Further details on interventions and funding are available within each Local Area Implementation Plan.

Similar documents
Investing in Greater Manchester transport 2017/2018

THE STOPS ARE JUST THE START

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

LTP3. Bolton Local Area Implementation Plan. March Shaping the future of Bolton.

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

Response to the London Heathrow Airport Expansion Public Consultation

IAT Annual Conference 'Driving Forward

Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway

Business Case Approved. Under Construction. Business Case Approved. Under Construction

The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order. Transport Assessment

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.

Our business plan for making travel easier in Greater Manchester

The New Northern Franchise

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

Major Scheme Business Case Summary Report for Programme Entry

Major Schemes and the wider Strategic Network

City Deal City Centre Enabling Infrastructure Public Realm. Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL

Re-opening of the Skipton to Colne Railway Executive Summary

Manchester Victoria 11 day blockade Easter 2016

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Jim O Sullivan Chief Executive

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

The Government s Aviation Strategy Transport for the North (TfN) response

GREATER MANCHESTER TRANSPORT STRATEGY 2040 Draft Delivery Plan : Executive Summary

Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council

Camborne, Pool, Redruth East West link road key messages. An overview of the project proposals

A unique opportunity. High standards with versatility built in. Local Information Pack an introduction

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

TRANSPORT UPDATE. September/October 2018

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Bournemouth, Poole, Dorset Local Transport Plan 3

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A

For public transport information phone Buses 256 X58. Easy access on all buses

Strategic Cross Border Planning in the West Midlands

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Map showing location of public transport projects in vicinity of railway station

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

3. Coach Supporting Statement

Apologies for absence were received from Councillor Michael Lyons, Councillor Tim Swift and Councillor Ian Gillis.

Infrastructure for Growth

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

Why MANCHESTER? MANCHESTER CASE

A6 to Manchester Airport Relief Road

MINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 21 APRIL 2017 AT COMMITTEE ROOM A, WELLINGTON HOUSE, WELLINGTON STREET, LEEDS

Section A: Scheme Summary

West Midlands Sustainable Urban

CITY OF MELBOURNE 10 Year Financial Plan People s Panel Report. 8 November 2014

Town Centre Improvements Plan

WIGAN PIER. Exciting new retail and leisure development, at the heart of the regeneration of the Wigan Pier Quarter QUARTER

Welcome. Fiona Piercy Oxford City and Oxfordshire County Council

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

This report is PUBLIC [NOT PROTECTIVELY MARKED] Board Meeting. Councillor Roger Lawrence Transport

PRIME MULTI-LET INDUSTRIAL INVESTMENT OPPORTUNITY IRLAM BUSINESS CENTRE SOAPSTONE WAY IRLAM MANCHESTER M44 6RA

Wolverhampton City Council

Research Briefing Flood and Coastal Erosion Risk Management in Wales

JOINT GREATER MANCHESTER COMBINED AUTHORITY & AGMA EXECUTIVE BOARD MEETING. GMSF: Greater Manchester s Plan for Homes and Jobs. Update on Consultation

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

Strategic Transport Forum

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

A140 study and Major Road Network

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Strategic Transport Forum 7 th December 2018

Metrolink Phase 3: One Year After Monitoring and Evaluation Report

Proposed Capital Programme 2016/17 to 2018/19 including the Capital Budget 2016/17

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Locate in Falkirk. A guide for retail businesses

East West Rail Consortium

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

Shrinking cities: a view from Britain. Brian Robson

Strategic Transport Forum 21 st September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

Joint Local Transport Plan 3

SUBMISSION FROM RENFREWSHIRE COUNCIL

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Draft City Centre Transport Proposals

The future of the TransPennine Express and Northern rail franchises

Buses. Saturday 29 December Normal Saturday service.

