BUNKERING SAFETY CHECK-LIST FOR BUNKER DELIVERY TO MARITIME SHIPS (Chapter ISGOTT)

Similar documents
GUIDELINES ON BUNKERING OPERATIONS AND SHIP TO SHIP CARGO TRANSFER OF OILS, SUBJECT TO ANNEX I OF MARPOL 73/78, IN THE BALTIC SEA AREA

Order on the transfer of bunker products between ships, etc. in Danish and Greenland territorial waters

APPENDIX 1 OPERATIONAL/SAFETY CHECK LISTS

8.4 Critical Equipment Analysis - TANKERS

Validity: indefinitely

Port information and safety regulations for oil terminals in the Port of Aarhus. Revised

COMPANY POSTERS INDEX

MERCHANT SHIPPING (PREVENTION OF OIL POLLUTION) (RECORDS) REGULATIONS 1986

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form

TRINIDAD OFFSHORE CALLING INSTRUCTIONS

CRITICAL EQUIPMENT LIST/ CRITICAL SPARES

Revised Ship Inspection Report (SIRE) Programme

TENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations

Shell Lillesund Marine Terminal Information Booklet Haugesund Norway

Statutory Order no of 25 November 2004 (Unauthorized translation by the Danish Coastal Authority) Statutory Order on Standard Regulations for

Part 104 CAA Consolidation 1 March 2007 Gliders - Operating Rules

JETTY REGULATIONS AND INFORMATION

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND

Section 4 / Rev Page 1 of 5

Flammable and Combustible Liquids. OSHA Office of Training and Education 1

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions

Corroded pipe causing oil spill

Dock Information Booklet Oiltanking Texas City

CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT

Safety. BBA Compliance Kit Multi-Pro 5800 Turf Sprayer Model No Installation Instructions

Operator's Manual. Model: RY10MK-PRO MPN: RA-MLT Gallon Direct Fire Melter Kettle Burner Model with Adjustable Flame-Out Valve

MV Vemaoil XXIII (IMO ) into the anchored vessel MV Duzgit Integrity (IMO )

Compact Stainless Spit Roast

1994 HSC Code HSC Code

HUDSON LEADER. Classification society: American Bureau of Shipping. Recognized Organization: American Bureau of Shipping

Twin Basket Deep Fryer

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

LIST OF NEW IMO/ILO OBLIGATORY REQUIREMENTS entering into force in 2014

The airfield. Hangers A259

Regulations for Sikuki Nuuk Harbour A/S. 1 July 2016

PRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE

Notice To Mariner No. 113

Sub-Standard vessels in German ports 2016

Fitting instructions T-Flex Flexi Tank for Trucks

Port dues and charges Free port of Ventspils

4Q2012. Near Miss Report Summary

Dalian VTS Guide for Users

Manufactured in New Zealand Metal Fab Industries Ltd PO Box Greenmount Auckland

CONCORD AVIATION SERVICES

Gas Conversion Kits and Instructions

Oil Companies International Marine Forum MTIS Programme Terminal TPQ

Harlingen Port Authority

TYPE CERTIFICATE DATA SHEET A3WE

Port Dues and Charges of the Freeport of Riga

LEGAL REQUIREMENTS FOR STORING AND TRANSPORTING FLAMMABLES AND CHEMICALS

TUBULAR BURNER CONVERSION KIT AGCK-TBXX / AECK-UBXX

REPLACEMENT PROCEDURE: ROTISSERIE ORIFICE: TOOLS REQUIRED TO INSTALL THIS KIT: ITEM DESCRIPTION: E C

ENGINEERING AND TECHNICAL CHALLENGES IN LNG CONVERSIONS. 1 Wärtsilä

OPERATIONS MANUAL PART A

Cooking Booth Construction and Location (See Figure 1 and 2 for diagrams):

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017

Containment Training. Jeff Hunter Hanford ALARA Center (509)

NOBODY READS MANUALS

Minimum suggested standards for handling food grade hoses during tank washing. cargotanksafety.org

Read all instructions and warnings before using this fireplace. WARNING

User Manual for Separera 40

Lennusadam Marina (Seaplane Harbour) Marina Rules

SAFETY MANAGEMENT SYSTEM

ECDIS Electronic Chart Display and Information Systems

Barefoot International / Fly High Fat Sac Filling and Emptying Options

Crusader Training updated 11/1/16

Tents & Membrane Structures Information Packet

AYR and TROON. Information for Visiting Vessels. To the Master, Officers and Crew. Welcome to the Ports of Ayr and Troon. Local time: GMT / GMT +1

AIP PORTUGAL ENR NOV-2007

Yamhill Fire Protection District

TABLE OF CONTENTS 1.0 INTRODUCTION...

BFC KNOWLEDGE TEST. 4. What are wing-tip vortices (wake turbulence)? With which aircraft are they the greatest? Describe proper avoidance?

Bantry Bay Port Company Limited

Tank. Part B, Section 1. This section covers the following unit configurations. Pump Piston Pump (E or G)

LNG the future fuel in ferry and cruise ship ports?!

