July VA 219. ATV Georges Lemaître

Similar documents
LAUNCH KIT. December 2017 VA240. Galileo FOC-M7 SAT

LAUNCH KIT. September 2018 VA243. Horizons 3e. Azerspace-2/Intelsat 38

December VA 221 DIRECTV-14 GSAT-16

A launch for the International Space Station

September VA 218. MEASAT-3b OPTUS 10

LAUNCH KIT. November 2017 VV11. MOHAMMED VI A satellite

September VA 226. Sky Muster ARSAT-2

LAUNCH KIT. December 2018 VA246 GSAT-11 GEO-KOMPSAT-2A

April VA 222 THOR 7 SICRAL 2

November VA 227 ARABSAT-6B (BADR -7) GSAT-15

LAUNCH KIT. February 2017 VA235. SKY Brasil-1 Telkom 3S

LAUNCH KIT. February 2019 VA247. Saudi Geostationary Satellite 1/Hellas Sat 4 GSAT-31

LAUNCH KIT. September 2017 VA239. Intelsat 37e. BSAT-4a

A launch for the International Space Station

LAUNCH KIT AUGUST 2018 VV12 AEOLUS

ARIANESPACE LAUNCHES SATELLITES FOR TWO MAJOR EUROPEAN OPERATORS

LAUNCH KIT. January 2018 VA241 SES-14. Al Yah 3

SATELLITES FOR SPAIN AND SOUTH KOREA

Flight 158 ARIANE 5. Follow the launch live on the internet broadband at (starting 20 minutes before lift-off)

LAUNCHING TWO DIRECT BROADCAST TV SATELLITES

Boosting two communications satellites into orbit

Satellites launched for Europe and India

A satellite launch for Mexico and Thailand

Two Telecom satellites

Satellites launched for the USA and Asia

CONTENTS VS21 ARIANESPACE TO ORBIT THE FIRST SIX SATELLITES IN THE ONEWEB CONSTELLATION. OneWeb F6

LAUNCH KIT MAY 2017 VS17 SES 15

Arianespace 2013 Organization, History and Programs

LAUNCH KIT. April 2019 VS22. O3b Satellites

LAUNCH KIT. December 2018 VS20 CSO-1

Arianespace Launch Service Operator Policy for Space Safety

SPOT 5 incorporates major upgrades, with several new instruments improving the quality of images and services offered to customers.

Flight th Ariane 5 to boost communications and weather satellites

Missions, Operations & Ground Infrastructure

Flight th launch for Eutelsat

Ariane 5 production and integration operations: ten years of continuous efficiency and quality improvement

The President s Commission on Implementation of US Space Exploration Policy

Space Transportation. The highlights of the year were bound up with the decisions taken at the ESA Ministerial Council in Paris on 27 May.

TECHNICAL INFORMATION Europe Head office USA Subsidiary French Guiana Singapore Liaison office Japan Liaison office

Space Transportation Systems. System Concepts

Payload Adapters and Separation Systems

KOUROU. September 2015 ARIANE 5. Data relating to Flight 226. Sky Muster ARSAT-2

Quality of service and reliability

THE ARIANE 6 SYSTEM : ON BOARD-GROUND INTERFACES AND LAUNCH FACILITY

Successful Return to Flight of the H-IIA Launch Vehicle

Bob Hawkins Deputy Lead Engineer SLS Integrated Avionics and Software

Vega Operational Launch System Overview on launch operations and launch service cost drivers

Introducing. RUAG Space. From our Electronics portfolio: Antenna. From our Spacecraft portfolio: Thermal Insulation

François CAHUZAC / Arnaud BIARD

Japan Fiscal Year 2009 Summer Launch Season. Launch/Operation and Control Plans for

DEMETER satellite disposal, CNES give an example of French Space Act compliance. Florence DUCHEVET & Henri DARNES - CNES

History of Sea Launch

Planned Orbital Flight Test of a 6m HIAD

Launching a Sub-Orbital Spacecraft

(a) This part prescribes rules governing the operation in the United States, of the following:

