AFI/MID Workshop on Aviation System Block Upgrades (ASBUs)

Similar documents
APIRG/20. Air Navigation System Implementation Action Plan (aligned with ASBU Methodology) Yamoussoukro, Cote d Ivoire 30 November 2 December 2015

INTERNATIONAL CIVIL AVIATION ORGANIZATION. SIXTH MEETING OF DIRECTORS GENERAL OF CIVIL AVIATION (DGCA/6) (Brazzaville, Congo, 2 4 November 2016)

MID Region Air Navigation Strategy

(Presented by United States) EXECUTIVE SUMMARY

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

Block 0 to Block 1 Vaughn Maiolla

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ATFM/CDM ICAO s Perspective

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

ASBU Block 0 Implementation and Regional ANPs

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

AFI AIR NAVIGATION SYSTEM IMPLEMENTATION ACTION PLAN FOR THE AFRICA-INDIAN OCEAN (AFI) REGION

Approach to implementation Process and checklist

SAMPLE TEMPLATE APPENDIX 3.5C-1

AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP DEVELOPMENTS RELATED TO AIR NAVIGATION CAPACITY AND EFFICIENCY IN OTHER ICAO REGIONS

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

Date Planned/Implemented Status Not commenced. Status Details Planned for m new MMMX airport 2 Element Description: Airport CDM tools

Prosper Zo o Minto o

ICAO ASBU Implementation/ Surveillance and ATS Automation

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

MET/SG/12-WP/05 REV2-23/11/14

Russian Federation ATM modernization program

GUATEMALA State Air Navigation Plan

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

APAC AIR NAVIGATION PLAN VOLUME III

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Packaging Tomorrow s Aviation System

BELIZE Air Navigation Plan

New Barbados State Air Navigation Plan

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

International Civil Aviation Organization. Fifth Meeting of MID Region AIM Database Task Force Fourth Meeting of MIDANPIRG AIM Sub-Group

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

METEOROLOGY PROJECT.1. Programme Title of the Project Start End

AFI Air Navigation Services Key Performance Indicators

NAM ASBU Handbook Supporting analysis and implementation reporting of the ICAO ASBU Modules

Objective. To show how the aviation system block upgrades (ASBUs) can help to improve safety at airport level and some regional initiatives.

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES

SERVICE DEVELOPMENT ROADMAP

ASBU-Bloc0 Moroccan achievements and planned activities

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Connecting ASBU with your State Air Navigation Plan

TWELFTH AIR NAVIGATION CONFERENCE

INTERNATIONAL CIVIL AVIATION ORGANIZATION

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

CNS/ATM Systems Interoperability and Harmonization

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

ASBU modules mapped to Work Programme

2012 Performance Framework AFI

Bits to Blocks Aviation System Block Upgrades (ASBU)

THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION (DRAFT 2016)

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

INTERNATIONAL CIVIL AVIATION ORGANIZATION

SESAR Solutions. Display Options

2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

ATM processes automatization for Runway (Airport) Throughput Enhancement

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING

Aviation System Block Upgrades

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

TWELFTH AIR NAVIGATION CONFERENCE

GANP ASBU Symposium 2017

INTERNATIONAL CIVIL AVIATION ORGANIZATION

NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

IBAC Bulletin Subject: AFI Region In-Flight Broadcast Procedure (IFBP).

AIR NAVIGATION REPORT ICAO Middle East Region

Global ATM System ~Interoperability and Harmonization ~

Connecting ASBU with your State Air Navigation Plan

ICAO GANP Requirements and Evolution

PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management)

TWELFTH AIR NAVIGATION CONFERENCE

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

TWELFTH AIR NAVIGATION CONFERENCE

International Civil Aviation Organization. Aerodrome Certification Implementation Task Force (ADCI TF/1)

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

THE UGANDA ASBU PLAN- HIGHLIGHTS ASBU WORKSHOP 18 TH TO 22 RD SEPT, DAKAR

Regional implementation ASBU Bn-AMET

NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (RPBANIP) v3.1 April 2014 International Civil Aviation Organization


Aviation System Block Upgrades

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

TWELFTH AIR NAVIGATION CONFERENCE

INTERNATIONAL CIVIL AVIATION ORGANIZATION

PIRG and RASG Global Coordination Meeting Setting the Stage. Nancy Graham. Director, Air Navigation Bureau

