Tunnelling Featured Projects

Similar documents
INDICATOR RESULTS FACTSHEET TRA01: TRAFFIC VOLUME

THE EXTENSIONS PROGRAMME

Egnatia Odos: An axis for development and co-operation

Egnatia Odos Observatory. Egnatia Odos Observatory Monitoring of Egnatia Motorway s s Spatial Impacts

WORKING PAPER In the context of the placement in the Observatory of the Egnatia Odos A.E.

INDICATOR RESULTS FACTSHEET ΤRA04: TRAVEL-TIME

ΙΕΝΕ 2011 Scientific Workshop. Highways and Wildlife: How do they coexist? Kastoria, September 22, 2011

Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach

Observatory of Egnatia Odos motorway, Greece

Travel behavior as a determining factor for sustainable transport measures

monitoring of egnatia motorways spatial impacts

A Strategy Proposal for Road Infrastructure Development in Recession Times

INDICATOR RESULTS FACT SHEET SET08: ACCESSIBLE SITES OF CULTURAL AND TOURIST INTEREST

RESULTS FACT SHEET SE-F-3: ACCESSIBILITY OF SITES OF CULTURAL & TOURIST INTEREST

- Socrates Seitanidis

visits4u Case Studies: Historical Centre of Athens Athens, Greece

MEGAPROJECT Case Study

Special Coordination Service for Implementation (SCOS) - ROLE

Related Expertise Concession Projects - PPP

C. SYKIANAKI, President, Organization for Planning and Environmental Protection of Athens.

RESULTS FACT SHEET SE-S-2: ACCESSIBILITY OF INDUSTRIAL AREAS

INTRAKAT ANALYST PRESENTATION FY RESULTS 2013

NEW, POST-OLYMPIC ATHENS

Issue 02 Spring Works in progress. OLYMPIA PASS: quick and easy. The first 4 tunnels of the Korinthos- Patra Motorway. Alliance for Road Safety

Corporate Presentation

Corporate Presentation

First draft program of CONT mission to Greece (24-25 September 2015)

Meetings & incentives.

Novelty and opportunities in the Greek PPP market

Economic impact of the Athens International Airport

A T H E N S I N V I T E S You to. 11 th International Congress of Engineering and Food

The Aesthetics of the Athens Metro Stations

MACEDONIA IN GREEK ADMINISTRATION

The Egnatia Motorway, Development and Combined Transports

EGNATIA ODOS MOTORWAY - LONG TERM NOISE MONI- TORING & STRATEGIC NOISE MAPS

Road Safety Campaigns in Greece

Corridor Forum organisations list 23/01/2017

Terms of Transport with the TRAINOSE S.A trains and buses What you need to know when traveling with us

THESSALONIKI AS AN EMERGING REGIONAL HUB IN SOUTHEASTERN EUROPE

1. Getting from Athens International Airport to the Liossion Coach Station:

Egnatia Odos, a tollway from the past to the future

Greece: Bright opportunities for the future. December 2, 2010

Development of an integrated transportation system in Thessaloniki: current situation and future prospects

1. TU2 tunnel at Edessa Florina trunk road 2. Cut & cover (25x250m) Thessaloniki 3. Edessa bypass Cut & cover tunnel 4. Trunk tunnel road at

PAGONI CONSTRUCTION COMPANY

Bill M. Halkias, PE, F.ASCE, F. ITE CEO, Attikes Diadromes SA Athens, Greece

The results of indicators, the reports, and generally the Observatory material are available on the internet at:

Profile of Attica Attica prefecture of Attica Athens Greece Administration

ITA AITES WORLD TUNNEL CONGRESS 2009

PRESS RELEASE. Graph 1: Road traffic accidents and casualties, January January Jul-14. Jul-15. Apr-15. Jan-15. Oct-15.

