Overview of Hokkaido Shinkansen (Opening between Shin-Aomori and Shin-Hakodate-Hokuto)

Similar documents
JR East: Earthquake Measures

High Speed Lines Operation in Japan

Station Name Sendai Morioka Hachinohe Shin-Aomori f. Basic fare 5,780 8,190 9,350 9,870 Express train charge 5,110 6,150 6,500 7,000

High Speed Network in Asian Countries: China, Korea and Japan. Naoto YANASE UIC, Senior Advisor High Speed Paris, France

Shinkansen Network in Japan and OutlineO of East Japan Railway Company. East Japan Railway Company

Signaling System and Communication System on Shinkansen of JR-EAST

Feature: Priority Initiative 01 Railway Network Expansion

Construction Scheme of Shinkansen

New Shinkansen Carriages

JR East Damage and Recovery from Great East Japan Earthquake and Tsunami

High-Speed Rail Operations in Japan Takao NISHIYAMA

Transportation >Tokyo Metropolitan Area Network

Education for Pedestrians at Level Crossings. Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company

Measures Perpetuating JR East s Unlimited Growth Potential

Role of Railways in Building Resilient Against Natural Disaster-Lessons from Japan

Damage to JR East from Great East Japan Earthquake and Current Situation

High Speed Rail & SHINKANSEN Nobukazu NAGAI Railway Bureau, MLIT May 11, 2015

JR East: International and Domestic Perspectives

Transporting Oil Products to Disaster Areas

We have been pursuing initiatives in light of the Group Philosophy since 1987.

Japan Railways Successful Financing Models

34 Review of Operations. 46 To Achieve Sustainable Growth. 65 Facts and Figures. Contents

Name Plate Design of Japanese Express Trains

Improving Safety at Level Crossings - JR East Developments

Transport and Travel in Japan

JR East: Domestic and International Perspectives

Evaluation of the National Railway Reform in Japan

Development of Transportation Networks

EXECUTIVE VICE PRESIDENT. Masaki OGATA. Copyright 2010 East Japan Railway Company. All rights reserved 1

High Speed System in Japan

Effectiveness of Electrical Safety Management Service proven by the Great East Japan Earthquake

Promoting JR EAST Groupʼs Inbound Initiatives

TRANSPORTATION BUSINESS SUPPORTS JR EAST AS A STABLE PROFIT RESOURCE

Transportation Shinkansen Network

THE IMPACT OF THE PARTLY-OPENED KYUSHU SHINKANSEN

The 2011 off the Pacific coast of Tohoku Earthquake. (immediate version)

CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019

ANA Reports Record Profits for FY2012

Summary of Life-Style Service Business Growth Vision (NEXT10)

ASSEMBLY 39TH SESSION

Quality Transport - Key to enhance Connectivity and Sustainability -

The Appliance of Science

JAPAN RAIL PASS Exchange Order cannot be purchased inside Japan.

Toward More Competitive Economy and Society

Station Development Eki-naka concept and practice. Hironori Tsujimura East Japan Railway Company London Office

FY Second Quarter Financial Results Presentation. October 29, 2015 East Japan Railway Company

1. Launch of the Tokyo-Osaka Hokuriku Arch Pass. November 4, 2015 East Japan Railway Company

The Asian evolution of high speed rail

Construction of Ueno Tokyo Line

KNOWLEDGE NOTE 1-3. Hydro-meteorological Disasters Associated with Tsunamis and Earthquakes. CLUSTER 1: Structural Measures

V i s i t o r s G u i d e C E N T R A L J A P A N R A I L W A Y C O M P A N Y

Discovery fully attractive towns. Southern Hokkaido 8 days Tour

Japan s Current Status and Challenges Towards Recovery

Tokyo Station. History of Tokyo Station (Opening 1970s) 4 November Prime Minister Takashi Hara assassinated on station concourse

Toward Japan-US Infrastructure Cooperation

Special edition paper Development of a Crew Schedule Data Transfer System

Tokyo-Aomori 3.0 million passengers. per year. Shin-Aomori. Aomori. Hachinohe (631.9km) Airport. Odate-Noshiro. Airport. Akita (662.

CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019

Cities Necessity to build intercity networks for their self-sustainability : Lessons learned from the Great East Japan Earthquake

Updated Priority Initiatives Going Forward of JR East Group Management Vision V Ever Onward

RESTORATIONS AND SYSTEM INTERACTIONS OF LIFELINES IN THE GREAT EAST JAPAN EARTHQUAKE DISASTER, 2011

Station Space Utilization

Arriving at Narita Airport and Traveling to Aizu-Wakamatsu

KNOWLEDGE NOTE 4-1. Infrastructure Rehabilitation. CLUSTER 4: Recovery Planning. Public Disclosure Authorized. Public Disclosure Authorized

What kind of ticket do I need to board a train?

RailTokyo March 2015 Japan High-Density Metropolitan and Intercity Railway Transportation

Pursuing Our. Unlimited Potential

Observation of the Exercise Objects, Locations, Points and Program on Day2 - Observers Manual -

Japan Rail Pass Price List. February 2013

NORTHERN TOHOKU AND WESTERN HOKKAIDO INDEPENDENT WINTER MINI TOUR

Change of passengers on airplanes due to the opening of the business of the Hokuriku Shinkansen

The Exterior and Interior Design of New Shinkansen Trains

Copyright 2017 East Japan Railway Company. All rights reserved. Rethinking the Safety Philosophy Yasutake Kojima Director June 12, 2017

Japan Rail Pass Fact Sheet

East Japan Disaster- Preliminary Report

Table Major analysis products provided by JAXA

A Railway Operator s Perspective on the Lessons of the Great Hanshin-Awaji Earthquake WEST JAPAN RAILWAY COMPANY. Takayuki Sasaki

Updated Priority Initiatives Going Forward

How to get to Shin-Osaka Washington Hotel Plaza from Kansai International Airport or Osaka (Itami) Airport Nobuyoshi Yabuki, Osaka University

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami

Network Safeworking Rules and Procedures

Updated Priority Initiatives Going Forward of JR East Group Management Vision V Ever Onward

Damage and Provision of Aid of Water Supply in Disaster-hit Areas, the Great East Japan Earthquake and Tsunami

FY Financial Results Presentation. May 1, 2014 East Japan Railway Company

GLOBAL PROMINENCE 2019 Aiming for Global Growth and Advancement

ANA Group Announces Its Fiscal Year 2018 Flight Schedule. ~Responding to the increasing demand in inbound tourism~

Toward More Competitive Economy and Society

Roles of Protected Areas for Recovery from Natural Disaster

Great East Japan Earthquake and Tsunami, Fukushima Daiichi NPP Accident (1/5)

Tsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion

Economic Impact of the Great East Japan Earthquake and current status of Recovery. April, 2011 May 4, 2011 Embassy of Japan in France Japan

JAL Group Announces Consolidated Financial Results for Full Fiscal Year 2011

Figure Pre- and post-disaster satellite topographical maps

Japanese Station Lunchbox Wrappers

Runway Status Lights (RWSL) in Japan. July 2015

Tsunami Impacting Eastern Japan and Preparedness for Extraordinary Natural Disaster. Takehiko Fujita

SYSTEM AND OVERVIEW OF ROADSIDE STATION. Ministry of Land, Infrastructure, Transport and Tourism

November 8, 2018 Hoosiers Holdings (3284) Second Quarter Fiscal Year Ending March 2019 Explanatory Materials on Financial Results

Earthquake. 2. MLIT s emergency response to the Great East Japan Earthquake. 3. Recent policy changes regarding tsunami

JNR(Japan National Railways) Reform. *No part of these slides may be reproduced in any form with out permission.

