I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, :00 AM to Noon

Similar documents
PARKING Access Points

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017)

Tower 55 Rail Reliever Study Technical Advisory Group

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016)

Retail / Restaurant / Office Space Available Grapevine, Texas

INTERSTATE 35 CORRIDOR UPDATE

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

Update on the Coalition Efforts to Make the Proposed I-20 Corridor Long-Distance Passenger Rail Connection a Reality

2015 BICYCLE AND PEDESTRIAN TRAFFIC COUNT REPORT

PREPARED FOR THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS DALLAS/FORT WORTH INTERNATIONAL AIRPORT TRANSIT SERVICE PLANNING STUDY.

TRANS-TEXAS CORRIDOR (TTC-35)

Dallas Executive Airport Marketing Plan

Northwest Corridor LRT Line to Irving/DFW

DALLAS SPORTS, HISTORY, CULTURE, AND MORE

Call for Public Hearing August 2019 Service Changes

North Central Texas. Development News. 2nd Quarter 2006 Volume 3 Number 2

PRE-LEASING KDTO. Denton Enterprise Airport ±15,500 SF CORPORATE HANGAR FACILITY. West Court Drive Denton Texas UNDER CONSTRUCTION OCT 2018

DALLAS-FORT WORTH 2017 TAX RATES

General Information. Welcome. General Information. Irving CVB. Transportation. Airports. Accessibility

Current list of entities that have an MOU with TxDOT

Initiatives. Regional Mobility

Dallas Area Rapid Transit Light Rail Transit. Rail Fleet Management Plan Revision I

Initiatives. Regional Mobility

Northwest Corridor LRT Line to Irving/DFW

3400 AT CITYLINE REVOLUTIONIZES THE TRADITIONAL OFFICE BUILDING.

94% occupancy weighted average remaining lease term of an astounding 9.87 years

DISCOVER THE DIFFERENCE OF A LANDMARK LOCATION.

9111 CYPRESS WATERS BLVD - SUITE 245 WHERE BUSINESS AND LIFESTYLE INTERSECT LEASING INFORMATION LUCY BURNS MARIJKE LANTZ

DMA Job Code Theater Location # of Screens # of Spots

FOR SALE DALLAS PARKWAY ADDISON, TX I LEASE 3,700-20,000 SQ. FT. SALE 62,000 SQ. FT. I THREE-STORY OFFICE BUILDING

2620 Windsor Centre Trail Flower Mound, Texas 75028

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

DALLAS/FORT WORTH. LOCATION #: DESCRIPTION: I ft S/O Swisher ES CITY:

Presentation to the DRCOG Board August 16, 2017

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

North Dallas / Richardson / Flower Mound / Plano Hotel Name Zip Code Hotel Name Zip Code

9001 CYPRESS WATERS BOULEVARD THE OFFICES OF CYPRESS WATERS BELT LINE ROAD / IH 635 DALLAS, TEXAS 215,000 SF FOUR-STORY OFFICE DELIVERS Q2 2016

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

SCOPING INFORMATION PACKET

North Dallas / Richardson / Plano / downtown Dallas / downtown. Carolton / Irving / Addison Hotel Name Zip Code Hotel Name Zip Code

N O R T H T E X A S T O L L W A Y A U T H O R I T Y

Cotton Belt Corridor PE/EIS

Membership Questionnaire CHAPTER MEETING... 1 OCTOBER 2, 2012 FOUNDER S BUILDING, GRAPEVINE, TEXAS... 1

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

2-Buildings Up to 292,997 SF Class A Core Industrial

FOR SALE DALLAS PARKWAY ADDISON, TX I 62,598 SQ. FT. THREE-STORY OFFICE BUILDING

SH 121: FM 423 To SH 121 At US 75 Interchange. APPENDIX A: Figures

Strategic Advantages. Steve Boecking Vice President Hillwood August 26, 2011

Score. Category. Access Aesthetics Community Resources

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017

9111 CYPRESS WATERS BOULEVARD THE OFFICES OF CYPRESS WATERS BELT LINE ROAD / IH 635 DALLAS, TEXAS 217,000 SF FOUR-STORY OFFICE DELIVERS Q1 2017

DALLAS LOVE FIELD MAY 2015 DRAFT

Corridor Certificate Development (CDC) tracking tables. This list is current as of: 1 January 2014

Figure 1: Little Dry Creek Trail Crossing

Dallas/Fort Worth International Airport Commercial Development Department. Urban Land Institute Fall Meeting October 18, 2012

HIGHLAND VILLAGE VILLAGE LEWISVILLE FLOWER MOUND TROPHY. Grapevine. Lake. Totaling 624 Units In Arlington, Texas CARROLLTON

2018 Special Edition: TSRR & Tomball THE ORDERBOARD. Photo by Vincent Walker. N Crowd visits Texas State Railroad and Tomball Depot Museum