I. F. A. L. P. A. African RVSM. Briefing Leaflet. Air Traffic Services. The Global Voice of Pilots. RVSM Compliance Operations

Transcription:

AFI/MID Workshop on Aviation System Block Upgrades (ASBUs) AFI Air Navigation System Implementation Action Plan (aligned with ASBU Methodology) Cairo, Egypt 23 26 November 2015

GANP Regional Implementation Air Next GANP 2016 Navigation PIRGS In Establish Regional Priorities, ASBU Modules & Targets Regional workshops and meetings Revise Regional Air Navigation Implementation Plans Revise Regional Air Navigation Plans In progress Annual Global Air Navigation Report Regional Performance Indicators Revised PIRG TORs & Work Programme PIRG Meeting Reports Annual ANC/Council Review 11/23/2015 2

Regional Implementation Support Mechanisms APIRG Set regional air navigation priorities and targets Support regional implementation of the GANP Review air navigation plans and deficiencies Involve all aviation stakeholders in the region States, ICAO, and international organizations Regional Offices Technical evaluation, follow-up and assistance missions to States Training courses, seminars and workshops Regional technical cooperation and assistance projects - FPPs Regional mechanisms RASGs and PIRGs 11/23/2015 3

Planning Process Step 1 Analysis Planning Process Step 1 Analysis 4

Planning Process Step 2 Assessment 5

The Dilemma ICAO AFCAC ASBU workshops 7

Huge region with remote areas such as: Desert (Sahara and Kalahari) Deep equatorial forests AFRICAN ENVIRONMENT Oceanic area (Atlantic and Indian oceans, Mediterranean and Red seas) ICAO 8

HOMOGENEOUS AREAS AND MAJOR TRAFFIC FLOWS IN THE AFI REGION 9

ATM Homogeneous Areas in AFI Region Areas of routing (AR) Traffic Flows Areas involved Type of area covered Remarks Africa Indian Ocean (AFI) Region AR1 Europe South America (EUR/SAM) (oceanic) Atlantico 1, Canarias, Casablanca, Dakar Oceanic, Recife, Sal Oceanic Oceanic en route low density in southern part and oceanic high density in northern part Major traffic flow EUR/SAM AR2 Atlantic Ocean interface between the AFI, NAT and SAM Regions Accra, Dakar, Johannesburg, Luanda, Sal Oceanic en route low density Homogeneous ATM area AFI/NAT/SAM AR3 Europe Eastern Africa routes including the area of the Indian Ocean Addis Ababa, Antananarivo, Asmara, Cairo, Dar es Salaam, Entebbe, Khartoum, Mauritius, Mogadishu, Nairobi, Seychelles, Tripoli Continental en route/ oceanic low density Major traffic flow AFI/EUR AR4 Europe to Southern Africa Algiers, Beira, Brazzaville, Cape Town, Gaborone, Harare, Johannesburg, Kano, Kinshasa, Lilongwe, Luanda, Lusaka, N Djamena, Niamey, Tripoli, Tunis, Windhoek Continental en route low density Major traffic flow AFI/EUR AR5 Continental Western Africa including coastal areas Accra, Addis Ababa, Brazzaville, Dakar, Dar es Salaam, Entebbe, Kano, Khartoum, Kinshasa, Nairobi, Ndjamena, Niamey, Roberts Continental/oceanic low density Homogeneous area AFI (this is a growing traffic, developing into major traffic flow) AR6 Trans Indian Antananarivo, Bombay 1, Johannesburg Male 1, Mauritius, Melbourne 1, Seychelles Oceanic high density Homogeneous ATM area AFI/ASIA 10

Development and trends of Civil Aviation industry in Africa Air Transport : key stakeholder in a huge continent Air Transport in Africa: 3 5% of Global Market For next two decades Annual Growth estimated trend: 5,9% Vs 4% for Global growth 125 Millions PAX to 377 Millions PAXs Air Transport based on Safety of life Context & Challenges Building One sky to ensure the provision of a seamless Air Navigation Service Safety of Civil Aviation, Continuity, Regularity of air traffic relies on a robust seamless integrated infrastructure, systems, procedures and human capacities Users requirements Interoperability requirements Environment protection Cost effectiveness to provide air navigation service relies on a balanced investment ensuring Performance Based Navigation. ICAO 11

