BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES

Similar documents
Press Release. Bilfinger with dynamic start to financial year 2018

Life cycle Solutions partner for the entire life cycle of industrial assets

Press Release. Bilfinger 2017: Stable foundation laid for the future

Bilfinger The international engineering and services group. April 7, 2016

Wärtsilä Scrubber Retrofit

Case examples: CEF -fundings for Innovations

Middle East: E&T and MMO

BALLAST WATER MANAGEMENT SYSTEMS

Bilfinger SE Bilfinger SE Company Presentation

Tradition and innovation

Bilfinger SE Company Presentation

Wärtsilä Italia S.p.A. Confindustria Venezia Giulia - Trieste, 28 th February 2018

YMA TRAINING CATALOG 2017

Packed to perfection. FAST, FUNCTIONAL AND FLEXIBLE For industrial self-generation, small utilities, industrial and IPP customers who do not

A SMARTER HOTEL INVESTMENT

In-Flight Entertainment and Connectivity

Department of Defense DIRECTIVE

English. Miba Automation Systems

Thales on the Civil Aerospace market

New innovations and possibilities an extension to old traditions

Materna Integrated Passenger Services (Materna ips)

Mobile Aircraft Maintenance Crew (MAMC) EXTENDING YOUR SUCCESS

Bilfinger IS Czech s.r.o.

ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES

CUSTOM HOSE FABRICATION

I would like to welcome you warmly to the Bilfinger SE Annual General Meeting in Mannheim - also on behalf of the Executive Board.

Standard fluid transfer assemblies

the foss seattle shipyard helping you succeed in a competitive market

E-RECORDS. Heading towards a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT

CASM electric cylinders

MEET OUR SUPPLY CHAIN EXPANSIONS

Your success is our goal. Rely on our engineering.

Industrial Fluid Systems

Bilfinger SE Bilfinger SE Company Presentation

I would like to welcome you warmly to this year s Annual General Meeting in Mannheim also on behalf of the Bilfinger SE Executive Board.

T R A V E L A G E N T G U I D E T O C L I A A C C R E D I T A T I O N 2018

Content. Type SIL100 Ultra-pure silicone hose 4. Type SIL200 Fabric-reinforced silicone hose 6. Type SIL300 Wire-reinforced silicone hose 8

Critical Systems and Software Solutions

Nunc Roller Bottles. No matter the culture, we have a solution

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia

ITA Europe 2015 Keynote Speaker

BAGGAGE HANDLING SYSTEM MAKES FAST CONNECTIONS

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

Load-following capabilities of nuclear power plants

Bilfinger Engineering and services: Group transformation bearing fruit

Propulsion Solutions for Fishing Vessels SERVICES

International Conference on Integrated Modular Avionics Moscow

Load-following capabilities of Nuclear Power Plants. Erik Nonbøl

CUSTOMER SEGMENTS IN SHIP POWER TIMO KOPONEN VP FINANCE&CONTROL, SHIP POWER

Progressing towards profitable growth

E-RECORDS. Our Innovation journey - a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT

Preliminary Figures FY 2016

World-Class. World-Wide.

WÄRTSILÄ CORPORATIONO O

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

Mobile Aircraft Maintenance Crew A380 Door Modification EXTENDING YOUR SUCCESS

Introducing. RUAG Space. From our Electronics portfolio: Antenna. From our Spacecraft portfolio: Thermal Insulation

Millions invested in the production of weak acid cation exchange resins and new food-compatible filling unit

The Fukushima nuclear accident

ENGINEERING AND TECHNICAL CHALLENGES IN LNG CONVERSIONS. 1 Wärtsilä

Helping you work safely. Many industrial applications. Safety in design

Terms of Reference: Introduction

Combined CAME & MOE INITIAL / AMENDMENT* COMPLIANCE CHECK LIST

Other invests projects at CEA Cadarache in the 10 next years

Entertainment Systems for Cruise Ships

Meeting the Management 2017 Structurally improving the financial profile. Michael Pontzen, CFO

Funa Solutions for Cruise Ships

Installation & Commissioning Report

ABOUT DUBLIN AEROSPACE

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

WӒRTSILӒ SHIP DESIGN COMPANY INTRODUCTION. Andrew Loh. Presentation name / Author. Day Month Year

Maintaining the dream

AviAlliance The Airport Management Company

Aircraft Management Comprehensive Ownership, Operation and Maintenance Management Services

CCI Nuclear Flow Control Products and Services

facc Interiors Extend Your Expectations November 2017 Copyright FACC, 2017 Page 1

Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across

Engineering work has advanced considerably since June 2011, when the company announced it had selected Singapore as the site for the new plant.

CARTRIDGE AND BAG FILTER UNIT. Passion for Filtration

The success story continues

Mixpac TM B-System Application System for 2-Component Products 25 ml, 50 ml and 75 ml

Aker companies investor day, London Jan Arve Haugan, President & CEO Eiliv Gjesdal, CFO

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Sliplining of Lock-Bar Steel Water Mains, Wilmington Delaware

WÄRTSILÄ Wärtsilä Value creation Sector in circular economy Main products:

REPLACEMENT KNIVES FOR INDUSTRIAL MACHINES.