MASER SOUNDING ROCKET MICROGRAVITY FLIGHTS

HIGH SPEED FLIGHT DEMONSTRATION PROJECT

Review of the Space Shuttle Program

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Transportation Systems. Demand / Market Analysis

FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission

COSMO-SkyMed COSMO-3

Total failure of the. on its maiden flight. Ian Sommerville 2001 CS 365 Ariane 5 launcher failure Slide 1

H-II TRANSFER VEHICLE TRAJECTORY PLANNING AND FLIGHT OPERATION RESULTS

EQUATORIAL LAUNCH AUSTRALIA

Spacecraft Avionics. Lecture #26 December 2, 2014 Avionics overview Shuttle systems Constellation systems MARYLAND U N I V E R S I T Y O F

The Boeing Next-Generation 737 Family Productive, Progressive, Flexible, Familiar

GUIDELINES FOR THE AWARD OF MAAA WINGS MOP027

Low Cost Spacelift to LEO, GTO, and Beyond Using the OSP-2 Minotaur IV Space Launch Vehicle. Scott Schoneman, Lou Amorosi, Ron Willey, and Dan Cheke

The Suborbital Space Tourism Project of EADS Astrium

AIRBUS FlyByWire How it really works

VORCORE/STRATEOLE. VORCORE / STRATEOLE Workshop. September 16-17, Paris VORCORE SYSTEM DESCRIPTION VORCORE IMPLEMENTATION 1/10/02

Efficiency has to be the key to success

Sven Kaltenhäuser, Frank Morlang, Dirk-Roger Schmitt German Aerospace Center DLR

Performance. Aircraft System

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia

Air Navigation Bureau ICAO Headquarters, Montreal

Missione Rosetta: come raggiungere ed esplorare una cometa

Propulsion Solutions for Fishing Vessels SERVICES

TOUR OF A RUSSIAN MANNED SOYUZ ROCKET LAUNCH

ARIANE 5. Flight 501 Failure

Surveillance and Broadcast Services

Air Transportation System Architecting

Commercial Human Spaceflight Safety

TEAM AMERICA ROCKETRY CHALLENGE 2014 EVENT RULES

EFIS-D10A DYNON S BEST-SELLING. Specifications STC APPROVED FOR TYPE CERTIFICATED AIRCRAFT NOW NOW

FLIGHT SAFETY Technology and the Human Factor. A pilot s perspective by Prof. dr ir J.A. Mulder Delft University of Technology

SABCA ANNUAL ANNOUNCEMENT Regulated information Inside information, published on 25/04/2018 at h

A320 FAMILY: The most successful aircraft family. Key Figures* 20% fuel burn reduction. 5% lower airframe A320 FAMILY.

SPACE SHUTTLE MISSION SUMMARY INTRODUCTION

ACES Atomic Clock Ensemble in Space

COSMO-SkyMed COSMO-1

H2020 Success Story Industrial Space Technology H2020 Large European Antenna (LEA)

July 2018 TRENDS IN TRANSPORT. The UK's Spaceport an opportunity in the commercial spaceflight market

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015

PRODUCT PRESENTATION R-BUS. The great traveller

By providing more capacity than any other twin-engine freighter, the 777F brings new levels of efficiency to the long-haul market.

EADS CASA response to the Ministry of Defence of the Slovak Republic

Magnetospheric MultiScale Mission. SpaceWire Implementation

Airbus A320 Training Courses

Transcription:

July 2014 VA 219 ATV Georges Lemaître

FIFTH AND LAST ATV LAUNCH FOR THE INTERNATIONAL SPACE STATION For its third Ariane 5 mission of the year, Arianespace will launch the fifth Automated Transfer Vehicle (ATV), dubbed Georges Lemaître, for the European Space Agency (ESA). Like the first four ATVs, launched in March 2008, February 2011, March 2012 and June 2013, the ATV-5 will play a vital role in bringing supplies to the International Space Station (ISS). Reflecting the excellence of European space transport, encompassing both the launcher and the payload, this latest mission spotlights Europe s key role in major international space programs. The ATV mission The ATV is designed to bring supplies to the International Space Station (water, air, food, propellants for the Russian section, spare parts, experimental hardware, etc.), and reboost the ISS into its nominal orbit. The ISS now weighs more than 420 metric tons, including the European laboratory, Columbus. After separating from the launch vehicle, the ATV will be autonomous, using its own systems for energy (batteries and four large solar panels) and guidance (GPS, star tracker), in liaison with the control center in Toulouse. During final approach, an optical navigation system will guide the ATV to its rendezvous with the Space Station, where it will automatically dock several days after launch. After being docked to the ISS for up to six months, the ATV will be loaded with waste and other items that are no longer needed, separated from the station and carry out a guided reentry, disintegrating in the atmosphere. Payload weight record The ATV-5 weighs more than 20 metric tons, making it the heaviest payload ever launched by an Ariane 5. Over the five ATV launches since 2008, Ariane 5 ES rockets have lofted over 100 metric tons into orbit. The latest Ariane 5 ES launcher will be used to inject the ATV-5 into a circular orbit at an altitude of 260 kilometers, inclined 51.6 degrees. With this launch, Ariane 5 continues to confirm its ability to handle a wide array of missions, ranging from scientific spacecraft in special orbits to commercial launches in geostationary orbit. The ATV cargo vessels are built by Airbus Defence and Space, leading a consortium of European manufacturers. A large cylinder measuring about 10 meters long by 4.5 meters in diameter, the ATV comprises two main parts: a service module with the avionics and propulsion systems, and a pressurized cargo carrier. CONTENTS The Launch: > Mission VA219 - ATV Georges Lemaître PAGE 1 > Automated Transfer Vehicle ATV PAGE 3 Further information: > Ariane 5-ES launch vehicle PAGE 4 > Range operations campaign PAGE 5 > Countdown and flight PAGE 6 > ATV Georges Lemaître mission profile PAGE 7 > Arianespace & the Guiana Space Center PAGE 8 Press Contact Mario de Lépine m.delepine@arianespace.com 01.60.87.60.15 06.85.13.13.96 #atv5 @arianespace @arianespaceceo arianespace.tv youtube.com/arianespace arianespace 1

MISSION DESCRIPTION The 218th Ariane launch will place the European Space Agency s fifth Automated Transfer Vehicle (ATV) into a low Earth orbit, inclined 51.6 degrees. This will be the 74th Ariane 5 launch. The launcher will be carrying a total payload of 20,060 kg, including 19,926 kg for the ATV itself. The launch will be from Ariane Launch Complex No. 3 (ELA 3) in Kourou, French Guiana. Circular orbit targeted Altitude : 260 km Inclination: : 51.63 degrees Liftoff is planned for the evening of Tuesday July 29, 2014 at precisely: 8:44:03 pm Local Time in French Guiana, 7:44:03 pm in Washington DC, 23:44:03 UTC, 1:44:03 am on July 30 in Paris, 3:44:03 am on July 30 in Moscow. The launch at a glance After the main stage cryogenic engine is ignited and its operation checked, the two solid rocket boosters are ignited to provide liftoff. The launcher rises vertically for about five seconds, then tilts towards the northeast. It will maintain its attitude to keep the launcher s axis parallel to its airspeed vector in order to minimize aerodynamic loads throughout the atmospheric phase of the launch, until the solid boosters are jettisoned. The fairing protecting the ATV is jettisoned shortly after the boosters, at about T + 144 seconds. Once the first part of the flight is completed, the onboard computers optimize the trajectory in real time to minimize fuel burn. The launcher reaches the targeted position for the extinction of the main stage engine, then the intermediate orbit targeted at the end of the first firing of the upper stage. On this mission, the main stage will fall back into the Atlantic Ocean off the coast of Portugal. Following a ballistic ( coasting ) phase lasting 45 minutes, the upper stage is then reignited to circularize the orbit, directing the ATV, once separated, into its targeted final orbit at an altitude of 260 kilometers and a speed of about 7,600 meters/second. Once the ATV has separated, the launcher starts a second long ballistic phase (making nearly a complete revolution around the Earth). The upper stage is then reignited once more to deorbit the upper segment of the launcher, sending it towards a deserted area of the South Pacific. Ariane payload configuration The was built by Airbus Defence and Space, leading a large European industrial consortium. Mission length The nominal length of the mission (from liftoff to separation of the ATV) is 1 hour 3 minutes and 56 seconds. 2