NATIONAL PASSENGER SURVEY - WAVE 23 Autumn 2010 REPORT FOR GREATER MANCHESTER PTE

CALDERDALE LIBERAL DEMOCRATS

Transport Delivery Committee

South of England north-south connectivity

Enterprise Way. The new Airport City link road. June 2017 Progress Update

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Transcription:

Greater Manchester Implementation Profiles Local Area Implementation Plans have been prepared for each of the ten District areas in Greater Manchester, and are available on the LTP3 website www.tfgm.com/ltp3. The Local Transport Plan settlement for to 2014/15 sets the level of funding to local authorities. Within Greater Manchester, all of the funding is committed to major schemes through the Greater Manchester Transport Fund for the first three years, with maintenance allocation being available for all years. The figures shown for the financial years 2012/13 to 2014/15 are currently indicative. Further details on interventions and funding are available within each Local Area Implementation Plan. The key local challenges and spending proposals in the period to 2014/15 are summarised in the following tables. ing on Greater Manchester-wide projects, by the Highways Agency, Network Rail and Transport for Greater Manchester is also summarised below. 1

Bolton Key local challenges and priorities for transport to be addressed in the financial years to 2014/15: to focus on the maintenance of the existing highway infrastructure using sound asset management principles; and to work in partnership with Transport for Greater Manchester and others to ensure the delivery of the Bolton Town Centre Public Transport Scheme (Bolton Interchange) and associated highway improvements in Bolton town centre to stimulate regeneration and economic growth, the delivery of improvements to Bolton, Blackrod and Westhoughton rail stations, and subject to funding, Hall i th Wood. Due to the lack of LTP funding available to Bolton for minor works and local safety schemes in the first three years of this LTP, it will be a challenge for Bolton Council to deliver against some priorities. In the early years they will concentrate on maintaining the network through investment in maintenance. They will endeavour to incorporate safety measures into maintenance schemes wherever possible and potentially seek funding from other sources such as the Local Sustainable Transport Fund to promote the use of cycling, walking and public transport. Bolton Programme Minor Schemes LTP Integrated Transport Block programmes (ITB) Public Transport Priority and Infrastructure Schemes as part of Transport Infrastructure Fund Programme 2012/13 2013/14 2014/15 Funding Source - - - 575LTP 5,500 - - - Transport Infrastructure Fund Main LTP3 Objectives Sub Total 5,500 - - 575 Maintenance Maintaining road network 2,000 - - BMBC Corporate - Borrowing Carriageways and footways 2,440 2,342 2,231 2,100LTP Bridges 1,241 1,207 1,150 1,083LTP Street lighting 128 110 105 98LTP Sub Total 5,809 3,659 3,486 3,281 TOTA L 11,309 3,659 3,486 3,856 The figures in the above table reflect a reduced level of funding for minor works for the years to 2013/14 and demonstrate a short term focus on maintenance. In view of longer term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. 2

Bury Key local challenges and priorities for transport in the financial years to 2014/15: to maintain the highway network; to implement integrated transport measures to address issues arising from high levels of car use, especially for journeys to work and to school; and to work in partnership with Transport for Greater Manchester to increase the capacity and quality of Metrolink services. Bury Council s programme reflects the current position of Integrated Transport Block funding becoming available at a local level in Year 4 only. Opportunities for alternative funding will be pursued. It should also be noted that the 3 Year Programme requires flexibility to enable works in either Bridges and Structures or Highways Maintenance to move programme years according to changing priorities. It has been assumed that the capital allocation will remain as now but the 3 Year Programme may have to be revised if circumstances change. Bury Programme 2012/13 2013/14 2014/15 Funding Source Main LTP3 Objectives Minor Schemes ITB - - - 737 ITB Sub Total - - - 737 Maintenance Bridge Assessments 50 50 50 50 LTP Bridge Works 550 460 425 395 LTP Sub Total 600 510 475 445 Highways Maintenance 1,445 1,401 1,315 1,241 LTP Sub Total 1,445 1,401 1,315 1,241 TOTAL 2,045 1,911 1,790 2,423 The figures in the above table reflect a reduced level of funding for minor works for the years to 2013/14 and demonstrate a short term focus on maintenance In view of longer term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. 3

