D L R C C T R A F F I C N E W S

Similar documents
D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S

Dun Laoghaire, Sallynoggin and Loughlinstown Bus Review

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

The Point Roundabout Improvement Scheme

Sky Temporary Car Park Transport Statement

Application form for a temporary road closure.

Construction Staging Area Blue Jays Way (357 King Street West)

5.5 Material Assets - Transportation

Public Document Pack. Bernie Gilligan

TRAFFIC MANAGEMENT INFORMATION ED SHEERAN PAIRC UI CHAOIMH

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Road Closure & Traffic Mangement Information during the 2018 ASICS Windermere Marathon Race.

Monthly Traffic Update

5.7 Local road upgrades

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

Business Case Approved. Under Construction. Business Case Approved. Under Construction

DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL

Information Items Submitted by Members for Written Reply. Criteria for placing Double and Single yellow lines in residential areas

1.2 If the Council is satisfied that traffic on a road should be prohibited for the purpose of:

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Long water shutdown scheduled for Tuesday, September 18

APRIL MONTHLY MANAGEMENT REPORT COUNTY COUNCIL CREATING AN ENVIRONMENT FOR ECONOMIC GROWTH

DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL

Section 1 approximately 90 metre section of road on the R610 from Toureen House to Passage West Library Road Closure of 4 weeks.

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,

Directions BIG 350+ NAILS SPA TANNING BRANDS RDS, DUBLIN 4-5 MARCH 2018 COMPLEMENTARY BRANDS TOURNAMENTS SALON SOFTWARE LASHES BROWS WAX COSMETICS

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

Traffic Calming and Road Safety Provision Options Woore Village

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

Enterprise Way. The new Airport City link road. June 2017 Progress Update

From M1 (Swords): can park here. Reception is directly opposite this car park. From M50 (Ballymun)

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Major Scheme Business Case Summary Report for Programme Entry

WOKING INTEGRATED TRANSPORT PROJECT

Derry Hill and Bingley Road, Menston. Accidents waiting to happen.

15.0 TRAFFIC AND TRANSPORTATION

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL

Chapter 2 Route window W25 Maidenhead station. Transport for London

Dublin Airport Update Presented by Pat Molloy

Guide to. Road Construction Projects

Liam Miller Tribute Match

EXPLANATORY STATEMENT

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Traffic Management Plan 2018


AREAS CONTAINED IN POLLING DISTRICT

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Wolverhampton City Council

JANUARY MONTHLY MANAGEMENT REPORT FOR COUNTY COUNCIL CREATING AN ENVIRONMENT FOR ECONOMIC GROWTH

Roads, Transportation and Safety

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

Cell: (408) Release MA June 25, 2012

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Felixstowe Branch Line FAQ

Movement Strategy. November On behalf of Barton Oxford LLP

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

PennDOT Interstate Work next week March 30-April 3:

November 21, 2012 Barbara Kelleher, (954)

NEWSLETTER #04 June 2018

Map showing location of public transport projects in vicinity of railway station

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

Concord Road Interchange. Standard hours of work

An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO An Bord Pleanála Reference Number: 29N.

Block C, Dundrum Business Park

Part four. In this part you will find: The next steps to deliver the master plan

DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL

Pedestrian Safety Review Spadina Avenue

PARKING ENFORCEMENT IS NOW IN PLACE USE THE DESIGNATED CAR PARKS.

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

A140 study and Major Road Network

TRAFFIC MANAGEMENT. Planned Works and Night Closures Review EAST MIDLANDS GATEWAY RAIL FREIGHT INTERCHANGE

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Oxfordshire Local Enterprise Partnership

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

The Cheltenham Festival

5.1 Traffic and Transportation

IAT Annual Conference 'Driving Forward

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Appendix C Stage 1 Road Safety Audit

Camborne, Pool, Redruth East West link road key messages. An overview of the project proposals

Kilkenny Borough Council. Heavy Commercial Vehicles Route Management April 2014

Christ Church Grammar School, Claremont

Construction Staging Adelaide Street West

Chapter 7 Route Window C6 Farringdon station. Transport for London

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

SUMMER /summerofheritage

Transcription:

D L R C C T R A F F I C N E W S Saturday, 24 th June 2017 to Friday, 30 th June 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works of which the Traffic and Road Safety Section has been informed. Details are supplied as per information received by 16:00 hrs. on the preceding Thursday. Emergency road works cannot be forecast.» New Entry Estimate of Potential Disruption: # Update *** major ** medium * minor ROAD CLOSURES» Section 75 of the Roads Act 1993 Temporary Closure of Thornhill Road at Fassaroe, Bray Dún Laoghaire-Rathdown County Council Traffic Section has made an order to temporarily close Thornhill Road from the Old Fassaroe Roundabout. Access will be restricted for the first 250 metres for Site Investigation Works on behalf of Irish Water. The closure is to take place from 9.00 a.m. to 5.00 p.m. each day from Monday 26 th June to Friday 7 th July, 2017. Depending on progress these dates may be reduced. Pedestrian Access will be maintained at all times. The proposed diversion route will be via the Old Fassaroe Roundabout, over the N11 and follow the route north bound along the Upper Dargle Road then left on the Dublin Road (R761) then left onto Old Connaught Avenue, passing over the N11 and turn left on to Thornhill Road. A Traffic Management Plan will be in place and the diversions will be clearly signposted. Section 75 of the Roads Act 1993 Temporary Closure of Main Street, Dundrum Dún Laoghaire-Rathdown County Council Traffic Section has made an order to temporarily close Main Street, Dundrum between its junctions with Upper Kilmacud Road to just south of the entrance to the Village Centre car park. The closure is to take place from 1.00 p.m. to 6.00 p.m. on Sunday, 25 th June 2017. The purpose of the proposed closure is to facilitate the Dundrum Arts & Cultural Festival. A Traffic Management Plan will be in place and all diversions will be signposted. Local access will be maintained at all times. Page 1 of 6

Section 75 of the Roads Act 1993 Temporary Closure of Sallynoggin Park Dún Laoghaire-Rathdown County Council Traffic Section has made an order to temporarily close Sallynoggin Park at the new Housing Development The Mews from 19 th June 2017 to 14 th July 2017 inclusive, in order to facilitate drainage connections and associated works adjacent to 49 Sallynoggin Park. A Traffic Management Plan with diversion routes will be in operation and local access will be maintained for the full duration of the works. ROADWORKS / LANE RESTRICTIONS» New Entry:» Dundrum Road, Dundrum *** Gas Networks Ireland will undertake works at the junction of Dundrum Road with Olivemount Road on Monday, 26 th June 2017 between 10:00 and 16:00 hrs. A Stop / Go Traffic Management System will be in operation. Traffic lights will be switched out at the junction of Dundrum Road with Olivemount Road.» Public Lighting Lantern and Bracket Upgrade Works ** Public lighting lantern and bracket upgrade works will take place on: 1. Drummartin Link Road 2. Kilmacud Road Upper 3. Goatstown Road 4. Enniskerry Road 5. Deansgrange Road 6. Clonkeen Road 7. Kill Lane/Avenue These works will continue until Friday, 28 th July 2017. A Stop / Go Traffic Management Plan will be in operation as required. Page 2 of 6

# Update: # Monkstown Village Improvement Scheme *** Work commenced on the Monkstown Village Improvement Scheme on Monday, 24 th April 2017 between 08.00 and 18.00 hrs. Monday to Friday. Works affecting two-way traffic through the Village are restricted between 10:00 and 16:00 hours. The first phase of the works is nearing completion and parking is being returned to the area around Church of Ireland. The next phase of works is along the south side of Carrickbrennan Road up to Goggins Pub. A Traffic Management Plan will be in operation and information relating to the scheme will be available at: www.dlrcoco.ie/monkstown # Nutgrove Avenue / Nutgrove Way, Rathfarnham *** (Nightworks) Major road works on Nutgrove Avenue / Nutgrove Way will continue until Friday, 7 th July 2017 between 19:30 and 05:00 hrs. Lights will be switched off and VMS signs are in place giving notice of works. # Grange Road / Pine Valley, Rathfarnham *** Footpath renewal works will continue until Friday, 7 th July 2017 between 10:00 and 16:00 hrs. # Newtownpark Avenue, Blackrock * Slit trench and trial hole works will continue until Friday, 30 th June 2017 between 10:00 and 16:00 hrs. # Westminster Road, Foxrock * Footpath restoration works will continue until Friday, 30 th June 2017 between 8:00 and 18:00 hrs. Page 3 of 6

