Presentation to the DRCOG Board August 16, 2017

Similar documents
APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW

Why we re here: For educational purposes only

Colorado Department of Transportation The Role of State Departments of Tr of T ansportation

2040 Regional Transit Element Adopted August 6, 2015

TTI REVIEW OF FARE POLICY: PRELIMINARY FINDINGS

Quality of Life Study

Miami Orlando Passenger Rail Project Overview

Miami Orlando Passenger Rail Project Overview

TRANSPORTATION PROGRAMS

Capital Metropolitan Transportation Authority. Monthly Performance Report

Board Box. February Item # Item Staff Page 1. Key Performance Indicators M. Thompson Financial Report for Dec H.

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

Chapter 3: Current Transit Conditions

Welcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form

The Northeast Corridor: Challenges and Opportunities for the Region s Future. Mitch Warren, Executive Director, Northeast Corridor Commission

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

Bus Operations Report

FY Transit Needs Assessment. Ventura County Transportation Commission

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Federal Subsidies to Passenger Transportation December 2004

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

STUDY PROCESS. Study. PHASE I Research. PHASE II Develop & Analyze Options. PHASE III Recommendations. Regional Transit

SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY NOTICE OF PUBLIC HEARING

Summary of Proposed NH 120 Service

Board of Directors Information Summary

Located in downtown Boston by the Fort Point Channel

Base Governor (Updated 4/20/17) First Special Session HF 3 Transportation - Ch. 3. Conference Position 5/1/2017. Conf Position Changes FY 18-19

Western Placer County Transit Operators Short Range Transit Plan Updates FY to FY Project Update and Alternatives Discussion

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS

A Case Study: Building a Partnership with a Freight Railroad for Passenger Service. Capitol Corridor Joint Powers Authority Oakland, California

Fare Policy Discussion Background and History

St. Johns County Transit Development Plan Update

LOWER RIO GRANDE VALLEY DEVELOPMENT COUNCIL

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

TIGER VIII Grant Application. Attachment 3: Letters of Support

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Creating Sustainable Communities Through Public Transportation

Railroad Safety in the United States. Ian Savage

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary

Caroline County / King George County Transit Studies. Meeting November 1, 2017

DEN is the #1 Economic Engine of the State of Colorado and the Rocky Mountain region Generating over $26 Billion annually in economic benefit DEN

A Public Transportation Review Evaluating Metro s Operational Efficiency, Service Capacity and Fiscal Impact

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Welcome. Green Line in Your Community

DRT Performance Measurement: the U.S. Experience

Regional Planning for Tri-Rail Coastal Link

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Capital Metropolitan Transportation Authority. Monthly Performance Report

Presentation to the Southeast Corridor High-Performance Transit Alternative Study Public Forum. Overview of MTA. presented by

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

VCTC Transit Ridership and Performance Measures Quarterly Report

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld

US287 Asset Inventory FLEX Routes. Figure 3-1 FLEX Routes and Stops

Link Union Station (LINK US)

Measure R Program Update

Draft for approval by TCC on 2/3, TAQC on 2/9 and ARC Board on 2/22. Regional Trail Plan. Mike Alexander, Director, Center for Livable Communities

Southwest Chief. Thruway bus link restored at Raton. Issue #57. May-June On the way Southwest...

South Bay Metro Green Line Extension

The Importance of Service Frequency to Attracting Ridership: The Cases of Brampton and York

YOSEMITE AREA REGIONAL TRANSPORTATION SYSTEM

MONTHLY REPORT SEPTEMBER 2017

Transit Performance Report FY (JUNE 30, 2007)

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

North Metro Rail Line Elected Officials Briefing. November 16, 2017

Elected Officials Briefing

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

DRAFT Service Implementation Plan

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

December 2018 Monthly Performance Report

January 2019 Monthly Performance Report

4 Transport projects underway in Western Sydney

Sustainable Urban Transport Development in Indonesia

GOLDEN CRESCENT REGIONAL PLANNING COMMISSION

* Data for prior months has been updated to reflect error corrections from missing passenger count data

(This page intentionally left blank.)

Public Transport for Perth in 2031

Proposed Dulles Toll Road Rate Adjustments

Aviation, Rail, & Trucking 6-1

APPENDIX B. Arlington Transit Peer Review Technical Memorandum

I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, :00 AM to Noon

EL PASO COUNTY REGIONAL TRANSIT INSTITUTIONAL OPTIONS ASSESSMENT STUDY

VCTC Intercity Five-Year Service Plan

Appendix A: Regional Fare Policy, SANDAG

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

2018 Service Implementation Plan Executive Summary

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

Multimodal Planning Studies

SKAGIT COUNTY PUBLIC WORKS DEPARTMENT Ferry Operations Division Ferry Fare Revenue Target Report

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

North Central Regional Transit District. Quick Facts. Our Mission Statement:

MASTER PLAN UPDATE Toronto Pearson International Airport. City of Toronto Planning and Growth Management Committee September 5, 2007

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Service Performance 2017 Networked Family of Services

RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA

TRANSPORTATION SERVICE Actual

CAPITOL CORRIDOR SERVICE PERFORMANCE

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Transcription:

Presentation to the DRCOG Board August 16, 2017

Systemwide FY 2015-2016 July June FY 2016-2017 July June Riders 102,577 155,864 Revenue $1,014,781 $1,551,435 Fare Recovery FY = State Fiscal Year. 38% 53% 2