Manchester Key local challenges and priorities for transport to be addressed in in the financial years to 2014/15: to maintain the existing transport assets and system infrastructure, in particular the condition of our roads, pavements, cycle lanes, footpaths and drainage; to ensure that the transport system remains fit for purpose and is able to support people s journeys, the economy and regeneration wards to improve our residents quality of life; and to work in partnership with Transport for Greater Manchester and others to ensure delivery of the GMTF major schemes, Wythenshawe Interchange, improvements to Oxford Road and Victoria rail stations and, subject to funding, Ashburys rail station. The programme has been developed to provide a more specific neighbourhood focus and to establish priorities within individual wards. There are several key developments and network management approaches that will, over time, require significant investments to help drive and accommodate growth, whilst helping to continue the physical transformation of the city and provide residents with access to new jobs and opportunities. Implementing the Transport Strategy for Manchester City Centre is our top transport priority. New urban spaces will be created in the city centre, making a greener more attractive city. Changes to traffic management will encourage more sustainable travel patterns by creating better conditions for pedestrians, cyclists and public transport passengers, which in turn will contribute to reducing carbon and harmful pollutants. Over the next three years where funding is scarce, improvements to the network will be funded either as part of other committed transport schemes or will be taken forward as part of development led activity using contributions from developers to improve highway accessibility for cyclists, pedestrians or public transport passengers. The City Council will continue to fund activities to encourage more residents and workers to make short trips by cycling and walking and for longer journeys help improve travel by public transport and barriers that prevent people from trying bus, tram and train. The figures in the table below reflect a reduced level of funding for minor works for years to 2013/14 and demonstrate a short term focus on maintenance. In view of longer term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. 4

Manchester Programme Minor Schemes Advance works (St Peter s Square highway) Walking and Public Realm (St Peter s Square) Highway Network Enhancement (Northern Gateway highways realignment) Northern Gateway Public Realm 2012/13 2013/14 2014/15 60 - - - MCC ü ü - - 7,250 7,250 MCC ü ü Walking and Public Realm (Greengate-Chapel Street - 2,000 - - MCC / Salford CC ü ü footbridge) MCC / ERDF Support for regeneration of Funding for years 2 4,000 - Oxford Road corridor and 3 not yet ü ü ü secured Victoria Contribution 2,000 2,000 11,000 MCC / Network Rail 10,000 / TFGM ü ü ü Improving Bus Journeys 16 Carry over MCC Wythenshawe Interchange 1,155 - - LTP2 funding Contribution contribution ü ü Low Emission Buses 554 554 - - MCC ü ü Cleaner Vehicles Campaign 3,400 3,400 - Defra Grant/MCC (continuation of campaign in - partnership with ü ü Energy Saving Trust) Capital Maintenance 6,500 3,379 3,224 LTP3 Maintenance / 3,065 MCC Major Drainage repairs, LTP3 Maintenance / carriageway and footway 1,818 - - - MCC repairs Bridge assessment / improvement works 8,000 7,000 - - 190 - - - Funding Source - - MCC / ERDF MCC / Third Party / ERDF LTP2 Carry over / MCC Main LTP3 Objectives Arndale Bridge, Cross Street 507 - - - MCC ü ü Neighbourhood Highways Services 16,200 MCC ü ü ü LTP2 Carry over / Indicative ITB Integrated transport measures 551 - - 1,000 allocation of 1m in 2014/15 for priority minor transport Traffic Management & Public Realm Schemes 1,946 - - - MCC ü ü ü Congestion Reduction 450 - - - DfT ü ü TOTAL 108,469 ü ü ü ü ü ü ü 5

Oldham Key local challenges and priorities for transport in in the financial years to 2014/15: to improve the condition of the highway network, in particular to reduce the maintenance backlog which has built up on the Borough s roads. This will be undertaken through Oldham s LTP maintenance programme and Highways Investment Programme; to repair failing drystone retaining walls through the Greater Manchester Retaining Wall scheme; to improve the condition of Oldham s street lighting stock by entering into a PFI contract which would enable replacement of 75% of all lighting columns; to tackle the problem of under-strength structures which currently carry weight limits through the bridge maintenance programme; to deliver the transport improvements required to support the changes in pupil travel patterns that will result from Oldham s Building Schools for the Future (BSF) and Academies programme; and to work in partnership with Transport for Greater Manchester to bring Metrolink to Oldham, including the route through Oldham town centre and improved park and ride facilities. Due to the lack of LTP funding available to Oldham for minor works and local safety schemes in the first three years of this LTP, Oldham Council has recognised the challenge in delivering against some priorities. In the early years Oldham Council will concentrate on maintaining the network through investment in maintenance. They will endeavour to incorporate safety measures into maintenance schemes wherever possible and seek funding from other sources such as the Local Sustainable Transport Fund to improve safety and promote the use of cycling, walking and public transport. 6

