Follow-up to the implementation of air navigation priorities FOLLOW-UP TO THE IMPLEMENTATION OF AMHS INTERCONNECTION AND NATIONAL IP NETWORKS

Similar documents
AN & FS/3-WP/05 International Civil South Third. (Presented SUMMARY. References. Group May Fourth. of air navigation

Operational implementation of new ATM automated systems and integration of the existing ones FOLLOW-UP ON THE IMPLEMENATION OF AUTOMATED SYSTEMS

Agenda Review to the action plans for the implementation of AIDC interconnection in the NAM/CAR/SAM Regions

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Agenda Follow-up to the performance of AIDC operation and results of the AIDC interconnection trials in the NAM/CAR/SAM Regions

SAM/IG/20-WP/08 South American. (Presented SUMMARY REFERENCES. October 2017).

Agenda Analysis to the availability and errors of flight plans in the NAM/CAR/SAM Regions

ICAO regional technical cooperation tools for the implementation of air navigation and safety improvements

(Presented SUMMARY REFERENCES. Group (SAM/IG/18) Lima,

OPTIMIZATION OF SAM AIRSPACE. (Presented by the Secretariat)

Analysis of flight plan availability in the SAM Region ANALYSIS OF FLIGHT PLAN AVAILABILITY. (Presented by the Secretariat) SUMMARY

Air navigation deficiencies in the CAR/SAM Regions with high risk ( U priority) (Presented by the Secretariat)

International Civil Aviation Organization

Spanish Countries. & Capitals. Map Labeling & Quiz SpanishMadeEasy.net

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Frederic Lecat, ICAO Regional Officer APAC Regional Office January 2016

Standards and procedures for performance-based navigation operations approval

ASSEMBLY 39TH SESSION

Fieldwork Dates AmericasBarometer

Update of the NOTAM Contingency Plans and deficiencies in the AIM area. (Presented by the Secretariat) SUMMARY

2.2 Air Navigation Deficiencies ICAO CAR/SAM AIR NAVIGATION DEFICIENCIES DATABASE SIP. (Presented by the Secretariat) SUMMARY

ASSEMBLY 35TH SESSION

ANI/WG/2 WP/11 22/05/15 Second NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/2) Puntarenas, Costa Rica, 1 to 4 June 2015

Proposal for the updating of the FASID ATM Evolution Tables

South American Countries. Capital Location Population Terrain Climate

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

FLIGHT PLAN FILING PROCEDURES IN THE SAM REGION

Geographic Qualities of South America

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

LN 3/24.1 LT 2/6B.5-SA371 7 June 2010

LACNIC REPORT. ARIN XI - Memphis, USA. Raúl Echeberría LACNIC CEO < > ARIN XI

I have the honour to inform you that the following meetings have been scheduled to be held in Lima, Peru, from 2 to 6 August 2016:

Comprehension Questions:

3.3 Specific Developments in Air Navigation MET WIFS TRANSITION STATUS UPDATE. (Presented by the United States of America) SUMMARY

INTERNATIONAL CIVIL AVIATION ORGANIZATION South American Office. Regional Project RLA/06/901

Participant Presentations (Topics of Interest to the Meeting)

Chapter 19 Test on South America

SOUTH AMERICA. Country Police Medical Embassy/Consulate. The U.S. Embassy is located at:

SECOND MEETING OF THE AVIATION SECURITY AND FACILITATION REGIONAL GROUP (AVSEC/FAL/RG/2) Antigua and Barbuda, 16 to 18 May 2012

Essential Questions. 1. How have historical figures and events affected South America today?

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

Agenda Item 2: Review of the Implementation of the Regional Air Navigation Plan. (Presented by the Secretariat) Summary

Air Traffic Flow Management (ATFM) in the SAM Region METHODOLOGY ADOPTED BY BRAZIL TO CALCULATE THE CONTROL CAPACITY OF ACC OF BRAZILIAN FIR

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Review the status of implementation of the World Area Forecast System (WAFS) in the CAR/SAM Regions WIFS TRANSITION STATUS UPDATE

INTERNATIONAL CIVIL AVIATION ORGANIZATION SOUTH AMERICAN REGIONAL OFFICE

2.1 AVSEC/FAL/RG/3 Meeting ICAO/LACAC NAM/CAR/SAM AVIATION SECURITY AND FACILITATION REGIONAL GROUP (AVSEC/FAL/RG) (Presented by the Secretariat)