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

Payload Adapters and Separation Systems

The Civil Aviation Sector as a Driver for Economic Growth in Egypt

Announcing the Sale of Manufacturing Rights, assets, and FAA/CAAC Type Certificates for the Lake Amphibian

PRODUCT PRESENTATION R-BUS. The great traveller

TWELFTH AIR NAVIGATION CONFERENCE

Attraction Safety. Westlakes. Engineering. Our Capabilities

Commercial Aircraft Customer Services

Competence training The knowledge that lets your career take off

Comlux Completion: your center of excellence for VIP cabin completions

Certificate IV Aeroskills (Mechanical) MEA The largest CASR and EASA Part 147 approved Maintenance Training Organisation in Australia.

POWER PLANTS FOCUS ON GAS

Location. waterfront property. Peninsula. ! Short ferry ferry ride ride (30 (30 minute passenger ferry, ferry, minute vehicle) from from Seattle

Driving STM32 to success STM32 services for sophisticated embedded applications

Transcription:

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES

Energy & Utilities

NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK We design, manufacture and supply crucial equipment for nuclear power plants and other nuclear facilities. We also take care of the assembly, maintenance and upgrade of those components. From containment to the handling of nuclear fuel, from compacting to the decontamination of nuclear material and from design and prefabrication to installation of vessels and complex piping assemblies, we manage the technological challenges and meet the regulatory requirements of the nuclear industry.

Energy & Utilities 1 2 SAFETY AND VALUE IN CRUCIAL EQUIPMENT AND COMPLEX SERVICES COMPLEX PIPING SERVICES FOR THE NUCLEAR INDUSTRY Based upon its long standing experience in the nuclear industry, Bilfinger provides complex piping services for the nuclear island, the turbine hall, for plants on the upstream part of the value chain (nuclear fuel preparation and upgrading) as well as on the downstream side of the value chain (for nuclear waste fuel treatment plants). Within the scope of these services, Bilfinger creates superior value by handling the engineering part (from complete layout, flexibility and stress analysis to detailed design) as well as complete logistics from procurement to inspection and testing. We also provide prefabrication of key components in our own workshops and handle the installation, welding and testing on site. Bilfinger manages these activities in accordance with the demanding industry codes and regulations such as ASME III, ANSI, RCCM, KTA and DIN EN and has extensive experience in managing all documentation and inspection requirements associated with these activities. While Bilfinger provides piping systems fabricated in-house as work packages, most of this type of work is carried out through fully-integrated teams with our customers or our partners in order to fully connect the various working processes and improve overall efficiency of the work. We help our customers reduce this complexity and improve the overall efficiency, thus creating added value. MANAGEMENT OF NUCLEAR ENCLOSURE CONTAINMENT Bilfinger has extensive experience supplying the nuclear industry with containment solutions from nuclear island pool liners to airlocks and associated containment solutions. Bilfinger not only designs and supplies the required equipment but also finds the best individual solution for every project. This includes all engineering phases from the concept design using structural and mechanical analysis through to fabrication and installation design. It takes into account for instance all required seismic related computations and analysis as well as all the engineering coordination phases required by the plant owner and all regulatory validations. This work is done by Bilfinger engineers. Bilfinger manages all the manufacturing of the relevant equipment as well as all associated inspection and testing according the most stringent nuclear codes. Finally, Bilfinger provides the complete field supervision through a senior supervision team and, if required, manages the overall construction on site as well.

3 4 5 1 Hot cells 2 Airlock 3 Narrow gap orbital welding 4 High pressure pipe induction bending 5 Super-compactor system 6 Phadec 6 Bilfinger is your partner of choice when it comes to optimizing mission critical containment concepts for the nuclear industry. HANDLING OF NUCLEAR FUEL Bilfinger supplies the nuclear industry with proprietary equipment to manage nuclear fuel in contained areas. We provide all the necessary handling equipment to remove the rods and handle them with automated fuel handling machines. We also provide the intermediate storage pools and racks. As for the containment, Bilfinger not only designs and supplies the required equipment, but can tailor design the optimum configuration and solution for hot cells, including all the engineering for the lining as well as all the engineering and planning for the handling equipment. COMPACTING AND DECONTAMINATION OF NUCLEAR WASTE MATERIAL Bilfinger has developed a service to help its customers in the nuclear industry better manage their radioactive waste. Bilfinger offers a modular system for the treatment of nuclear waste that includes sorting, decontamination, compaction and grouting. The major advantage is the flexibility that this system creates: It allows operators to temporarily install the equipment when they need it, saving space and money. As this service is charged based on unit rates, customers have better control of their spending and achieve greater value for their money. Bilfinger is uniquely positioned to design, supply and install under one umbrella the complete hot cells which is reducing a large number of interfaces for the plant owners and associated tier one contractors and bring a higher return on the invested capital.