THE AUTOMATED TRANSFER VEHICLE (ATV) GEORGES LEMAÎTRE Customer Manufacturer Mission Mass Stabilization Dimensions Span in orbit Onboard power The European Space Agency (ESA) Airbus Defence and Space Carry cargo to the ISS, re-boost the ISS s altitude Total mass at liftoff 20,060 kg Dry mass 9,778 kg 3 axis 10.27 m length 4.48 m diameter (max.) 22,3 m with solar arrays deployed 4,600 W (end of life) PRESS CONTACT: Pal A. Hvistendahl European Space Agency Head of Media Relations Office Tel. + 33(0) 1 53 69 71 58 / 72 99 E-mail: pal.hvistendahl@esa.int Astrid Emerit Airbus Defence and Space Head of Media Tel. + 33 (0) 1 77 75 80 93 E-mail : astrid.emerit@astrium.eads.net 3

ARIANE 5-ES LAUNCH VEHICLE 50.5 m Fairing (RUAG Space) 17 m Mass: 2.6 t 773 tons (total mass at liftoff) ATV 5 Georges Lemaître Mass: 19.9 t (without adapteur) EPS - Storable propellant upper stage Height: 3.36 m Aestus engine Without TP 29 kn Vehicle Equipment Bay Hauteur : 1.56 m Masse : 1.7 t EPC - Main Cryogenic stage Height: 31 m Mass: 188.3 t EAP - Solid Rocket Boosters Height: 31.6 m Mass: 278 t approx. Propellants (in ton) at T-O L: Storable propellant H: Cryogenic P: Solid Vulcain 2 Engine (Safran) Thrust: 1,390 kn (in the vacuum) 540 sec of propulsion 13.000 kn at Liftoff (at HO + 7 to 8 sec) MPS - Solid Rocket Motor (Europropulsion) Average thrust: 5,060 kn Maximum thrust: 7,080 kn (in the vacuum) 130 sec of propulsion 4

RANGE OPERATIONS CAMPAIGN: ARIANE 5 - ATV GEORGES LEMAÎTRE ATV and launch vehicle campaign calendar Dates ATV activities Launch vehicle activities October 24, 2013 November 4, 2013 Nov. 29 - Dec. 19, 2013 January 8-24, 2014 Feb. 12 - March 5, 2014 April 22, 2014 April 22, 2014 April 23, 2014 April 23, 2014 April 28, 2014 April 28, 2014 May 6, 2014 May 16, 2014 Arrival in Kourou and beginning of the ATV Georges Lemaître preparation campaign in the S5C building Electrical functional tests Propulsion system tests Solar array integration Loading of water and of dry cargo Mechanical mating of the 2 ATV modules Transfer of the ATV from the S5C to the S5B Campaign start review EPC erection EAP transfer and positioning EPC/EAP integration Equipment bay integration EPS erection May 20-28, 2014 Filling operations of the Russian propellant subsystem in S5 B June 5, 2014 Rollout from BIL to BAF June 5-13, 2014 Filling operations of the ATV propulsion subsystem in S5 B ATV and launch vehicle campaign final calendar Dates ATV activities Launch vehicle activities Monday June 23, 2014 ATV transfer to Final Assembly Building (BAF) Thursday June 26, 2014 ATV integration on launcher Friday July 11, 2014 Fairing integration around ATV Friday July 11, 2014 EPS and SCA preparations for filling 12 to 21 July 11, 2014 Additional checks Tuesday 22 July 2014 Filling of SCA Wednesday July 23, 2014 EPS filling with MMH Thursday July 24, 2014 Launch rehearsal. EPS filling with N2O4 Friday July 25, 2014 Arming of launch vehicle Saturday July, 26 2014 Monday July 28, 2014 Mardi July 29, 2014 Launch readiness review (RAL) and final preparation of launcher Rollout from BAF to Launch Zone, launch vehicle connections and filling of the EPC liquid helium tank Start of final countdown and launch countdown, including EPC filling with liquid oxygen and liquid hydrogen 5

