HISTORY OF RTO OPERATIONS AT EVERGREEN

Similar documents
IATA Air Carrier Self Audit Checklist Analysis Questionnaire

TAKEOFF SAFETY ISSUE 2-11/2001. Flight Operations Support & Line Assistance

USE OF TAKEOFF CHARTS [B737]

Agenda Item 5: Group Discussion How Could We Prevent Runway Excursions (Risks and Lessons Learned)

Quiet Climb. 26 AERO First-Quarter 2003 January

APPENDIX X: RUNWAY LENGTH ANALYSIS

HARD. Preventing. Nosegear Touchdowns

A Human Factors Approach to Preventing Tail Strikes. Captain Vern Jeremica Senior Safety Pilot Boeing Commercial Airplanes May 2004

F L I G H T S A F E T Y F O U N D A T I O N. Vol. 47 No. 9 For Everyone Concerned with the Safety of Flight September 1990

All-Weather Operations Training Programme

March 2016 Safety Meeting

REJECTING A TAKEOFF AFTER V1 WHY DOES IT (STILL)

RE: Draft AC , titled Determining the Classification of a Change to Type Design

Runway Length Analysis Prescott Municipal Airport

This page intentionally left blank.

Airplane takeoff speeds are designed to ensure the liftoff speed does not exceed the tire speed rating.

TYPICAL ERRORS. Making a keystroke or transposition

SPORT PILOT TRAINING SYLLABUS

Turboprop Propulsion System Malfunction Recog i n titi ion on an d R d Response

Available Technologies. Session 4 Presentation 1

F1 Rocket. Recurrent Training Program

STUDENT INFORMATION Name LAST FIRST MIDDLE Address City State ZIP Telephone. Pilot Cert. TYPE CERT # DATE ISSUED Emergency Contact Phone Relationship

ADVISORY CIRCULAR 2 of 2009 FOR AIR OPEATORS

Private Pilot Flight Training

Lesson Plan Introduction

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

[Docket No. FAA ; Directorate Identifier 2012-NM-206-AD; Amendment

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

Dave Burr - AFS-260. Steve Gibbs AFS-300

Why You Hate your Flight Review (and what you can do about it) Richard Carlson SSF Chairman

REPUBLIC OF KENYA MINISTRY OF TRANSPORT AND INFRASTRUCTURE DEPARTMENT OF AIR ACCIDENT INVESTIGATION

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE

Available Technologies. Asia / Pacific Regional Runway Safety Seminar Session 4

Preventing Runway Excursions. Technical solutions From the Design and Manufacturing Sector

Advancing FTD technologies and the opportunity to the pilot training journey. L3 Proprietary

Decisions on which type of approach to use vary with each airline, and sometimes even for each flight. aero quarterly qtr_02 10

RNP In Daily Operations

(ii) Weight. Maximum gross weight for all tests, except where otherwise described in subparagraph (iii) below.

LESSON PLAN Introduction (3 minutes)

REPORT IN-038/2010 DATA SUMMARY

USE OF LANDING CHARTS [B737]

CESSNA CITATION IIB PW JT15D-4 INTRODUCTION. Runway Analysis provides the means to determine maximum allowable takeoff and landing weights based upon:

CESSNA SECTION 5 PERFORMANCE

Cirrus Transition Training

FALCON SERVICE ADVISORY

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)

INVESTIGATION REPORT. Incident to ATR registered F-GVZG on 11 September 2011 at Marseille

[Docket No. FAA ; Directorate Identifier 2006-NM-178-AD; Amendment ; AD ]

ATP CTP CRJ-200 FSTD 1 Briefing Guide

Worldwide, the likelihood

TCAS Pilot training issues

CAUTION: WAKE TURBULENCE

FAA SAFO Turbojet Braking Performance on Wet Runway SAPOE Recommendations

Very few accidents have occurred where there was loss of normal flight control

ONE-ENGINE INOPERATIVE FLIGHT

Advisory Circular. Regulations for Terrain Awareness Warning System

flightops Diminishing Skills? flight safety foundation AeroSafetyWorld July 2010

The Noise & Environmental office reviews airline schedules and night-time performance of the airlines operating at the Airport.