Oldham Programme Major Schemes Oldham local contribution to GM major retaining wall scheme Oldham Council Metrolink contribution 2012/13 2013/14 2014/15 370 - - - 2,950 250 - - LTP maintenance block LTP maintenance block Prudential Borrowing Sub Total 3,320 250 - - Minor Schemes LTP Integrated Transport LTP maintenance Block commitments from 36 - - - block 2010/11 LTP Integrated Transport LTP integrated - - - 475 Block programmes transport block Infrastructure to support BSF and Academies Programme* 1,000 1,000 166 - Funding Source Prudential borrowing / BSF Grant / Academies Grant Sub Total 1,036 1,000 166 475 Maintenance Carriageways and footways** 1,269 1,502 1,365 LTP maintenance 1,287 block Bridges** 543 611 598 LTP maintenance 562 block Street lighting** 223 269 259 LTP maintenance 244 block Highways Investment Prudential 3,000 3,000 2,500 - Programme Borrowing Sub Total 5,035 5,382 4,722 2,093 TOTAL 9,391 6,632 4,888 2,568 Main LTP3 Objectives ü ü ü The figures in the above table reflect a reduced level of funding for minor works for the years to 2013/14 and demonstrate a short term focus on maintenance. In view of longer term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. * A maximum capital resource of 2.166 million has been set aside by the Council towards the cost of complying with planning requirements and delivering the necessary transport improvements to support the BSF and Academies programme over the next two to three years. The expenditure profile shown above is an estimate and will be subject to change. ** allocations for capital maintenance are subject to formal approval being obtained in April 2011. 7

Rochdale Key local challenges and priorities for transport in in the financial years to 2014/15: to respond to the enhanced pressures of reduced finance and resources, retaining and developing commercial operations / partnerships and delivery of essential local regeneration, all of which influence local contributions to GMLTP3 to deliver modal shift and increase public transport patronage through establishing park and ride sites, thus improving quality of life and air quality in those localities; to deliver Rochdale s contribution to the Greater Manchester retaining walls scheme; to improve the condition of the highway network; to promote the East Lancashire Railway to increase tourism and support regeneration; to address congestion caused by HGVs, other commercial and private vehicles; and to work in partnership with Transport for Greater Manchester and others to deliver Metrolink, including a stop at Kingsway, develop and deliver the new Rochdale Interchange as part of the regeneration of Rochdale Town Centre, deliver improvements to Littleborough rail station and, subject to funding, Castleton and Smithy Bridge. Funding remains a primary concern for Rochdale MBC as the highways programmes proposed to progress within LTP3 will now no longer receive district allocations of the DfT ITB for minor works. This funding stream had previously been identified as essential to support development of the key transport improvements, including road accident prevention; either as match funding or to kick start a financial commitment for the schemes identified. The funding requirements remain subject to further work and confirmation. Rochdale Programme 2012/13 2013/14 2014/15 Funding Source Main LTP3 Objectives Bus Infrastructure schemes 1,100 - - 1,100 PIF* and other Traffic Management Schemes - 2,000 - - PIF ü Local Road Schemes 500 - - - PIF ü ü Other schemes (town centre, Roch Valley Way, PIF, DfT and third 800 - - - Littleborough Arches, Drake party contribution ü Street) Structures scheme 1,940 - - - DfT Grant ü TOTAL 4,340 2,000-1,100 * All budgets are indicative and subject to change. Please refer to Rochdale MBC s Local Area Implementation Plan for additional detail. DfT - ITB/Maintenance or other grant, CO Carry over funding received previous years, PIF Priority Investment Funds (internal RMBC). 8

