Submission to the Airports Commission

Similar documents
High-Speed Rail Inquiry

HSR the creation of a mega-project

Chapter 11. Links to Heathrow. Prepared by Christopher Stokes

THE IMPACT OF HIGH SPEED RAIL ON HEATHROW AIRPORT

Travel market demand and the HS1 HS2 link

WRITTEN SUBMISSION FROM RMT 17 OCTOBER 2008

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Prospect ATCOs Branch & ATSS Branch response to CAP Terminal Air Navigation Services (TANS) contestability in the UK: Call for evidence

Impact of Heathrow expansion on passenger growth at UK airports

Meeting the capacity challenge: The case for new lines

The Future of Air Transport

easyjet response to CAA consultation on Gatwick airport market power

The Government s Aviation Strategy Transport for the North (TfN) response

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Connecting HS2 to Scotland: the North of England Criteria

High Speed Two. A Greengauge 21 Proposition. June Production of this Report has been sponsored by the Railway Forum

Plugging the greater Midlands region into global wealth

Scotland to England Journeys (million)

FAO: Sir Howard Davies, Chair, Airports Commission 21 Apr 2013

BARNSLEY METROPOLITAN BOROUGH COUNCIL

High Speed Rail London to the West Midlands and Beyond Supplementary Report. A report to Government by High Speed Two Limited

CAA Passenger Survey Report 2005

International Air Connectivity for Business. How well connected are UK airports to the world s main business destinations?

Gatwick Airport s Assessment of Heathrow North-West Runway: Air Noise. July The world s leading sustainability consultancy

Images Revealed: Proposed HS4Air will create new transport hubs boosting regional economies and slash journey times beyond London.

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

CAA Passenger Survey Report 2017

Sheffield City Region, Leeds City Region High Speed Rail to Yorkshire Technical Report

In your area. Stonebroom to Clay Cross LA09. June Introduction

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Barbara Cooper Director of Economic Development

Aviation Trends. Quarter Contents

Aviation Trends. Quarter Contents

Submission by Heathrow Southern Railway Ltd.

Why build a third runway, when you can build a longer runway?

About 2M. For more information visit JOINING UP BRITAIN

East West Rail Consortium

UK Airport Operators Association

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Airports Commission. Discussion Paper 04: Airport Operational Models. Response from the British Air Transport Association (BATA) June 2013

Airport Drop Off and Pick Up Charges

In your area. Pinxton to Newton and Huthwaite LA08. June Introduction

Airport accessibility report 2016/17 CAP 1577

Transition of the framework for the economic regulation of airports in the United Kingdom CAP 1017

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

Surface Access Congestion

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Adding capacity at Heathrow Airport consultation by Department for Transport

The impacts of proposed changes in Air Passenger Duty

Rail passengers priorities for improvement November 2017

RAIL HUB FOR HEATHROW?

New style, old story. A review of UK Airport Noise Action Plans. A report by the Aviation Environment Federation for AirportWatch

FAST Future Airport STrategies

Please find enclosed a submission for consideration as written evidence as part of the scrutiny of the Scotland Bill.

Aviation Trends. Quarter Contents

No Hard Analysis. A critique by HACAN of the recently-published

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

Aviation Trends. Quarter Contents

MODAIR. Measure and development of intermodality at AIRport

TRANSPORT, INFRASTRUCTURE AND CLIMATE CHANGE COMMITTEE AGENDA. 21st Meeting, 2008 (Session 3) Tuesday 11 November 2008

University of South Wales Pontypridd CF37 1DL. Tel / Ffôn: / E-bost: Title

National Rail Passenger Survey: User Guidance Report

Written evidence from the Federation of Small Businesses (HSR 181)

About your flights to Barcelona

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

An Assessment on the Cost Structure of the UK Airport Industry: Ownership Outcomes and Long Run Cost Economies

National Rail Passenger Survey: User Guidance Report

This report, and information or advice which it contains, is prov ded by MVA Consultancy Ltd solely for internal use and reliance by ts Client in

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

Aviation Trends. Quarter Contents

BSc (Hons), DIS Air Transport Management - University of Loughborough

2nd March, 2017 Corporate Report Format. Conisbrough Mexborough Sprotbrough

The Future Development of Air Transport in the United Kingdom: South East

HS2 Plans & Updates. Prof Andrew McNaughton

THE ECONOMIC IMPACT OF ABERDEEN AIRPORT

Measure 67: Intermodality for people First page:

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

PROTECTING LONDON S POSITION AS A WORLD CITY: CREATING THE FIRST VIRTUAL HUB AIRPORT

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

RICHARD KABERRY PRINCIPAL CONSULTANT

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL SOUTH EAST REGIONAL AIRPORT STRATEGY

Demand and Appraisal Report

EU Guidelines on State aid to airports and airlines

The Airport Charges Regulations 2011

ALDERNEY GUERNSEY 3 BARRA BENBECULA 1 BELFAST CITY (GEORGE BEST) BELFAST INTERNATIONAL 17 BELFAST INTERNATIONAL LIVERPOOL (JOHN LENNON) 1