Tire failure and systems damage on takeoff, Airbus A , G-JDFW, 10 July 1996

Runway Excursion 2018 projects ALTA 2018

Experience Feedback in the Air Transport

Advisory Circular (AC)

Mountain / Canyon Flying LLC TAILWHEEL ENDORSEMENT SYLLABUS

CENTRAL TEXAS COLLEGE AIR AGENCY No. DU8S099Q SYLLABUS FOR AIRP 2251 FLIGHT MULTI-ENGINE Semester Hours Credit: 2_

NOISE ABATEMENT PROCEDURES

FIRST FLYING TECHNIQUES - APPROACH AND LANDING

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1

Advanced Transition Training

FLIGHT LESSON RECORD

Airlines are responsible for MagVar updates, which can be performed during scheduled maintenance.

SUPPLEMENT OCTOBER CITATION PERFORMANCE CALCULATOR (CPCalc) MODEL AND ON REVISION 8 68FM-S17-08

Embraer CAE Training Services Phenom Jet Association / 14 June 2013

Lesson 1: Introduction to Flight

Executive Summary Introduction

CRUISE TABLE OF CONTENTS

Amendment Docket No. FAA ; Directorate Identifier 2002-NM-12-AD

FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT

SERVICE LETTER REVISION

Terms of Reference for rulemaking task RMT.0704

Two s Too Many BY MARK LACAGNINA

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

5.1 Approach Hazards Awareness - General

CENTRAL TEXAS COLLEGE AIR AGENCY No. DU8S099Q SYLLABUS FOR AIRP 2337 COMMERCIAL GROUND SCHOOL Semester Hours Credit: 3. Instructor: Office Hours:

Report. Serious Incident on 11 January 2010 At Lagos Aerodrome (Nigeria) To the Boeing ER Registered F-GSQI Operated by Air France

Jet Transport Airplane Performance - Briefing For Business Aviation Pilots & Operators

series airplanes with modification and Model A321 series airplanes with modification

Available On-Board Technologies For Runway Excursions Prevention

Boeing Aircraft and the Impact on Airports

SUPERSEDED. [Docket No. FAA ; Directorate Identifier 2008-NM-061-AD; Amendment ; AD ]

report for the SIU Aviation Flight Program for Data for the report were

Consideration will be given to other methods of compliance which may be presented to the Authority.

Automation Dependency. Ensuring Robust Performance in Unexpected Situations Sunjoo Advani, IDT

Newcastle Airport. 36 years

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Application for the inclusion of the A330 Aeroplane Type in Aircraft Rating (In Flight Cruise Relief Only) of a Pilot s Licence (Aeroplanes)

National Transportation Safety Board Aviation Accident Final Report

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS

CENTRAL TEXAS COLLEGE AIR AGENCY No. DU8S099Q SYLLABUS FOR AIRP 1451 INSTRUMENT GROUND SCHOOL Semester Hours Credit: 4_. Instructor: Office Hours:

[Docket No. FAA ; Directorate Identifier 2016-NM-158-AD; Amendment ; AD ]

11/20/15 AC 61-98C Appendix 2 APPENDIX 2. SAMPLE AIRPLANE PILOT S PROFICIENCY PRACTICE PLAN. Flight Rules (VFR) Flight Profile Every 4-6 Weeks:

Transcription:

BCKGROUND The RTO maneuver has been a fact of a pilot s life since the beginning of aviation. Each takeoff includes the possibility of an RTO and a subsequent series of problems resulting from the actions taken during the reject. Historically, the RTO maneuver occurs approximately once each 3,000 takeoffs. Because the industry now acknowledges that many RTOs are not reported, however, the actual number may be estimated at 1 in 2,000 takeoffs. For example, an unreported RTO may occur when a takeoff is stopped very early in the takeoff roll because the flight crew hears a takeoff warning horn, stops to reset trim, then taxis back to the runway and continues takeoff. ccording to these statistics, a pilot who flies primarily long-haul routes, such as in our Boeing 747 fleet, may be faced with an RTO decision only once in 20 years. n contrast, a pilot in our DC-9 shorthaul fleet who makes 30 takeoffs per month may see an RTO every 7 years. Unfortunately, the pilot in each of these fleets must be prepared to make an RTO decision during every takeoff. Boeing studies indicate that approximately 75 percent of RTOs are initiated at speeds less than 80 kt and rarely result in an accident. bout 2 percent occur at speeds in excess of 120 kt. The overruns and incidents that occur invariably stem from these high-speed events. takeoff may be rejected for a variety of reasons, including engine failure, activation of the takeoff warning horn, direction from air traffic control (TC), blown tires, or system warnings. n contrast, the large number of takeoffs that continue successfully with indications of airplane system problems, such as master caution lights or blown tires, are rarely reported outside the airline s own information system. These takeoffs may result in diversions or delays, but the landings are usually uneventful. n fact, in about 55 percent of RTOs the result might have been an uneventful landing if the takeoff had been continued, as stated in the Takeoff Safety Training id published in 1992 with the endorsement of the U.S. Federal viation dministration (F). Some of the lessons learned from studying RTO accidents and incidents include the following: More than half the RTO accidents and incidents reported in the past 30 years were initiated from a speed in excess of V 1. bout one-third were reported as occurring on runways that were wet or contaminated with snow or ice. Only slightly more than onefourth of the accidents and incidents actually involved any loss of engine thrust. Nearly one-fourth of the accidents and incidents were the result of wheel or tire failures. pproximately 80 percent of the overrun events were potentially avoidable by following appropriate operational practices. HSTORY OF RTO OPERTONS T EVERGREEN Evergreen nternational irlines began a study of the RTO maneuver in 1991. Resources included information from the F and industry studies, notably RTO data produced by Boeing. Our standard procedure was to use the V speeds generated from Boeing airplane flight manuals (FM) in the form of speed cards. These cards list the appropriate speeds for a given weight and flap configuration. However, the speeds given provide only the F minimum recognition interval. n addition, a definition of V 1 was in use that referred to decision speed. This term implied that the airplane could accelerate to that speed, that the decision to reject or continue could then be made, and that the resulting maneuver would have a successful outcome. ll the data we collected pointed toward some weaknesses in this philosophy. n addition, the Fapproved takeoff data is based on performance demonstrated on a clean, dry runway. Separate adjustments for a wet or contaminated runway are published in operational documents. The takeoff accelerate-stop distance shown in the FM is based on a specified amount of time allocated to accomplish an RTO from V 1 speed. Time delays in addition to those demonstrated in actual flight tests are included in the FM computations. Simulator studies conducted in the 1970s showed that a flight crew requires anywhere from 3 to 7 seconds to recognize and perform an RTO, especially when the cause is other than a power plant fire or failure. More recent studies with higher fidelity simulations, such as those conducted in conjunction with the development of the Takeoff Safety Training id, indicate that the times for the pilot to recognize and perform the RTO procedure are within the time allotted in the FM. NTL PROPOSLS lthough we did not have a history of high-speed RTOs to use for our data, we determined that a better method must be designed to improve the flight crew s chances for an uneventful RTO. Using the Boeing data, quoted below from F dvisory Circular 120-62, we first changed the definition of V 1. We used the definition of V 1 as: The speed selected for each takeoff, based upon approved performance data and specified conditions, which represents: 1. The maximum speed by which a rejected takeoff must be initiated to assure that a safe stop can be completed within the remaining runway, or runway and stopway; ERO 6