The figures in the above table reflect a reduced level of funding for minor works for the years to 2013/14 and demonstrate a short term focus on maintenance. In view of longer term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. 9

Salford Key local challenges and priorities for transport in the financial years to 2014/15: to provide an integrated transport system to support the city s expanding and developing economic and business areas in Central Salford and Salford West; to continue to reduce the rate of road casualties in Salford; to maximize the number of trips made on foot or by cycling; to commence the implementation plan for highway network recovery, so as to help minimise future maintenance costs; and to work in partnership with Transport for Greater Manchester and others, including Network Rail, to deliver improvements to Salford Crescent and Walkden rail stations and, subject to funding, Eccles and Irlam. Salford Programme 2012/13 2013/14 2014/15 Funding Source Main LTP3 Objectives Minor Schemes Local Safety Schemes 580 600 600 LTP (Maintenance 600 reallocation); Borrowing ü ü ü LTP (Maintenance Schemes to Assist Cycling 85 200 200 200 reallocation); ü ü ü Borrowing Other Minor Works 1,890 800 600 LTP (Maintenance 400 reallocation); Borrowing ü Sub Total 2,555 1,600 1,400 1,200 Maintenance Bridges 535 800 800 LTP(Maintenance 800 reallocation); ü ü ü Borrowing Highways Maintenance 3,050 2,000 2,000 2,000 Borrowing ü ü ü Street Lighting 1,916 1,600 1,600 1,600 Borrowing Sub Total 5,501 4,400 4,400 4,400 TOTAL 8,056 6,000 5,800 5,600 These figures have been provided prior to the City Council setting its budget for ; and prior to known outturn figures for expenditure in 2010/11. Consequently, the values supplied may be subject to change during the financial year. The figures in the above table reflect a reduced level of funding for minor works for the years to 2013/14 and demonstrate a short term focus on maintenance. In view of longer term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. 10

Stockport Key local challenges and priorities for transport in the financial years to 2014/15: to maintain and improve the transportation assets to enable the networks to be used as efficiently, effectively and safely as possible and to improve resilience to all weather conditions; to manage and maintain the transportation networks to seek to reduce congestion and maximise their efficiency and effectiveness including considering the needs of more sustainable forms of transport, freight and motorised vehicles; to deliver Stockport s contribution to the Greater Manchester Retaining Walls major scheme; to work in partnership with Transport for Greater Manchester and others to deliver improvements to Bramhall, Brinnington, Cheadle Hulme, Marple, Reddish North and Rose Hill Marple rail stations and, subject to funding, Strines; and to continue to develop the detail of the scheme and identify and secure an appropriate funding mechanism for the SEMMMS A6 to Manchester Airport Relief Road. Stockport Programme Schemes/ interventions Year Funding source Objectives 1 2 3** 4** Major Schemes GM Retaining Walls 1,750 DfT Grant ü ü ü Greater SEMMMS Relief Road Manchester ü Transport Fund Minor Schemes Integrated Transport Element 550 LTP3 ü Connect2 250 Match Funding from Sustrans. Maintenance Invest to Save 1,800 1,800 1,800 Prudential Borrowing ü ü ü Drainage improvements 200 200 200 Prudential Borrowing ü ü Drainage Hotspots 140 140 140 Council Funding ü ü Highway maintenance 1,629 1,609 1,629 1,215 LTP3 ü ü ü Highways winter damage repair 505 DfT Grant ü ü ü Street Lighting 320 300 309 280 LTP3 ü ü ü Highways Structures 1,300 1,250 1,250 900 LTP3 TOTAL 8,644 5,299 5,328 2,945 ** Subject to confirmation. The figures in the above table reflect a reduced level of funding for minor works for the years to 2013/14 and demonstrate a short term focus on maintenance. In view of longer term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. 11

