Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017

Similar documents
South Western Railways December 2018 Timetable Consultation

Timetable consultation for December Opens: 29 September 2017 Closes: 22 December 2017

December 2018 timetable consultation outcome report. Published April 2018

SWR December 2018 Timetable Consultation Response

December 2018 timetable consultation outcome report

ACTIVITY & ACHIEVEMENT FOR DORSET

Regulatory Committee

To provide the best possible service during the Thameslink construction work at London Bridge;

HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Proposed Lidl Food store West Hendford, Yeovil

Delivering a better railway for a better Britain Route Specifications 2016 Wessex

Summary of questions and discussion

Greater Western franchise. December 2006 timetable. Passenger Focus briefing document

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Our new Great Western Franchise. Tarka Rail Association AGM June 2015

DEPARTMENT FOR TRANSPORT SOUTH WESTERN RAILWAY CONTROL PERIOD 6 ACCESSIBILITY FUNDING SUBMISSION

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

EAST WEST RAIL EASTERN SECTION. prospectus for growth

c2c s timetable consultation Passenger Focus report

Report of the Executive

New electoral arrangements for Dorset Council. Final recommendations

FirstGroup plc South Western

Dorset Proposition. Image courtesy of Framestore. Dorset Innovation Park Enterprise Zone

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

May 2019 Timetable. Highlights and Response to Feedback

The DfT also offered stakeholders the opportunity to meet with the DfT team and SENRUG confirms it would like such a meeting.

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise.

UNLOCKING THE BRIGHTON MAINLINE

3. Coach Supporting Statement

GTR December 2015 timetable consultation

CrossCountry Future Timetable Consultation

CHRISTCHURCH RELIEF ROAD OPTIONS ASSESSMENT REPORT

Response from the Heart of the South West Local Enterprise Partnership

Summer 2017 Newsletter from Railfuture Wessex Branch

Healthy, prosperous, vibrant, inclusive. Formal proposal to Rt Hon Sajid Javid MP. Secretary of State for Communities and Local Government

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive

4. The Department for Transport will be consulting in 2018 on the next GWR franchise to run from 2020 or 2022, including service levels and patterns

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Appendix to the 20 year plan

The New Northern Franchise

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Core NHS Health Check Providers

Bath Corridor Works. Matt Barnes FGW Regional Development Manager. Chris Prior FGW Project Manager (Major Possessions Delivery)

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

Anglia Winter Key Route Strategy (KRS) 2017/18

National Passenger Survey Spring putting rail passengers first

W3C QAWG Face-to-face Meeting

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Autumn putting rail passengers first

London Bridge station opens upgrade works

East Sussex Rail Strategy Shaping Rail in East Sussex and Action Plan

BUS USERS MANIFESTO. Background and overview of transport needs, legislation and options

N ewsrail. WEEK ENDING 19 May 2007 ITEM FOR TRAIN COMPANY ON RETAIL TRAIN TRAVEL ITEM SUBJECT OUTLETS STAFF AGENTS

Transport Assessment Appendix L: Match Day Impacts

Improvements to East Coastway train services from May 2018

1. Shrewsbury Aberystwyth Rail Liaison Committee held on Friday, 12 th February 2016.

The Rail Network in Wales

Date: 22 September Grove Vale parking consultation. East Dulwich, South Camberwell. Head of Public Realm

South of England north-south connectivity

STRATEGY FOR BRIDGWATER RAIL STATION FRIENDS OF BRIDGWATER STATION

Report of the Strategic Director (Place) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 March 2017.

Welcome to the Recovery Education Centre

ASLEF s Response to the East Anglia Rail Franchise Consultation

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

BREWERY SQUARE DORCHESTER REDEFINED THE MOST EXCITING SHOPPING & LEISURE DESTINATION IN THE SOUTH WEST

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017

GTR 2018 timetable proposals

1.1 We note that the following WCML access applications have been made:

TRANSFORMING TRANSPENNINE

Bus Passenger Survey

Whiteley Town Council

Information for participants

CONFERENCE BROCHURE.

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Reshaping your councils

Delivering a better railway for a better Britain Network Specification 2016 Wessex

Response to the South Western Rail Franchise Consultation

Transport Assessment Appendix M: Avonmouth Impacts

Welcome to the Recovery Education Centre

Railway Upgrade Plan Western 2017/18

Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016

Thames Valley Branch Lines Notes of Meeting

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

Michèle Dix Managing Director 17 January 2018

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd

Bus and Community Transport Services in Wales

The future of the TransPennine Express and Northern rail franchises

Strategic Transport Group

RailFAIR! RailFAIR! - Castle to Castle. Castle to Castle. Nottingham to Lincoln - Proposed Train Service Improvements

Economic Development Sub- Committee

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

EAST SUFFOLK LINES. Stations Investment Plan. Produced by the East Suffolk Lines Community Rail Partnership

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

Representing the users of the Barnstaple to Exeter railway line. Response to the Devon County Council Local Transport Plan December 2010

