THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

Similar documents
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

2012 Performance Framework AFI

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10 DECEMBER

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Russian Federation ATM modernization program

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10 DECEMBER 2010) ZAMBIA

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

Bits to Blocks Aviation System Block Upgrades (ASBU)

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

(RN R A N V A V & & RN R P N

TWELFTH AIR NAVIGATION CONFERENCE

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY

Review of Air Navigation Matters 2.1 Global Air Navigation and CAR/SAM developments NAM/CAR Regional Air Navigation Implementation Plan

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

CNS/ATM Systems Interoperability and Harmonization

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

PBN Implementation Plan Tonga

MID Region Air Navigation Strategy

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

CMATS The Civil Military ATM System

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

NATA 2018 AGM & CONFERENCE

Global ATM System ~Interoperability and Harmonization ~

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

ICAO GANP Requirements and Evolution

Benefits of CNS/ATM Implementation for the Region

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

PBN and airspace concept

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Continuous Improvement of the Global Air Traffic Management System

Trajectory Based Operations

APAC PBN UPDATE Slide 1 of xx

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Concept of Ops: A Strawman

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes

Packaging Tomorrow s Aviation System

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Air Navigation Bureau ICAO Headquarters, Montreal

PBN Implementation Plan - Fiji Version 1 19 January 2010

REG ASP MIL APO USE INT IND NM

30 SEP - 02 OCT, 2014

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

Surveillance and Broadcast Services

Safety and efficiency performance framework ASBU methodology. H.Sudarshan Air Navigation Bureau, ICAO

Session III Issues for the Future of ATM

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

RNP AR and Air Traffic Management

SAMPLE TEMPLATE APPENDIX 3.5C-1

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

REG ASP MIL APO USE INT IND NM

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Enterprise Integration: A Framework for Connecting the Dots

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

TWELFTH AIR NAVIGATION CONFERENCE

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009

MetroAir Virtual Airlines

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

IATA FUEL EFFICIENCY CAMPAIGN

TWELFTH AIR NAVIGATION CONFERENCE

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Making the World A better place to live SFO

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

34 th Airline/ATS Safety Forum

Enter here your Presentation Title 1

PBN Airspace Concept. ATS requirements

ECOsystem: MET-ATM integration to improve Aviation efficiency

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

Presented by: Trinidad and Tobago

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

UK Implementation of PBN

On Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1

Navigation at the. Federal Aviation Administration Crossroads

Boeing Air Traffic Management Overview and Status

Draft PBN Implementation Plan Papua New Guinea

Transcription:

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM

MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq Km Yearly 25,000 Commercial 2,500 Over Flights 3,000 Military Flights Mauritius 12,000 Local Flights OHT 1

Characteristics of Industry (Contd) A 7% traffic growth is predicted for the coming 10 years Main challenges augment airspace capacity for en-route RNP-4 Introduce ADS-B in Mauritius TMA Implement RNAV GNSS approach

2. The air navigation service provider WHO WE ARE AND WHAT WE DO? WE ARE THE ANS PROVIDING ARM OF THE DCA WE PROVIDE CNS ATM AIM TO THE AERONAUTICAL COMMUNITY WE ARE REGULATED BY DCA MAURITIUS WE ARE FUNDED BY GOVT ON A THREE YEAR PERFORMANCE BASED BUDGETTING

3. MAJOR STAKEHOLDERS/PARTNERS THE MAJOR STAKEHOLDERS /PARTNERS ARE AIRPORT OPERATORS, AIRLINES,THE REGULATOR, MET, ADJACENT ANS SERVICE PROVIDERS, FIXED BASED OPERATORS FOR GENERAL AVIATIATION, MILITARY AND EQUIPMENT SUPPLIERS.THE FUNDING SOURCE IS COLLECTION OF RANC AND GOVERNMENT FUNDED.

4. PROBLEM DEFINITION THE WHOLE MAURITIAN AIRSPACE IS RNP 10 CLASS A AIRSPACE. LIMITATIONS ARE NO SURVEILLANCE IN THE TMA TO INCREASE CAPACITY WE INTEND TO UPGRADE TO RNP 4. REDUCE CO2 EMISSION AND FUEL BURN BY PROMOTING FLEXI TRACK, AIRLINE PREFERRED FLIGHT PROFILES AND DYNAMIC REROUTING AND FLIGHT PLANNING. IN OUR OCEANIC AIRSPACE WE DONT NEED ATS ROUTES.

