MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016

Similar documents
MBTA ATM/Branding Opportunities 43 ATM Locations Available

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

A A A A MEN'S ROOM EQUIPMENT 117 EXISTING HOTEL TOWER WOMEN'S ROOM 115 EXISTING HOTEL TOWER AREA APPROX 23 STORIES

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

Capitol Hill Prime Retail Space For Lease

HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

HEARST GARDENS BERKELEY, CA 94702

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

AREA TENANTS CONTACT Dan Clark DEMOGRAPHICS

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. December 13, 2017

ST. PAUL'S RESIDENCE ADDITION WATERLOO, ONTARIO

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

SAN RAFAEL City Council January 20, 2015

TORONTO TRANSIT COMMISSION REPORT NO.

PARKS & BEACHES PROJECTS

Building the transportation network we need for the future in Niagara Region

Reston EastPointe Sunset Hills Road Reston, VA 20190

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

TORONTO TRANSIT COMMISSION REPORT NO.

site plan GREAT AMERICA PARKWAY FIRST FLOOR... GREAT AMERICA PARKWAY GREAT AMERICA PARKWAY

IREDALE GROUP A R C H I T E C T U R E

Better rail journeys arriving in May 2018 The Great North Rail Project between Preston and Blackpool 1 December 2017

TORONTO TRANSIT COMMISSION REPORT NO.

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

2018 Capital Improvement Budget Department Summary by Funding Source

Ground Level. BCEC on Grey Street. more personal - more choice. Grey St. Glenelg St. Medical. Parent. Olio Terrace.

Chapter 16 Route Window NE15 Brentwood station. Transport for London

gables station s dixie hwy & ponce de leon blvd coral gables, fl 33133

Ongoing Projects 3/16/2017 2

Pre-Construction Public Meeting July 2017

SCHEMATIC PACKAGE SHEET INDEX

Hampton Roads Passenger Rail Task Force. February 29, 2012

Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

BOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS

RETAIL FOR LEASE. Mixed-Use Development Heart of Point Loma BELLAMAR POINT LOMA 1180 ROSECRANS STREET, SAN DIEGO, CA 92106

Madison Metro Transit System

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Calgary River Access Strategy Priority Sites and Proposed Funding

M E S T I Z O C U R T I S P A R K

2600 COLORADO ENTRY DESIGN

TORONTO TRANSIT COMMISSION REPORT NO.

RETAIL FOR LEASE MIXED-USE DEVELOPMENT IN THE HEART OF POINT LOMA. Bella mar POINT LOMA 1180 ROSECRANS STREET, SAN DIEGO, CA 92106

Planning the Future. Campus and Community Forum August 18, 2011 South Dakota State University

Draft Environmental Assessment and Draft Section 4(f) Determination. Appendix A Station Headhouse Alternatives Analysis

Ossington Station Easier Access Project - Construction & Public Art Concept Update

WHERE POLISHED MEETS PROFESSIONAL

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

build to suit brand to recruit

TORONTO TRANSIT COMMISSION REPORT NO.

COMMERCIAL LAND/BUILDING Salmon Arm Industrial Park. For Sale $1,350,000

25 th Avenue Grade Separation. Community Meeting November 13, 2018

NEW MEADOWS PARK PROPOSED MASTER PLAN

AVENUE OF THE AMERICAS REINVENTING THE ART OF FIRST CLASS

FOR SALE OR LEASE // AN OPPORTUNITY LIKE NO OTHER WARM SPRINGS BLVD FREMONT CA

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

BUILDING 1 4 FL, 1N134CD06300 LOT 1 BUILDING 2 1 FL, 1N134CD06400 LOT 2 BUILDING 3 2 FL, 1N134CD06500 LOT 3 NOW PRE-LEASING

Purpose of Presentation. Outline of Presentation. Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ

OFFICE SUITES AVAILABLE

TORONTO TRANSIT COMMISSION REPORT NO.

Community Advisory Panel Meeting #

TORONTO TRANSIT COMMISSION REPORT NO.

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

Bluefield State College Research and Development Center

CAMS Capitol Accessibility, Maintenance and Safety

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

Railfuture East Anglia Whittlesford Parkway station audit

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

FOR LEASE 525 WEST 8 TH AVENUE VANCOUVER, BC HOW CONNECTED ARE YOU? David Mackay Senior Associate

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT

201 E LAS OLAS BLVD DOWNTOWN FORT LAUDERDALE S NEWEST LUXURY OFFICE TOWER

Appendix E DRAFT. Airport Tenant Facilities

Surgical Services and Observation Unit Project Given by Highland Hospital to the Highland Park Community.