Safety of civil aviation supported by seamless : Ground/Ground Communication (Voice and data) Air/Ground Communication (voice and data) Navigation (Global Navigation Satellite System-GPS; Glonass, Galileo) & Augmented GNSS Surveillance data exchange (Radar, flight data) Interoperable ATM systems INFRASTRUCTURE REQUIREMENTS Efficient airspace organization and AT Management ICAO 12

Outcome of APIRG/19 Implementation of AN Conf/12 Rec 6/1 APIRG Conclusion 19/06: Adoption of AFI Regional Air Navigation System Implementation Plan aligned with the ICAO Aviation System Block Upgrades That: a) AFI States adopt the Regional Air Navigation System Implementation Plan aligned with the 18 Block 0 Modules of the ICAO Aviation System Block Upgrades (ASBU) Methodology, as provided at Appendix 3.0A to this report; b) That AFI States implement the adopted modules based on their operational needs, the categorization and the prioritization defined in the Action Plan; c) The Secretariat finalize the implementation targets set for the adopted ASBU Block 0 Modules, and ensure that these targets are aligned with existing regional programmes aimed at enhancing air navigation capacity and efficiency and aviation safety; 11/23/2015 13

APIRG Conclusion 19/06: Adoption of AFI Regional Air Navigation System Implementation Plan aligned with the ICAO Aviation System Block Upgrades d) The APIRG and the ICAO Regional Offices coordinate the implementation of the ASBU Block 0 Modules related to Safety Key Performance Area with regional aviation safety mechanisms (RASG AFI, AFI Plan) and other relevant safety initiatives for the AFI Region; e) ICAO continually provide capacity building through workshops and seminars to AFI States and regional stakeholders as the needs arise in the different levels of ASBUs; and f) The African Civil Aviation Commission (AFCAC), Regional Economic Communities and Financial institutions to provide their support and assist States the implementation of the AFI Regional Air Navigation System Implementation Action Plan. 11/23/2015 14 11/23/2015 14

Performance Improvement Areas Airport Operations Globally Interoperable Systems and Data Optimum Capacity and Flexible Flights Efficient Flight Path B0 RSEQ Improved Runway Traffic Flow through Sequencing (AMAN/DMAN) B0 SURF Safety & Efficiency of Surface Operations (A SMGCS 1 2 & cockpit moving map) B0 ACDM Improved Airport Operations through A CDM Block 0 in Perspective B0 AMET Meteorological information supporting enhanced operational efficiency and safety B0 CCO Improved Flexibility & Efficiency in Departure Profiles ToC B0 DAIM Service Improvement through Digital Aeronautical Information Management B0 NOPS Improved Flow Performance through Planning based on a Network Wide view B0 TBO Improved Safety & Efficiency through the initial application of Data Link En Route B0 ASEP Air Traffic B0 ASUR Initial surveillance capability ADS B Out, MLAT) B0 FRTO Improved Operations through Enhanced En Route Trajectories B0 FICE Increased Interoperability, Efficiency & Capacity through Ground Ground Integration Situational Awareness (ATSA) B0 ACAS Improvements ToD B0 OPFL Improved Access to optimum FL through climb/descent procedures using ADS B) B0 SNET Baseline Goundbased Safety Nets B0 CDO Improved Flexibility & Efficiency in Descent Profiles (CDOs) CTA B0 APTA Optimisation of approach procedures including vertical guidance B0 WAKE Increased Runway Throughput through Wake Turbulence Separation 15

Categories of 18 adopted Block 0 Modules are as follows: Essential (E): These are the ASBU modules that provide substantial contribution towards global interoperability, safety or regularity. The nine (9) Modules for all States of AFI region are FICE, DATM; ACAS, FRTO, APTA, CDO, CCO, AMET and ACDM. Desirable (D): These are the ASBU modules that, because of their strong business and/or safety case, are recommended for implementation almost everywhere. The four (4) Modules for all States of AFI region are NOPS, ASUR, SNET, and TBO. Specific (S): These are the ASBU modules that are recommended for implementation to address a particular operational environment in specific countries of AFI region (for example South Africa). The three (3) Modules are OPFL, ASEP and WAKE (elements and targets to be developed by APIRG). Optional (O): These are the ASBU modules that address particular operational requirements in specific countries of AFI region and provide additional benefits that may not be common everywhere. The two (2) Modules are SURF and RSEQ. 11/23/2015 16