Chapter Meeting. Special Features & Announcements Chapter Officers. 24 Hours at Saginaw and Cowcatcher Magazine Gold Rail Award

Northaven Trail Phase 2 Initial Project Overview

Local Government or Entity with an AFA

Division 1 Whistle Vol. 3. No. 1 January 2019

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

HY-TEK's MEET MANAGER 3.0-6:01 PM 8/3/2014 Page 1. TAAF Championship Meet

Freight Study Phase II. Kick-Off Meeting

OFFERING MEMORANDUM East Arapahoe Road, Greenwood Village, CO. JEFF HALLBERG PRINCIPAL

Miami Orlando Passenger Rail Project Overview

CITY OF DALLAS TRAIL NETWORK UPDATE

TEXAS TRANSPORTATION COMMISSION

Approval of August 2019 Service Changes

Miami Orlando Passenger Rail Project Overview

Missouri, Kansas & Texas Railway

IEEE 802 Plenary Session November 8-13, 2015 Dallas, Texas USA

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

1.2 Corridor History and Current Characteristics

CITY OF DALLAS TRAIL NETWORK UPDATE

TORONTO TRANSIT COMMISSION REPORT NO.

I-3 DFW Extension Public Hearing. June 2, 2011

TRANSPORTATION PROGRAMS

Dallas/Fort Worth International Airport The World Connected. Dallas City Council Transportation & Environment Committee Briefing May 23, 2011

Use a Texas highway map or Texas digital highway map and the blank Texas map on the next page to complete the following tasks.

A Guide to the services available near your new home. Bridgewater Crossing. Community Guide

Southwest LRT Alignment Video Narration

BOND PROGRAMS PROJECTS SCHEDULE AND DELIVERY

Call for Public Hearing August 2019 Service Changes

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Technical Report Documentation Page 2. Government 3. Recipient s Catalog No.

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Union Station Rail Corridor East Enhancements Project

Golden Triangle Medical Park Development

3200 OLYMPUS WHERE BUSINESS AND LIFESTYLE INTERSECT LEASING INFORMATION LUCY BURNS MARIJKE LANTZ

TABLE OF CONTENTS IV. II. VI. III. LOCATION FRISCO STATION OVERVIEW WALKABILITY LIFESTYLE SITE PLAN

Welcome. Green Line in Your Community

National Fact Sheet: FY 2008

Lake Erie Commerce Center Traffic Analysis

Offering Memorandum. 142 and 144 Old Town : : Argyle, TX OFFICE INVESTMENT OPPORTUNITY : : DENTON COUNTY. Exclusively Offered by:

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

CLEBURNE ROAD FAST FOOD RESTAURANT

9797 ROMBAUER RD WHERE BUSINESS AND LIFESTYLE INTERSECT LEASING INFORMATION LUCY BURNS MARIJKE LANTZ

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

Transcription:

I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, 2010 9:00 AM to Noon Welcome Mark Mathews, the Facilitator, welcomed the I-35 Corridor Segment Committee 1 (CSC 1) members to the March meeting and explained that the main objective for today s meeting was to discuss the Rail Solutions (passenger and freight) proposed by the Committee at their January meeting and to decide which solutions to include as potential rail elements in their preliminary Segment 1 Multi-modal Plan for the I-35 corridor. The Facilitator explained that the meeting would include two presentations on rail planning, followed by a committee work session on potential rail solutions and review of their potential roadway elements identified to date. Presentations Committee Member Jeff Neal gave a presentation on regional freight and passenger rail planning efforts and issues in the Dallas/Fort Worth metroplex (PowerPoint Attached). Jennifer Moczygemba from the Texas Department of Transportation (TxDOT) Rail Division gave a presentation on state rail planning efforts by TxDOT. Committee Work Session The I-35 CSC 1 members reviewed the list of proposed Rail Solutions that they developed at their January meeting and discussed whether or not to carry these solutions forward as potential rail elements of the Segment 1 Preliminary Multi-modal Plan. A summary of committee action on their proposed rail solutions follows: Extend Light Rail from Dallas to Denton CSC 1 decided to rephrase this proposed solution to extend passenger rail from Dallas to Denton; Light Rail to Sherman-Denison CSC 1 decided to rephrase this proposed solution to extend passenger rail to Sherman-Denison; Provide commuter rail from Gainesville to DFW Committee members noted that this proposed solution would be a lower priority than roadway improvements to I-35. CSC 1 members were interested in potential improvements to the existing Heartland Flyer route, but more committee discussion is needed on this item before it is added as a potential rail solution; and, Address Tower 55 Issues CSC 1 members supported this proposed rail solution. Additionally, CSC 1 members decided to include the following potential rail solutions: Cotton-Belt Rail Line improvements; and, High-speed rail following the US 287 corridor (existing BNSF line) to Wichita Falls. After the discussion of rail concluded, the Facilitator reviewed the CSC 1 Potential Roadway Elements Map and Summary Table with the Committee. March 3, 2010 I-35 Corridor Segment Committee 1 Page 1