STRATEGIC OPERATIONAL IMPROVEMENT/ NATIONAL PERFORMANCE OBJECTIVE PFF1 INTRODUCTION OF FLEX TRACKING IN MAURITIUS FIR TO ENHANCE CAPACITY AND EFFICIENCY OF ENROUTE AIRSPACE Performance Benefits Safety Environm ent Capacity Cost effective ness 1. Safety level maintained 1. Reduced emissions through shorter flights and use of optimum routes/trajectories 1. Increased capacity through better utilization airspace resources 1. Fuel cost reduction through availability of more optimized routes/trajectories; and 2. Ability of aircraft to conduct flight more closely to preferred trajectories

PERFORMANCE MEASUREMENT METRICS 1. En ROUTE DYNAMIC REFLIGHT PLANNING WITH ATC GROUND ASSISTANCE CLEARANCE REROUTING & FPL WITHIN 5 MIN. OF REQUEST 2. PERCENT DIFFERENCE BETWEEN OPTIMAL AND ACTUAL ROUTE 30 MINUTES OVER 13 HOURS 3. FACILITY AVAILABLE TO ALL ENROUTE AIRCRAFT 4. 1-3 % ECONOMY PER FLIGH 5. PERCENTAGE OF TIME THE FLEX TRACK AVAILABLE 100%

ATM OPERATIONAL CONCEPT COMPONENTS AOM, DCB, TS AND CM Strategy Medium term (2010-2015) TIMEFRAME PROJECTS/TASKS START/END OPR USES BEST WINDS AND REQ PREFERRED FLIGHT PROFILE. ATC REROUTE THE AIRCRAFT.FPL IS AUTOMATICALLY AMENDED AND AIDC COORDINATION TAKES PLACE.AUTOMATED LAT SEP TOOL USED FOR SEPARATION. JANUARY 2010 - OCTOBER 2015 RESPONSIBI LITY STATES /MAURITIUS AUSTRALIA STATUS (AS OF 01/01/10 ) AROUND 30 FLIGHTS INITIALLY. 1. FLEXIBLE RNAV ROUTES USED WITH ATC GROUND ASSISTANCE. IMPLEMENTE D 1. HORIZONTAL SEPARATION REDUCE D TO 50 NM BETWEEN EQUIPED AIRCRAFT IN RNP 10 AIRSPACE 1. IMPLEMENT ELECTRONIC FLIGHT STRIPS IMPLEMENTE D IMPLEMENTE D 1. ALIGN AIRSPACE CLASSIFICATION TO CLASS A ABOVE FL 195 IMPLEMNTE D

AOM, DCB, TS and CM 1. Transition to new flight plan 01/07/11 Mauritius Software MODIF as from 01/01/11 1. Implement AIDC Implented 1. Migration to WGS-84 Implemented 1. Implementation of AXIM ( AIXM!!!) 2012 1. Implement etod for Area 1 1. Implementation of eaip Implemented 2012 Soft version available on WEB 1. Digital NOTAMs??? NOTAM system automated 1. Quality management systems for AIM 1. Improve data and voice communications 2012 Flight Clearance functions already ISO Certified WE have the QMS VHF HF CPDLC Implemented VSAT SITA 1. Implementation of GNSS 1. Enhance situational awareness DECEMBER 2011 ASD all FLTS Procedures Ready awaiting Flight CHECKS

Risk Management Risk factors: delay in aircraft equipage; Disaster recovery Risk mitigation: involvement of aircraft operators in the decision making process, System Design Tower and ACC alternate. We maintain a highly efficient and independent HF and extn VHF Linkage to GPIs GPI/5: performance-based navigation (RNP10); GPI/7: dynamic and flexible ATS route management; GPI/8: collaborative airspace design and management; GPI/9: situational awareness; GPI/12: FMS-based arrival procedures; GPI/17 Data link applications; GPI/18 Aeronautical information; GPI/19 Meteorological systems; GPI/20 WGS-84; GPI/21 Navigation systems; and GPI/22 Communication infrastructure.

Performance Benefits Safety Drastically improved by surveillance Environment Reduction of CO2 emission with less fuel burn caused by low level restrictions Capacity Increased with reduction of horizontal separation Cost effectiveness CDA and quicker turn around for inter island flights very beneficial

STRATEGIC OPERATIONAL IMPROVEMENT/ NATIONAL PERFORMANCE OBJECTIVE PFF 2 IMPLEMENTATION OF ADS-B FOR SURVEILLANCE AND SEPARATION IN LIEU OF RADAR Performance Measurement METRICS 1. 10 DME TO 5 NM SEPARATION 2. 100 PERCENT OF TIME THE FIXED AIRSPACE IS AVAILABLE TO CIVIL USERS 3 NUMBER OF AIRCRAFT ENTERING MAURITIUS TMA 7 TO 10 FLIGHTS PER HOUR. 4. LEVEL RESTRICTION REDUCED BY 70%