AVIATION SECURITY (AVSEC) AND FACILITATION (FAL) TRAINING AND ASSISTANCE ACTIVITIES IN THE NAM/CAR REGIONS. (Presented by the Secretariat)

International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions

Second Seminar on RVSM Implementation in the CARS/SAM Regions

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule

(Presented by Secretariat) EXECUTIVE SUMMARY

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

International Civil Aviation Organization South American Regional Office

International Civil Aviation Organization. UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

POST-IMPLEMENTATION MONITORING OF THE NEW ICAO MODEL FLIGHT PLAN FORMAT. (Presented by Cuba)

HIGH-LEVEL SAFETY CONFERENCE

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

ICELANDAIR NICE-REYKJAVIK SURVEY. OPPORTUNITIES SURVEY SOUTH & CENTRAL AMERICA / CARRIBEAN FROM/TO NICE AIRPORT Routes Online 2012

ACTION PLAN OF THE SOUTH AMERICAN DEFENSE COUNCIL 2012

Advisory Circular. File No.: Z U Issue No.: 01

Agenda Item 1: Use of VSAT technology in the AFI Region

VI Meeting of the Executive Steering Committee

INTERNATIONAL CIVIL AVIATION ORGANIZATION South American Office. Regional Project RLA/06/901

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat)

LT 2/8.23 SA186 Lima, 17April 2013

SUMMARY. of the North. Reference: A B

Suriname/All aerodromes There is no Bird Strike Committee NOV 2002 Detected during mission conducted by ICAO Secretariat

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Ref.: LT 2/6B.49-SA121 Lima, 26 March 2014 LT 11/49

Ref.: LN3/ SA5097 Lima, 12 February 2015 LT2/6B.61

International Civil Aviation Organization. Aeronautical Telecommunication Network/Internet Protocol Suite Working Group

International economic context and regional impact

Global Operational Data Link Doc 10037

Aviation Security (AVSEC) and Facilitation (FAL) 7.3 Other Aviation Security and Facilitation Matters

LACNIC REPORT. Ricardo Patara RSG Manager lacnic.net. RIPE 49 September 2004 Manchester

REVIEW OF THE AIM PROGRAMME (B0-DATM) PROJECTS. (Presented by the Secretariat) SUMMARY. References: B - Air Navigation Capacity and Efficiency

NZQA registered unit standard version 2 Page 1 of 5

Call Center Industry in Colombia

WHY IS BIRD STRIKE REPORT A KEY ISSUE FOR BIRD HAZARD PREVENTION?

Implementation of air traffic flow management (ATFM) and improvement of procedures for coordination between units FOLLOW-UP TO ATFM IMPLEMENTATION

TWELFTH AIR NAVIGATION CONFERENCE

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016)

1.2. Follow up of the AORRA airspace implementation (Presented by Secretariat) Summary

Regional air navigation planning and implementation performance framework: Review of programmes and projects

MARKET REPORT. Argentina: Low-Cost Airlines - the New Protagonists

LT 2/6B.43-SA September 2013

MARM ACTIVITIES ON WATER IN IBERO-AMERICA

Inter-American Defense College

FRENCH GUIANA ATM CONTINGENCY PLAN FOR ROCHAMBEAU FIR

INTER-AMERICAN DRUG ABUSE CONTROL COMMISSION C I C A D

Presented by Esteban Toha G PC-IDEA vice president NSDI-Chile

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE

AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

Regional Activities. 25 June Carlos Vogeler Director Executive Secretary for Members Relations and Regional Director for the Americas UNWTO

Name: Hour: Day: The Land and Its Regions (pg ) Define, in your own words, escarpment. Define, in your own words, sertão

UN-GGIM:Americas. UN-GGIM Expanded Bureau Meeting 7-9 December 2016, UN Headquarters New York. Rolando Ocampo President of UN-GGIM:Americas

Transcription:

ANFS/5-WP/05 International Civil Aviation Organization 02/07/18 South American Regional Office Fifth Meeting of Air Navigation and Flight Safety Directors of the SAM Region (ANFS/5) (Lima, Peru, 20 to 22 August 2018) Agenda Item 1: Follow-up to the implementation of air navigation priorities FOLLOW-UP TO THE IMPLEMENTATION OF AMHS INTERCONNECTION AND NATIONAL IP NETWORKS (Presented by the Secretariat) SUMMARY This working paper presents the status of implementation of AMHS interconnection and national IP networks in the SAM Region since the Fourth meeting of air navigation and safety directors of the SAM Region. References Fourth meeting of air navigation and safety directors, Lima, Peru, 2-4 October 2017) Twentieth workshop/meeting of the SAM Implementation Group (SAM/IG/20) Lima, Peru, 21-25 May 2018). Summary of AMHS teleconferences held in 2018. 1 Introduction 1.1 The implementation of AMHS interconnections and the implementation of national IP networks are two air navigation implementation priorities contemplated in the Declaration of Bogota for the period 2014-2016. 1.2 All AMHS interconnections required for the SAM Region are listed in Table CNS II- 1 of Volume II of the CAR/SAM Regional Air Navigation (Doc 8733 - eanp). For the 2014-2016 period, 26 AMHS interconnections were scheduled for implementation. Concerning the implementation of national IP networks, it was considered that 80% of SAM States should have them implemented by the end of 2016. 1.3 Significant progress has been made in the implementation of AMHS interconnections since the AN&FS/4 meeting. In this regard, special note should be taken of the operational implementation of AMHS interconnections between Brasilia Ezeiza, Brasilia-Maiquetía, Maiquetía- Lima and Maiquetía-Bogotá. 2 Discussion AMHS interconnections 2.1 Progress reported on, and actions defined for, the implementation of AMHS interconnections in each SAM State are described below.

ANFS/5-WP/05-2 - Argentina 2.2 Software and hardware updating at all national user agent terminals of the AMHS system was completed in late January 2018. The AMHS connection between Ezeiza and Brasilia became operational on 5 April 2018. In accordance with the information provided by the States involved, migration of the following AMHS interconnections to the operational phase was scheduled for the end of the first semester of 2018: Bolivia Ezeiza MTA - Lima MTA Ezeiza MTA - GATEWAY SITA Ezeiza MTA - Montevideo MTA Ezeiza MTA - Maiquetía MTA (extra plan) Ezeiza MTA - Santiago MTA 2.3 Positive AMHS operational tests between the La Paz MTA and the Lima MTA were conducted in early June 2018, leaving pending the migration to the operational phase. The designation and registration of the external COM operator for the Eurocontrol AMC is still pending. Brazil 2.4 Note is taken of the commissioning of the following AMHS interconnections: Brasilia - Maiquetía (8 February 2018) Brasilia - Ezeiza (5 April 2018) 2.5 Regarding the AMHS interconnection between the Brasilia MTA and the SITA Gateway, all tests have been carried out, only pending commissioning. For commissioning, the guidance document SITA transition planning, prepared by the EURONTROL AMC, was reviewed at the SAM/IG/21 meeting. This guidance document provides planning information and advice to AMHS COM centres of the Region affected by the implementation of the SITA Gateway AMHS in the AMHS network. The SAM/IG/21 meeting adopted the action plan used in the MID Region, with some adjustments to meet the characteristics of the SAM Region. The action plan for the transition is contained in Appendix A to this working paper. In order to follow up the implementation of the AMHS interconnection between Brasilia MTA and the SITA Gateway, several teleconferences were held in June and July with all AMHS focal points of the SAM Region, representatives of the EUROCONTROL AMC and SITA. The AMHS interconnection between the Brasilia MTA and the SITA Gateway in Atlanta is expected to become operational on the AIRAC date of 19 July 2018. 2.6 SAM States must add to their AMHS address list the SITA AMHS addresses registered in the AMC. Accordingly, those States that have not yet designated the external COM operator for the AMC (Bolivia, Chile, Guyana, French Guiana, Suriname, and Uruguay) should do so as soon as possible in order to access the AMC. Given the importance for those States that have already installed an AMHS system to designate a focal point to act as external operator for the AMC, the SAM/IG/18 meeting formulated conclusion SAM/IG/18-2 ("Designation and registration of SAM candidates for Eurocontrol AMC ). 2.7 On 28 June 2018, coordination activities were resumed for the implementation of the AMHS interconnection between the Brasilia MTA and the Atlanta MTA (FAA). It is expected that it will become operational by late August 2018. Said AMHS connection will be through the REDDIG II node of Bogotá, which provides the interconnection with the MEVA III network.