TARIFF OF HARBOUR DUES

Installation Instructions

THE TARIFF OF PORT FEES AND CHARGES SZCZECIN AND ŚWINOUJŚCIE SEAPORTS AUTHORITY

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

SPOT COMMENTARY 1/17 Kidnapping, Harassment and Suspicious Activities in Waters off East Sabah and Southern Philippines

Bantry Bay Port Company Limited

CONTENTS CARGO CHARGES. Effective from January 1, 2017 GENERAL TERMS

Hawker Beechcraft Corporation

The purpose of this procedure is to establish guidelines for the response of Fire Department personnel and equipment to an aircraft emergency.

Installation Instructions

SERVICE BULLETIN SERIAL NUMBERS

SECTION 2 LIMITATIONS

WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES

Getting Started Guide

Merchant Shipping (Tonnage) Regulations 2017

Guidelines for NOTAM Workflow and Allocation of Responsibilities

PART E SECTION 5 AVIATION FUEL SUPPLY SYSTEM

Section B 5 Parts. 1. Introduction. Using the Illustrated Parts List. Parts B 5-1

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 05/22/13

Modena2G Series. Specification Sheet. Wood and Gas-Fired Pizza Ovens for Restaurants and Pizzerias. The Modena2G Family

In this presentation you will find about: Who we are Our Activities & Services Some of our Customers Our Certificates Contact us

Installation Instructions

2-Berth Motorhome without shower and toilet Automatic transmission. Longford Caravan Park, Longford

PART 101--MOORED BALLOONS, KITES, UNMANNED ROCKETS AND UNMANNED FREE BALLOONS

Transcription:

BUNKEING SAFETY CHECK-LIST FO BUNKE DELIVEY TO MAITIME SHIPS (Chapter 25.4.3 ISGOTT) Port:... Date:... Ship:... Barge:... Master:... Master:... 1. Bunkers to be Transferred Grade Tonnes Volume at Loading Temp Loading Temperature Maximum Transfer ate Maximum Line Pressure Fuel Oil Gas Oil/Diesel Lub. Oil in Bulk 2. Bunker Tanks to be Loaded Tank No Grade Volume of Tank @ % Vol. of Oil in Tank before Loading Available volume Volume to be Loaded Total Volumes Grade 3. Checks by Barge Prior to Berthing Bunkering Ship Barge Code emarks 1. The barge has obtained the necessary permissions to go alongside receiving ship. 2. The fenders have been checked, are in good order and there is no possibility of metal to metal contact. 3. Adequate electrical insulating means are in place in the barge-toship connection. (34) 4. All bunker hoses are in good condition and are appropriate for the service intended. (7) Edition 1-2010 CCN/OCIMF 2010 Page 1

4. Checks Prior to Transfer (cont.) Bunkering Ship Barge Code emarks 5. The barge is securely moored. (2) 6. There is a safe means of access between the ship and barge. (1) 7. Effective communications have been established between esponsible Officers. (3) A (VHF/UHF Ch....). Primary System: Backup System: Emergency Stop Signal: 8. There is an effective watch on board the barge and on the ship receiving bunkers. (22) 9. Fire hoses and fire-fighting equipment on board the barge and ship are ready for immediate use. (5) 10. All scuppers are effectively plugged. Temporarily removed scupper plugs will be monitored at all times. Drip trays are in position on decks around connections and bunker tank vents. (10) (11) 11. Initial line up has been checked and unused bunker connections are blanked and fully bolted. (13) 12. The transfer hose is properly rigged and fully bolted and secured to manifolds on ship and barge. (7) 13. Overboard valves connected to the cargo system, engine room bilges and bunker lines are closed and sealed. (16) 14. All cargo and bunker tank hatch lids are closed. (15) 15. Bunker tank contents will be monitored at regular intervals. A at intervals not exceeding. Minutes 16. There is a supply of oil spill cleanup material readily available for immediate use. 17. The main radio transmitter aerials are earthed and radars are switched off. (42) 18. Fixed VHF/UHF transceivers and AIS equipment are on the correct power mode or switched off. (40) Edition 1-2010 CCN/OCIMF 2010 Page 2

Bunkering Ship Barge Code emarks 19. Smoking rooms have been identified and smoking restrictions are being observed. (36) A Nominated Smoking ooms Tanker: Barge: 20. Naked light regulations are being observed. (37) 21. All external doors and ports in the accommodation are closed. (17) 22. Material Safety Data Sheets (MSDS) for the bunker transfer have been exchanged where requested. (26) 23. The hazards associated with toxic substances in the bunkers being handled have been identified and understood. (27) H2S Content... Benzene Content... Edition 1-2010 CCN/OCIMF 2010 Page 3

Edition 1-2010 CCN/OCIMF 2010 Page 4

DECLAATION We have checked, where appropriate jointly, the items of the Check-List in accordance with the instructions and have satisfied ourselves that the entries we have made are correct to the best of our knowledge. We have also made arrangements to carry out repetitive checks as necessary and agreed that those items coded in the Check-List should be re-checked at intervals not exceeding. hours. If, to our knowledge, the status of any item changes, we will immediately inform the other party. For ship For barge Name:... Name:... ank:... Position or Title:... Signature:... Signature:... Date:... Date:... Time:... Time:... ecord of repetitive checks: Date: Time: Initials for Ship: Initials for barge: Edition 1-2010 CCN/OCIMF 2010 Page 5

Edition 1-2010 CCN/OCIMF 2010 Page 6