Transcription:

Overview of Hokkaido Shinkansen (Opening between Shin-Aomori and Shin-Hakodate-Hokuto) Shoshi Shimamura Introduction The Hokkaido Shinkansen (between Shin-Aomori and Sapporo) is essential for the revitalization of Hokkaido Railway Company (JR Hokkaido) as well as Hokkaido as a whole, and we would like to see it fully opened as soon as possible. The much anticipated service on the section between Shin-Aomori and Shin-Hakodate-Hokuto started on 26 March 2016. Hokkaido Shinkansen Line Conditions Series H5 logo (JR Hokkaido) About 149 km of the approximately 360 km of the Hokkaido Shinkansen between Shin-Aomori and Sapporo was opened recently between Shin-Aomori and Shin-Hakodate-Hokuto. More than half that or about 82 km including the 53.9-km Seikan Tunnel is shared between shinkansen and freight trains using dual-gauge tracks (Figure 1). Work on this shared section started in 1964 with the construction of the Seikan Tunnel, and it opened in 1988 as the conventional Kaikyo Line with a catenary voltage of 20 kv and using a cab signal block system. Kaikyo Line structures such as tunnels and bridges were built to shinkansen specifications right from the start, but shinkansen rails and three-rail turnouts and conversion of overhead catenary equipment to 25 kv were needed before the start of service to Shin-Hakodate-Hokuto. Moreover, opening the Hokkaido Shinkansen to Shin- Hakodate-Hokuto involved the following unprecedented special characteristics. Works, such as construction and renovation of equipment and test runs of rolling stock until just before the start of shinkansen services, were limited to specific periods, such as late at night when conventional services had stopped. Tests before the start of shinkansen services (ATC signal aspect tests, passing tests, etc.) differed from those just for shinkansen due to the presence of equipment for conventional services (three-rail turnouts, dual-gauge DS-ATC, etc.). To handle these special characteristics, discussions were held with related organizations and adjustments were made, such as setting increased intervals between trains and cancelling some overnight sleeper trains. Before the start of shinkansen services, equipment inspections were made from late FY2013, and crew training runs started from August 2015. Completion inspections were made by the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) from 16 November 2015, and an inspection certificate was received on 24 December 2015. Hokkaido Shinkansen Cold-Weather Countermeasures The Hokkaido Shinkansen must continue running in extremely cold winter months, so it has special coldweather countermeasures, requiring pre-verification in snow and cold temperatures. The usual snow countermeasure of sprinkling warm water on tracks could result in icing at very low temperatures, so snow-melting with sprinklers is only used on a few sections, such as near Shin-Aomori Station. Most sections use viaducts with snow-storage spaces where ploughed snow is stored along the track, or open-floor viaducts where snow is dropped down. Electric snow melters are the basic countermeasure to iced turnouts, along with snow-melting pits at level turnouts and air-jet snow removers used by JR Hokkaido on Japan Railway & Transport Review No. 68 Oct 2016 6

Figure 1 Plan for Full Hokkaido Shinkansen Line Shin-Otaru (provisional name) Sapporo Kutchan Oshamambe Shin-Yakumo (provisional name) Construction costs About 1.670 trillion Budget total (until FY2016 budget) 72.6 billion (4%) Shin-Hakodate-Hokuto to Sapporo Planned completion in 2030 211 km Shin-Hakodate-Hokuto 360 km Kikonai Goryokaku Hakodate Opened 26 March 2016 Shin-Aomori to Shin-Hakodate-Hokuto 149 km 82 km (Tsugaru Kaikyo Line) Structures built to shinkansen specifications Seikan Tunnel 54 km Construction costs About 550.8 billion* Budget total (until FY2016 budget) 545.6 billion (99%) Okutsugaru-Imabetsu Shin-Aomori Shichinohe-Towada Hachinohe *Changed to about 558.3 billion on 26 April 2016 7 Japan Railway & Transport Review No. 68 Oct 2016