ATM OPERATIONAL CONCEPT COMPONENTS REGULATOR,AIRLINES ADJACENT CENTRE Strategy Medium term (2010-2015) PROJECTS/TASKS INTRODUCTION OF A SURVEILLANCE SYSTEM IN THE MAURTIIUS TMA USING ADS-B AS OPPOSED TO RADAR TIMEFRAME START/END APRIL 2011 APRIL 2015 RESPONSIBILI TY ANS DCA STATUS (AS OF 01/01/10 ) ON 01 JAN 2010 MEETING UPGRADING OF EUROCAT PLATFORM DEVELOPMENT OF CNS/ATM PROCEDURES AND ATC TRAINING AIRCRAFT EQUIPAGE COOP APP AIRLINES SUB REGIONAL ICAO ATM SYSTEM CAPABLE TO INTEGRATE NON ADS-B AIRCRAFT BUSINESS PLAN OUT OF 3YR PBB FUNDS PROJECT REQUIRE NO ADD FUNDS 2013/2014 ANS 2012/2014 OPRS 2017 ANS/OPRS APRIL 2011 APRIL 2015 ANS

RISK MANAGEMENT RISK FACTORS: DELAY IN AIRCRAFT EQUIPAGE RISK MITIGATION: INVOLVEMENT OF AIRCRAFT OPERATORS IN THE DECISION MAKING. ICAO ASSISTANCE REGION SPECIFIC. ACCESS TO COMMERCIAL DATABASES LINKAGE TO GPIS GPI/8: COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT; GPI/9: SITUATIONAL AWARENESS; GPI/12: FMS-BASED ARRIVAL PROCEDURES; GPI/17 DATA LINK APPLICATIONS; GPI/18 AERONAUTICAL INFORMATION; GPI/19 METEOROLOGICAL SYSTEMS; GPI/20 WGS-84; GPI/21 NAVIGATION SYSTEMS; AND GPI/22 COMMUNICATION INFRASTRUCTURE.

STRATEGIC OPERATIONAL IMPROVEMENT/ NATIONAL PERFORMANCE OBJECTIVE PFF3 OVERLAY OF RNAV GNSS APPROACH PROCEDURES ON EXISTING ILS APP AND ENHANCEMENTS OF NON- PRECISION APPROACHS PERFORMANCE BENEFITS SAFETY 1. SAFETY LEVEL IMPROVED ENVIRONMENT 1. NOISE ABATEMENT PROCEDURES CAPACITY COST EFFECTIVENESS 1. NOT SIGNIFICANT PROVIDE SUFFICIENT REDUNDENCY IN CASE OF ILS/VOR OUTAGES EG AFTER CYCLONES. REDUCTION OF DIVERSION DUE BAD WEATHER BY 95%.

PERFORMANCE MEASUREMENT METRICS 1. ILS AND NON-PRECISION APPS NON - AVAILABILITY IS AROUND 5% OF TOTAL USE TIME CAUSING DIVERSIONS AND HOLDINGS. REDUCE UNAVAILABILITY OF AN APPROPRIATE IAP TO ZERO 2. REDUCE DIVERSION OR HOLDING DUE UNAVAILABILITY OF AN APPROPRIATE IAP BY 97%. 4. 1% ECONOMY OF TOTAL FUEL BURNS PER TOTAL OPERATIONS. 5. PERCENT OF TIME THE FIXED AIRSPACE UNAVAILABLE TO CIVIL USERS

STRATEGY MEDIUM TERM (2010-2015) ATM OPERATIONAL CONCEPT COMPONENTS PROJECTS/TASKS TIMEFRAME START/END RESPONSIBILI TY STATUS (AS OF 01/01/11 ) ANS DCA MET AD & AIRLINE OPRS IMPLEMENT RNAV GNSS APP PROCEDURES FOR ALL MAURITIUS AIRPORTS JAN 2011 DEC 2011 DCA ANS PROCEDURES UNDER FINAL REVIEW BY ANS AND OPRS PLAN FLIGHT CHECK OF PROCEDURES TO COINCIDE WITH IMPLEMENTATION DATE NOV 2011 ANS OPS FRAMEWORK WITH ASECNA TRAINING OF ATC ONGOING SIMULATOR ANS MORE THAN 2 AIRAC CYCLES (A FULL 3 MONTH) JAN 2011 AUG 2011 ANS

RISK MANAGEMENT LINKAGE TO GPIS RISK FACTORS: LATE AVAILABILITY OF AERONAUTICAL INFORMATION. ADDITIONAL TRAINING REQUIREMENTS. RISK MITIGATION: INVOLVEMENT OF AIRCRAFT OPERATORS IN THE DECISION MAKING; ACCESS TO COMMERCIAL DATABASES GPI/5: PERFORMANCE-BASED NAVIGATION; GPI/7: DYNAMIC AND FLEXIBLE ATS ROUTE MANAGEMENT; GPI/8: COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT; GPI/9: SITUATIONAL AWARENESS; GPI/12: FMS-BASED ARRIVAL PROCEDURES; GPI/17 DATA LINK APPLICATIONS; GPI/18 AERONAUTICAL INFORMATION; GPI/19 METEOROLOGICAL SYSTEMS; GPI/20 WGS-84; GPI/21 NAVIGATION SYSTEMS; AND GPI/22 COMMUNICATION INFRASTRUCTURE.