SSO Summary Report. For overflows between: 1/1/16 And 12/31/16. Date Began. Service Area / Municipality. Overflow ID. Date Ended.

Similar documents
Appendix E. System Issues

BRYANT ASSOCIATES RECENT SURVEY AND MAPPING EXPERIENCE

Project Purpose: Project History and Status:

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Some Historical Aspects of Urban Water Systems

MINUTES BEECH MOUNTAIN TOWN COUNCIL Regular Meeting November 10, 2009

CITY OF HOBART SANITARY DISTRICT/STORM WATER BOARD MEETING MEETING OF

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

EMERALD ASH BORER (EAB) MANAGEMENT PLAN. For the Radisson Community Association. May 28, 2014

DRAFT. Dorabelle Campground Rehabilitation

What are Private Sewer Laterals?

First time sewerage scheme from

Circuit Reliability Review

Chapter VIII: Agencies and Organizations

Capital Improvement Plan

Section 7 - Capital Improvement Program

City of Redding Airports

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

This section presents the jurisdictional annex for the Onondaga County Water Authority.

Towns of Clifton and Fine Consolidation Study Water, Sewer & Lighting 7/22/15

Pump Stations...more than just pumps

Second Street Improvements Project Project Update Archive

Pipeline Support Services Theme Park Projects. Pipe rehabilitation using non-destructive techniques


Hydrology Input for West Souris River IWMP

What Makes UCT Unique

2013 Regional Water System Improvements Program Public Hearing March 14, 2013

Agenda for Regular Meeting September 5, 2012, 6:00 PM, 16 Saratoga Ave.

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Recommendations for Funding Water, Sewer and Drainage Systems. Presentation to the Citizens and Businesses of New Orleans January 2012

Developmental Cost Charge (DCC) Program Summary

Sliplining of Lock-Bar Steel Water Mains, Wilmington Delaware

Weymouth & Hingham (ARAWH) Draft Report: Weymouth Water Supply & Regulatory Review

Since the voltage was bad at the power pedestal, the problem was not with the motorhome.

Discontiguous Features Southern Adirondack Feeder Reservoirs

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority

Hurricane Maria Disaster Relief and Rehabilitation Project Report-2017 Puerto Rico

Long water shutdown scheduled for Tuesday, September 18

II. THE BOULDER CREEK DRAINAGE BASIN

VILLAGE OF DOWNERS GROVE Stormwater and Flood Plain Oversight Committee Meeting October 26, 2006, 7:00 p.m. DRAFT Downers Grove Public Works Facility

WASTEWATER ENGINEERING PROJECTS - FY19

The Early Settlers Revised: September 7, 2013

Geography. Onondaga Creek Fact Sheet. Ontario Lake Plain. Finger Lakes. Appalachian Plateau. Figure 1. Regional Context. Introduction.

Lower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium

CAPITAL IMPROVEMENT PLAN

Sent by to: krjohnstgmail.com

City of Redding. Redding Police Facility. Enough study! Just do it!

City of Peoria Clean Water Efforts. Governor s s Conference on the Management of the Illinois River October 4, 2007

Council Committee Memorandum

Matanuska Susitna Borough Community Development Recreation Bond

PROJECT UPDATES October 26, 2017

Crew Chief: Start Date: Completion Date: T & A Code:

Welcome to the Pacific Spas family!

Circuit Reliability Review

2017 RPPC/JPC Joint Adult Mission Trip Report. March 21, 2017

Outdoor Tent Permit Requirements

Circuit Reliability Review

Completion: August 2011 LS #321 Design LS #8

Circuit Reliability Review

One month after Typhoon Jebi. October 3, 2018

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

A Regular Town Board meeting was held on April 5, 2018 at Lysander Town Hall, 8220 Loop Road, Baldwinsville, New York.