Listings Format (but not the content!) Mike South Page 1 of 8 23 March 2001)

Highland Mainline Journey Time Improvements Phase 2

Felixstowe Branch Line FAQ

Transcription:

Cabinet Date of Meeting 6 December 2017 Cabinet Member Cllr Daryl Turner Cabinet Member for Natural and Built Environment Lead Director Mike Harries Corporate Director for Environment and Economy Subject of Report Executive Summary Dorset County Council s response to South Western Railway s consultation on proposed timetable changes from December 2018 The County Council has been contacted as a key stakeholder by South Western Railways (SWR) to provide a response to their consultation regarding proposed timetable changes to their services from December 2018. SWR propose to run two trains per hour off peak from Weymouth one fast direct to London Waterloo, the other stopping at all stations to Portsmouth so that journeys from Weymouth to London will be up to 12 minutes faster and the two trains per hour between Weymouth and Bournemouth to be spaced much nearer to a half-hourly frequency. Wool will get an increase to 2 trains per hour in each direction. So this can be achieved, off peak direct services to and from London will not be provided from Upwey, Moreton and Holton Heath. Instead passengers must change trains either at Brockenhurst or Southampton to connect to/from London. An indication of the numbers likely to be affected can be found in the table included in the main body of the report. There will still be direct trains to/from London to Upwey and Moreton in peak times. The questions pertinent to Dorset are focussed on timetable 158 for the Weymouth Waterloo Service and timetable 160 for the West of England line covering Sherborne and Gillingham. DCC are asked: Do you support the speeding up of services from Weymouth with improved service intervals between Weymouth and Bournemouth and the change in connectivity for smaller stations?

Do you feel that the seasonal Saturday through service that operates between Waterloo, Yeovil Pen Mill and Weymouth, via Maiden Newton, should continue? Impact Assessment: Equalities Impact Assessment: To be carried out by South Western Railway. Use of Evidence: The Local Transport Plan 3 adopted by the Local Authorities and the Transforming Dorset document produced by Dorset LEP influenced the recommendations. Budget: Not applicable Risk Assessment: To be carried out by South Western Railway. Recommendation That the Cabinet: Reason for Recommendation (i) (ii) (i) (ii) respond positively to the proposal of speeding up of services from Weymouth with improved service intervals between Weymouth and Bournemouth and the change in connectivity for smaller stations; respond positively to the proposal of seasonal Summer Saturday service between Waterloo and Weymouth via Gillingham, Yeovil and Maiden Newton. The aspiration for faster journey times to London are included in the Local Transport Plan 3 adopted by the Local Highway Authorities and the Dorset LEP Strategic Economic Plan. It has also been a long held aspiration to have a more even interval between train services. There will still be provision to commute to and from London and there is little difference in the frequency of local service between Weymouth, Dorchester, Poole, Bournemouth and Southampton Central meeting the needs of most of Dorset s rail passengers. The County Council has in the past contributed to a trial summer Saturday service on the route and more services on the Weymouth-Bristol line are included in LTP3. Appendices Background Papers Appendix 1 Top 12 Destinations per Dorset Station provided by SWR. https://www.southwesternrailway.com/contact-and-help/timetableconsultation https://www.dorsetforyou.gov.uk/article/417819/view-the-local- Transport-Plan

https://dorsetlep.s3.amazonaws.com/sep%20pics%20&%20docs/634 2%20LEP%20Strategic%20Economic%20Plan%20v3%20LOW%20RE S.pdf Officer Contact Name: Kelly Flynn, Sustainable Transport Officer Tel: 01305 224687 Email: k.a.flynn@dorsetcc.gov.uk 1. Weymouth Mainline - Summary of Current Rail Service 1.1 The current Weymouth to Waterloo service takes between 2h 46min and 3 hours and can be achieved with no changes. There are 2 trains per hour (tph) at 17 and 43 minutes apart with the first train of the day from Weymouth arriving at London Waterloo at 08:50. 1.2 In the morning peak Upwey and Moreton has 6 direct trains to London, Holton Heath has 5. 1.3 After 08:39 alternate trains from Weymouth do not stop at Moreton, Wool or Holton Heath, meaning there is 1 direct tph to London Waterloo. Moreton and Wool passengers are usually given the option to go back to Dorchester south using the Weymouth bound train and change to the faster London bound train instead of waiting for the stopping train. Holton Heath is not offered the same alternative to hourly service as the Weymouth bound train does not call there. 1.4 There are 2 (tph) from Wareham to London in morning peak times. 1.5 Wool and Hinton Admiral (serving East Christchurch and Highcliffe) have 1 tph off peak in each direction to/from Waterloo, with the service from Hinton Admiral terminating at Parkstone. 1.6 2 tph stop at Southampton Airport and the current stopping train calls at Clapham Junction. 2. Weymouth Mainline - Proposed Service 2.1 The proposed service will have 2 tph off peak at 23 and 37 minutes apart therefore more evenly spread across the hour, one fast to London the other a new hourly stopping service to Portsmouth. The fast train Weymouth to Waterloo will have a journey time of 2h34m offering a time saving of up to 12 minutes with the first train of the day arriving in London at 08:22. 2.2 The first 3 trains of day will be fast, direct trains to London stopping at Upwey and Moreton, Dorchester South, Wool and Wareham and there will be 3 late afternoon/early evening fast, direct trains from London that stop at Moreton and Upwey. Hinton Admiral will also get 3 fast, direct trains to London in the morning peak and 3 from London in the afternoon/evening peak thereby still offering a commuter service. 2.3 In the morning peak Upwey and Moreton will have 7 train services 3 direct to London, 4 stopping to Portsmouth. Holton Heath will get 3 stopping services to Portsmouth with no direct train to London.