North Route FY 2015-2016 July - June FY 2016-2017 July June Riders 42,959 64,642 Revenue $345,748 $500,785 Fare Recovery 39% 55% South Route FY = State Fiscal Year. FY 2015-2016 July - June FY 2016-2017 July June Riders 40,404 57,306 Revenue $365,427 $503,965 Fare Recovery 28% 41% 3

4

5

RTD = Regional Transportation District 6

CDOT Rail Planning Activities North I-25 EIS Commuter Rail Update (2015) Interregional Connectivity Study (ICS) Complete July 2017 State Freight & Passenger Rail Plan late 2017/early 2018 7

Interregional Connectivity Study (ICS) Tasks 1-4, 2012-2014 Vision Network 340 Miles, $30 B (2013$) Initial Operating Segment (IOS) 132 Miles, 2/3 rds Benefits, 1/3 rd Cost IOS = Initial Operating Segment from Fort Collins to Briargate, from total corridor Fort Collins to Pueblo. CR = Commuter Rail, HS = High Speed Rail. 8

Interregional Connectivity Study (ICS) Task 5 Alignment Alternatives (2016-2017) Alternative 1 - ICS IOS Alternative 2 - Southeast LRT and North Metro CR as HS Rail Alternative 3 East Corridor CR and North Metro CR as HS Rail IOS = Initial Operating Segment from Fort Collins to Briargate, from total corridor Fort Collins to Pueblo. CR = Commuter Rail, HS = High Speed Rail. 9

ICS Results Summary 2017$ Alternative Description CAPEX OPEX Ridership Revenue OPEX B/C (B$) (M$/yr) (M/yr) (M$/yr) Ratio Ratio 1 $11.5 $86.3 13.6 $198 2.30 1.63 2 $9.7 $79.6 11.6 $156 1.96 1.63 3 $11.2 $98.2 10.6 $168 1.71 1.56 CAPEX = capital expenditure, OPEX = operating expenditure, B/C = Benefit/Cost, B$ = Billions of dollars, M$ = Millions of dollars. 10

Interregional Connectivity Study (ICS) Project Leadership Team Recommendations Alternative 1 - ICS IOS Alternative 2 - Southeast LRT and North Metro CR as HS Rail Alternative 3 East Corridor CR and North Metro CR as HS Rail Carry Forward Carry Forward Place Aside 11

Interregional Connectivity Study (ICS) Summary of Key Comments No community wants to be relegated to Phase 2 Colorado Springs wants more study on how DIA and COS airports interact with rail Use of RTD track did not reduce costs significantly enough Consider other ideas such as using Castle Rock Littleton DUS corridor on the South I-25 Corridor. Refer to North I-25 Commuter Rail Update for lowercost option considered there. FRA = Federal Railroad Administration, COS = Colorado Springs Airport, DIA = Denver International Airport. 12

North I-25 EIS Commuter Rail Update $684 M in 2009$ Inflation 4%/yr $819 M in 2014$ Scope Changes $1.2 B - $1.4 B 2014$ Inflation 4%/yr $1.4 B - $1.6 B 2017$ EIS = Environmental Impact Statement 13

Front Range Transit & Rail Options Bustang (w/ future Park & Rides) Commuter Rail + RTD High Speed Rail ICS $55 M $1.6 B $4.3 B $75 M $2.1 B $6.1 B $150 M* $4.0 B* $11.5 B* *Includes Vehicles, 2017$ *Includes Vehicles, 2017$ *Includes Vehicles, 2017$ 14

Front Range Transit & Rail Options 1 hr 25 min 1 hr 45 min 54 min 36 min 2 hr 15 min 1 hr 40 min 63 min 46 min Bustang (Existng) Commuter Rail + RTD High Speed Rail High Speed Rail 15

State Freight & Passenger Rail Plan Federal Railroad Administration requirement to remain eligible for intercity & high(er) speed intercity passenger rail funding. Used in Federal Transit Administration documents, i.e. State Transit Plan, to remain eligible transit funding. 16

Funding Sources This page only, COS = Colorado Springs generically, not specific to the airport, FTC = Fort Collins, PnR = Park & Ride. 17

Southwest Chief & Front Range Passenger Rail Commission (SB 17-153, signed into law May 22, 2017) SB = Senate Bill 18

Southwest Chief & Front Range Rail Commission Purpose (SB 17-153) Continue Amtrak Southwest Chief Line track rehabilitation, expansion to Pueblo, and consider Walsenburg service Facilitate the development of Front Range Passenger Rail, including draft legislation due by December 1, 2017 Authority to receive & expend funds 19

Opportunities & Challenges Opportunities Population, VMT, congestion growing faster than highway lane miles are added Transit use growing through FasTracks, MAX BRT, Bustang, Outrider, PPRTA & others Millennials (for now) supporting flexible travel Challenges Funding growing slower than population & congestion Fixed Transit (rail, BRT) projects are very costly, even though they return large benefits Agreeing on an implementation strategy: incremental funding vs. whole-corridor grow bus into rail vs. rail extensions 20

Next Steps SWC & FRRC: legislative report by December 1 st CDOT Complete State Rail Plan by late 2017 or early 2018 to maintain funding eligibility w/ FRA CDOT South I-25 Planning & Environmental Linkage Study for Monument Castle Rock, and also E-470, by mid 2018 Walk-before-you-run strategy with Bustang unless and until there is political & financial support for more Continue to seek balance of travel time, price-point, and construction cost, all tied to public support 21