Start End Project Cost (mil) Client 1994 1998 2001 2003 2005 2005 Kuala Lumpur International Aiport, Sepang, Selangor. (Project Management) Terminal 3, Subang Airport (Design Consultancy Including Pre-Planning ) The Upgrading Works For The New Large Aircraft (Nla) Ab-380 Operations at Kl International Airport, Sepang (Up To Tender Stage Only) - Design Consultancy (In Conjunction With Design-And-Build Contractor) 9,000.0 Ministry of Transport 150.0 Ministry of Transport 88.0 Trans Resources Corporation Sdn. Bhd. Malaysia Airports Sdn. Bhd. 2005 2007 External Parking Apron for MAS Hangar at KLIA 25.0 Malaysia Airlines System 2006 2008 2006 2009 2006 2009 2006 2009 2007 2008 2007 2009 Rehabilitation And Strengthening Of Runway Pavement at Penang International Airport - Design Consultancy (In Conjunction With Design-And- Build Contractor) Rehabilitation Of Airfield Pavement For Parking Apron and Deepening Of The Parking Apron Operations at Penang International Airport Redevelopment of Penang International Airport User Requirement and Pre-Planning Rehabilitation of Air-field Pavement For Parking Apron Bay 3,4,5 & 6 at Penang International Airport DCA Project In Relation To LCAT at Kl International Airport, Sepang Package B (In Conjunction With Design-And-Build Contractor Rehabilitation Of Taxiways At Penang International Airport ( Design Consultancy) 15.0 SM Pelangi Sdn. Bhd. and Malaysia Airports Sdn. Bhd. 25.0 Malaysia Airports Sdn. Bhd 36 20.0 Malaysia Airports Sdn. Bhd Malaysia Airports Holding Ministry of Transport Department of Civil Aviation 12.0 Malaysia Airports Sdn. Bhd 2007 2007 Upgrading of Miri Airport 20.0 Binapuri Holdings 2007 2008 Senai International Airport, Johor Bharu, Johor 90 2008 2009 2008 2010 Upgrading of Kuala Terengganu Air-port, Terengganu: Package IV(a) & IV(b) Sea Reclamation & Coastal Erosion Upgrading Of Kuala Terengganu Airport, Terengganu: Package IV(A) - Runway Extension and Associated Works Risk Managemen t 250.0 Senai Airport Teriminal Services Sdn.Bhd. Inai Kiara Sdn. Bhd. Trans Resources Corporation Sdn.Bhd. 2008 2010 The proposed of aerodrome certification in Kerteh Airport 1.6 Petronas 2008 2009 Rehabilitation Of Airfield Pavement For Runway, Taxiways And Parking Apron And All Associated Facilities At Sultan Abdul Aziz Shah International Airport, Subang 28 Malaysia Airports Holding 2009 2013 KLIA2 Detail Design and Construction Supervision for Package AF01 Runway 3, Taxiway and Drainage 336.0 Malaysia Airports Holdings 2009 2011 Upgrading of Sultan Ismail Petra Airport, Kota Bharu, Kelantan 50.0 Ministry of Transport 2010 2012 Upgrading of Sultan Azlan Shah Airport, Ipoh,Perak 47.8 Ministry of Transport 2010 2011 Privatisation Of The Proposed Rehabilitation Expansion, Development, Operation And Maintenance Of Prince Mohammed Bin Abdulaziz International Airport, Madinah Al-Munawarah, Kingdom Of Saudi Arabia Masterplan and Preliminary Design Al-Bakri and Sons Holdings Co. Malaysia Airports Holdings *Cost in Malaysian Ringgit (Million) 58
Start End Project Cost (mil) Client 2010 2014 Proposed of design & consultancy services for Apron Widening, Kerteh Airport, Keerteh, Kemaman, Terengganu 7.0 Petronas 2011 2012 A On Proposed Expansion And Upgrading Of Facilities To Accommodate The Growth Of Cebu Pacific Air At Ninoy Aquino International Airport In The Philippines Cebu Pacific 2011 2012 Rehabilitation, Expansion, Development, Operation And Maintenance Of Proposed Upgrading and Extension Works, Development, Operation And Maintenance Of Iranian Imam Khomeini International Airport, Islamic Republic Of Iran Airport Master Plan For China Railway, Amona and Imam Khomeini International Airport Consortium Masterplan Amona Holdings China Railway Group Limited Imam Khomeni International Airport, Iran. 2012 2012 Upgrading of The Existing Suai Aiport, Timor-Leste 300.0 Ministry of Petroleum and Mineral Resources, Republic Democratic of Timor-Leste 2012 2013 Privatisation Of The New Al-Maty International Airport, Kazakhstan - Technical Feasibility And Airport Master Plan - Detail Engneering Design Masterplan The Government of Kazakhstan Airport Limo(M) Sdn.Bhd Malaysia Airports Holdings 2013 2013 Redang Airport, Technical feasibility study for the upgrading of the airport for option B-737 operations and option ATR72-600 operations Destination Resorts and Hotel Sdn.Bhd. 2013 2014 Senai Airport Aviation Park Planning and Detail Design Of Aviation Park 36.0 Senai Airport Terminal Services Sdn.Bhd 2013 2014 Upgrading of Sandakan Airport, Sandakan, Sabah 60.0 Ministry of Transport 2013 2017 On The Proposed Facilities For The Development Of Subang Skypark, Sultan Abdul Aziz International Airport, Subang 145 Subang Skypark Sdn Bhd. 2013 2014 Senai Business Aviation Centre Proposed Phase 1 Development Construction Of Hangars and General Aviation At Senai International Airport 40.0 Senai Airport Terminal Services Sdn. Bhd. 2014 2015 The upgrading of Sultan Ahmad Shah Airport, Kuantan, Pahang 16.9 Ministry of Transport 2014 2015 Senai Business Aviation Centre-Proposed Phase 2 development construction of hangars and general aviation at Senai International Airport VVIP hangar 64 MMC Engineering Services Sdn.Bhd. 2016 2017 Development Plan for Batu Berendam Airport (Land Development and Pre- Planning ) 165.0 Ministry of Transport 2016 2017 Pre-feasibility study for Thakhek Airport, Khammoun District, Lao People s Democratic Republic Inovica Global Sdn.Bhd. *Cost in Malaysian Ringgit (Million) 59
KLIA2 Runway 3, Taxiways, Drainage and Associated Works KLIA2 - Official Opening of Runway 3 - Trial Landing. Upgrading Of Kuala Terengganu Airport, Terengganu - Runway Extension On Reclaimed Area and Associated Works. Senai Airport - VVIP Hangar and Associated Services 60
Upgrading of Sultan Azlan Shah Airport, Ipoh,Perak Landside and Airside Penang International Airport Pavement Rehabilitation Sandakan Airport Passenger - Terminal Building Upgrading 61
Suai Airport, Timor-Leste - Under Construction Suai Airport, Timor-Leste Overall Upgrading Scope 62
Kota Bharu runway reposition and helipad Privatisation Project for The Expansion, Upgrading Operation And Maintenance Of Iranian Imam Khomeini International Airport, Islamic Republic Of Iran Airport Master Plan For China Railway, Amona and Imam Khomeini International Airport Consortium Senai Hangar, view from outside and inside of hangar. Privatisation Project For Prince Mohammed Bin Abdulaziz International Airport - Madinah Al-Munawarah, Kingdom Of Saudi Arabia - Airport Masterplan For Al-Bakry and Malaysia Consortium 63