THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END.

Similar documents
Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

UNLV Campus Improvement Authority Board Estimated Event Utilization and Financial Projections. May 22, 2014

UNLV Campus Improvement Authority Board Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events.

TABLE OF CONTENTS Executive Summary. Convention Industry Overview and Trends. Convention Market Competitive and Comparable Analysis

SOUTH DAKOTA BOARD OF REGENTS. Full Board ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

EVENT CENTRE / ARENA COMPLEX

ANN ARBOR CONFERENCE CENTER Ann Arbor, Michigan Summary of Benefits - 24 Month Construction and 20 Years After Completion of Construction

SEAWORLD RAMADA LIMITED caacre.com

FOR SALE. Current CAP Rate 5.42% BROADWAY & F STREET CHULA VISTA, CA 91910

For Sale - NNN. 76 Gas Station with Car Wash & Auto Repair 750 N Escondido Blvd Escondido, CA Duane R. Bernard. Exclusively Offered By:

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

NEW STADIUM LUXURY SUITES

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Public Assembly Facilities Tacoma Dome Greater Tacoma Convention & Trade Center Cheney Stadium Pantages Rialto Theater on the Square

Capital Improvements. Practical Solutions for Aging Venues / Planning for Future Needs. Planner: Brailsford & Dunlavey Architect: Generator Studio

PROJECT. Renovation y Upgrade La Quinta Inn & Suites Sebring

LA Waterfront Public Sites Opportunity Analysis Community Meeting

State of Center City Charlotte

LA Waterfront Public Sites Opportunity Analysis IGTCT Committee Meeting

West of England. Priority Places Requiring Public Investment

3. Proposed Midwest Regional Rail System

OFFICE INVESTMENT OR OWNER/USER OPPORTUNITY Long Beach, California / Long Beach Suburban Market. Capital Markets Investment Properties

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

These recommended actions come to the board with the recommendation of Interim President Cauce.

MUSIC CITY CENTER, NASHVILLE KAY BAILEY HUTCHINSON CONVENTION CENTER, DALLAS ALBANY CAPITAL CENTER

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Post Oak Blvd & San Felipe St

Join: 1660 INDIA STREET SAN DIEGO, CA FOR LEASE LITTLE ITALY. Little Italy 1680 INDIA STREET San Diego, CA FOR LEASE

Downtown Hotel Development

FOR LEASE. 15,000 sf Retail / Creative Office / Medical

INDIA STREET W FIR STREET KETTNER BLVD 731 W FIR STREET SAN DIEGO, CA FOR LEASE LITTLE ITALY

PROJECTED UTILIZATION OF THE PROPOSED HOTEL

Philadelphia Casino Application Review September 24, 2013 AKRF.COM

transportation + demographics = opportunity

Alternative Highest & Best Use Analysis Boutique Hotel

Executive Directors Review

Indianapolis - MIDTOWN - Redevelopment

Downtown Boise Hotel Market Study

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

3333 camino del rio south

Downtown Frederick Hotel and Conference Center BRIEFING.

OPPORTUNITY PRESENTED BY

Great Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17

Powerade Centre Overview. Budget Committee October 2015

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

SAMTRANS TITLE VI STANDARDS AND POLICIES

Treasure Island Supplemental Information Report Addendum

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

THE PARK AT CANYON RIDGE

PRESENTATION TO THE RICHMOND REGIONAL TRANSPORTATION PLANNING ORGANIZATION: JUNE 2, 2016 BRT CONNECTIVITY AND LAND USE ANALYSIS PLAN JOSH MALLOW

Offered at $3,765,000

Westbrook Station. Transit Oriented Development Opportunity

FOUNTAIN ARMS A 14 UNIT VALUE-ADD INVESTMENT OPPORTUNITY LOCATED IN EAST HOLLYWOOD (LOS ANGELES), CALIFORNIA. hfflp.com

North Denver Cornerstone Collaborative. Six Projects One Vision

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

Executive Summary NAPLES NORTH BONITA SPRINGS PORTFOLIO PRESENTED BY

An outdoor waterpark is a facility offering three or more waterslides and other aquatic facilities.