- 3 - ANFS/5-WP/05 2.8 No progress was reported in coordination activities for AMHS implementation in the interconnection between the Brasilia MTA and the Dakar MTA. The interconnection between the Brasilia MTA and the Dakar MTA will be implemented through the AFISNET VSAT network, and is foreseen for the end of 2018. Chile 2.9 AMHS operational implementation between the Santiago MTA and the Ezeiza MTA is still pending, and is foreseen for the first semester of 2018. The external COM operator for the Eurocontrol AMC has not been registered yet. Colombia 2.10 Operational AMHS interconnection tests were successfully conducted between the Bogota MTA and the Panama MTA through the MEVAIII/REDDIG II interconnection. For the operational implementation of this circuit, administrative arrangements must be completed with the MEVA III service providers. The circuit goes through the MEVAIII/REDDIG II interconnection in Bogota. Ecuador 2.11 The operational implementation between the Guayaquil MTA and the Bogota and Maiquetía MTAs is still pending, which is foreseen for the end of the second semester of 2018. French Guiana 2.12 A new AMHS system (COMSOFT) became operational in January 2018, but AMHS tests with the corresponding SAM States will be conducted in October or November 2018. Prior to the implementation of AMHS interconnections, security equipment must be in place to prevent possible cyber attacks. The external COM operator for the Eurocontrol AMC has not been designated and registered yet. Guyana 2.13 The reactivation of the AMHS circuit with Suriname is pending; it will take place once Suriname updates its AMHS system. The operational implementation of the AMHS interconnection between the Georgetown MTA and the Maiquetía and Port-of-Spain MTAs is foreseen for December 2018. The external COM operator for the Eurocontrol AMC has not been registered yet. Panama 2.14 Positive operational tests between the Panama MTA and the Atlanta MTA were conducted in mid-february 2018 through MEVA III, and operational implementation is foreseen for the third quarter of 2018. Regarding the status of implementation of the AMHS interconnection between the Panama MTA and the Bogota MTA, see paragraph 2.10. Paraguay 2.15 Positive IP connectivity tests have been carried out between the Asunción MTA and the Brasilia MTA. Operational tests are scheduled for August 2018.

ANFS/5-WP/05-4 - Peru 2.16 Regarding activities to interconnect the Lima MTA and the La Paz MTA, see paragraph 2.3. Operational interconnection between the Lima MTA and the Ezeiza MTA is scheduled for the end of the first semester of 2018. Finally, the interconnection between the Lima MTA and the Atlanta MTA through the MEVA III REDDIG II interconnection is foreseen for December 2018. Peru and Brazil are the States with more AMHS operational connections in the SAM Region. Suriname 2.17 The updating of the AMHS system of Suriname has not started yet, waiting for the aeronautical authority of Suriname to approve the process. Upon completion of this process (no date reported), the AMHS connection with Guyana will be reactivated and tests for AMHS interconnection between the Paramaribo MTA and the Brasilia MTA will be resumed. The external COM operator for the Eurocontrol AMC has not be designated and registered yet. Uruguay 2.18 The AMHS operational interconnection between the Montevideo MTA and the Brasilia MTA is foreseen for the end of the first semester of 2018. The external COM operator for the Eurocontrol AMC has not been registered yet. Venezuela 2.19 With the commissioning of the new AMHS system on 20 September 2017, the following AMHS interconnections were implemented: Maiquetía MTA - Bogotá MTA (December 2017) Maiquetía MTA - Lima MTA (December 2017) Maiquetía MTA - Brasilia MTA (March 2018) 2.20 Positive tests have been conducted between the Maiquetía MTA and the Ezeiza MTA (CIPE development system) in May 2018, and the operational connection is scheduled for the first semester of 2018. 2.21 The operational interconnection between the Maiquetía MTA and the MTAs of Atlanta, Cayenne, Guayaquil, Georgetown, Madrid and Port-of-Spain is scheduled for the end of the second semester of 2018. Other AMHS considerations 2.22 The Declaration of Bogota set the goal of implementing 26 AMHS interconnections by the end of 2016. To date, 20 AMHS interconnections have been implemented, 9 of which are in the operational phase, and 11 in the pre-operational phase, awaiting States to migrate to the operational phase during the second semester of 2018. Coordination has not started yet for the remaining interconnections (6), whose implementation is estimated for late 2018. It should be noted that 56% AMHS implementation has been achieved to date in the Region. 2.23 Appendix B to this working paper contains Table 1, which shows the status of implementation of the 26 regional interconnections contemplated in the Declaration of Bogota, and of the other connections with other Regions and with the SITA Type X Gateway. 2.24 It should be recalled that any AMHS addressing change made by a State must be reported to the EUROCONTROL ATS message management centre (AMC) according to the procedure