Tameside Key local challenges and priorities for transport in the financial years to 2014/15: to deliver the A6140 Ashton Northern Bypass Stage 2; to deliver Tameside s contribution to the Greater Manchester Retaining Walls Major Maintenance Scheme in partnership with Stockport, Oldham and Rochdale; to maintain and future proof the Borough highway infrastructure including highways, bridges, street lighting and other associated infrastructure; to reduce the incidence and severity of casualties on the network; and to work in partnership with Transport for Greater Manchester to bring Metrolink to Droylsden (Phase 3a) and Ashton-under-Lyne (Phase 3b), to deliver improvements to Ashton-under-Lyne rail station and, subject to funding, Broadbottom, Flowery Field, Hattersley and Newton-for-Hyde. Tameside Programme 2012/13 2013/14 2014/15 Funding Source Main LTP3 Objectives Major Schemes Greater Manchester Retaining Wall 4,310 - - - DfT s Sub Total 4,310 - - - Minor Schemes Prudential TMBC Capital Funding - Local 365 365 365 - Borrowing (Subject Safety Scheme to Council Approval) initiatives LTP Integrated Transport - - - 475 ITB Block Programme Structural maintenance (highways, bridges & street lighting) 2,103 1,930 1,820 1,867 DfT Sub Total 2,468 2,295 2,185 2,342 Maintenance (Revenue) Footways, Drainage, Bollards, Signs, Signals and Loops 489 - - - Tameside Council Minor Works 921 - - - Tameside Council Drainage 579 - - - Tameside Council Street Lighting (Maintenance, Energy, RCCO) 2,183 - - - Tameside Council Winter Maintenance 686 - - - Tameside Council Highways 174 - - - Tameside Council Management Sub Total 5,032 - - - TOTA L 11,810 2,295 2,185 2,342 The figures in the above table reflect a reduced level of funding for minor works for the years to 2013/14 and demonstrate a short term focus on maintenance. In view of longer 12

term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. The major schemes are noted with appropriate spend profiles. With a Year 1, 33% reduction in DfT Integrated Transport Block (ITB) funding to local authorities and Greater Manchester s commitment to funding major schemes through the Greater Manchester Transport Fund, there is currently no direct funding available for ITB type schemes for any Greater Manchester district. For only, Tameside intend to allocate 365k for Local Safety Scheme initiatives through Prudential Borrowing. The Local Transport Plan (LTP) settlement for to 2014/15 sets the level of funding for highway capital maintenance for and 2012/13, with indicative amounts for the two following years 2013/2014 and 2014/15. Tameside has committed over 5m revenue funding in 2010/11 for investing in ongoing general maintenance on the highway. Whilst funding levels for are still to be determined, the figures give a general indication of ongoing need. 13

Trafford Key local challenges and priorities for transport in the financial years to 2014/15: to tackle congestion on main roads and at key junctions; to reduce the number of people killed & injured on Trafford s roads; to improve local air quality by reducing harmful emissions from transport, and minimise wider adverse environmental impacts of the transport network; to improve bus services and increase bus patronage; to make it easier for people to get to key services; to increase levels of walking and cycling; to maintain the highway network; and to work in partnership with Transport for Greater Manchester to increase the capacity and enhance the quality of Metrolink services, to deliver the new Altrincham Interchange and, subject to funding, to improve Hale and Flixton rail stations. Trafford Council has set out a clear vision and a number of challenges relating to transport in its Local Area Implementation Plan. In order to begin to deliver on these challenges in the current constrained funding environment, they have identified a programme of schemes, which can be viewed in the full Local Area Implementation Plan. The following table summarises this programme, and the funding associated with it for the year. In addition, an indication of likely funding allocations for the years 2012/13 to 2014/15 is provided. Funding allocations from a number of sources are yet to be finalised, and therefore it is noted that this is an indicative programme only and may be subject to change at a later date due to changes in funding availability or as a result of the further development of the listed schemes. 14

