places Mooloolaba s heart five

Similar documents
Public Event Day. 1. Community visioning 2. Street activation 3. Interactive feedback 4. Survey questionnaire and social media feedback

Arts and Cultural Precinct Masterplan. July 2017

West End Action Plan. Draft June 2017

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

places esplanade Distinctive Destinations Healthy,Active and Event Ready Family Friendly Foreshore Evolution five

CANNING CITY CENTRE. the new energy of the southeast

place making Mooloolaba final Master Plan November 2015

EAST-WEST STITCH. Connecting the Western Edge of the City to the Centre

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

The 30-Year Plan for Greater Adelaide. ECONOMIC PRIORITY 8: Adelaide, the Heart of the Vibrant State FOREWORD RIVERBANK AUTHORITY.

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

MASTER PLAN July 24, 2014

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

Re-integrate the River Torrens

DARWIN LUXURY HOTEL CONNECTIVITY AND PUBLIC REALM Our concept includes:

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

A VISION FOR EL MIRAGE

David Tickle, Principal, Urban Design, Hassell

Submission on Draft Ingleburn Structure Plan. Prepared for: Ingleburn Chamber of Commerce & Industry Inc. 6 February 2015

A Gladstone Regional Council Initiative to Revitalise our CBD Draft for Community Consultation

T H E WAT E R F R O NT H O M E S

Part 005 Implementation Strategy _

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE

GUNGAHLIN TOWN CENTRE

CITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter

Overview of Ford Land Projects PTY Limited aspirations

Wynyard Precinct: Urban Design Framework February 2014

Mango Hill/North Lakes

Business needs consumers! Get people back in to Port by attracting them!

T H E W AT E R F R O N T L A N D

Part four. In this part you will find: The next steps to deliver the master plan

ALBANY WATERFRONT STRUCTURE PLAN REPORT. Submitted by Hames Sharley on behalf of LandCorp February 2006

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Everett Riverwalk Life style explore

TEMPE BEACH PARK - RECOMMENDATIONS

Creating a High Quality Business District

EP8.2 Presentation Exhibition GO Station Improvements

WATER PETALUMA TRAIL WATER WAYS PROJECT PORTFOLIO. petalumawaterways.org OVERVIEW

REGATTA MEWS DUE DILIGENCE PROJECT REPORT REGATTA MEWS

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

Dubai s most prestigious freehold neighbourhood

Proposed Development Scheme. January 2014

PCAL Case Study Retail Areas: Rouse Hill Town Centre

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

Welcome to our exhibition

Millenia Partners is proud to present the iconic. Welcome to. Neighboring Tenants Include:

Shell Cove. The Waterfront Retail Precinct Stage 1: Construction commencing in 2017 SUMMER 2016

Millport Charrette. Moving forward What do you think? Where are the opportunities? What are the priorities?

CREATIVE. A city of authentic and internationally renowned experiences. Creative City of Adelaide Strategic Plan

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

Concept Gungahlin Precinct Map and Code Includes Gungahlin Town Centre

Hemisfair Civic Park. Vision and Program Plan

St. Patrick s Street Development Brief

Your new bayside address

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

A PRIME WATERFRONT INVESTMENT OPPORTUNITY

WESTIN DARWIN HOTEL OUR VISION

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

Volume Three. 3.9 Planning Area No. 9 North Shore Location and Role Vision Statement Key Character Elements

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

CONNECTED URBAN LIVING

Sydney CBD - Partnering with the coach industry for solutions

PALM JUMEIRAH. 1 The Palm Tower 2 Nakheel Mall 3 Palm West Beach (St. Regis Beach Club)

11 JORL COURT, BUDERIM

230 CHURCH AVENUE CHULA VISTA, CA 91910

City of Port Adelaide Enfield Report for Port Adelaide Centre Car Parking and Movement Study. Final Report

A NEW ERA IN LUXURY APARTMENT LIVING AWAITS

PALM JUMEIRAH. 1 The Palm Tower

BEACHSIDE ON THE PARK

IN 2017 Investor confidence is soaring in the Cairns & Great Barrier Reef region on the back of record visitor numbers and infrastructure upgrades in

