CONSTRUCTION PROJECT. INFORMATION REGARDING STATUS OF R/A/FINAL BILL PAYMENT OF CONTRACTOR'S BILL (November MONTH)

SUB:- Status of Tenders dealt by CP Division for month of October, Nos and names of parties qualified after Technical evaluation

SUB:- Status of Tenders dealt by CP Division for month of September, Nos and names of parties qualified after Technical evaluation

SUB:- Information of Tenders Status of CP Division May 2011

Last date of receipt of Tender. Numbers of tenders received Nil YES RITES/CP/RAM AMJAS/SCIEN Block (Science Block) and

SUB:- Status of Tenders dealt by CP Division for month of December, Nos and names of parties not qualified after Technical evaluation

RITES LIMITED RPO LUCKNOW

DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No.

COMPANY PROFILE. Quality & Work, Speaks.

LIST OF ESIC HOLIDAY HOME

ROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE

ROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE

EXHIBITORS DIRECTORY. Ms Neha Shukla American Physical Society C/o Balani Infotech Pvt. Ltd Mobile:

S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun

List of officials/eminent persons nominated by Ministry of Rural Development, Government of India as Members of Ombudsman Selection Committee

S b Sky Brother Designer, Developer & Interior Decorators Sher singh complex, Sector-49,Noida Phone , ,

07/01/ /09/ /09/ /11/2014

Shri N.S. Kang, IAS Addl. Secy & DG (CGHS) Dr. D.C.Joshi, Director (CGHS)

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

List of the projects to be taken-up in the 102 nd meeting of SEIAA held on at 12:00 PM

SmartCity (Kochi) Infrastructure Private Limited SEZ

Central Power Research Institute Civil Engineering Division. Quarterly Progress Report for the period ending February 2012

Aero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity. November 18 th, 2016.

Table-1.1 SEASONS, SOWING & HARVESTING PERIOD AND PRODUCTION. Five year Average Production ( to Harvesting Period.

Name of retail store Address and Weekly Holiday Contact No. 1 Andrews Ganj Road No.4, Qr. No.9 & 11, Andrews Ganj, New Delhi (Wednesday )

MEMBERS OF THE GOVERNING COUNCIL

Nos. of Tenders Reeived. Nos. and Name of parties not qualified after technical bid

One Under-rated achievement of the Delhi Master Plan MPD 2021 wins the ISOCARP award 2008 for Urban planning.

8. Karnataka Cooperative Consumers Federation Ltd. No. 4, Pampamahakavi Road, Chamarajpet, Bangalore (Karnataka)

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

DCB Bank Regional Nodal Officers

3 Day s of Intense Business Networking. VENUE : D.D.A Ground, Behind Japanese Park, Near Rithala Metro Station, Sector-10, Rohini, New Delhi

Contact and other details of SEZs established/notified prior to SEZ Act, 2005

SUPREME COURT BAR ASSOCIATION Directory Membership no: Res: Res: Membership no: Res: Tel: Membership no: Res: Tel: Res: Tel: Res:

SOUTHWEST MONSOON-2010: DAILY FLOOD SITUATION REPORT SUMMARY OF IMPORTANT EVENTS AS ON

Central Power Research Institute Civil Engineering Division. Monthly Vigilance Report for the month of JULY 2014

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

Company Profile DEAR SIR,

DLF Ltd. Q1 Analyst Presentation

Syllabus. B.A. - III Public Administration Mata Gujri College (Autonomous) Re-Accredited with 'A' Grade by NAAC Session

DETAILS OF CONTRACT AWARDED DURING THE MONTH OF OCTOBER ( ABOVE RS. 5 LAKHS) Nos. and names of parties qualified after technical evaluation

PUNJAB NATIONAL BANK HUMAN RESOURCES DEVELOPMENT DIVISION HEAD OFFICE : NEW DELHI LIST OF CIRCLE HEADS

16 Edition Friday, 5 to Monday, 8 April 2013 Himachal Bhawan, Madhya Marg, Sector 28 B, Chandigarh RETROSPECT

Development of Road Infrastructure in India

Names of parties qualified after technical evaluation M/s

DELHI METRO TRAIN WRAPS & (Authorised Marketing Associate for Advertising through Delhi Metro Trains on Line I, II, III & IV)