Energy & Utilities BILFINGER, PARTNER OF CHOICE FOR THE NUCLEAR INDUSTRY 1 3 4 2 3 5 8 9

6 7 1 Containment liner 2 RPV closure head equipment 3 Airlock 4 Steam generator piping 5 Auxiliary piping nuclear island 6 Auxiliary piping turbine hall 7 Filter changing machine 8 Core melt stabilization system 9 Super-compactor system

Energy & Utilities BILFINGER S LIFE CYCLE COMPETENCES 1. PROJECT CONSULTANCY Bilfinger provides a full range of consultancy services to support the early project development phase in the nuclear industry. We provide feasibility studies and concept design for containment, nuclear fuel handling as well as nuclear waste management. Bilfinger also offers a wide range of project engineering and project management services in these fields as well as for equipment installation and piping work for nuclear islands, turbine halls and balance of plants. Bilfinger also provides project engineering and project management services for processes related the upgrading and retreatment of nuclear fuel. 3. EQUIPMENT MANUFACTURING Bilfinger, along with a network of qualified suppliers, has strong capabilities in the manufacturing of both specific equipment as well as pressure vessels and piping assembly works. We operate our own workshops that meet all necessary certificate requirements of the industry as well as local regulatory requirements. We also provide air lock manufacturing, handling systems for fuel rods as well as equipment for the compacting and decontamination of nuclear waste. Project Consultancy Engineering Procurement/ Fabrication Construction/ Commissioning/ Startup 2. DESIGN ENGINEERING Bilfinger has strong in-house expertise for the management of complex design engineering work. Our capabilities cover containment with the design of liners, windows and feedthroughs, airlocks and associated equipment as well as fuel and waste handling systems including all automated equipment to manipulate the fuel rods and for compacting nuclear waste. We also provide design engineering for complex piping systems that includes piping layout as well as all relevant fluid-flow computation and stress analysis. 4. PLANT CONSTRUCTION Bilfinger has qualified project and construction management teams that conduct installation work on site. As is the case with manufacturing activities, Bilfinger has a large range of certified staff in the relevant nuclear industry and local regulations to fully support our customers with the construction or enhancement of their plants. Our services cover supervision of the installation, start-up and commissioning of specific equipment as well as complex piping assembly including inspection and testing services.

6. NUCLEAR POWER PLANT MODIFICATION/OPTIMIZATION Based on its project planning capabilities combined with its design, manufacturing and construction competences in the nuclear industry, Bilfinger can undertake and manage complete projects for the expansion, modification and optimization of nuclear power plants. Bilfinger has, for example, been deeply involved in the on-site installation of the standby diesel power generation systems at the nuclear power plants in France that have been requested by the ASN as a post Fukushima measure in order to improve operational safety. Modification/Optimization/Extension Operations/Digitalization ASSET LIFE CYCLE Maintenance/Turnaround 7. PLANT DECOMMISSIONNING Bilfinger is a specialist for decommissioning as well as for the dismantling and handling of the equipment of the primary circuit of nuclear power plants and has a solid background in providing such services to the industry. We cover the full scope of services including feasibility studies, project planning and the supply of all the equipment required to handle and manage contaminated material. Our staff from field operators to specialized engineers are trained and certified to operate in such contaminated environments and manage operations, scheduling and documentation for traceability. We also provide waste-treatment services on an on-demand basis. Decommissioning 5. OPERATIONS: NUCLEAR FUEL HANDLING Bilfinger offers a broad spectrum of operation services for the nuclear industry including the operation of polar cranes and nuclear fuel handling machines and associated manipulators. Based on its broad experience in designing and supplying hot cells and the relevant equipment to reload and transport nuclear fuel rods, Bilfinger has been selected for several plants across Europe by renowned plant owners to provide such operational services.

Energy & Utilities WE ARE BILFINGER We offer international engineering and local maintenance. Our portfolio covers the entire value chain from consulting, engineering, manufacturing, assembly to maintenance, plant expansion as well as turnarounds. It also includes environmental technologies and digital applications. We increase the efficiency of assets, ensure a high level of availability and reduce maintenance costs. BILFINGER AT A GLANCE Our organization along two complementary business segments enables us to accompany our customers along the entire life cycle of their assets: the capex side is covered by our Engineering & Technologies (E&T) segment, while our Maintenance, Modifications & Operations (MMO) segment addresses the opex side. Within E&T, we develop, construct and expand industrial plants. Within MMO, we assume responsibility for industrial maintenance. And while the MMO segment offers its services locally in four core regions, E&T is a project and technology business with an international setup.

We have a particular focus on six industries: Oil & Gas Chemicals & Petrochemicals Energy & Utilities Oil & Gas, Chemicals & Petrochemicals, Energy & Utilities, Pharmaceuticals & Biopharma, Metallurgy and Cement. Our 36,000 employees ensure that our customers can focus on what they can do best: their core business. Pharmaceuticals & Biopharma Metallurgy Cement

Bilfinger SE Engineering & Technologies Europaallee 1 46047 Oberhausen Germany sales.contact@bilfinger.com www.bilfinger.com Northwest Europe Continental Europe North America Middle East WE MAKE IDEAS WORK