Key. Cotswold Water Park

PLANNING THE SUNBURY GROWTH CORRIDOR

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

CRANE LAKE TRAILS NETWORK AND SPACES

King s College Upland Road Wing and Learning Centre Extension

Live a life like no other at The Waterfront

beachside living risemaroochydorebeach.com.au

Creating Walkable Environments in Frankston. Marti Fooks Urban Designer & Clare Davey Traffic and Transport Coordinator

Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018

COCONUT GROVE WATERFRONT MASTER PLAN. ERA / Curtis Rogers / ConsulTech / Paul George Ph.D.

MOORE PARK_ DIRECTIONS nd July, 2015

Millenia Partners is proud to present the Park Ave. Welcome to. Neighboring Tenants Include:

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

5.7 Local road upgrades

AUCKLAND WATERFRONT VISION 2040

a new urban landscape class a office & retail district murfreesboro, tennessee

Downtown Mobility Hub: Draft New Precinct Plan. Art Gallery of Burlington September 7, 2017

PERTH CITY SWAN PERTH AIRPORT CURTIN UNIVERSITY WESTFIELD CAROUSEL TANGNEY CITY OF CANNING JANDAKOT AIRPORT SWAN TANGNEY

public transport. Norman Park is a suburb on the rise. Its accessibility and amenity have made it a location of choice. With

CONNECTED URBAN LIVING

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

Pier Enhancements April 6, 2017

Transcription:

five places the mooloolaba heart 1 Flexible community event use of school oval 2 Enhanced streetscape District cycle route Future cross-block pedestrian link 5 Existing school buildings New signalised intersection 1 Mooloolaba s heart The Heart of Mooloolaba is a permeable, pedestrian friendly, mixed use development core that provides an alternative destination to the waterfront for visitors and locals. The Heart offers a place to live or holiday in a garden setting with all of the benefits of urban living at your doorstep. It is a place to meet or explore a finer urban grain of streets and pedestrian lanes and discover unexpected retail, culinary and cultural delights. Access to Mooloolaba s water, natural environments and open spaces is enhanced by the creation of compact and vibrant pedestrian lanes that are the stage for an array of community activities and events. The Mooloolaba State School will provide enhanced and flexible community open space outside of school hours with potential for temporary public car parking or caravan and camping accommodation during the school holidays. 7 Naroo Court street extension 8 Muraban Street shady pedestrian spine and active street frontage 9 New street to access public carpark 10 Brisbane Road car park site with redevelopment potential integrating multistorey public car parking 11 First Avenue shared zone with driveway access to existing hotels 12 First Avenue public forecourt to integrated carpark development 1 First Avenue wall treatments including vertical gardens, wall art and pop-up commercial pods 1 Pocket park expansion and upgrade to improve waterfront access 15 Streetscape improvements along the Mooloolaba Loop walking route 1 Brisbane Road and Walan Street widening, boulevard streetscape treatment and future light rail corridor 17 Active retail sleeve to integrated public carpark development 18 Community hub 19 Pocket park enhancement of existing grassy road reserve areas 20 Signature avenue tree axis to beach 21 New pedestrian crossing 22 Streetscape planting upgrade connection to the Wharf 5 2 The heart is connected to the broader Sunshine Coast attractions by high quality cycleway infrastructure and public transport links. 2 Existing River Esplanade bus stops Scale 1: 2,000 @ A 0 25 50 75 100m 52

1 11 17 12 10 17 19 8 9 21 7 18 20 1 22 19 2 19 1 15 1 5

five places Muraban Street looking west Cross-block Links A key initiative of the Master Plan is to enhance permeability into the heart of Mooloolaba by exploring the potential to create a series of publicly accessible cross-block links through future development sites. These connections have the potential to be open air laneways or covered links with active retail or commercial frontages, building foyers, dining lighting and artwork to enhance their attractiveness, vibrancy and surveillance. The cross-block links shown within this Master Plan are indicative only and subject to further consideration and discussions with interested parties. 5 Scale 1: 1,000 @ A 0 25 50m