conventional lines. This is the first time these technologies have been used on a shinkansen. Rather than using snowmelting pits, snow shelters are used at three-rail turnouts on the shared section. The cold-weather performance of these equipment and on-board equipment, and the like was verified over the two winters of FY2014 and FY2015. Hokkaido Shinkansen Earthquake Countermeasures Shinkansen earthquake countermeasures consist of improving the aseismic performance of civil-engineering structures as well as taking measures to minimize damage to operating trains when an earthquake strikes. Earthquake early warning system A typical countermeasure to earthquakes is prompt early detection to cut power to overhead lines and stop trains. Like other shinkansen lines in Japan, the Hokkaido Shinkansen, has wayside seismometers along lines as well as coastal seismometers installed close to hypocentral regions in order to detect earthquakes. As shown in Figure 2, there are wayside seismometers at nine locations near hypocentral regions for anticipated Figure 2 Wayside and Coastal Seismometers for Hokkaido Shinkansen Wayside seismometer Coastal seismometer Monitored hypocentral region Oshamambe Shin-Otaru (provisional name) Kutchan Sapporo Mukawa Setana Shin-Yakumo (provisional name) Shin-Hakodate- Hokuto Esan Kikonai Urakawa Matsumae Shimokita Okutsugaru-Imabetsu Fukaura Shin-Aomori Kazuno Shichinohe-Towada Hachinohe Hachinohe Japan Railway & Transport Review No. 68 Oct 2016 8

major earthquakes plus eight coastal seismometers at 20-km intervals along the line. These seismometers are housed in seismological observation huts with two types of seismometer for redundant protection. At an earthquake, trains are stopped automatically and wayside equipment is inspected based on the spectrum intensity (SI) measured by the seismometers. Operation restarts after safety has been confirmed. Derailment countermeasures The earthquake early warning system stops trains as soon as an earthquake occurs, but seismic waves can strike tracks quickly in an inland earthquake. The first ever shinkansen derailment occurred in the 2004 Mid-Niigata Prefecture Earthquake, so countermeasures have been taken to minimize damage in similar circumstances. Deviation prevention guides keep carriages upright and close to the rails even when derailed. Hokkaido Shinkansen Operation Control Train protection and operation The Hokkaido Shinkansen operation control centre in Sapporo controls operations between Shin-Aomori and Shin-Hakodate-Hokuto. The track section shared with freight trains uses the CYGNUS operation control system to integrate control of both shinkansen and conventional trains. The conventional Kaikyo Line initially used cab signal block signalling (using analogue ATC), but ATC for dualgauge track supporting track sharing by shinkansen and freight trains was introduced when shinkansen services started. This new ATC is based on the system used on the Tohoku Shinkansen. Final wayside equipment switchover Prior to the start of Hokkaido Shinkansen services, conventional trains were running on the Kaikyo Line, including through the Seikan Tunnel and on sections at the tunnel portals, so a conventional operation control system was used between Aomori and Goryokaku. When Hokkaido Shinkansen services started, freight trains would be running through operations in the sections between Aomori and Shin-Naka-Oguni junction (conventional line operation control system), between Shin-Naka-Oguni junction and Kikonai (CYGNUS), and between Kikonai and Goryokaku (conventional line operation control system). For this reason, it was necessary to switchover the conventional line operation control system after the start of shinkansen service, enabling exchange of train numbers for freight trains between the operation control systems of the three sections. The risk of such a large-scale system switchover on the same day as shinkansen service started was deemed too high, so the system was switched on 22 March 2016 before the start of shinkansen service. At the same time, the catenary voltage was changed to 25 kv and the protection system was changed to digital ATC with discontinuation of the cab signal block system. Conventional passenger services were completely suspended and the final switchover of wayside equipment was finished by 25 March to confirm 24-hour stable operation of systems and equipment. Ahead of the final switchover, as a trial, all conventional passenger services were suspended from New Year s Eve 2015 to early 2 January 2016 during the New Year holidays when freight trains were not running, and the condition after the trial switchover was confirmed separately by teams for operation control, signalling, stations, depots, rolling stock maintenance, and others. Completely suspending conventional passenger services to conduct final switchover of wayside equipment and advance confirmation inconvenienced passengers, but was a key task in opening the Hokkaido Shinkansen without major problems. Overview of Hokkaido Shinkansen Operations H5 Rolling stock Series H5 running through snow The Series H5 cars used by the Hokkaido Shinkansen have the same basic specifications as the Series E5 used by JR East with 10-car trainsets, the same onboard equipment, and a top speed of 320 km/h, taking into consideration through services from the Tohoku Shinkansen. The Series (JR Hokkaido) 9 Japan Railway & Transport Review No. 68 Oct 2016