Prioritization of Block 0 Modules Criteria for priority allocation Priority 1 = Immediate Implementation Priority 2 = Recommended Implementation 17

Categorization and prioritization of Block 0 Modules for the AFI Region PIA Module Description Module Category Priority PIA 1 Improve Traffic flow through Runway Sequencing (AMAN/DMAN) B0 RSEQ O 2 Optimization of Approach Procedures including vertical guidance B0 APTA E 1 B0 WAKE S 2 Increased Runway Throughput through optimized Wake Turbulence Separation Safety and Efficiency of Surface Operations (A SMGCS Level 1 2) B0 SURF O 2 Improved Airport Operations through Airport CDM B0 ACDM E 1 PIA 2 Increased Interoperability, Efficiency and Capacity through Ground Ground Integration Service Improvement through Digital Aeronautical Information Management Meteorological information supporting enhanced operational efficiency and safety B0 FICE E 1 B0 DAIM E 1 B0 AMET E 1 18

Categorization and prioritization of Block 0 Modules for the AFI Region PIA Module Description Module Category Priority PIA 3 Improved Operations through Enhanced En Route Trajectories B0 FRTO E 1 Improved Flow Performance through Planning based on a Network Wide view B0 NOPS D 2 Initial capability for ground surveillance B0 ASUR D 2 Air Traffic Situational Awareness(ATSA) B0 ASEP S 2 Improved access to Optimum Flight Levels through Climb/Descent Procedures using ADS B B0 OPFL S 2 ACAS Improvements B0 ACAS E 1 Increased Effectiveness of Ground Based Safety Nets B0 SNET D 2 PIA 4 Improved Flexibility and Efficiency in Descent Profiles (CDO) B0 CDO E 1 Improved Safety and Efficiency through the initial application of Data Link En Route B0 TBO D 2 Improved Flexibility and Efficiency Departure Profiles Continuous Climb Operations (CCO) B0 CCO E 1 11/23/2015 19

AFI Regional Performance Objectives ASBU Workshop.AFI ATM PFFs.docx ASBU Workshop.AFI AIM PFFs.docx ASBU Workshop.AFI SAR PFFs.docx ASBU Workshop.AFI MET PFFs.docx ASBU Workshop.AFI AOP PFFs.docx ASBU Workshop.AFI CNS PFFs.docx 11/23/2015 20

AFI Regional Performance Objectives RVSM Implementation (PFF ATM/01) PBN Implementation (en-route, terminal and approach) (PFFs ATM/02, ATM/03 and ATM/04) Enhancement of CNS Infrastructure (PFF CNS/01) Search and Rescue (PFF SAR/01) Transition from AIS to AIM (PFFs AIM/01 and AIM/02) Improvement of the provision of Meteorological Services (PFFs MET/01, MET/02) Improvement of Aerodrome Operations (PFF AGA/01)

Regional Targets Communications ASBU B0 FICE: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) 1. Complete AMHS implementation at States still not counting with this system December 2015 Services provider 2. AMHS interconnection December 2015 Services provider 3. Implement AIDC/OLDI at some States automated centres 4. Implement operational AIDC/OLDI between adjacent ACCs 5. Implement the AFI Integrated Telecommunication Network June 2014 Services provider June 2015 Services provider June2015 Services provider 11/23/2015 22

Regional Targets Communications ASBU B0 ASUR: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) 1. Implementation of ADS B June 2018 Users and service provider 2. Implementation of Multilateration June 2018 Users and service provider 3. Automation system (Presentation) June 2017 Users and service provider ASBU B0 TBO: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) 1. ADS C over oceanic and remote areas June 2018 Service provider 2. Continental CPDLC June 2018 Service provider 11/23/2015 23

Regional Targets Surveillance ASBU B0 SNET: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) 1. Short Term Conflict Alert (STCA) June 2014 / Service provider 2013 2018 2. Area Proximity Warning (APW) June 2014 / Service provider 2013 2018 3. Minimum Safe Altitude Warning June 2014 (MSAW) 4. Dangerous Area Infringement Warning 2013 2018 (DAIW) 11/23/2015 24