Welcome! This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements

QUALITY + SPACE BINARY CENTRE 3 RICHARDSON PLACE, NORTH RYDE, NSW

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Plaza Park, Village Park, and Community Clubhouse

Memorandum / Letter of Intent

Having trouble reading this ? View it in your browser. Welcome

Capital Five-Year Fiscal Forecast

Main Street Station Upgrades

FOR LEASE 7707 Gateway Boulevard, Newark CA

Board of Park Commissioners Project Summary

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

New Orleans Municipal Yacht Harbor

4.1.1 Improved facilities and layout cont.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

15150 Memorial Drive 155,100 RSF OF OFFICE SPACE AVAILABLE

CITY COUNCIL AGENDA MEMORANDUM

Transcription:

MBTA WOLLASTON Station Improvements Public Meeting January 14, 2016 Kleinfelder, Inc. Architectural Engineers, Inc. Code Red Consultants, LLC Keville Enterprises, Inc. Vertical Transportation Excellence WSP Group

AGENDA Project Update Design Improvements Comments & Questions Next Steps

PROJECT UPDATE Project schedule Project funding New station and site layout

WESTON AVE. 1 WAYL AND ST. NORTH PARKING LOT PICK-UP/DROP- OFF AREA 2 WOODBINE STREET EXISTING CONDITIONS PROJECT AREA NEWPORT AVENUE BROOK STREET STATION 5 GREENWOOD AVENUE LOT ATTENDANT BOOTH SOUTH PARKING LOT 4 3 BEALE STREET NEWPORT AVENUE ENTRY OLD COLONY AVE. 2 PEDESTRIAN & BIKE ACCESS POINT PARKING LOT ENTRY

EXISTING CONDITIONS CONCRETE ENTRANCE CANOPY INBOUND TRACK Bench, Typ. Porter Rm Storage Lights Shelter Shelter Lightwell Lights EDGE OUTBOUND TRACK COMMUTER RAIL TRACK LEVEL PLAN 0' 8' 16' 32' N PARKING LOT DN CONCRETE ENTRANCE CANOPY ABOVE UNEXCAVATED COMM W/ FA FA UP TO W M AFC JAN UNEXCAVATED EDGE OF ABOVE ESCALATOR ELEC ELEC & PUMP STO DN DN NEWPORT AVE LOBBY LEVEL PLAN 0' 8' 16' 32' 64' N

EXISTING CONCRETE ENTRANCE CANOPY INBOUND TRACK Bench, Typ. Porter Rm Storage Lights Shelter Shelter Lightwell Lights EDGE OUTBOUND TRACK COMMUTER RAIL TRACK LEVEL PLAN 0' 8' 16' 32' N PARKING LOT DN CONCRETE ENTRANCE CANOPY ABOVE UNEXCAVATED COMM W/ FA FA UP TO W M AFC JAN UNEXCAVATED EDGE OF ABOVE ESCALATOR ELEC ELEC & PUMP STO DN DN NEWPORT AVE LOBBY LEVEL PLAN 0' 8' 16' 32' 64' N

CONCRETE ENTRANCE CANOPY INBOUND TRACK Bench, Typ. Porter Rm Storage Lights Shelter Shelter Lightwell Lights EDGE OUTBOUND TRACK COMMUTER RAIL TRACK LEVEL PLAN 0' 8' 16' 32' N PARKING LOT DN CONCRETE ENTRANCE CANOPY ABOVE UNEXCAVATED COMM W/ FA FA UP TO W M AFC JAN UNEXCAVATED EDGE OF ABOVE ESCALATOR ELEC ELEC & PUMP STO DN DN NEWPORT AVE Lobby LeveL PLan 0' 8' 16' 32' 64' N

STATION DESIGN PROCESS Develop Alternatives (15% Design) Consensus Option (30% Design) Develop Design (60% Design) Finalize Design (100% Design)

PROGRAM OF IMPROVEMENTS Flooding Accessibility Code Additional Station Improvements Coordination with City & Planning Agencies

ACCESSIBILITY REQUIREMENTS Accessible pathways around the site Accessible entrances Accessiblity between platform and lobby

ADDITIONAL FULL STATION IMPROVEMENTS Electrical upgrades Replace escalator Update ire alarm and ire suppression Remedy drainage and looding Site improvements Security upgrades Enhance architecture Mechanical upgrades Replace signage

CONSENSUS STATION OPTION AT 30% NEW NORTH HEADHOUSE NEW SOUTH HEADHOUSE NEW CANOPY NEW BRIDGE w/ AFC NEW BRIDGE NEW CANOPY NEW ADA RAMP 2 Headhouses Maintain passthrough PN N

DESIGN IMPROVEMENTS FOR 60% ONE CENTRAL HEADHOUSE COMBINING NORTH + SOUTH HH FROM 30% NEW NORTH HEADHOUSE NEW SOUTH HEADHOUSE NEW CANOPY NEW BRIDGE w/ AFC NEW BRIDGE NEW CANOPY NEW ADA RAMP PN N MAINTAIN UNDERGROUND PASSTHROUGH AND USE IT AS A LOBBY Quicker route to the platform More compact footprint