1 RTO GO/NO-GO DECSON FGURE Go/no-go decision Failure recognition Engine failure RTO initiated irplane stopped V 1 2. The minimum speed which assures that a takeoff can be safely completed within the remaining runway, or runway and clearway, after failure of the most critical engine at a designated speed; and 3. The single speed which permits a successful stop or continued takeoff when operating at the minimum allowable field length for a particular weight. Note 1: Safe completion of the takeoff includes both attainment of the designated screen height at the end of the runway or clearway and safe obstacle clearance along the designated takeoff flight path. Note 2: Reference performance conditions for determining V 1 may not necessarily account for all variables possibly affecting a takeoff, such as runway surface friction, failures other than a critical power plant, etc. The go/no-go decision must be made prior to reaching the published V 1 (fig. 1). s the speed approaches V 1 the go decision becomes more appealing. Our goal became to identify a reduced decision speed to provide increased flight crew recognition time in case of a catastrophic situation. Using the Boeing data, we initially approached the F with a proposal to call a reduced V 1 the decision speed and treat it as a V 1 speed. The flight crew would remove their hands from the thrust levers, and the takeoff would continue. The initial proposed speed was 10 kt less than published V 1. We presented this proposal to our principal operations inspector (PO) in 1991. fter several months of dialogue and deliberation, it was disapproved because it was too different from certification criteria. PPROVED PROCEDURES n late 1992, after we received the Boeing Takeoff Safety Training id in draft form, we decided to again seek approval of the decision speed concept. This time we chose a speed of 8 kt for a reduction, which added approximately 2 seconds of recognition time. n the worst case the screen height was degraded to approximately 15 to 20 ft. We also expanded our efforts to include a revised airspeed call. We had been using an airspeed call of 80 kt, both for airspeed verification and for power setting completion in the 747. 100-kt call was added, which indicates entry to a high-speed regime where an RTO would be more difficult and dangerous. We also refined the guidelines for an RTO as follows: lthough V 1 will be obtained from the appropriate speed cards, 8 kt will be subtracted from this value and the airspeed bug will be set at that point. n no case will this speed be less than ground minimum control speed. The call at this new speed will be V 1 and the takeoff will be continued. f an adjustment is required for contamination, the 8-kt reduction will not be made. bove 100 kt the takeoff should be rejected only for engine failure or other catastrophic failure. mproved climb procedures will use the 8-kt reduction. gain with the help of our PO, the revised procedure was presented to the F in early 1993 and approved after much discussion. t was implemented throughout our fleet in June 1993. We believe that this reduced V 1 procedure provides a valuable increase in the safety margin over that provided in the FM in the event of an RTO. t V 1, the decision to initiate an RTO must already have been made and the RTO must already have begun. f there is any hesitation, the remaining time may be insufficient to allow a successful high-speed RTO (see information on simulator studies in the previous section, History of RTO Operations at Evergreen). With our reduced V 1, we increase the stopping margins on every takeoff. f an engine failure did ERO 7

occur just before V 1, screen height is reduced. However, engine failure was not involved in nearly 75 percent of all RTO accidents. n addition, because we fly earlier generation airplanes that lack the automatic inhibit of lower level warnings after 80 kt, the use of 100 kt as a notification of entry to high-speed operations provides the pilots with more incentive to continue a takeoff if a nuisance warning occurs. During training, our instructors traditionally used simple engine failures to teach the RTO maneuver. This technique, however, may condition pilots to think an engine failure is the only cause of all rejects. fter the new procedures were implemented, the check airmen were instructed to use other failures, such as tires, warning lights, or system failures, to force pilots to make an RTO decision. n the high-speed regime above 100 kt, rejects should be performed only for engine failure or other catastrophic failure. The takeoff should be continued if noncritical alerts, tire failures, or system problems not related to the safe completion of the takeoff occur. ntroduction of these problems requires a decision by the pilots and makes the RTO maneuver more realistic. The reject itself is now taught as an emergency maneuver, with emphasis on full braking and correct use of spoilers and reverse as essential to the successful outcome of the maneuver. RESULTS Since the introduction of our RTO procedures, we have had only one related incident. This incident, however, proves the point of the procedure. DC-9 was departing Portland nternational irport on runway 10L. Conditions included a crosswind, wet runway, and the airplane at balancedfield maximum weight. Near 100 kt during the takeoff roll, the captain felt something strange occur in the nose area. Because he was not sure if a tire had blown or failed in another manner, he elected to continue takeoff. noise similar to a deflated tire thump was heard as the airplane accelerated. The takeoff continued uneventfully, however, and the airplane diverted to Seattle-Tacoma nternational irport. fter landing, it was discovered that the left nose tire had come apart and deflated. This incident could have had other consequences had the captain attempted an RTO from high speed. Given the conditions of the runway, and the fact that the tire was deflated, the airplane could have been very difficult to stop on the available runway. The captain reported that, when he first heard the noise from the nose tire area, he remembered our training and cautions regarding a high-speed reject for any reason other than a catastrophic failure. SUMMRY lthough we sacrifice about 15 to 20 ft of screen height on the DC-9 and less on the 747 if an engine actually fails at V 1, the airplane is flying when it reaches the end of the runway. We believe that the procedures and training we have developed, using flight operations data and other information from Boeing and other sources, have helped give our pilots an edge in takeoff safety. (ll references to Boeing studies are from the Boeing Takeoff Safety Training id as endorsed by the F in 1992, in draft and final form, and other documents produced by Boeing, the ir Transport ssociation, the F, and the U.S. National Transportation Safety Board. Statistics noted in this article appeared in either the draft or final version of the training aid. Doug Smuin, then director of flight training at Evergreen and currently DC-9 captain, assisted in the preparation of this article and initial approval of the RTO studies project.) ERO 8