STEM Club Challenge 3

Circuit Reliability Review

A P P R O V E D. Michelle Borton Commissioner of Planning & Development

MEMORANDUM VILLAGE OF NORTHBROOK

Circuit Reliability Review

Water & Wastewater Project Activity Report

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

Non-motorized Trail Plan & Proposal. August 8, 2014

Circuit Reliability Review

CHAMBER HAPPENINGS. what the Chamber has been up to... July What s Inside: Inspired by the Past... Building for the Future

GRUENE HOMESTEAD INN & TAVERN IN THE GRUENE 830 & 832 Gruene Road, New Braunfels, TX For Sale

Circuit Reliability Review

Tenders. Manitoba Infrastructure

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

Due Diligence Questions: 1800 Windsor mobile Home Park Newton Kansas

Solar Power Shade INSTRUCTION MANUAL

Design and Construction of the Lake St. Martin Emergency Outlet

BIOMASS STOVE SAFETY PROTOCOL GUIDELINES

Brevard County Utility Services Department

Ditch flows slowly to the north

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

Index. How To Specify TY-CM

An overview. Albemarle County Service Authority s Facilities Maintenance

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

Capital Five-Year Fiscal Forecast

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

Circuit Reliability Review

2013 Flood. April 18, 2013

Cofferdam Performance Hurricanes Harvey & Irma

Circuit Reliability Review

Sandyoak Village Association

San Antonio's River Walk Behind the scenes tour or did you know?

RECREATIONAL PARK INSPECTION REPORT Tillamook Co. Environmental Health PO Box 489 Tillamook, OR (503)

Permit Application Requirements For Temporary Tents, and Membrane Structures

Transcription:

SSO Summary Report For overflows between: 1/1/16 And 12/31/16 Overflow 387 Town of Camillus County owned Camillus Forcemain 01/08/2016 01/13/2016 121.30 2,183,400 Ground Approximate six inch hole in forcemain. 388 Town of Onondaga Town owned sewer on Barker Hill Rd. 01/13/2016 01/13/2016 1.90 1,000 Ground Grease and rags blocked sewer line approximately three feet from pump station. 389 Town of Dewitt Town of Dewitt owned force main 01/15/2016 01/15/2016 2.50 300 Ground Two inch force main from Town of Dewitt owned Tow Path Commons Pumping was leaking. 390 Town of Geddes County owned 02/16/2016 02/16/2016 1.00 100,000 Onondaga Lake Rain and snowmelt in conjuction with power outages and fluctuations in the area resulted in brief power losses. The main Motor Control Circuit Breaker tripped in the station during the power outages, resulting in the pumps not being able to run by either generator or incoming power. Flow overtopped the diversion structure and was conveyed to the lake. 06/08/2017 Page 1 of 5

391 Town of Salina Town owned sewer on Garden City Drive 02/16/2016 02/16/2016 0.50 2,000 Ley Creek County owned Ley Creek pump station had one pump out of service being rebuilt. Rain and snowmelt resulted in high flows one of the two existing pumps experienced mechanical problems. Portable pump was utilized due to elevated sewer levels until pumps at Ley Creek could catch up to the surcharged condition. 392 Village of Solvay County owned manhole at Milton Ave & Chemung St 02/17/2016 02/18/2016 28.00 3,000 Ground Water main break contributed to collapse of County owned manhole, resulting in a partial obstruction and not all flow being able to be carried through the sewer main. 393 Town of Geddes County owned 02/24/2016 02/25/2016 5.80 345,000 Onondaga Lake Rain and snowmelt accompanied with one pump being out of service for mechanical issues. 394 Town of Camillus Town owned sewer on Richlee Drive 05/31/2016 05/31/2016 3.75 500 Basement 43 Richlee Drive Roots grease and rags partially restricted flow in Town owned 8-inch Vitrified Clay sewer. 396 Village of Camillus Village owned Sewer on MacLaughlin Street 06/06/2016 06/06/2016 2.00 1,000 Basement 114 Maclaughlin Street Grease and grit build up in Village owned eight inch sewer restricted flow resulting in basement 397 Town of Salina Town owned sewer in ROW along the Thruway 06/27/2016 06/27/2016 1.50 300 Basement 115 Park Place Grease build-up in Town of Salina owned eight-inch sewer main restricted flow resulting in basement 398 Town of Clay Town owned sewer on Amalfi Drive 07/16/2016 07/16/2016 2.33 1,000 Basement 5414 Carina Circle Grease build up in Town of Clay owned asbestos cement sewer restricted flow resulting in basement Oak Orchard 06/08/2017 Page 2 of 5