2.4 There will be two morning peak time trains from Holton Heath to Waterloo, the first one gets into London 25 minutes later than the current service. 2.5 There will be 2 extra stopping local trains from Wareham to Bournemouth early morning, where it will join the fast train to London Waterloo meaning that Wareham will have 3 tph (one going to Portsmouth) in morning peak times. 2.6 There will be no direct off peak trains to London from Upwey, Moreton, Holton Heath and Hinton Admiral. Instead there will be one stopping service to Portsmouth requiring a (same platform) change at Brockenhurst or Southampton to get to Waterloo for passengers travelling from Upwey, Moreton and Holton Heath. 2.7 In off peak times Hinton Admiral will no longer have a direct train service to London or the other hourly service to Southampton. These will be replaced by an hourly stopping service to/from Portsmouth. Connection to London onto a fast train can be made either at Brockenhurst (16 min wait) or Southampton (10 min wait) with an overall journey time 3 minutes faster than the current timetable. 2.8 Hinton Admiral will get a direct stopping service to Weymouth. 2.9 Throughout the day Wool will have an additional train service in each direction per hour. 2.10 There is little difference in the frequency of local service between Weymouth, Dorchester, Poole, Bournemouth and Southampton Central, however there will be a reduction to 1 tph direct to Southampton Airport Parkway. 2.11 There will no longer be a direct service to Clapham Junction from most Dorset stations (although Christchurch will get 1 per hour). You would need to change trains at Woking or London Waterloo to get to Clapham Junction. Clapham Junction only features in the top 12 destinations list (Appendix 1) 4 times with 1% of journeys from these stations to Clapham. 3. Other Information 3.1 A reduction in journey time to London is included in the Local Transport Plan 3 adopted by the Local Authorities, and Dorset LEP s Strategic Economic Plan. 3.2 DCC officers have looked at the potential impact of the additional trains stopping at Wool on the level-crossing barrier downtime and the barriers are likely to be down for slightly longer (approximately 5 minutes instead of 3.5 minutes), but less frequently so overall barrier downtime will probably be less. This has not been verified by SWR or Network Rail. 3.3 The media headline of one direct train per hour to London does seem on the face of it a dramatic decline in service provision for Dorset. However, thorough interrogation of the consultation proposals included in this report shows that there will be some betterment as well as new travel opportunities and consideration has been given by South Western Railways to achieving some of our rail aspirations.

3.4 Table showing passenger and population data. Station Population 1 Number of Approx. no. of % trips to % Trips to Annual Trips to Approx Daily Total Daily Total Daily Total Daily Total Daily Total Households proposed new London 3 Dorset and London 3 trips to London Passengers Passengers Passengers Passengers (existiting) 1 dwellings 2 Southampton 3 (annual trips/365 (London Train) (London (Weymouth (Weymouth days) On 4 Train) Off 4 Train) On 4 Train) Off 4 Weymouth* 58,295 25,359 2,000 19% 49% 42,910 118 1,392 - - 1,176 Upwey*** 6,336 3,176 900 9% 66% 2,182 6 87 16 15 64 Dorchester South 19,481 8,449 2,000 9% 76% 8,718 24 790 395 333 686 Moreton** 2,754 1,148 600 11% 80% 2,850 8 Wool 5,689 2,015 1,000 14% 70% 9,121 25 Wareham 5,654 2,557 200 19% 61% 22,469 62 563 141 156 434 Holton Heath N/A N/A N/A 5% 82% 181 0.5 Christchurch 49,480 21,475 950 Not provided 0.0 410 316 340 374 * Population and households for Weymouth & Portland less Upwey, Broadwey and Littlemoor ** Population figures for Moreton and Crossways *** Population figures for Upwey, Broadwey and Littlemoor 1 Data provided by Dorset Area Statistics on dorsetfoyou.com 2 Data included in current adopted local plans which are under review 3 Data provided by SWR 4 Data collected by DCC Aug 16 3.5 These proposals are for the duration of the franchise (7 years), although South Western Railways will have another opportunity to tweak the timetable in this period. Mike Harries Corporate Director for Environment and Economy December 2017