- 5 - ANFS/5-WP/05 established in ICAO State letter AN 7/49.1-09/34 dated 14 April 2009. According to this procedure, this communication must be done to the AMC by an external operator designated by the State. Implementation of national IP networks 2.25 Regarding the implementation of national IP networks, no progress has been made. To date, they have been installed in Argentina, Brazil, Colombia, Chile, Ecuador, Paraguay, Uruguay and Venezuela. This represents 62% of total implementation expected by the end of 2016. The implementation of national IP networks, by State, is shown in Appendix C to this working paper. 3 Suggested action 3.1 The Meeting is invited to: a) take note of the information presented herein; and b) review and discuss the activities for implementing the AMHS interconnections and national IP networks indicated in section 2 of this working paper and its respective appendices, and report on the plans for achieving this implementation goal. - END -

ANFS/5-WP/05 APPENDIX A TABLE 1 ACTION PLAN FOR THE TRANSITION TO THE SITA TYPE X GATEWAY No. Action Responsible party Deadline Remarks Define an AIRAC date for the transition to the SITA Type X States/ 18 Jun 2018 AIRAC dates: 19 Jul 1 Gateway in the Region and 16 Aug advise AMC. 13 Sep 11 Oct 2 States designate focal points (external operators) for the AMC. States 22 Jun 2018 States still pending 3 Revalidate SITA AMHS user addresses published by the AMC. States/ 22 Jun 2018 Argentina Brazil Chile 4 Upload the validated information on SITA (AMHS) user addresses to the AMC database. AMC 29 Jun 2018 Argentina Brazil Chile 5 Review the routing proposed by SITA through the Brasilia centre. States/ 29 Jun 2018 6 Notify the intention of incorporating a new SITA Type X Gateway into the SAM Region. AMC 2 Jul 2018 7 Conduct tests by sending messages from AMHS users to SITA users and vice versa. COM centres/ SITA centre/ 3 Jul 2018 SITA users: C=XX/A=ICAO/P= SITA/O=AFTN/OU 1=SBGLIBED y C=XX/A=ICAO/P= SITA/O=AFTN/OU 1=KATLSITX 8 Complete the Planning Acknowledgement table (Appendix A to WP/13 of SAM/IG/21) 4 Jul 2018

ANFS/5-WP/05 -A2 - No. Action Responsible party Deadline Remarks Send the Planning and 4 Jul 2018 9 Routing Table to the AMC operator, confirming transition readiness. 10 Publish the date set for the transition (published in the AMC Bulletin) AMC 6 Jul 2018 11 Create the routing tables in the AMC application in order to properly reflect the SITA PRMD routing to each COM centre. AMC 6 Jul 2018 12 Verify the data in the AMC, including routing and user address list. States (external operators) 12 Jul 2018 13 14 15 Complete the transition table. Update the AMC Bulletin Board to confirm that the activity is being carried out. Each COM centre will confirm to the AMC operator, by e-mail, that it has properly implemented the AMHS user address list and the SITA PRMD routing. States/ 13 Jul 2018 AMC 16 Jul 2018 17 Jul 2018 16 Monitor transition and inform the coordinator (Transition Manager) in order to get assistance in case of any problem. States / 19-26 Jul 2018 -----------------------