Brisbane Road (northern section) The northern section of Brisbane Road provides a compact, low speed street connection to the foreshore Esplanade. The redevelopment of the Brisbane Road car park site will create an active street frontage and shady covered pathway to complement the opposite side of the street. Kerb build outs along the street will define car parking bays, reduce the perceived width of the street, and capture and cleanse pavement runoff. Signature street trees will form an axis to the beach as a continuation of the Southern Gateway corridor treatment..25 2.25 7.00 2.25.25 Muraban Street Muraban Street will form a key east to west pedestrian connection through the heart of Mooloolaba and also defines the boundary between the taller building zone to the north and the garden living quarter to the south. The street will become a lush, landscaped corridor, particularly to the southern side where sun exposure is greater and building setbacks allow for deep planting and a residential front garden interface. Variable setbacks to new development are to accommodate outdoor dining and under cover pedestrian movements. Carriageway Parking / planting zone Footpath Scale 1: 200 @ A.25 2.25 7.00 2.25.25 0 1 2 8 10 12m 55

five places the mooloolaba heart Character Specific Opportunities include: 1 2 Redevelopment of the Brisbane Road car park site to include public car park and street level retail with potential for conference facilities and hotel / residential accommodation above A shared zone and public plaza to the eastern end of First Avenue as an arrival experience for visitors exiting the new multistorey public car park on foot Brisbane Road widening and integration of the future light rail system to provide an improved transport mode within an enhanced boulevard streetscape experience East to west cross-block pedestrian connections linking school to the Wharf via Muraban Street North to south central pedestrian connection linking First Avenue to southern canal residential area Improved wayfinding and presence of existing links through buildings between Esplanade and First Avenue Unlocking the school oval site for community recreational and event uses during school holidays and after-hours Opportunity for central community facilities in a community hub development, such as a community art space / gallery, small performance space, meeting rooms, etc. New local street connections to increase permeability and ease traffic load on the Brisbane Road and Walan Street intersection Public transport stops on Walan and Venning Streets to align with key destinations and pedestrian links Enhanced public access to and use of the canal Low speed streets Opportunities for temporary street closures for community events First Avenue activation in the form of wall art, pop-up kiosks and food trucks 1. Podium and rooftop gardens 2. Community hub. Compact active streets with kerb side bioretention. Active pedestrian mid block laneways 5. Garden living apartments. Green leafy streets 7 5 8 7. Permeable ground plane through developments 8. Pocket parks as rest and meeting points 5

Activity Materiality 1 2 1 1. Subtle use of water and planting to soften laneways 2. Canopy tree groves to street corners. Atmospheric night lighting. Vertical planting to sides of buildings 5. Pocket parks. Shade trees in plaza spaces 5 2 7 1. Community use of school oval 5 2. Outdoor night life. Food Trucks. Street closures for community events 5. Community art space. Pop-up kiosks to inactive street frontages 7. Wall art to existing blank facades on First Avenue 57

five places Elevated view of wharf site looking east 58 the wharf the wharf Mooloolaba would benefit from redevelopment of the wharf site into a vibrant entertainment and water themed leisure precinct that embraces its Mooloolah River frontage and integrates activities that promote experiences in, on and under the water. The precinct could expand boating and marina facilities for locals and visitors, introduce riverfront dining along and over the water s edge, and enhance the SEALIFE Mooloolaba (Underwater World) experience with active public realm interfaces. A new High Street connects the Wharf site to surrounding streets, creating an attractive, active, shady and walkable experience into the precinct. A linear pedestrian spine reinforces a strong connection between the beach and marina, drawing pedestrians between the two destinations via a plaza with potential to include outdoor attractions such sea life tank and a programmed, interactive light and water display. New residential and resort development would support the holiday accommodation offer within the precinct and include integrated public car parking capacity. Redevelopment of the wharf should incorporate a strong and active pedestrian spine leading from the beach front down to the marina edge. A new waterfront boardwalk dining precinct takes advantage of river views while a contemporary pier and boat pontoon creates a high quality arrival experience for cruise ship transferring passengers at a consolidated departure point for day cruises / dive boats. Note: The Wharf site contains a mix of privately held, state and local government tenures and leases. Resolution of these lease arrangements would be required between government bodies and a potential developer in order to realise the vision of the Wharf precinct suggested by this Master Plan. The proposals contained within this Master Plan are suggestions only and propose a vision for what the Wharf site could become. The framework for redeveloping this site will require a separate process to the Mooloolaba Master Plan. A future detailed Master Plan study is recommended for developing the Wharf site and to address more detailed site and leasing aspects of the properties.