UPDTE ON REJECTED TKEOFF SFETY STTSTCS n 1989 the U.S. Federal viation dministration (F) urged the aviation industry to take steps to reduce the number of overrun accidents and incidents resulting from high-speed rejected takeoffs (RTO). This led to the formation of an international takeoff safety task force, with members from airlines, regulatory agencies, pilot unions, and manufacturers. The task force produced nine recommendations, including the following three directly related to training: Develop model training practices. Develop model operational guidelines. mprove simulator fidelity. When the task force concluded its study, Boeing led an industrywide effort to develop the Takeoff Safety Training id (TOST). The TOST was released in 1992 with the endorsement of the F. The TOST specifically addressed the task force s first two recommendations and indirectly caused an improvement to the third. long with the TOST, F dvisory Circular 120-62 provides direction and guidelines for airlines to implement the lessons learned (as presented in the TOST) in their own training programs. Many airlines around the world did incorporate these lessons into their training programs, and the results show that we the aviation DCK ELLOTT MNGER, RLNE SUPPORT FLGHT OPERTONS ENGNEERNG BOENG COMMERCL RPLNES GROUP BLL ROBERSON CHEF PLOT, TRNNG, TECHNCL & STNDRDS FLGHT CREW OPERTONS BOENG COMMERCL RPLNES GROUP FLGHT OPERTONS MKE SHRKEY SENOR PRNCPL ENGNEER FLGHT OPERTONS ENGNEERNG BOENG COMMERCL RPLNES GROUP ERO 9

tistics updated through the end of the 20th century. Despite the relatively high number of RTO overrun events that occurred in both 1996 and 1997, the rate of RTO overruns in the 1990s was significantly less than in the previous decade. Figure 5 in sections 2 and 4 of the TOST shows a chart describing seven categories of reasons for initiating an RTO in the 74 cases listed in appendix B. Figure 2 in this article incorporates the additional 20 RTO events that occurred from pril 1990 through December 1999. t shows that the percentage of RTO accidents and incidents precipitated by perceived or real engine failures dropped slightly to 21 percent from 24 percent. The figure also shows an increase in the percentage of RTO events related to tire failures (real or perceived), lack of flight crew coordination, and indicator/light problems. Figure 4 in sections 2 and 4 of the TOST shows a distribution of speeds at which the overrun RTOs were initiated and a breakout of the reported runway condition for the 74 cases in the study. Figure 3 in this article shows the breakout of RTO initiation speed for the total 94 RTO accidents and incidents reported through the end of the 20th century. The number of overrun events that began after V 1 remains at more than 50 percent. Figure 4 in this article industry made a positive difference. The number of RTO overrun accidents and incidents that occurred in the 1990s was 22. This compares to 28 RTO overrun accidents and incidents during the 1980s, despite a nearly 50 percent increase in the number of takeoffs in the 1990s. ll of us in the industry should be proud of this important achievement in aviation safety. t resulted from the regulators, airlines, pilots, and manufacturers working together to define the root causes of RTO events, and from airlines and other training agencies incorporating important lessons learned into their training programs. ppendix 4B of the TOST contains a list of the 74 RTO overrun accidents and incidents studied during development of the training aid. The additional 20 events reported since the TOST study are shown in table 1 (see p. 11). The total 94 events are all the RTO runway overrun accidents and incidents for the Western-built jet fleet associated with the length of the runway available for takeoff. The incidents are events that could have been accidents had the overrun area been more hostile. Figure 3 in sections 2 and 4 of the TOST shows the occurrence of RTO overrun accidents and incidents by year. Figure 1 in this article shows RTO stashows the updated percentages for the runway condition. These numbers remain fairly constant, with 39 percent of RTO events occurring on dry runways and 32 percent of them occurring on wet or contaminated runways. Unfortunately, RTO overrun accidents and incidents continue to occur. However, the rate of occurrence continues to drop. Table 2 shows the number of departures and RTO accidents and incidents by decade. Figure 5 in this article shows the rate of RTO overrun accidents and incidents expressed as events per 10 million takeoffs. Compared to the 1960s, the 1990s showed a 78 percent decrease in the rate of RTO overrun accidents and incidents. The industry can attribute this major improvement in RTO safety to many factors, but especially to better airplane systems, better and more reliable engines and, in the 1990s, better training and standards, such as the Evergreen nternational irlines example in the accompanying article. t Boeing, we will continue to improve our airplanes and work with our engine, tire, and brake suppliers to improve their products. We urge all airlines to continue their good efforts related to effective training in the areas of takeoff decisionmaking and RTO procedure execution. ERO 10