Table 1 Operations between Tokyo and Shin-Hakodate-Hokuto Service Name Hayabusa Hayabusa Hayate Hayate Hayabusa with shortest Number of runs 10 round trips 1 round trip 1 round trip 1 round trip travel time Tokyo Ueno Omiya Sendai Furukawa Kurikoma-kogen Ichinoseki Mizusawaesashi Kitakami Shin-Hanamaki Morioka Iwate-Numakunai Ninohe Hachinohe Shichinohe-Towada Shin-Aomori Okutsugaru-Imabetsu Kikonai Shin-Hakodate-Hokuto Notes: indicates some trains stop H5 is further equipped with snowploughs, covered underfloor equipment, etc. It is designed to handle temperatures down to 20ºC based on past meteorological data. The top operating speed on the Hokkaido Shinkansen section is 260 km/h (140 km/h for the time being on the section shared with conventional trains). Operation structure of Tohoku/Hokkaido Shinkansen The train diagram (Table 1) considered the initial numbers of passengers after the service start and factors such as convenience. Hayabusa services make 10 round trips between Tokyo and Shin-Hakodate-Hokuto and one round trip between Sendai and Shin-Hakodate-Hokuto, and Hayate services make one round trip between Morioka and Shin- Hakodate-Hokuto and between Shin-Aomori and Shin- Hakodate-Hokuto, for a total of 13 round trips. Trains stop at Kikonai Station on eight round trips and at Okutsugaru- Imabetsu Station on seven round trips. Moreover, there are plans to run extra trains during peak travel times, such as during the Golden Week spring holiday, Obon summer holiday, and New Year s holiday. The fastest time between Tokyo and Shin-Hakodate- Hokuto is 4 hours 2 minutes. Hayabusa No. 5 departing Tokyo at 08:20 and Hayabusa No. 11 departing Tokyo at 09:36 with stops at Omiya, Sendai, Morioka, and Shin- Aomori are the fastest outbound trains, and Hayabusa No. Japan Railway & Transport Review No. 68 Oct 2016 10

Figure 3 Train Change at Shin-Hakodate-Hokuto Station Cross Section South Exit Station Front North Exit Transport Hub Shinkansen Station Building Transfer Gate Conventional Station Building Passageway (North Side) To be built by start of service to Sapporo Shinkansen Track 12 Shinkansen Track 11 (Shinkansen) (Shinkansen) Transfer Gate Conventional Track 2 (Conventional Line) Conventional Track 3 (Conventional Line) Conventional Track 4 (Conventional Line) Conventional Track 5 (Conventional Line) Shinkansen Platform 2 Shinkansen Platform 1 Conventional Platform 1 Conventional Platform 2 Plan (Platform Level) Conventional Limited Express Train Conventional Track 2 To Sapporo Conventional Platform 1 Elevator Shinkansen Platform 1 Escalator Escalator Transfer Gate Elevator Stairway Stairway Access Train Conventional Track 1 (New Access Line) To Hakodate Shinkansen Train Shinkansen Track 11 To Tokyo Note: Shinkansen Station Building built by Japan Railway Construction, Transport and Technology Agency, and passageway built by Hokuto City. 34 departing Shin-Hakodate-Hokuto at 17:20 is the fastest inbound train. The fastest time between Omiya and Shin- Hakodate-Hokuto is 3 hours 38 minutes, and the fastest time between Sendai and Shin-Hakodate-Hokuto is 2 hours 30 minutes. With the start of shinkansen service, the travel time of the fastest trains from Tokyo to Hakodate was cut by 53 minutes from 5 hours 22 minutes to 4 hours 29 minutes, and the travel time of the fastest trains from Tokyo to Sapporo was cut by 1 hour 23 minutes from 9 hours 7 minutes to 7 hours 44 minutes. With the Hokkaido Shinkansen opening, Series 261 carriages were introduced on the Hokuto limited expresses travelling between Hakodate and Sapporo. This increased the number of round trips between the cities by three to 12 per day (24 runs) with all services stopping at Shin- Hakodate-Hokuto, which is the end of the line for the Hokkaido Shinkansen for the time being. Excluding the Super Hokuto No. 1 starting at Hakodate Station and the Super Hokuto No. 24 ending there, 11 of these round trip runs connect to the shinkansen. To provide the most convenience for passengers changing trains, the transfer between the limited express and shinkansen services has been kept across platform as far as possible (Figure 3). The section between Goryokaku and Shin-Hakodate- Hokuto was also electrified in conjunction with the start of shinkansen service and Hakodate Liner access trains were introduced. Four Series 733 EMUs (three-car basic trainsets) were introduced, and 16 round trips are set for the line with connections to all shinkansen trains. Two types express with travel time in mind and ordinary cover the 17.9 km between Hakodate and Shin-Hakodate-Hokuto in as little as 15 minutes. Expresses stop only at Goryokaku, while ordinary services stop at Goryokaku, Kikyo, Onakayama, 11 Japan Railway & Transport Review No. 68 Oct 2016