Regional Targets Navigation ASBU B0 APTA: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) 1. APV with Baro VNAV December 2016 Service Providers and users 2. APV with SBAS December 2017 As per AFI GNSS Strategy. 3. APV with GBAS December 2018 Initial implementation at some States (service providers) 11/23/2015 25

Regional Targets Surveillance ASBU B0 SURF: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) 1. Surveillance system for ground surface movement (PSR, SSR, ADS B or Multilateration) 2. Surveillance system on board (SSR transponder, ADS B capacity) December 2017 Service provider December 2017 Service provider 3. Surveillance system for vehicle December 2017 Service provider 4. Visual aids for navigation December 2015 Service provider 5. Wildlife strike hazard reduction December 2015 Aerodrome operator / Wildlife Committee 6. Display and processing information December 2017 Service Provider 11/23/2015 26

Regional Targets Surveillance ASBU B0 SNET: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) 1. Short Term Conflict Alert (STCA) June 2014 / Service provider 2013 2018 2. Area Proximity Warning (APW) June 2014 / Service provider 2013 2018 3. Minimum Safe Altitude Warning June 2014 (MSAW) 4. Dangerous Area Infringement Warning 2013 2018 (DAIW) 11/23/2015 27

Regional Targets Meteorological Information Management ASBU B0 AMET: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) 1. WAFS In process of implementation 2. IAVW In process of implementation 3. Tropical cyclone watch In process of implementation 4. Aerodrome warnings In process of implementation 5. Wind shear warnings and alerts 50% by December 2014 6. SIGMET 80% by December 2014 7. QMS/MET 75% by December 2014 8. Other OPMET Information (METAR, SPECI, TAF) In process of improvement 11/23/2015 28

Regional Targets Aeronautical Information Management ASBU B0 DATM: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) 1. QMS for AIM December 2014 2. e TOD implementation December 2016 3. WGS 84 implementation Implemented 4. AIXM implementation December 2016 5. e AIP implementation December 2014 6. Digital NOTAM December 2017 11/23/2015 29

Regional Targets Avionics ASBU B0 ACAS: Planning Targets and Implementation Progress Elements Targets and Implementation Progress (Ground and Air) ACAS II (TCAS Version 7.1) 2013 2018 11/23/2015 30

AFI MID ASIA/PAC NAM CAR SAM EUR NAT Regional Targets AIR NAV. REGION REGIONAL OFFICE SAFETY AIR NAVIGATION ESAF MID APAC NACC SAM EUR/NAT ADOPTED (Abuja Ministerial July 2012) ADOPTED (DGCA MID/2 May 2013) (Review 27 29 April 2014) RASG APAC/4 (November 2014) US CAST/Canada ADOPTED (NACC/DCA/5 April 2014) ADOPTED (RAAC/13 December 2013) ADOPTED (RASG EUR/03 February 2014) ADOPTED (NAT SPG/49 June 2013) ADOPTED (APIRG/19 October 2013) ADOPTED (MSG/4,November 2014) (Rev. MIDANPIRG/15, June 2015) ADOPTED (APANPIRG/25 September 2014) ADOPTED (NACC/DCA/5 April 2014) ADOPTED (RAAC/13 December 2013) ADOPTED (EANPG/55 November 2013) TBA 11/23/2015 31

Abuja Ministerial Targets 32

Targets Linkage with ASBU AFI Plan SC/14 _ ANS Performance Indicators ANS Performance Indicators/Metrics Qualitative performance benefits associated with Safety key performance area Remarks Implement Perfor-mance Based Navigation (PBN) ASBU Module B0-APTA Number of PBN routes Number of International Aerodromes/TMAs with PBN SIDs implemented Number of International Aerodromes/TMAs with PBN STARs implemented Number of International Aerodromes with Approach Procedures with vertical guidance (APV) Increased safety through stabilized approach paths Reduced runway safety related accidents/incidents and CFIT Increased safety through optimization of airspace use in the vertical and horizontal planes. Reflected on the AN Dashboard Safety key performance area (KPA) related ASBU Module identified by APIRG/19 Number of International Aerodromes with Approach Procedures with lateral guidance (LNAV) 11/23/2015 33