1 TBLE RTO OVERRUN CCDENTS/NCDENTS SNCE RTO TKEOFF SFETY TRNNG D STUDY Event number (1) (2) (3) (4) 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 Date 04/18/90 03/12/91 04/15/92 11/20/92 03/20/93 03/02/94 09/24/95 10/19/95 05/01/96 06/13/96 07/08/96 08/02/96 11/17/96 01/10/97 01/20/97 06/25/97 07/20/97 08/03/97 12/28/97 02/07/99 Operator OKD T US RG DLH CL SWS CD FLF hmad ir SW LG LM FR COP SUS SHY FR P vistar /P type BC111 DC8 F28 B747 MD80 3xx DC10 B727 B707 300 B727 MD80 B747 B707 Location Lagos New York Charlotte San Luis Frankfurt New York Tel viv Vancouver Quito Cairo Nashville Tlemcen Johannesburg Jeddah Panama City Bogota Dalian Douala Dubai Bratislava = accident, = incident RTO initiation speed (the speed at which the first action was taken relative to V1) / (1) Cause (why the RTO decision was made) Engine Tires Configuration ndicators/lights Flight crew coordination Bird strike ir traffic control (TC) R/W (runway) condition (reported condition of the runway surface at the time of the event) RTO initiation speed (2) V 1-10 V 1 +10 V 1 +5 Cause (3) nd/lt Config Crew Crew Bird nd/lt nd/lt Engine Crew Crew Bird nd/lt nd/lt Tire Tire nd/lt Tire Engine Config ctual, temporary, or perceived loss of thrust Main or nosegear tire vibration or failure ncorrect control or high lift surface setting for takeoff reading observed on an indicator or a warning light illuminating Miscellaneous events where inappropriate flight crew action resulted in the RTO decision Crew observed birds along runway and experienced or perceived a subsequent problem TC or other radio messages caused flight crew to elect to reject takeoff R/W condition (4) ce/snow 2 TBLE RTO OVERRUN CCDENTS/NCDENTS PER 10 MLLON TKEOFFS Decade Departures RTO overrun accidents/incidents Rate per 10 million takeoffs 1960 to 1969 19,045,363 12 6.3 1970 to 1979 75,984,954 32 4.2 1980 to 1989 108,963,013 28 2.6 1990 to 1999 161,957,587 22 1.4 ERO 11

1 FGURE 94 RTO OVERRUN CCDENTS/NCDENTS SNCE 1959 1960 1961 1962 1963 1964 1965 1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 2 RESONS FOR NTTNG RTO (94 CCDENTS/NCDENTS) FGURE Engine 21% Wheel/tire 21% Configuration 12% ndicator/light 14% Flight crew coordination 11% Bird strike 7% 1959 to 1990 (74 total) 1991 to 1999 (20 total) Other and unknown 14% 0 5 10 Number of accidents/incidents 15 20 25 Compared to the 1960s, the 1990s showed a 78 percent decrease in the rate of RTO overrun accidents and incidents. ERO 12

Overruns included in TOST study, 74 total Overruns since TOST study, 20 total 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 3 RTO NTTON SPEED RUNWY CONDTON FGURE Unknown 20% 4 FGURE Unknown 29% 39% Less than or equal to V 1 26% Greater than V 1 54% ce/snow 9% 23% Based on 94 RTO overrun accidents/incidents, 1961 to 1999 Based on 94 RTO overrun accidents/incidents, 1961 to 1999 5 RTE OF RTO OVERRUN CCDENTS/NCDENTS FGURE 7 6 5 ccidents/ incidents per 10 million takeoffs 4 3 2 1 0 1960 to 1969 1970 to 1979 Decade 1980 to 1989 1990 to 1999 ERO 13