# Mather Road South, Mount Merrion * Footpath restoration works will continue until Friday, 30 th June 2017 between 8:00 and 18:00 hrs. R118 / Wyattville Dual Carriageway, Cherrywood **** The delivery of the Cherrywood Strategic Development Zone will involve significant construction works over the next 18 months in the Cherrywood area. The first phase of infrastructure provision for the Cherrywood Strategic Development Zone will be delivered by JCL the joint venture between John Cradock Ltd. / Jons Civil Engineering. Major road works began on the Wyattville Dual Carriageway between M50 Junction 16 and the N11 at Cherrywood, on 9 th February 2017 and will continue for the remainder of the year. The primary focus of this phase of the infrastructure works is the upgrade of the Wyattville Roundabout to a signalised junction, and upgrade of Tullyvale Road, involving road construction, road drainage, public lighting, provision of utilities, etc. Traffic restrictions will be in place for the duration and delays can be expected. It is intended to retain two lanes of traffic inbound and outbound. Please note that Pay and Display parking on Tullyvale Road will cease permanently from 1 st February 2017, however, Pay and Display parking is available adjacent to the Brides Glen Luas stop, on Cherrywood Avenue Extension. From the 24 th April 2017, traffic shall be reduced to 1 lane in both directions on the R118 Wyattville Link Rd between the N11 and M50 from 10am and 4pm daily. This is to facilitate the installation of new service crossings across the R118 Wyattville Link Road in multiple locations. From the 24 th April 2017, it is also intended to install barriers to the median of the R118 Wyattville Link Rd (between the M50 and Cherrywood Roundabout) to facilitate works in the median. Wyattville Road Pedestrian and Cycle Scheme *** Work commenced on the Wyattville Road Pedestrian and Cycle Scheme on Monday, 8 th May 2017 between 08.00 and 18.00 hrs. Monday to Friday. Works affecting two-way traffic are restricted between 10:00 and 16:00 hours. The scheme involves the upgrade of Wyattville Road between Wyattville Close and Churchview Road and is expected to continue until May 2018. Page 4 of 6

Frascati Shopping Centre Extension *** Right Turn into Shopping Centre from City Centre - Closed Straight Ahead into Shopping Centre from Rock Hill - Closed In order to facilitate the on-going extension works at Frascati Shopping Centre the existing right turn lane, on the outbound carriageway from the City Centre and the existing straight ahead movement from Rock Hill into Frascati Shopping Centre will be closed for the next 5 months. The temporary closures of the right hand turning lane and straight ahead movement from Rock Hill are to facilitate the on-going construction process for the new underground car park. A one-way traffic management system will be implemented on site to facilitate the works. Car park attendants will be deployed at peak times within the shopping centre to ensure that shopping centre traffic operates smoothly during the period of the development works. A Traffic Management Plan will be in operation for the duration of the works. Diversions will be in place to direct traffic towards the shopping centre entrance at the end of Georges Avenue. Enniskerry Road, Kilternan *** Works will continue on Enniskerry Road until Friday, 7 th July 2017 between 10:00 and 16:00 hrs. A Stop / Go Traffic Management System will be in operation. Desmond Avenue, Dún Laoghaire ** ESB and public lighting upgrade works will continue on Desmond Avenue until Friday, 30 th June 2017 from 09:00 until 17:00 hrs. A Traffic Management Plan will be in operation as required. There will be restrictions on pay and display parking on Desmond Avenue to facilitate the works. N11 - Southbound from its junction with Johnstown Road to Kilbogget Grove ** Work commenced on Monday, 13 th May 2017 until Monday, 3 rd July 2017 on the upgrading of end of life public lighting columns and lanterns. Working hours 10:00-16:00 hours and 19:30-00:00 hours (if required). A Traffic Management Plan will be in operation for the duration of the work. Page 5 of 6

N11 Northbound from ESSO Garage to Johnstown Road Junction ** Work commenced on Tuesday, 23 rd May 2017 until Monday, 3 rd July 2017 on the upgrading of end of life public lighting columns and lanterns. Working hours 10:00-16:00 hours and 19:30-00:00 hours (if required). A Traffic Management Plan will be in operation for the duration of the work. M50/M11 - Northbound/Southbound Information on planned road works along the M50 can be found at: http://m50concession.com/operation-maintenance/planned-road-works/ End Page 6 of 6