Marriott International

Oakland A s Gondola Economic Impact

PERTH CITY SWAN PERTH AIRPORT CURTIN UNIVERSITY WESTFIELD CAROUSEL TANGNEY CITY OF CANNING JANDAKOT AIRPORT SWAN TANGNEY


MEMORANDUM MARKET OVERVIEW. Matt Roberts, Director of Parks and Recreation City of Carpinteria. Kevin Engstrom James Rabe. Date: June 21, 2016

FOR LEASE 4,640 SF FREESTANDING BUILDING

DAVID BAXT Co-Founder & President Wheels Up, LLC O: E:

Heathrow (SP) Limited

approved del mar village mixed use project

8,844 SF office micro-campus for sale or lease

1 st Quarter Report City of Chandler - Economic Development Division

2001 S STATE STREET & 2000 S WABASH AVE CHICAGO, IL

Burlington Colchester, Vermont OFFERING SUMMARY

CLSA Asia Investor Forum. January, 2008

SKY S THE LIMIT COMMONWEALTH STADIUM EDMONTON.ALBERTA.CANADA.

Heritage Character Area Zoning - Edmonton s Approach to Preserving(?) Community Character

MERIDIAN DELTA LTD BRIEFING DOCUMENT

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South.

Investing in Brampton s downtown

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities

Starwood Hotels & Resorts Worldwide, Inc. Systemwide (1) Statistics - Same Store For the Three Months Ended March 31, UNAUDITED

Nichewaug Inn & Academy Property

Lodging and Conference Center Analysis ECONOMIC AND REAL ESTATE ANALYSIS FOR SUSTAINABLE LAND USE OUTCOMES

Final Report. Community Recreation Inventory Burwash Landing. Capital Management Engineering Limited. April 2016 Project Number

RETAIL/RESTAURANT OPPORTUNITY MISSION BAY DRIVE FOR LEASE. LUKE HOLLER

INTERNATIONAL DRIVE ECONOMIC IMPACT ANALYSIS. Luis Nieves-Ruiz, AICP Economic Development Program Manager March 29, 2017

10,000SF-150,000SF No Cotenancy No Common Area Factor FREE Parking All Ground Floor/No Elevators

STAFF REPORT FOR ACTION

STAYBRIDGE SUITES COVINGTON 140 Holiday Blvd Covington, LA 70433

Dallas/Fort Worth International Airport Commercial Development Department. Urban Land Institute Fall Meeting October 18, 2012

Project Presentation For the

DOWNTOWN EAST RESTAURANT AND RETAIL SPACE. Matt Friday. Senior Vice President

FOR SALE. Auction Date July 28, 2014 Review Details and Register at. Days Inn Lake Havasu 1700 McCulloch Blvd North Lake Havasu City, AZ 86403

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

CITY CLERK. Toronto International Festival Caravan (Various Wards)

2014 HOUSING ELEMENT COUNTY OF SISKIYOU

Heathrow (SP) Limited

PREFERRED HOTELS & RESORTS

A VISION FOR EL MIRAGE

Markham Sports, Entertainment & Cultural Centre April 20, 2012

Transcription:

THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END.

URBAN DESIGN PRINCIPLES. QUALCOMM STADIUM SITE.

I-5 805 15 I-8 DEVELOPMENT PATTERNS.

I-5 805 I-I5 I-8 EMBRACE THE RIVER AND PARK SYSTEM. FROM THE MOUNTAINS TO THE SEA.

120 ACRES OF SURFACE PARKING. FUTURE DEVELOPMENT OPPORTUNITY.

SCALE COMPARISON GASLAMP DISTRICT AND BALLPARK ON QUALCOMM SITE.

COASTAL 50 805 FUTURE TRANSITWAY ( 2020 REG. TPT. PLAN ) 15 SERRA MESA FUTURE TROLLEY EXTENSION TROLLEY BLUELINE BALBOA PARK DOWNTOWN TROLLEY ORANGELINE REDUCE PARKING. INCREASE USE OF TRANSIT.

CAPTURING THE SAN DIEGO SPIRIT.

WITH A GREEN APPROACH.