Trafford Programme Major Schemes 2012/13 2013/14 2014/15 Altrincham Interchange 600 - - - Sub Total 600 - - - Minor Schemes Bus performance and congestion A56 Chester Rd/Edge Lane junction; A560 Stockport Road, Timperley; targeted bus stop accessibility 190 - - - Funding Source Internal Trafford Council budget Trafford ITB (Maintenance Reallocation) Main LTP3 Objectives ü ü ü Active Travel Bridgewater Way Phase; Completion of Old Trafford Cycle Link; safer walking and cycling routes to schools; dropped crossing upgrades; pedestrian facilities at the A560/Wellington Road junction; Feasibility and design - the Bridgewater Way and Manchester City centre; Cycle parking improvement programme; Bikeability Cycle training for all Year 6 school children Car parking Parking control schemes; Provision of new Pay and Display machines in Council car parks 425 - - - 240 - - - Road Safety/Casualty Reduction A56 Gorse Hill safety zone; Wharfside Way/John Gilbert Way junction; VAS review and upgrades; Design work for other schemes associated with casualty hotspots 200 - - - To Be Allocated - 500-450 Trafford ITB (Maintenance Reallocation), DfT Bikeability, S106, Heritage Lottery, Bridgewater Canal Trust Trafford ITB (Maintenance Reallocation) and other internal Trafford budgets Trafford ITB (Maintenance Reallocation) The figures in the above table reflect a reduced level of funding for minor works for the years to 2013/14 and demonstrate a short term focus on maintenance. In view of longer term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. ü ü ü ü ü Sub Total 1,055 500-450 Maintenance A56 corridor and the classified B and C roads into Trafford Park and the south of the Borough; Sections of the urban unclassified roads most in need of maintenance 2,370 2,288 2,149 2,054 Maintenance Block Sub Total 2,370 2,288 2,149 2,054 TOTAL 4,025 2,788 2,149 2,504 15

Wigan Key local challenges and priorities for transport in the financial years to 2014/15: to increase network efficiencies to tackle the cost of deprivation and to sustain economic activity; to address congestion, cited as the major issue for Wigan Borough by residents and businesses; to improve accessibility in order to generate economic activity; to maintain the highway network and to work in partnership with Transport for Greater Manchester and others to deliver the Leigh-Salford-Manchester busway, improvements to Wigan North Western rail station and, subject to funding, Gathurst, Ince, Pemberton and Wigan Wallgate rail stations. Wigan Programme 2012/13 2013/14 2014/15 Funding Source Main LTP3 Objectives Minor Schemes Network Management 460 400 400 Wigan Council 400 Revenue ü ü ü Public Rights of Way 140 140 140 Wigan Council 140 Revenue Street Lighting - Replacement Highways Block 130 130 130 130 of columns Maintenance Street Lighting - Replacement Wigan Council 900 900 - - of existing units Capital Congestion Relief Through Demand Management - - - 400 ITB ü ü Deliver the Road Safety Strategy for the Borough to reduce the incidences of casualties on the network. - - - 200 ITB Sub Total 1,630 1,570 670 1,270 Maintenance Highways Maintenance - Wigan Council 1,200 1,100 1,000 1,000 Safety Revenue ü ü ü Highways Maintenance - Annual Programme Including Structured 2,615 2,588 2,542 Highways 2,501 Maintenance Block / Wigan Council ü ü ü Sub Total 3,815 3,688 3,542 3,501 TOTAL 5,445 5,258 4,212 4,771 The figures in the above table reflect a reduced level of funding for minor works for the years to 2013/14 and demonstrate a short term focus on maintenance. In view of longer term funding uncertainty, the figures shown for the financial years 2012/13 to 2014/15 are currently indicative. 16