COUNTDOWN AND FLIGHT The countdown comprises all final preparation steps for the launcher, the satellites/spacecraft and the launch site. If it proceeds as planned, the countdown leads to the ignition of the main stage engine, then the two boosters, for a liftoff at the targeted time. The countdown culminates in a synchronized sequence (see appendix 3), which is managed by the control station and onboard computers starting at T-7 minutes. If an interruption in the countdown means that T-0 falls outside the nominal liftoff window, then the launch will be delayed by one, two or more days, depending on the problem involved, and the solution developed. TIME EVENT - 11 h 30 mn Start of final countdown - 07 h 30 mn Check of electrical systems - 04 h 50 mn Start of filling of main cryogenic stage with liquid oxygen and hydrogen - 03 h 20 mn Chilldown of Vulcain main stage engine - 01 h 10 mn Check of connections between launcher and telemetry, tracking and command systems - 07 mn 00.0 s All systems go report, allowing start of synchronized sequence - 04 mn 00.0 s Tanks pressurized for flight - 01 mn 00.0 s Switch to onboard power mode - 05.5 s Cryogenic arm opening command - 04.0 s Onboard systems take over - 03.0 s Two inertial reference systems switch to flight mode T-0 Ignition of the cryogenic main stage engine (EPC) + 07.0 s Ignition of solid boosters (EAP) + 07.3 s Liftoff + 12.8 s End of vertical rise, beginning of pitch motion + 17.1 s Beginning of roll maneuver + 02 mn 24.0 s EAP separation + 03 mn 33.0 s Fairing jettisoned + 08 mn 48.0 s End of EPC thrust phase + 08 mn 54.0 s EPC separation + 09 mn 00.0 s Beginning of first EPS thrust phase + 17 mn 12.0 s End of first EPS thrust phase +17 mn 14.0 s Beginning of ballistic phase + 59 mn 03.0 s Beginning of second EPS thrust phase + 59 mn 58.0 s End of second EPS thrust phase + 01 h 00 mn 00.0 s ATV orientation phase + 01 h 03 mn 56.0 s ATV-5 separation + 01 h 04 mn 12.0 s Avoidance and distancing maneuvers + 01 h 38 mn 39.0 s ATV solar array deployment complete + 02 h 24 mn 22.0 s Third EPS boost for deorbiting + 02 h 35 mn 55.0 s End of Arianespace mission 6

ATV GEORGES LEMAÎTRE MISSION PROFILE The launcher s attitude and trajectory are entirely controlled by the two onboard computers in the Ariane 5 vehicle equipment bay (VEB). The synchronized sequence starts 7 minutes before ignition (T-0). It is primarily designed to perform the final operations on the launcher prior to launch, along with the ultimate checks needed following switchover to flight configuration. As its name indicates, it is fully automatic, and is performed concurrently by the onboard computer and by two redundant computers at the ELA 3 launch complex until T-4 seconds. The computers command the final electrical operations (startup of the flight program, servocontrols, switching from ground power supply to onboard batteries, etc.) and associated checks. They also place the propellant and fluid systems in flight configuration and perform associated checks. In addition, they handle the final ground system configurations, namely: Startup of water injection in the flame trenches and jet guide (T-30 sec). Hydrogen aspiration for chilldown of the Vulcain engine in the jet guide (T-18 sec). Burnoff of hydrogen used for chilldown (T-5.5 sec). At T-4 seconds, the onboard computer takes over control of final engine startup and liftoff operations. It: Starts the ignition sequence for the Vulcain main stage engine (T-0). Checks engine operation (from T+4.5 to T+7.3 sec). Commands ignition of the solid boosters for immediate liftoff at T+7.3 seconds. Any shutdown of the synchronized sequence after T-7 mn automatically places the launcher back in its T-7 min configuration. Ariane 5ES - ATV trajectory 7