CITY OF VILLAGES ISSUES _ Urban Village Center: a cluster of more intensive employment, residential, regional and sub-regional commercial uses to maximize walkability and support transit. The village center will contain public gathering spaces and civic uses. City of Villages Policies: _ URBAN FORM _ NEIGHBORHOOD QUALITY _ PUBLIC FACILITES AND SERVICES _ CONSERVATION AND THE ENVIRONMENT _ MOBILITY _ HOUSING AFFORDABILITY _ ECONOMIC PROSPERITY AND REGIONALISM _ EQUITABLE DEVELOPMENT TRANSIT ORIENTED DEVELOPMENT GUIDELINES _ MIXED USE NEIGHBORHOODS UP TO 160 ACRES IN SIZE _DEVELOPED AROUND A TRANSIT STOP AND CORE COMMERICAL AREA _TOD SITE MUST BE WITHIN AN AVERAGE 2,000 FOOT WALKING DISTANCE OF A TRANSIT STOP (AND CORE COMMERCIAL AREA.) MISSION VALLEY PLANNED DISTRICT ORDINANCE MISSION VALLEY COMMUNITY PLAN

stadium dominates site TRANSIT CREATES THE OPPORTUNITY FOR A VILLAGE

VILLAGE ORGANIZING ELEMENTS

THE PARK.

THE PARK.

THE PARK.

THE PARK.

THE PARK.

THE VILLAGE.

THE VILLAGE.

THE VILLAGE.

THE VILLAGE.

RESIDENTIAL OFFICE RETAIL HOTEL PARK 1,000 DU 3200 DU 500,000 SF 1,150,000 SF 100,000 SF 350,000 SF 300 ROOMS 450 ROOMS 9 ACRES 18 ACRES A POSSIBLE RANGE OF DEVELOPMENT INTENSITIES

THE VILLAGE. A RANGE OF DENSITIES AND IMPACTS

SAN DIEGO FOOTBALL.

QUALCOMM STADIUM

_STADIUM LOCATION THE CURRENT SITE IN MISSION VALLEY CONTINUES TO BE THE MOST PRACTICAL LOCATION IN THE SAN DIEGO AREA FOR SUCH A FACILITY. _SEATING TOTALS AND DISTRIBUTION CAPACITY GENERAL SEATING 55,300 CLUB SEATING 8660 SUITE SEATING 1640 TOTAL 65,600 MUHLEMAN MARKETING KEY FINDINGS

QUALCOMM STADIUM EXISTING QUALCOMM STADIUM RENOVATION QUALCOMM STADIUM NEW FIELD LEVEL 11,422 FIELD LEVEL SEE PLAZA LEVEL FIELD LEVEL SEE LOWER BOWL PLAZA LEVEL 21,819 PLAZA LEVEL 32,198 LOWER BOWL 35,500 CLUB LEVEL 7,668 CLUB LEVEL 7,668 SUITE LEVEL 724 LOGE LEVEL 6,185 LOGE LEVEL 6,212 CLUB LEVEL 8660 PRESS LEVEL 3,178 PRESS LEVEL 3,178 SUITE LEVEL 2 916 VIEW LEVEL 20,176 VIEW LEVEL 20,176 UPPER DECK 19,800 TOTAL 70,448 TOTAL 65,600 RENOVATION IS ADA COMPLIANT TOTAL 65,600 SUPER BOWL CAPACITY 73,000+ ADD 8,000 to12,000 TEMPORARY SEATS SAN DIEGO FOOTBALL. SEATING ANALYSIS.

QUALCOMM STADIUM EXISTING QUALCOMM STADIUM RENOVATION QUALCOMM STADIUM NEW FIELD LEVEL 122,940 LOWER BOWL 181,000 PLAZA LEVEL 157,000 CLUB LEVEL 112,600 CLUB BOWL 84,000 LOGE LEVEL 84,200 PRESS LEVEL 100,800 VIEW LEVEL 137,000 UPPER BOWL 102,100 RAMPS 227,000 FIELD LEVEL 280,000 LOWER BOWL 199,300 PLAZA LEVEL 244,700 CLUB LEVEL 163,200 CLUB BOWL 84,000 LOGE LEVEL 94,200 PRESS LEVEL 100,800 VIEW LEVEL 137,000 UPPER BOWL 102,100 RAMPS 227,000 SERVICE LEVEL 270,000 LOWER BOWL 166,000 MAIN CONCOURSE 234,000 SUITE LEVEL 91,000 CLUB BOWL 70,000 CLUB LEVEL 130,000 SUITE LEVEL 2 91,000 UPPER CONCOURSE 121,000 UPPER BOWL 126,000 RAMPS 245,000 TOTAL 1,260,660 TOTAL 1,600,000 TOTAL 1,600,000 SAN DIEGO FOOTBALL. AREA ANALYSIS.