Heathrow Airport. May 2017

TfL Planning. 1. Question 1

August Briefing. Why airport expansion is bad for regional economies

In your area. Tibshelf to Shuttlewood LA10. June Introduction

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

Sarah Olney s submission to the Heathrow Expansion Draft Airports National Policy Statement

I have attached to this letter a short summary of this analysis, which highlights:

Government consultations : Airports National Policy Statement, UK Airspace Policy, Night Flights

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

CAA Consultation on issues affecting passengers access to UK airports: a review of surface access

Aviation Trends Quarter

Gatwick Airport Limited. Response to Airports Commission Consultation. Appendix. Gatwick Airport Ltd - Supporting Traffic & Competition Analysis

Transcription:

Submission to the Airports Commission Greengauge 21 February 2013 www.greengauge21.net 1

1. Introduction Greengauge 21 is a not for profit company established to promote the debate and interest in highspeed rail for Britain in 2006. It is supported by a Public Interest Group and by an Industry Leaders Group; broadly these cover the public and private sectors respectively. It is not completely clear whether this submission falls under the medium term or the long term category as defined by the Davies Commission, 1 so we hope that submission at this early stage will be helpful. It provides both evidence and proposals on the issue of rail accessibility to the South East s airports. Our proposal is for an integrated approach that treats the questions of high-speed rail, airport accessibility and airport development together, with active consideration of environmental and other wider impacts. The evidence we provide is in summary form here, but is drawn from reports which have been published and are available in full on the Greengauge 21 website. The planned HS2 connection to Heathrow is on hold pending the Davies Commission findings. We wish to draw to the Commission s attention: 1. The value and wider role of high-speed rail connections at Heathrow; and 2. The plans drawn up under the guidance of Greengauge 21 s Public Interest Group for a national HSR network which also serves Stansted, as well as the airports of Birmingham, Manchester and Edinburgh. Our submission is that the inter-relationship between high-speed rail and airport infrastructure (in particular, additional runway capacity) is extremely important and need to be considered together in an integrated manner. This echoes the conclusion in relation to conventional rail reached by the Strategic Rail Authority and BAA plc which set out the rail developments needed to support airport planned airport development in an Appendix to the 2003 Aviation White Paper. The proposal is shown in summary form overleaf. 1 Airports Commission Guidance Document 01: Submitting evidence and proposals to the Airports Commission www.greengauge21.net 2

Integrating Airport development with a national High-Speed Rail Network High Speed 2 High Speed 2 has been designed with a connection to serve Heathrow that provides national connectivity to the airport hub and serves as a key part of a joined-up national high-speed network. A national HSR network The national network shown here was developed and published by Greengauge 21 in September 2009 as Fast Forward (and subsequently updated to show HS2). Airports, along with city centres, are the locations most suitable for HSR stations. The national network provides for a second eastern high-speed line that would serve Stansted Airport. The Heathrow Opportunity HSR services to Heathrow Airport should connect to the south and west over existing rail lines. The approach follows that used by SNCF with TGV at Paris CDG Airport, and by DB at Frankfurt. The connectivity is especially important for the wider south east, the south west and south Wales. www.greengauge21.net 3

2. Impact of high-speed rail on Heathrow An early study by Greengauge 21 showed the scale of aviation demand at Heathrow that could be attracted to HSR services if direct links were provided to the airport. 2 It was estimated that 19% of the then current demand for air travel at the airport, amounting to 12.8mppa could be presented with a realistic option of travel by high-speed rail instead. Overall, it might be expected that perhaps 10% of Heathrow s demand (on the basis of 2004 CAA data) would switch to high-speed rail if the necessary direct links were provided. Work carried out by Greengauge 21 and submitted to the Mawhinney Review of 2010 3 showed that the relationship between high-speed rail and Heathrow needed to be considered in a broader context than the question of air to rail mode diversion. In particular, it showed that Heathrow is a unique location in the wider south east, with high levels of accessibility by all modes and with plans to improve accessibility by rail even further. In particular, western rail access, linking Heathrow directly westwards to the Great Western Main Line (GWML), is now a committed scheme. This forms a critical connection in the national HSR network, since an upgrade to the GWML which is being electrified could allow through operation of HSR services from HS2 and HS1 to the south west and Wales. In any event, it will mean that cities such as Bristol and Cardiff would join the national HSR network. A proposal was developed by Greengauge 21 that showed how the connections at Heathrow to HS2 and to the wider rail network could be made. Figure 1 HSR Interconnection network at Heathrow 2 Greengauge 21, Impact of High Speed Rail on Heathrow Airport, March 2006 3 Greengauge 21, The Heathrow Opportunity, February 2010. www.greengauge21.net 4