ARIANESPACE AND THE GUIANA SPACE CENTER Arianespace, the first launch service company in the world Arianespace was founded in 1980 as the world s first launch Service & Solutions company. Arianespace now has 21 shareholders from ten European countries (including French space agency CNES with 34%, Airbus Defence and Space with 30%, and all European companies participating in the construction of Ariane launchers). Since the outset, Arianespace has signed more than 350 launch contracts and launched 320 satellites. More than two-thirds of the commercial satellites now in service worldwide were launched by Arianespace. The company posted sales of about 989 million euros in 2013. At January 1, 2014, Arianespace had 330 employees, working at the company s headquarters in Evry (near Paris), the Guiana Space Center in French Guiana, where the Ariane, Soyuz and Vega launch pads are located, and offices in Washington, D.C., Tokyo and Singapore. Arianespace offers launch Service & Solutions to satellite operators from around the world, including private companies and government agencies. These services call on three launch vehicles: The Ariane 5 heavy launcher, operated from the Guiana Space Center in Kourou, French Guiana. The Soyuz medium launcher, currently in operation at the Baikonur Cosmodrome in Kazakhstan and the Guiana Space Center. The Vega light launcher, also operated from the Guiana Space Center. Building on its complete family of launchers, Arianespace has won over half of the commercial launch contracts up for bid worldwide in the last two years. Arianespace now has a backlog of more than 40 satellites to be launched. The Guiana Space Center: Europe s Spaceport For over 30 years, the Guiana Space Center (CSG), Europe s Spaceport in French Guiana, has offered a complete array of facilities for rocket launches. It mainly comprises the following: CNES/CSG technical center, including various resources and facilities that are critical to launch base operations, such as radars, telecom network, weather station, receiving sites for launcher telemetry, etc. Payload processing facilities (ECPU), in particular the S5 facility. Ariane, Soyuz and Vega launch complexes, comprising the launch zones and launcher integration buildings. Various industrial facilities, including those operated by Regulus, Europropulsion, Air Liquide Spatial Guyane and Airbus Defence and Space, all involved in the production of Ariane 5 components. A total of 40 European manufacturers and local companies are involved in operations. Europe s commitment to independent access to space is based on actions by three key players: the European Space Agency (ESA), French space agency CNES and Arianespace. ESA is responsible for the Ariane, Soyuz and Vega development programs. Once these launch systems are qualified, ESA transfers responsibility to the operator Arianespace. ESA has helped change the role of the Guiana Space Center, in particular by funding the construction of the launch complexes, payload processing buildings and associated facilities. Initially used for the French space program, the Guiana Space Center has gradually become Europe s own spaceport, according to the terms of an agreement between ESA and the French government. To ensure that the Spaceport is available for its programs, ESA takes charge of the lion s share of CNES/CSG fixed expenses, and also helps finance the fixed costs for the ELA launch complexes. French space agency CNES has several main responsibilities at the Guiana Space Center : It designs all infrastructures and, on behalf of the French government, is responsible for safety and security. It provides the resources needed to prepare the satellites and launcher for missions. Whether during tests or actual launches, CNES is also responsible for overall coordination of operations, collects and processes all data transmitted from the launcher via a network of receiving stations, to track Ariane, Soyuz and Vega rockets throughout their trajectories. Arianespace in Guiana In French Guiana, Arianespace is the contracting authority in charge of operating the family of three launchers, Ariane, Soyuz and Vega. Arianespace supervises the integration and functional checks of the Ariane launcher in the Launcher Integration Building (BIL), built by Airbus Defence and Space as production prime contractor. It then carries out acceptance tests of the launcher, while coordinating satellite preparations in the Payload Preparation Complex (EPCU), operated by the Guiana Space Center (CSG). Arianespace then oversees final assembly of the launcher and integration of satellites in the Final Assembly Building (BAF), followed by transfer of the launcher to Launch Zone No. 3 (ZL3), and then final countdown and liftoff from Launch Complex No. 3 (CDL3). Arianespace deploys a top-flight team and technical facilities to get launchers and satellites ready for their missions. Building on this unrivalled expertise and outstanding local facilities, Arianespace is now the undisputed benchmark in the global launch services market. 8