RENOVATION NEW DIFFERENCE Demolition & Site Clearing $9,800,000 $8,400,000 $1,400,000 Relocation and New Services $1,600,000 N/A Utility Relocation and New Services $1,600,000 $1,600,000 $0 Excavation and Foundation $25,400,000 $22,400,000 $3,000,000 Structural Frame $59,200,000 $83,200,000 ($24,000,000) Roofing and Waterproofing $4,800,000 $4,800,000 $0 Exterior Wall 17,600,000 $17,600,000 $0 Interior Finishes $44,800,000 $44,800,000 $0 FF&E $3,200,000 $3,200,000 $0 Playing Field $1,600,000 $1,600,000 $0 Scoreboard $12,800,000 $12,800,000 $0 Equipment $4,800,000 $4,800,000 $0 Food Service Equipment $11,200,000 $11,200,000 $0 Seating $4,000,000 $8,000,000 ($4,000,000) Vertical Transportation $4,800,000 $4,800,000 $0 Plumbing $12,800,000 $12,800,000 $0 Fire Protection $3,200,000 $3,200,000 $0 HVAC $16,000,000 $16,000,000 $0 Electrical $28,800,000 $28,800,000 $0 Audio Visual $4,800,000 $4,800,000 $0 Plaza and Site $8,000,000 $8,000,000 $0 Schedule & Discontinuous Work $15,000,000 N/A $15,000,000 Direct Work Subtotal $294,200,000 $302,800,000 ($8,600,000) Indirect Costs $44,100,000 $45,400,000 ($1,300,000) Contingency $14,700,000 $15,100,000 ($400,000) STADIUM COST COMPARISON 2005 CONSTRUCTION START 1,600,000 s.f. Construction Total $353,000,000 $363,000,000 ($10,000,000) *Cost information provided by TURNER CONSTRUCTION SPORTS

RENOVATION _STADIUM LOCATION IS PROBLEMATIC FOR DEVELOPMENT _CONSTRUCTION DURATION: 26 MONTHS RELOCATE CHARGERS, AZTECS AND HOLIDAY BOWL FOR 2 SEASONS NEW _ LOCATION SUPPORTING DEVELOPMENT _CONSTRUCTION DURATION: 26 MONTHS CHARGERS, AZTECS AND HOLIDAY BOWL CONTINUE TO PLAY IN QUALCOMM 32 MONTHS CHARGERS, AZTECS AND HOLIDAY BOWL CONTINUE TO PLAY IN QUALCOMM DIFFERENCES.

RENOVATION _NO INCREASED CAPACITY FOR SPECIAL EVENTS _SEATING DISTRIBUTED 60% SIDELINE VERSUS 40% ENDZONE NEW _INCREASED CAPACITY FOR SPECIAL EVENTS _SEATING DISTRIBUTED 80% SIDELINE VERSUS 20% ENDZONE DIFFERENCES.

RENOVATION UPPER SEATING LEVELS REMAIN FAR FROM SIDELINE _ UPPER SEATING LEVELS IN ENDZONE HAVE RESTRICTRED VIEWS NEW _IDEAL LOCATION _IDEAL LOCATION DIFFERENCES.

SERVICE LEVEL SAN DIEGO FOOTBALL. A NEW STADIUM.

STEELERS TEXANS MAIN CONCOURSE SAN DIEGO FOOTBALL. A NEW STADIUM.

PATRIOTS TEXANS LOWER SUITE LEVEL SAN DIEGO FOOTBALL. A NEW STADIUM.

PATRIOTS CLUB LEVEL SAN DIEGO FOOTBALL. A NEW STADIUM.

TEXANS UPPER SUITE LEVEL SAN DIEGO FOOTBALL. A NEW STADIUM.

REDSKINS UPPER CONCOURSE SAN DIEGO FOOTBALL. A NEW STADIUM.

STEELERS BROWNS SEATING BOWL SAN DIEGO FOOTBALL. A NEW STADIUM.

MODERN NFL STADIUMS.

MODERN NFL STADIUMS.