PRESS RELEASE. ARRIVALS OF NON-RESIDENTS IN GREECE: January - June 2016 HELLENIC REPUBLIC HELLENIC STATISTICAL AUTHORITY. Piraeus, 13 October 2016

UNVEILING AND OPENING TO TRAFFIC OF THE THIRD GUADARRAMA TUNNEL ON THE AP-6 MOTORWAY

From S to sigma: towards a new development pattern of the Hellenic space? Is there a role for Mega Transport Projects in spatial restructuring?

Plot of sq.m. at the beach Orkos of Kea (Tzia) in Cyclades GENERAL INFORMATION ON THE PLOT

Current Traffic Arrangements on. Korinthos-Patra. 16 kilometers of tunnels under construction on. Korinthos-Patra

London and Crossrail 2. Chris Moores Transport for London

A) Corporate Portfolio B) Land Development

Asset Development Plan. 31 January, 2017

Have you got any real estate property?

Co-operative Systems in Infrastructure Operation

Management of Contaminated Sites in Greece

PRESS RELEASE GREEK AIRPORTS TRAFFIC, 2015

Logistics Information

Part four. In this part you will find: The next steps to deliver the master plan

SSLNG PORTS INFRASTRUCTURE

PRESS RELEASE GREEK AIRPORTS TRAFFIC, 2016

HRADF: Putting Greek economy into long-term perspective

Asset Development Plan

L. Issaia - Keramida Consultant to the Managing Director of ERGOSE

RAIL & CITY CODE - ATHENS

The Egnatia Motorway a chance for Northern Greece to catch up?

Corporate Presentation

POSEIDON MED II Fleet of vessels Port infrastructure

Greek Interoperable Tolling Systems (GRITS) Interoperability Travel faster and more conveniently using only one transponder

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

Curriculum Vitae. Personal information. Mobile: (Personal) (Personal) Greek.

2008 OCEA Award (Outstanding Civil Engineering Achievement Award)

INTRAKAT. Analyst Presentation June 2012

Greek. Islands Pass. Discover the Greek islands with just one Pass!

4th GPU Photo Festival 2017, updated

Panama Business Day- Hamburg. BAUER Fundaciones Panamá S.A.

Industry briefing NOVEMBER 2017

COMMERCIAL PROPERTIES OF CHARAGIONIS GROUP. Presentation. 11 a Evelpidon str. & 5, Troias str.

ELENA RAPTI, MP GREECE. Coordinator of the ONE in FIVE campaign in Greece

3-day trip with rafting at Lousios, and not only!

PARTNERING FOR SUCCESS

Rights of passengers travelling by sea and inland waterway Regulation (EU) 1177/2010

Who goes where? How long do they stay? How much do they spend?

Keller Group plc. Keller in Eastern Europe. Justin Atkinson/Michal Topolnicki

PARTNERING FOR SUCCESS

RESULTS FACT SHEET INDICATOR - SET13: COMPOSITION OF GROSS VALUE ADDED (GVA) PER SECTOR

G R E E C E I T I N E R A R Y

FREEING UP MELBOURNE'S BIGGEST BOTTLENECK

O T M PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE

HOTEL BLUE LAGOON VILLAGE KOS ISLAND. 5 ***** hotel Capacity: 228 rooms Buildings area: sq. m.

Citizens in Action is a non-profit, non-governmental, voluntary youth organisation based in Athens.

Hospital Link Project Project Update September 2015

Mapping of the theoretical potential for wind energy and small hydropower plants in the region of Peloponnesus

Travel by coach from City, University of London to Schofield Centre, Cambridge University

INTERNATIONAL CONFERENCE ROAD SAFETY

Transcription:

Tunnelling Featured Projects We have been involved in the following Major Tunnel Projects: Attico Metro S.A. (Athens metro underground network, http://www.attikometro.gr/) Egnatia Odos SA (670 Km motorway, http://www.egnatia.eu/page/) Ergoose SA (a subsdiary of Hellenic Railway Organization executing related projects http://www.ergose.gr/) Egnatia Odos is the Greek part of the European route E90. It is a motorway in Greece that extends from the western port of Igoumenitsa to the eastern Greek Turkish border at Kipoi. It runs a total of 670 km (420 mi). The project began in the 1990s and was completed in 2009. We have participated as a geotechnical engineering consultant in a number of projects like the ones which are indicatively presented below: Geotechnical site investigation, characterisation & Design in Section: 1-1.1.3 to 1.1.8. Neochori - Grika (Paramithia) Tunnels within the framework of the project: Consulting services for implementation of Geotechnical site investigation works in various positions along the Egnatia Odos Motorway (Geotechnical Site Investigation call ups). Geotechnical site investigation, characterisation & Design in Section: 14.1.1 - New Karvali - Chrisoupolis junction and Tunnels within the framework of the project: Consulting services for Motorway (Geotechnical Site Investigation call ups).

Geotechnical site investigation, characterisation & Design in Sections: 4.1.5 / 6 - Panagia-Grevena Tunnels and junction Grevena. 4.2.4 - Grevena - Kozani (Industrial Area Kozani). 5.2. - Veria (Asomaton Detour). Work Order Numbers: 27a, 27b and 27c respectively, within the framework of the project: Consulting services for implementation of Geotechnical site investigation works in various positions along the Egnatia Odos Motorway (Geotechnical Site Investigation call ups). Geotechnical site investigation, characterisation & Design in Section: 4.1.2s - Panagia Grevena Tunnels. Work Order Number: 27a.a, within the framework of the project: Consulting services for Motorway (Geotechnical Site Investigation call ups).

Geotechnical site investigation, characterisation & Design in Section: 2.4 - Arachthos River Peristeri Twin Tunnels. Work Order Number: 30.a, within the framework of the project: Consulting services for Motorway and its vertical axis (Geotechnical Site Investigation call ups). Geotechnical site investigation, characterisation & Design in Sections: 4.1.3s - Panagia - Grevena, Bridge C2. Work Order Number: 30.b, within the framework of the project: Consulting services for Motorway and its perpendicular axes (Geotechnical Investigation call ups). Geotechnical site investigation, characterisation & Design in Sections: 4.1.2s - Panagia - Grevena, Bridge C3. Work Order Number: 30.c, within the framework of the project: Consulting services for Motorway and its perpendicular axes (Geotechnical Investigation call ups).

The Athens Metro The Athens Metro is a rapid transit system in Greece, serving the Athens conurbation and parts of East Attica. It incorporates the former Athens- Piraeus Electric Railways (ISAP S.A.), which opened in 1869 and is now part of Line 1. Beginning in 1991, Attiko Metro S.A. constructed and extended Lines 2 and 3 and the Attiko Metro Operations Company (AMEL S.A.) operated these lines from 2000 until 2011. The metro network formally merged in 2011 when the Greek government created the Urban Rail Transport Company (STASY S.A.), a subsidiary of the Athens Urban Transport Organization (OASA S.A.). Our company has participated as a geotechnical engineering consultant in a number of projects like the ones which are indicatively presented below: Geotechnical engineering and Soil Mechanics Study for the Analysis, Design and stability Calculations of Anchored piled Retaining Walls, 19,45 m deep, for the forty (40) excavation faces of Agios Antonios Metro Station at Peristeri City Attica - Greece, in the framework of the project: "CON 00/001 - Extension of Line 2 Sepolia - Peristeri towards Peristeri - Agios Antonios Metro Station".

The Athens Railways Transporting Organization Evaluation of existing Geotechnical site investigation & characterisation Factual Reports and compilation of Soil Mechanics Study for the safe & economic design of the foundation of temporary columns with micropiles required in the underground openings and retaining walls for the renovation of the existing Athens Railways Transport Organisation (ISAP) station in the Municipality of Neo Heraklion - Attica Prefecture / Greece. Evaluation of existing Geotechnical site investigation & characterisation Factual Reports and compilation of Soil Mechanics Study for the safe & economic design of the foundation of temporary columns with micropiles required in the underground openings and retaining walls for the renovation of the existing Athens Railways Transport Organisation (ISAP) station in the Municipality of Neo Heraklion - Attica Prefecture / Greece. For all the aforementioned projects a more detailed presentation could be made upon request