CG Image of interior of Series 733-1000 (JR Hokkaido) CG Image of exterior of Series 733-1000 (JR Hokkaido) Japan Railway & Transport Review No. 68 Oct 2016 12

and Nanae stations. Most trainsets are three cars (total capacity of 439 and seated capacity of 148), but six-car trains are sometimes run when there are many passengers, such as on the Hokkaido Shinkansen opening day. The Hakodate Liner rolling stock is based on Series 733 EMUs operating in the Sapporo area, and the livery image concepts are linkage to and sense of integration with the shinkansen and Hokkaido-ness. The main colour is the same purple as the Hokkaido Shinkansen Series H5 rolling stock with a stripe in the same light green as JR Hokkaido s corporate colour. The interior design concepts are the rich nature of Hokkaido and the exotic atmosphere of Hakodate with green seats invoking the feeling of Hokkaido s wide fields, wood-grain partitions near passenger doors with a feeling of Hokkaido s nature, and door parts in brick colours reminiscent of the brick warehouses and monasteries of Hakodate. Training Hokkaido Shinkansen Personnel Human resource development Preparations for the opening of the Hokkaido Shinkansen were made by JR Hokkaido as a whole, centring on training some 270 people in charge of work related to the shinkansen. A high safe and stable transport level must be secured for shinkansen, so work such as running tests and training runs was conducted thoroughly. Efforts were put into building an operation structure, including education of necessary personnel, formation of an organization for use at start of service with an eye to business structure, and preparations of rules and manuals. We received help from JR East in order to learn technologies related to shinkansen operation. Shinkansen crews, dispatchers, rolling stock inspection and maintenance personnel, and construction personnel were sent to JR East for training. increase in passengers exceeding the average of 2800 a day on conventional limited express and express services between Naka-Oguni and Kikonai. Year-on-year, the number doubled to an average of 5600 a day. Passenger numbers also tended to increase in May and June. In future, we will run extra shinkansen services at busy periods, while prioritizing continuing safe operation. In operating the Hokuto and Hakodate Liner express trains for access to the shinkansen, we intend to maintain capacity by means such as operating extras services and coupling extra cars. Conclusion I would like to use this space to express our thanks to the various people who have helped with the opening of the Hokkaido Shinkansen, without forgetting that today s achievements are thanks to the efforts, passion, and labour of the many who have gone before us. Using the opportunity provided by the recent start of Hokkaido Shinkansen services, we intend to push forward with continued efforts toward completing services through to Sapporo. Training runs Realistic training runs were conducted before the service start. Tasks included mastering driving operations by drivers as well as door operation by conductors, platform door operation by station personnel, and management of train operation by dispatchers. However, this had to be done after conventional operations at night between Shin-Aomori and Shin-Hakodate-Hokuto, so only three round trips could be made each night. Consequently, training was conducted over a long period from August 2015 to the service start. Future Outlook The first month of Hokkaido Shinkansen operations between Shin-Aomori and Shin-Hakodate-Hokuto saw a steady Shoshi Shimamura Mr Shimamura is a Director in the Shinkansen Management Department at JR Hokkaido 13 Japan Railway & Transport Review No. 68 Oct 2016