FOOTBALL IN A SAN DIEGO SETTING

SAN DIEGO FOOTBALL. A NEW STADIUM EXPERIENCE.

SAN DIEGO FOOTBALL. A NEW STADIUM EXPERIENCE.

SAN DIEGO FOOTBALL. A NEW STADIUM EXPERIENCE.

SAN DIEGO FOOTBALL. A NEW STADIUM EXPERIENCE.

THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END.

FINANCIAL ANALYSIS.

RENOVATION NEW DIFFERENCE Demolition & Site Clearing $9,800,000 $8,400,000 $1,400,000 Relocation and New Services $1,600,000 N/A Utility Relocation and New Services $1,600,000 $1,600,000 $0 Excavation and Foundation $25,400,000 $22,400,000 $3,000,000 Structural Frame $59,200,000 $83,200,000 ($24,000,000) Roofing and Waterproofing $4,800,000 $4,800,000 $0 Exterior Wall 17,600,000 $17,600,000 $0 Interior Finishes $44,800,000 $44,800,000 $0 FF&E $3,200,000 $3,200,000 $0 Playing Field $1,600,000 $1,600,000 $0 Scoreboard $12,800,000 $12,800,000 $0 Equipment $4,800,000 $4,800,000 $0 Food Service Equipment $11,200,000 $11,200,000 $0 Seating $4,000,000 $8,000,000 ($4,000,000) Vertical Transportation $4,800,000 $4,800,000 $0 Plumbing $12,800,000 $12,800,000 $0 Fire Protection $3,200,000 $3,200,000 $0 HVAC $16,000,000 $16,000,000 $0 Electrical $28,800,000 $28,800,000 $0 Audio Visual $4,800,000 $4,800,000 $0 Plaza and Site $8,000,000 $8,000,000 $0 Schedule & Discontinuous Work $15,000,000 N/A $15,000,000 Direct Work Subtotal $294,200,000 $302,800,000 ($8,600,000) Indirect Costs $44,100,000 $45,400,000 ($1,300,000) Contingency $14,700,000 $15,100,000 ($400,000) STADIUM COST COMPARISON 2005 CONSTRUCTION START 1,600,000 s.f. Construction Total $353,000,000 $363,000,000 ($10,000,000) *Cost information provided by TURNER CONSTRUCTION SPORTS

TOTAL DEVELOPMENT COST OF REN0VATED QUALCOMM OR NEW STADIUM IS VERY SIMILAR ($ in millions) COMPARSION OF STADIUM COSTS Qualcomm Renovation New Stadium Hard Cost $353.0 $363.0 Financing Costs and Interest During Construction 20.0 20.0 Financial Contingency 17.0 17.0 Total Cost $390.0 $400.0

PROPOSED STADIUM COSTS WOULD BE EQUALLY FUNDED BY THE CITY AND THE CHARGERS ($ in millions) SOURCES OF STADIUM FINANCING Team Contribution Funds from Chargers Debt and/or Equity $132.0 Funds from NFL G-3 Loan (1) 68.0 Total Team Contribution $200.0 Public Funds City of San Diego $200.0 Total Public Contribution $200.0 Total Stadium Cost $400.0 (1) NFL G-3 loan amount equal to 34% of team contribution..

QUALCOMM SITE OFFERS SIGNIFICANT POTENTIAL FOR ANCILLARY DEVELOPMENT ILLUSTRATIVE ANCILLARY DEVELOPMENT RESIDENTIAL OFFICE RETAIL HOTEL Total Parcels Developed 2,904,998 square feet (66.6 acres) Developed Square Footage 2,533,092 1,145,225 323,875 204,894 Total Units / Rooms 3,166 N/A N/A 300 Structured Parking Spaces 14,362 300 Projected Assessed Value ($MM) (Total $1.1 billion) $529.9 $389.7 $103.1 $54.6

