers were built to provide stabilization (Photo #2). 3. Trail Maintenance: 15,800 linear feet of trail maintenance As is the norm for large-scale trail projects, unplanned trail maintenance projects arose at the onset of the field season. Tree snags were cleared, logs were cut from the trail corridor, overgrown vegetation was brushed back, and rockslides were removed from the Willow Lake Trail. Crews maintained more than 3 miles (15,800 linear feet) of the Willow Lake Trail below Willow Lake. While not originally included in the proposal for Phase 1 of the project, this work was necessary for the mule string to pack in project supplies. The work was also very important for the overall sustainability of the access trail to Willow Lake. Other Work The 2015 spring season saw record rain and snowfall in many areas of Colorado, which affected snowpack, stream crossings, and the ability to use mule pack strings to establish a basecamp in the Willow Lake Basin. Therefore, in order to be in compliance with organizational safety policies and procedures and to allow for early season access into the Basin, the two 9-day hitches with SCC were delayed from an original start date of June 8 th to June 22 nd. In place of restoring campsites around Willow Lake, work crews improved a hazardous stream crossing with the construction of a log bridge. This accomplishment was a very high priority as it ensured safe

4 access to the project site by the mule string and work crews (Photo #3). Campsite restoration will occur during the 2016 field season. Work Statistics 1,874 linear feet of trail improved 1,050 linear feet of trail constructed 15,800 linear feet of trail maintained 2,200 linear feet of rubble wall 1 185 linear feet of retaining wall 83 rock steps 12 cairns 1, 2-log bridge crossing Labor Statistics 36 workdays 2,730 volunteer hours $62,981.10 volunteer value 1,090 paid crew hours 1,201 RMFI staff hours Contact Information Joe Lavorini RMFI Program Director joe@rmfi.org (719) 471-7736 ext. 3#

5 Map of Willow Lake Basin and project objectives.

6 Photo Documentation Photo #1: Tread through talus at 44+04. Photo #2: Rock staircase at 46+05. Photo #3: New bridge at major crossing of Willow Creek, below headwall.

7 Photo #4 (above): Before and after rock steps at 43+49 to 43+80. Photo #5 (below): Before and after of trail corridor clearing through Krummholz at 35+65.

8 Photo #6 (above): Before and after of rock staircase at 34+41. Photo #7 (below): 2015 SCC crew (left) & 2015 Earth Corps crew (right).