Wrap Up/ Adjourn Television media from KUVN Channel 23 and KTVT Channel 11 were in attendance at the meeting. There was a committee request for current traffic counts on US 75. In discussion, CSC 1 inquired as to the current price of a ticket from Fort Worth to Gainesville on the Amtrak Heartland Flyer route. A one-way ticket costs $10.00 and the trip duration is approximately 1 ½ hours. Planned improvements to this route will increase speeds and reduce the trip duration by approximately 20 minutes. The next CSC 1 meeting is scheduled for Wednesday, April 7, 2010 at the North Central Texas Council of Governments (NCTCOG) Office. Make-Up Conference Call for March CSC 1 Meeting A make-up conference call was held on Tuesday March 23, 2010 to give CSC 1 members who were unable to attend the regularly scheduled CSC 1 March meeting an opportunity to review the meeting materials and ask staff questions and/or make further suggestions. There were no CSC 1 members who attended the make-up conference call in March. March 3, 2010 I-35 Corridor Segment Committee 1 Page 2

1 Interstate 35 Segment Committee 1 Freight and Passenger Rail Recommendations Dallas/Fort Worth Jeffrey C. Neal March 3, 2010

2 Freight Rail Projects Tower 55 Construct grade separation at the crossing of two trans-continental rail corridors in Downtown Fort Worth 100-120 trains per day pass through Tower 55 Two build alternatives under evaluation: East-West Trench (2 tracks) North-South Trench (3 tracks) Completion of Environmental Assessment for the Locally Preferred Alternative expected by Fall 2010/Winter 2011 Proposed grade separation would improve safety, air quality, reduce automobile/truck congestion, and significantly add capacity for freight movements through the D-FW region

3 Tower 55 Location Legend Tower 55 UP Railroad BNSF Railway Trinity Railway Express Fort Worth & Western Railroad

4 Passenger Rail Projects Light Rail (LRT) DART Light Rail Current system has 48 miles of track and 39 stations on 3 LRT lines: Red Line Parker Road Station (Plano) to Westmoreland Station (Dallas) Blue Line Downtown Garland Station to Ledbetter Station (Dallas) Green Lane Victory Park Station to Martin Luther King, Jr. Station Funded Expansions (additional 42 miles of track and 23 stations): Green Line (South) 7 mile extension to Buckner Station (December 2010) Green Line (North) 17.5 mile extension to North Carrollton/Frankford Station (December 2010) Blue Line Lake Highlands Station (December 2010) Blue Line 4.5 mile extension to Downtown Rowlett (December 2012) Orange Line 11 mile LRT line to Irving/Belt Line Station (December 2012) System Plan Expansions (programmed but not funded): Orange Line Extension to DFW Airport (2014) Second LRT Line ( D2 Study ) through Downtown Dallas (2016) Blue Line Extension to UNT Dallas (2018)

5 Passenger Rail Projects Commuter Rail Trinity Railway Express (TRE) Shared-use BNSF line between Fort Worth and Dallas 10 stations in Fort Worth, Richland Hills, Hurst, Irving, and Dallas Planned double-track expansion (not fully funded) will enable express trains, Sunday service, and full relocation of Amtrak Texas Eagle Denton County Transportation Authority (DCTA) A-Train New corridor from Carrollton to Denton (parallel to I.H. 35E) with service beginning in December 2010 6 stations in Carrollton, Lewisville, and Denton (potential 7 th station in Lake Dallas) Southwest-to-Northeast Commuter Rail (FWTA) Shared-use line (FWWR, BNSF, and Union Pacific) between southwest Fort Worth and DFW Airport with service beginning in 2013 15 stations in Fort Worth, Haltom City, North Richland Hills, Colleyville, and Grapevine

6 Passenger Rail Projects Commuter Rail (cont.) Rail North Texas 2009 legislative effort to gain funding for up to 251 miles of planned rail projects throughout the Dallas-Fort Worth region under the proposed Texas Local Option Transportation Act (TLOTA) Though the legislation did not pass, four of the planned rail corridors remain under evaluation through a Conceptual Engineering and Feasibility Study (CE&FS): Cotton Belt Corridor: DFW Airport (DART/SW2NE) to Plano (DART) Frisco Corridor (BNSF): South Irving (TRE) to Frisco McKinney Corridor: Plano (DART) to McKinney (possible extension of the DART LRT Red Line) Waxahachie Corridor: Dallas Union Station (DART/TRE) to Waxahachie Another attempt to secure funding for these projects is planned for the 2011 legislative session

7 Passenger Rail Projects Rail North Texas Corridors

8 Passenger Rail Projects Inter-Regional and High Speed Rail

9 Passenger Rail Projects South Central High Speed Rail Corridor

10 Contact Information Jeffrey C. Neal Program Manager (817) 608-2345 jneal@nctcog.org http://www.nctcog.org/trans/spd