Transport for Greater Manchester (Capital) Key local challenges for transport and priorities in the financial years to 2014/15: to deliver the projects and programmes, for which funding has been secured, within the Greater Manchester Transport Fund; to identify and/or confirm funding for the projects and programmes within the Greater Manchester Transport Fund for which funding has not yet been secured; and to develop and deliver the other committed capital schemes Transport for Greater Manchester Capital Programme Prior Years 2012/13 2013/14 Future Total Greater Manchester Transport Fund* 167,726 322,739 239,444 139,793 182,412 1,052,114 Other Metrolink Capital Programmes Metrolink Phase 3A 374,442 166,070 34,500 - - 575,012 Metrolink SEP/SIP 131,379 9,681 2,415 3,692-147,167 Sub Total 505,821 175,751 36,915 3,692-722,179 Other Committed Capital Schemes Transport Infrastructure Fund - 5,500 - - - 5,500 Victoria Station Roof - 1,000 1,000 1,000 1,000 4,000 Wythenshawe Interchange 448 500 500 4,000 22 5,470 Rochdale Interchange 3,221 320 5,310 2,649-11,500 Traffic Signals - - 3,608 3,297-6,905 SEMMMS Minor - 1,085 - - - 1,085 Smart Ticketing 1,682 1,206 4,569 5,377 3,565 16,400 Green Bus 4,833 12,546 - - - 17,379 Sub Total 10,184 22,157 14,987 16,323 4,587 68,239 Total Capital 683,731 520,648 291,346 159,808 186,999 1,842,532 *Please note that the schemes incorporated within the Greater Manchester Transport Fund are detailed in Section 10.2 of the LTP3 Core Strategy document. 17

Transport for Greater Manchester (Revenue) Key local challenges for transport and priorities in the financial years to 2014/15: to maintain an effective and accessible public transport network in the context of prevailing budgetary constraints. Transport for Greater Manchester Revenue Programme ' million Revenue Expenditure Concessionary Support 66.4 Supported Bus Services 31.5 Rail 78.3 Accessible Transport 6.1 Passenger Services, Facilities & Support 34.5 Financing 56.9 Total Expenditure 273.7 Revenue Funding Levy Base 163.4 Levy GMTF Funding 10.1 National Concessionary Travel Scheme 11.1 Rebased Levy 184.6 Special Rail Grant 78.3 Metrolink net revenues and third party contributions 10.8 Rural Bus Subsidy Grant - Total Grant 89.1 Total Revenue 273.7 18

Network Rail The table below represents an overview of Network Rail s planned and forecast expenditure for the 2011/2012 to 2014/1/2015 ing Review Period. This expenditure is broken down into the following key areas: Major Schemes Minor Schemes Maintenance Renewals Network Rail Programme Major Schemes 2012/13 2013/14 2014/15 Northern Urban Centres* 1,000 10,000 20,000 TBC Network Rail Liverpool-Leeds linespeed improvements 19,500 14,000 TBC Network Rail North West Electrification - - - 300,000 Network Rail Sub Total 20,500 10,000 34,000 300,000 Minor Schemes *Northern Urban Centres Scheme (between 2011 and 2015) covers: GM train maintenance facilities Salford Crescent station rebuild GM infrastructure capacity improvements at Guide Bridge and Stalybridge Cheadle Hulme station 3,000 - - - DfT Access for All ü ü Littleborough station 1,300 - - - DfT Access for All ü ü Manchester Oxford Road station - 2,000 - - DfT Access for All ü ü Manchester Victoria 1,700 - - NSIP / MCC / - TFGM ü ü Sub Total 6,000 2,000 - - Maintenance and Renewals Renewals (Network Rail national) 252,000 256,000 205,000 TBC Sub Total 252,000 256,000 205,000 - TOTAL 278,500 512,000 410,000 300,000 Funding Source Main ü ü ü ü ü ü ü ü ü 19

Highways Agency The table below represents an overview of the Highway Agency s planned and forecast expenditure for the 2011/2012 to 2014/2015 ing Review Period. This expenditure is broken down into the following key areas: Major Schemes Minor Schemes Renewals Highways Agency Programme Structures capital 3,100 HA TOTA 255,900 L *Subject to completing statutory processes Main LTP3 Objectives Funding Source 2012/13 2013/14 2014/15 Major Schemes* M60 J15-12 Lane Gain Scheme 46,000 HA M60 J8-12 Managed Motorway 87,000 HA M60 J18-20 Managed Motorway 93,000 HA Minor schemes** Local Network Management Schemes 6,600 HA Renewals ** Roads capital 20,200 HA **Preliminary bid as of January 2011. These figures may be subject to change and depend upon final settlement decisions 20