CAUSE L IST B - XXX /C - 203/1, PHASE VII, FOCAL POINT, LUDHIANA - 10, PUNJAB. V/S M/S PACKSON TRADERS GILL ROAD, MILLER GANJ, LUDHIANA

(ii) DESCRIPTION OF DUTIES - PROJECT MANAGEMENT, FINANCIAL CURRICULUM VITATE 1. NAME: SUDHIR TENGSHE

VISHWAKARMA. (Online Monthly E-Journal of Construction Industry Development Council) Vol. 7 Issue VI E Journal of CIDC June, 2018

CONSULTATIVE GROUP 11 DECEMBER Lori Keeve Communications Grangegorman Development Agency

Decisions where applications for information rejected. 4. No. of times various provisions were invoked. 4b.

Table 1 Achievements of Youth Hostels in 10 th Five Year Plan

SITREP NO-110/ hours 32-20/2007-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 18 TH September, 2007

Designed Built Ecosystem for Smart Living. New Chennai Township Private Limited

MECON LIMITED, RANCHI. CSR & Sustainability Programme. Report for the period April,2015 to June,2015

DLF Limited. Q2 Analyst Presentation

BHEL:PSWR DETAILS OF CONTRACT (WORKS CONTRACT) CONCLUDED DURING MAY-2017

M.P. POLICE HOUSING CORPORATION LTD. Multi-Storey Residential Complex for Police Personnel At 15 th Battalion, INDORE (Madhya Pradesh)

LIST OF PARTIES WITH WHOM BUSINESS DEALINGS HAVE BEEN BANNED/SUSPENDED THROUGHOUT NTPC. Address of the Agency

RITES LIMITED RPO LUCKNOW Status of Tenders for the Month of JULY 2015

MACQUARIE CAPITAL SECURITIES (INDIA) PRIVATE LIMITED. India/ China Oil & Gas Yatra Mumbai 16 February 2011

LAND VALUE CAPTURE FOR RAILWAY STATION DEVELOPMENT. Changing perception of Railways

Domestic LPG Stove INTRODUCTION MARKET POTENTIAL

Sl. No. 1. God father Communication Pvt Ltd 9/36/2013-BP & L. Name of MSO Address of MSO Applied date and for Area Status

DISTRICT PROFILE ARWAL

Sub:- Rate Inquiry for Supply and installation of Fixtures for Visual Merchandising & Photography Lab of FC department at NIFT Patna.

RITES LTD RPO KOLKATA

Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, The Mumbai Metro Line-3

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT


LINGAYA S UNIVERSITY TRANSPORT DEPARTMENT

JAIPUR METRO. One of the world s fastest project completions. A presentation by. Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation

2 AGATTI Airports Authority of India, Agatti Airport Controller

PROPINSIGHT A Detailed Property Analysis Report

G.O.Ms.No.142 Dated:

PROPINSIGHT A Detailed Property Analysis Report

List of Participating Hotels:

Akshara Lotus Garden

RPO/North SBU. Details of Contracts Awarded by RITES/in progress during Month-DEC, Tender No.

1) SUB: ENVIRONMENT AWARENESS & STRESS MANAGEMENT RETREAT (12 th 14 th AUGUST, 2016)

APPENDIX

LIST OF VALID RQPs AS ON 20/03/2015 DEHRADUN REGIONAL OFFICE

Development of Convention-cum-Trade Zone in Bhubaneswar PRE-PROPOSAL MEETING

Capability Statement SUNJAAY ATHANKI PROJECTS MANAGEMENT PVT LTD

PROPINSIGHT A Detailed Property Analysis Report

32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

Third scorpene submarine 'Karanj' was launched from Mazgaon Badargaon

Network Size and Growth

MONTHWISE DETAILS OF JOBS SPONSORED (EMP-3) Designation of vacancy. Jr Engineer/Asstt Engineer/Engineer. Jr Engineer/Asstt Engineer/Engineer

Arrival and Departure Transport Request. Sl. No. Names Track Attending Dinner on 6 th / 7 th Mark 6 or 7 or 6,7

NATIONAL POLICE MISSION List of Members of Micro Mission: 03 Communication & Technology

ANDHRA PRADESH. Murty ASSAM. President Dr. Umesh Ch.Sarma Off. (0361) Res: Mobile:

PART I Issue 2 Rev. 3 Chapter 4 January 2017 Page 1 of 12

ORDER. Subject : Constitution of the Working Group on Tourism for the Twelfth Plan ( ).