29 1 2 18 17 7 9 2 9 15 1 New signalised intersection 2 New High Street through the Wharf Pedestrian prioritised crossing zone SEALIFE Mooloolaba (Underwater World) with active plaza interface and entry 5 Public transport stop Drop-off and loading zone 7 Pedestrian plaza with interactive water spine 25 1 20 8 5 1 10 1 2 8 Potential mixed use redevelopment of existing multistorey car park to include public parking 9 Resort / residential redevelopment of existing car park site to include public car parking 10 Marina redevelopment with entertainment facilities and waterfront residential apartments 11 Public pier 12 Pontoon for tour boat arrival and departures 1 Public access over water boardwalk and river edge dining 1 Floating commercial tenancy 15 Riverfront parkland pedestrian walkway 1 Parkyn Parade streetscape improvements 17 Pedestrian prioritised crossing zone and foreshore access pathway 19 21 2 11 2 18 Removal of existing signalised intersection and installation of pedestrian prioritised crossing zone 19 Off-road bidirectional cycleway 20 Terraced marina seating edge and water touch point 21 Riverfront parkland promenade and picnic shelters 22 Public boat pontoon and kayak launch point 2 Marina reconfiguration to increase berths 12 2 New large boat marina berths 25 Streetscape planting upgrade connection to the Heart 2 Mid-block pedestrian connection through to the Heart 27 River beach 28 Riverfront Parkland Parking 29 Beach access path Scale 1: 2,000 @ A 25 22 0 25 50 75 100m 28 27 59

five places the wharf Character Specific Opportunities include: 1 2 Reinvigorate the Wharf as a mixed use precinct Potential redevelopment including a new entertainment facilities and hotel / residential accommodation overlooking the river Improved public and active transport connections to the Wharf and The Spit Enhanced pedestrian links to the Mooloolaba Heart and the Esplanade Opportunity for marina berth reconfiguration and expansion Create a pedestrian / parkland spine linking Mooloolaba Beach and Mooloolaba Surf Club to the Wharf A new central plaza arrival point for the Wharf precinct Upgraded riverfront parkland and public pedestrian boardwalk connection along the marina edge Integration of SEALIFE Mooloolaba (Underwater World) and enhancement of its entry and street interface Opportunity for a new pier as an arrival point for transferring passengers to and from offshore cruise ships and for tourist boat day trips Public plazas and open space demonstrate integrated water sensitive urban design as a commitment to waterway quality preservation Integration of public car parking into developments 1. Tour boat arrival and departure pontoon 7 5 8 2. Water plaza at new SEALIFE Mooloolaba (Underwater World) entry. Cinema and garden forecourt. River view apartments and public waterfront boardwalk dining 5. Contemporary pier. Boutique retail strip 7. Upgraded marina edge parkland 8. River and canal piers 0

Activity Materiality 1 2 1 1. Reflective lighting on the water 2. Resort pools and subtropical gardens. Wharf boardwalk seating edge. Lighting to water plaza 5. Reuse of wharf piles in the riverfront parklands. Contemporary pier detailing 2 5 5 1. River edge promenade picnics 2. Cinema for night activation of pedestrian spine to pier. Waterfront dining. Fishing opportunities 5. Night time interactive water and light show 1