DESIGN IMPROVEMENTS FOR 60% Comm Main Elec Elev 1 ONE CENTRAL HEADHOUSE COMBINING NORTH + SOUTH HH FROM 30% Mezz Ecr Mezz Stair Mezzanine Level Starter/ Break Supv Port Fire L.S. Elev 1 Jan M W Escr Stair CSA AFC Paid Up Lobby Up Unpaid Lobby Ramp Stair Ramp Mezz Stair Esc 1 Elev 2 abv Up Jan Elev 3 Up PN N MAINTAIN UNDERGROUND PASSTHROUGH AND USE IT AS A LOBBY More active lobby in passthrough

STATION LOBBY LEVEL LAYOUT EXISTING LOBBY REMAINS PASSTHROUGH AND BECOMES DOUBLE ACCESS TO SECURED BIKE PARKING MOVES NEW HEADHOUSE + PASSTHROUGH ELEVATORS CIRCULATION STAIR/ RAMP ELEVATOR ESCALATOR N PN BRIDGE HEADHOUSE SERVICE SPACE SECURED BIKE PARKING

PASSTHROUGH SECTION MAINTAIN PASSTHROUGH BASEMENT LOBBY ON BOTH SIDES WITH ACCESS TO THE CIRCULATION STAIR/ RAMP ELEVATOR ESCALATOR BRIDGE HEADHOUSE SERVICE SPACE SECURED BIKE PARKING

SECTION BRIDGE OVER TRACKS AT HEADHOUSE NEW ELEVATORS NEW STAIRS REPLACE CANOPY CIRCULATION STAIR/ RAMP ELEVATOR ESCALATOR BRIDGE HEADHOUSE SERVICE SPACE SECURED BIKE PARKING

BRIDGE LOBBY LEVEL LAYOUT DROP OFF PARKING LOT BRIDGE LOBBY MEDIUM ROOF LOWER ROOF BIKE STORAGE NORTH BRIDGE INBOUND RED LINE CANOPY BELOW DN RD RD CANOPY BELOW OUTBOUND RED LINE COMMUTER RAIL CANOPY BELOW UP NEWPORT AVE PN N BRIDGE OVER TRACKS FROM HEADHOUSE NEW ESCALATORS AND ELEVATORS TO/ FROM BRIDGE REPLACE CANOPY CIRCULATION STAIR/ RAMP ELEVATOR ESCALATOR BRIDGE HEADHOUSE SERVICE SPACE SECURED BIKE PARKING

HEADHOUSE ELEVATOR SECTION BRIDGE OVER TRACKS AT NEW HEADHOUSE ELEVATORS AT NEW HEADHOUSE AND CIRCULATION STAIR/ RAMP ELEVATOR ESCALATOR BRIDGE HEADHOUSE SERVICE SPACE SECURED BIKE PARKING

STATION LEVEL LAYOUT PARKING LOT DROP OFF PARKING LOT HEADHOUSE MEZZANINE LOWER ROOF SECURED BIKE PARKING DN INBOUND RED LINE OUTBOUND RED LINE COMMUTER RAIL WEST ENTRANCE NEWPORT AVE PN N ELEVATOR TO HEADHOUSE BRIDGE ELEVATOR TO PASSTHROUGH LOBBY NEW STAIR FROM LOBBY TO CIRCULATION STAIR/ RAMP ELEVATOR ESCALATOR BRIDGE HEADHOUSE SERVICE SPACE SECURED BIKE PARKING

PERSPECTIVE VIEWS FROM THE PARKING LOT SIDE 1 2 1 2

PERSPECTIVE VIEWS FROM BROOK STREET AND NEWPORT AVENUE 1 2 1 2

PERSPECTIVE VIEWS FROM THE HEADHOUSE LOBBY AND FROM PASSTHROUGH

4 2 MBTA WOLLASTON - STATION IMPROVEMENTS PUBLIC MEETING - JANUARY 14, 2016 SITE LAYOUT Separate pedestrians WAYLAND ST WOODBINE ST 2 GREENWOOD AVE 23 and bicyclists from the parking Plan for integration with future BEALE ST neighborhood bike WESTON AVE 21 NORTH LOT SOUTH LOT * lanes Allow for future site development Maintain parking capacity 5 2 NEWPORT AVE * TBD pending coordination w/ City BROOKE ST N PN

COMMENTS & QUESTIONS WWW.MBTA.COM/ABOUT_THE_MBTA/T_PROJECTS WOLLASTONSTATIONPROJECT@GMAIL.COM

NEXT STEPS 60% Design January 2016 Next Public Meeting Spring 2016 Final Design Summer 2016

THANK YOU!