REPRESENTING A SUBSTANTIAL UNTAPPED REVENUE SOURCE FOR THE CITY Land sale proceeds could reach $100 million (1) City benefits from annual property tax, transient occupancy tax, and sales and use tax revenues which would likely be in the neighborhood of $16 million per year (upon full development of the site) Illustrative Tax Revenues (2) ($ in millions) $13.5 $2.1 $14.4 $2.1 $15.7 $15.9 $2.2 $2.2 $2.1 $2.1 $16.4 $16.7 $2.3 $2.3 $2.2 $2.2 $17.3 $2.4 $2.3 $17.7 $2.5 $2.3 HOTEL RETAIL $5.7 $2.0 $10.4 $2.0 $1.9 $2.1 $2.0 $3.0 $2.0 $3.8 $4.7 $4.8 $4.9 $5.0 $5.2 $5.3 OFFICE RESIDENTIAL $1.2 $6.4 $6.5 $6.7 $6.8 $7.0 $7.2 $7.4 $7.6 $4.4 $2.5 1 2 3 4 5 6 7 8 9 10 Year (1) Based on land sale price of $1.5 million per entitled acre. (2) Assumes 2 year construction period prior to year 1. Assumes 3 year phase-in of residential development and 5 year phase-in of office development. Assumes hotel development completed in year 1 and retail development completed in year 2.

POTENTIAL REVENUES FROM ANCILLARY DEVELOPMENT OFFSET CITY STADIUM CONSTRUCTION COSTS AND LEAVE SIGNIFICANT EXCESS ($ in millions) Sources: CITY SOURCES & USES Net Present Value of Tax Revenues (1) $223.4 Land Sales Proceeds 99.8 Total City Revenues (2) $323.2 Uses: Total City Stadium Contribution $200.0 Excess to City for Other Uses $123.2 (1) Based on projections using a 5% discount rate over a 25 year period. (2) Does not include infrastructure and other development costs.

CHARGERS PROVIDE SUBSTANTIAL FINANCIAL COMMITMENT TO NEW STADIUM Over the last 10 years, private contributions for new NFL stadiums have averaged approximately 37% of total project costs In cities that are demographically similar to San Diego, private contributions have been significantly lower Chargers assumption of 50% of costs demonstrates the team s strong commitment to San Diego Chargers assume all risk with respect to: Sales of premium and general admission seating, advertising and sponsorship Obtaining construction and long-term financing for Chargers $200 million contribution Ongoing debt service on financing obtained for Chargers contribution

CHARGERS LOCAL REVENUE RANKING HAS CONSISTENTLY DECLINED Since 1994, the Chargers NFL local revenue ranking has steadily fallen from 15th to 27th (currently out of 32 teams) Local revenues include all revenue generated by the stadium as well as the national visiting team share of general admission ticket revenues received by the Chargers Stadium renovation in 1997 temporarily boosted Chargers ranking Nineteen new NFL stadiums have been built since 1995 (including 2 under construction), driving down Chargers ranking Decline in local revenues relative to remainder of the NFL has put the Chargers at a competitive disadvantage Fewer local revenues relative to other teams equates to less liquidity to provide competitive signing bonuses and retain and attract top free agents and quality front office football personnel Chargers Historical Local Revenue Ranking (1) 10 15 Rank 20 25 30 1994 1995 1996 1997 1998 1999 2000 2001 2002 Current Rank: 27th (1) Source: National Football League.

CHARGERS REVENUES WILL INCREASE WITH A NEW STADIUM Qualcomm is currently poorly configured for premium seating and signage and lacks most of the amenities and revenue opportunities of a new stadium New stadium increases revenues from the following sources: Luxury suites Club Seats Other premium options Advertising Inventory Sponsorship opportunities Based on experience of other NFL teams with new stadiums in similar demographic areas, the Chargers can expect an aggregate increase of at least $15 million in these revenue sources 2006 Comparative Gross Suite Revenue 2006 Comparative Gross Club Seat Revenue ($ in millions) $9.6 ($ in millions) $15.7 $6.9 $10.3 Qualcomm As Is New Stadium Qualcomm As is New Stadium

NEW SAN DIEGO STADIUM SIGNIFICANTLY ENHANCES LOCAL REVENUE RANKING Chargers local revenue base improves significantly in a new stadium relative to Qualcomm New stadium vaults the Chargers into the top half of the NFL with respect to local revenues Stronger local revenues provide the Chargers with greater financial resources and the ability to assemble a more competitive product for Chargers fans Projected Chargers 2008 Local Revenue Ranking (1) 14 29 Qualcomm New San Diego Stadium (1) Qualcomm rank based on NFL projections. New San Diego stadium rank based on projections developed by the Chargers and their advisors.