Targets Linkage with ASBU ANS Performance Indicators/Metrics AFI Plan SC/14 ANS Performance Indicators Qualitative performance benefits associated with Safety key performance area Remarks Implement Continuous Descent Operations (CDO) and Continuous Climb Operations (CCO) ASBU Modules B0-CDO and CCO Number of International Aerodromes/TMA with CDO implemented Number of International Aerodromes/TMAs with CCO implemented Annual environmental benefits attained (reduced fuel consumption/ghg emissions) More consistent flight paths and stabilized approach paths. Safety key performance area (KPA) related ASBU Module identified by APIRG/19 Reduce Aircraft Proximity incidents (AIRPROX) due to ANS deficiencies by 50% Number of Aircraft Proximity incidents (AIRPROX) due to ANS Number of ACAS Resolution Advisory (RA) events due to ATS deficiencies Number of States with training programmes for ANS personnel implemented on yearly basis Increased safety through application of standard separation minima between aircraft and improved recurrent ATC training. Safety key performance area (KPA) related ASBU Module identified by APIRG/19 11/23/2015 34

Objectives Linkage with ASBU ANS Performance Indicators/Metrics AFI Plan SC/14 ANS Performance Indicators Qualitative performance benefits associated with Safety key performance area Remarks Reduce risk of accidents related to ATM safety Number of accidents related to ATM safety ACAS, SLOP, TIBA and IATA IFBP to increase safety in the case of breakdown of separation. Implement Digital ATS Coordination/Tran sfer ASBU Module B0-FICE Number of FIRs within which all applicable ACCs have implemented at least one interface to use ATS Inter-facility Data Communications (AIDC) with neighboring ACCs Number of reported incidents related to lack of coordination between ACCs Improved coordination between ATS units. Reflected on the AN Dashboard 11/23/2015 35

Targets Linkage with ASBU AFI Plan SC/14 ANS Performance Indicators ANS Performance Indicators/Metrics Qualitative performance benefits associated with Safety key performance area Remarks Establish effective and operational SAR Organization Number of States with SAR Organization Number of States with SAR Plans Number of States with SAR Agreements Better capacity to provide SAR services over own territory and regionally Improved response for near-border events Implement En-Route Data Link Applications ASBU Module B0-TBO Number of FIRs having implemented Data Link (ADS- C/CPDLC, ADS-B) for enroute operations ADS-C and ADS-B based safety nets support cleared level adherence monitoring, route adherence monitoring, danger area infringement warning and improved search and rescue. CPDLC to reduce occurrences of misunderstandings between air traffic controllers and pilots Solution to stuck microphone situations Safety key performance area (KPA) related to ASBU Module identified by APIRG/19 11/23/2015 36

Targets Linkage with ASBU ANS Performance Indicators/Metrics AFI Plan SC/14 ANS Performance Indicators Qualitative performance benefits associated with Safety key performance area Remarks Implement Aeronautical Information Management (AIM) Quality Management System (QMS) ASBU Module B0-DATM Number of States with AIM QMS implemented Reduction in the number of data inconsistencies and inaccuracies Reflected on the AN Dashboard Safety key performance area (KPA) related to ASBU Module identified by APIRG/19 Implement Aeronautical Meteorology (MET) Quality Management System (QMS) ASBU Module B0-AMET Number of States with MET QMS implemented Number of incidents/accidents with MET conditions as a sole or contributory factor Reduced MET related incidents/accidents in flight and at international aerodromes Safety key performance area (KPA) related to ASBU Module identified by APIRG/19 11/23/2015 37

That the new organizational structure of APIRG comprising: one Projects Coordination Committee (APCC) one Airspace and Aerodrome Operations Sub-Group (AAO/SG), one Infrastructure and Information Management Sub-Group (IIM/SG), and one Traffic Forecasting Group is adopted and will become effective following the next APIRG meeting; APIRG Decision EO/01 the preliminary terms of reference of the APCC provided at Appendix D to this report are to be reviewed and finalized at the next APIRG meeting; and projects be identified from ASBU modules and regional performance objectives adopted by APIRG, to be carried out by teams of experts provided by States and concerned international organizations. 11/23/2015 38

New Structure of the APIRG and its Contributory Bodies

Next Steps Adoption by APIRG and by AU of AFI ANS Performance Targets Identification of Regional AN projects by APIRG Development of AFI States national ASBU Plans Implementation and reporting through the AFI Regional Dashboards ICAO 40