399 Town of Geddes Town owned Geddes Nine Pump 08/12/2016 08/12/2016 0.50 200 Ground, Onondaga Lake Watershed Main breaker at station was tripped. Potentially caused by thunderstorms in the area. Baldwinsville-Seneca K 401 Town of Camillus Town owned sewer on Hinsdale Road 08/19/2016 08/19/2016 2.50 750 Ground / Geddes Brook Watershed Town of Camillus owned eight inch sewer partially blocked resulting in oveflow from manhole, possible pipe failure. 400 Town of Lysander Town owned Whispering Oaks Force Main 08/19/2016 08/19/2016 1.50 500 Seneca River National Grid auger hit force main due to inaccurate location of infrastructure during pole installation. Onondaga County is investigating the cause of the inaccurate utility markout. Baldwinsville-Seneca K 402 City of Syracuse James Rigi Trunk Sewer 08/30/2016 08/30/2016 0.45 2,000 Did not discharge to receiving water Sewer lining contractor was installing liner on 12 inch diameter James-Rigi Trunk Sewer. Back up pump system failed to operate causing surcharge condition upstream of sewer plug. Water backed into the basement of 829 Coughlin Ave and on the floor of 219 Lamson Street. Once the pumnp failure was observed, the plug was deflated to allow water to flow downstream. 403 Town of Geddes County owned West 09/18/2016 09/19/2016 2.50 200,000 Onondaga Lake Total of 1.58 inches of rain inches of rain falling between 8:40 and 10:35 PM. 1.19 inches of rain fell between 8:40 and 9:10 PM, as recorded by Weather UnderGround's Solvay, NY rain gauge. 06/08/2017 Page 3 of 5

406 Town of Geddes County owned West Side pumping station 5.00 1,050,000 Onondaga Lake 2.09 inches of rain on 10/20/16 combined with Motor Control Center #2 failure at station which caused three of the six pumps to be out of service. 407 Town of Geddes County owned 12.00 1,440,000 Onondaga Lake 5.62 inches of rain beginning on 10/20/16 of which 3.62 inches came down in periods of heavy showers during 10/21/16. 408 Town of Clay Town owned sewer on Davis Rd North 5.00 100 Basement 7961 Davis Rd North Grease and rags partially restricted flow in Town of Clay owned 10-inch Asbestos Cement sewer, in conjunction with 5.62 inches of rain beginning on 10/20/16 of which 3.62 inches came down in periods of heavy showers during 10/21/16. Oak Orchard 409 Village of Manlius Village owned sewer on Military Drive 2.00 Basement 107 Military Drive Possible roots and rags restricting flow in Village of Manlius owned 8-inch sewer, in conjunction with 5.62 inches of rain beginning on 10/20/16 of which 3.62 inches came down in periods of heavy showers during 10/21/16. 410 Town of Salina Town of Salina owned sewer on Chestnut Hill Dr. 0.75 Basement 108 Chestnut Hill Drive Abandoned sewer lateral connection failed and partially blocked flow on Town of Salina owned 8- inch vitrified clay sewer in conjunction with 5.62 inches of rain beginning on 10/20/16 of which 3.62 inches came down in periods of heavy showers during 10/21/16. 06/08/2017 Page 4 of 5

411 Town of Salina County owned Ley Creek Force Main 10/22/2016 37.00 10,800,000 Onondaga Lake Deterioration in top of 42- inch force main resulting in sanitary sewer overflow when flows are over 30 MGD. Flow has remained below 30 MGD since 11:00 PM on 10/22/16 and no overflow has been observed. 412 Town of Salina County owned Ley Creek Pumping 10/29/2016 10/29/2016 10.60 6,996,000 Ley Creek Bypassed wastewater pumping station directly to Ley Creek in order to remove and repair bad section of Ley Creek Force Main. 413 Village of Manlius County Owned West Field "Back- Lot" Sewer 10/31/2016 10/31/2016 1.00 150 Limestone Creek Watershed Roots and grease restricted flow resulting in surcharge and overflow from manhole. 414 Town of Geddes County owned West 11/04/2016 11/04/2016 0.13 48,000 Onondaga Lake Power interuption caused pumps to trip out. By the time OCDWEP personnel could get onsite and get the station running on generator power, eight minutes of overflow time occurred. 415 Town of Geddes County owned West 11/27/2016 11/27/2016 0.50 10,000 Onondaga Lake Main MCC breaker tripped causing loss of all pumps. 417 Town of Salina Town owned Sewer Right of Way 12/31/2016 12/31/2016 0.75 250 Basements 517 & 519 Sunflower Drive Grease partially restricted flow in a Town owned eight inch vitrified clay tile sewer, resulting in basement backups. 06/08/2017 Page 5 of 5