Figure 2 Heathrow and the HSR network Subsequent work by HS2 Ltd, published in January 2013, has identified how the connections to Heathrow could be created. 4 The Heathrow connections link both northwards on to HS2 so that direct services can run from Heathrow to Birmingham, Manchester, Leeds and Scotland; and eastwards to London and to the planned HS2 HS1 connection, so that services could operate directly from Heathrow to Paris, Brussels, Amsterdam and Frankfurt. The HS2 Ltd plans, however, stop at Heathrow, and no work has yet been undertaken into the idea of southwards extension as shown on the outline plans above. Yet this onward connection is essential, because: In making Heathrow a through station, it can accommodate trains operating over routes such as Southampton Heathrow Manchester and Gatwick Heathrow Leeds Newcastle. As a consequence, the viability of HSR services to/from the airport will be much greater than has been assessed so far by HS2 Ltd. We judge that the non-aviation demand that would be generated by through HSR services at Heathrow would be substantial and would have much greater benefits from diversion from car travel than will be achieved by HSR services between central London and the Midlands and the North. Taken together with the western rail access scheme that now features in the rail industry plans for 2014-29 (with implementation, perhaps, in 2020), the effect would be to create a surface transportation hub at Heathrow. Heathrow could have, by the late 2020s, direct fast rail connectivity to all of the English core cities, all of the English regions, as well as to south and north 4 The Heathrow spur: description of HS2 Ltd s recommended route and station option, January 2013. www.greengauge21.net 5

Wales and to Scotland. In effect it would mean that Heathrow airport could be a global hub for the whole country and not just London, with two significant outcomes: The accessibility of Heathrow from much of Britain would be dramatically improved because a range of regular cross-heathrow HSR services can be provided viably; and Access to the high-speed rail network would be provided for passengers across the wider south east and south west without needing to travel via London. While it is the case that short-haul flights at Heathrow have been cut back since the initial work was carried out by Greengauge 21 in 2006, and domestic air travel demand has fallen, there are some new services now starting, including Virgin Atlantic s first short haul feeder flights planned for later this year, which will replace some of the previously withdrawn flights. And in any event, as Greengauge 21 s work on carbon impacts has noted, account has also to be taken of the impact of providing HSR at British hub airports on short haul feeder flights to competing European airports, such as Schiphol in any full analysis of both demand and carbon impacts. 5 5 Greengauge 21, The carbon impacts of High Speed 2, September 2012 www.greengauge21.net 6

3. National high-speed rail network It is Government policy to create a truly national high-speed network. The creation of HS2 (in two stages) is seen as an essential step in achieving this aim. However, Government has not yet developed a national HSR network plan, even in outline. But Greengauge 21 has, through a major planning study carried out in 2009, in which alternative network shapes were compared through a benefit:cost appraisal process. The best value network was summarised in a report Fast Forward, developed on behalf of a widely drawn Public Interest Group and published in September 2009 (before the first plans from HS2 Ltd emerged). 6 It is illustrated below, with the HS2 plans incorporated and current Scottish Government aspirations. Figure 3 A national HSR network 6 Greengauge 21, Fast Forward, September 2009 www.greengauge21.net 7

This national HSR network serves airports at Birmingham, Manchester, Edinburgh, Heathrow and Stansted. With suitable extensions, it could serve a Thames estuary airport. The arrangements at Heathrow are described in section 2 above. Stansted Airport could be served by a second north-south high-speed line that HS2 Ltd have acknowledged may well be needed in the future to provide the necessary capacity. To serve Stansted, a delta junction is shown on the plan, similar to the one shown for Heathrow, together with onward extensions (in this case, pointing eastwards toward Colchester/Ipswich). It would be possible through this network to provide Stansted with HSR services linking the north east and north west directly to the airport and these could also operate onwards into East Anglia. The new lines at Stansted would have other advantages: they could provide long term capacity to relieve the London Ipswich main line. No specific proposals for a second terminus in central London for the Stansted/eastern high-speed line were developed in the Fast Forward studies, although Stratford might be a candidate location. The eastern HSR line, including Stansted had a benefit:cost ratio of 2:1. 7 In general, the Greengauge 21 research has shown that HSR stations should be located in city centres. Other edge-of-town locations may bring localised development opportunities, but tend to create significant new demands on the surface transportation networks. HSR stations located at airports represent the key exception to this general finding as in the main they already have welldeveloped local transport facilities. They also bring the potential to divert some air demand to HSR, including from short-haul European flights as well as from domestic flights. 7 Ibid p48 www.greengauge21.net 8

4. An integrated solution We have shown that planning of airports and of the national high-speed rail network should progress hand in hand in order to secure the widest national benefits. Provision of HSR at Heathrow assuming the airport has a future can offer, as HS2 Ltd has shown, a station fully integrated with the air passenger terminal at Terminal 5. The national network of HSR services would reduce the demand for short-haul flights and create better value from the runway slots used. The network of airport HSR services would increase the overall value of the national HSR network and is pivotal to ensuring that the south and west of the country benefits from HSR, as well as the Midlands and the north. The national HSR network allows for a second major airport in the South East to be equally well connected and our work has assumed that location is Stansted, but clearly, other locations could be chosen. An airport on the Thames Estuary could be served by HSR at some additional cost with similar benefits (although with somewhat longer journey times) to the Stansted proposal. www.greengauge21.net 9