ANFS/5-WP/05 APPENDIX B / APÉNDICE B TABLE 2 AMHS IMTERCONNECTIONS / TABLA 2 INTERCONEXIONES AMHS # Connection / Conexión Notes / Notas 1 SAEZ SBBR Operational / Operacional 2 SAEZ SCSC Pre-operational phase / Fase preoperativa 3 SAEZ SGAS SAGS system updating / Actualización en el sistema de SGAS 4 SAEZ SLLP Coordinations not initiated / Coordinaciones no iniciadas 5 SAEZ SPIM Pre-operational phase / Fase preoperativa 6 SAEZ SUMU Pre-operational phase / Fase preoperativa 7 SBBR SGAS SAGS system updating / Actualización en el sistema de SGAS 8 SBBR SKBO Operational / Operacional 9 SBBR - SLLP Coordinations not initiated / Coordinaciones no iniciadas 10 SBBR -SMJP SMJP system updating / Actualización en el sistema de SMJP 11 SBBR SOCA Coordinations not initiated / Coordinaciones no iniciadas 12 SBBR SPIM Operational / Operacional 13 SBBR SVMI Operational / Operacional 14 SBBR SYCJ Operational / Operacional 15 SCSC SPIM Operational / Operacional 16 SEQU SKBO Pre-operational phase / Fase preoperativa 17 SEQU SPIM Operational / Operacional 18 SEQU SVMI Pre-operational phase / Fase preoperativa 19 SKBO SPIM Operational / Operacional 20 SKBO SVMI Pre-operational phase / Fase preoperativa 21 SLLP SPIM SLLP system updating / Actualización en el sistema de SLLP 22 SMJP SVMI Coordinations not initiated / Coordinaciones no iniciadas 23 SMJP SYCJ SMJP system updating / Actualización en el sistema de SMJP 24 SOCA SVMY Coordinations not initiated / Coordinaciones no iniciadas 25 SPIM SVMI Operational / Operacional 26 SYCJ SVMI Coordinations not initiated / Coordinaciones no iniciadas 27 SAEZ SVMI (Extra Plan) Pre-operational phase / Fase preoperativa 28 SAEZ FAOR (South Africa / Sudáfrica) Coordinations not initiated / Coordinaciones no iniciadas 29 SAEZ SITA Pre-operational phase / Fase preoperativa 30 SBBR GOOO (Senegal) Coordinations not initiated / Coordinaciones no iniciadas

ANFS/5-WP/05 -B2-31 SBBR LEEE Pre-operational phase / Fase preoperativa. 32 SBBR KATL (United States / Estados Unidos) Coordinations initiated / Coordinaciones iniciadas. 33 SBBR SITA Pre-operational phase / Fase preoperativa. 34 SKBO MPPC Pre-operational phase / Fase preoperativa. 35 SPIM KATL (Estados Unidos) Coordinaciones no iniciadas. 36 SVMI LEEE (España) Coordinaciones no iniciadas. 37 SVMI KATL (Estados Unidos) Coordinaciones no iniciadas. 38 SVMI TNCC Coordinaciones no iniciadas. 39 SVMI TTPP Coordinaciones no iniciadas. -------------------

ANFS/5-WP/05 APPENDIX C / APÉNDICE C IMPLEMENTATION OF DOMESTIC IP NETWORKS / IMPLANTACIÓN DE REDES IP NACIONALES STATE/ESTADO IP APPLICATIONS IMPLEMENTED/ APLICACIONES IP IMPLANTADAS IMPLEMENTATION DATE OF DOMESTIC IP NETWORK FOR ALL IP APPLICATIONS/ FECHA DE IMPLANTACION DE RED IP NACIONAL PARA TODAS LAS APLICACIONES EN IP Argentina AMHS, DATA RADAR, IP VOICE/VOZ IP 2005 Bolivia AMHS 2019 Brazil/Brasil AMHS, DATA RADAR, IP VOICE/VOZ IP 2015 Chile AMHS 2015 Colombia AMHS, RADAR 2016 Ecuador AMHS, RADAR 2014 French Guiana (France) / Guyana Francesa (Francia) AMHS 2019 Guyana AMHS 2019 Panama/Panamá AMHS, RADAR 2018 Paraguay AMHS 2014 Peru/Perú AMHS, RADAR 2019 Suriname/Surinam AMHS 2019 Green = Implemented Verde = Implantada Uruguay AMHS RADAR 2014 Venezuela AMHS 2010 - END / FIN -