RITES LIMITED RPO LUCKNOW Status of Tenders for the Month of JUNE 2015

expect faridabad's finest

Department of Economic Analysis and Research (R &D Cell) Status of Proposals sanctioned For Conferences/ workshop/ seminars etc Sl.

ALL INDIA FEDERATION OF MASTER PRINTERS

Transcription:

Tender No. Item / Nature of work Mode of Date of Tender Enquiry Publication of NIT Type of Last date of Bidding receipt of (Single/Two Bid Tender ) Numbers of tenders received Numbers & names of parties qualified after technical evaluation Details of Contracts during the Month November '2013 Ref: No: RITES/CO/VIG/Policy/G-10, Dated 10.07.2012 Numbers & names of parties not qualified after technical evaluation Whether Letter of contract Award/Letter of awarded Acceptance No. & to lowest Date tenderer/e Name of contractor Value of Contract (Rs. lakh) Scheduled date Actual date of of completion of start of work supplies/ work. Actual date of completion Reasons for delay, if any 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 RITES/CP/ TC Construction of Library Annex LIMITED 03.02.2010 Single Packet 22.02.2010 3 1.M/s Consolidated Construction 1.M/s Consolidated Construction RITES/CP/TC/PU/P M/s URC 2840.09 13.02.2011 28.04.2010 In progress Delay in handing over site and frequent changes /PU / Pondi/P- Building, Centre for Electronic TENDER Consortium Ltd Consortium Ltd ondi/p-iii/2010 Construction by Client III/2010 Media & Communication Research 2. M/s IVRCL Infrastructure & Projects Ltd 2. M/s IVRCL Infrastructure & Dated: 13.04.2010 private, building including internal and 3. M/s URC Construction (P) Ltd Projects Ltd external services & Construction and Provision of bulk services for 110acre site including external services for six buildings, 2 RITES/CP/PU- Puducherry. MS.BIO/2011 3 RITES/ TC /PQ/PU/ Pondi/Auditoriu m/civil Package 4 RITES/CP/ICA R/AUDI/2011 Construction of Madanjeet Singh School of Green Energy Technology Building & Bioinformatics Building including water supply & Electricity at Pondicherry University, Puducherry. Construction of "Convention Center" having Auditorium of 2500 seating capacity and ancillary buildings for Pondicherry University at Puducherry Construction of Auditorium at NASC Complex, Pusa, New Delhi. OPEN TENDER 31.02.2011 Two packet 23.02.2011 4 1. M/s URC Consturction (P) Ltd 1.M/s SRICO Projects Pvt. 2.M/s KMV Projects Ltd 2.M/S B&B Era Infra Engineering No. RITES/CP/PU- Pudducherry.MSBI O/2011 Dated: 29.06.2011 M/s.KMV Projects Pvt. Ltd OPEN TENDER 12.10.2011 Two packet 31.10.2011 3 1. M/s B.E. Billimoria & Co. 2. 1. M/s URC Const. Pvt RITES/CP/TC/PQ/P M/s. M/s Consolidated Const. U/Pondi/Auditorium B.E.Billimoria /Civil Package & Co limited Dated: 24.01.2012 OPEN TENDER 26.6.11 Two packet 28.7.2011 7 1. M/s East Coast Construction and M/S simplax Infrastructures RITES/CP/ICAR/A M/S unity Industries 2. UDI/2011 Dated Infraproject. M/S JMC Projects( India) 30.01.2012 3.M/S Ahluwalia Contracts (India) 4.M/s Unity Infra Projects 5. M/s NCC 6.M/S B.E. Billimoria Co. 1648.09 29.06.2012 14.07.2011 In progress 2929.92 24.07.2013 07.02.2012 In progress 7126 30.7.2013 13.02.2012 In progress Changes by client removing of column 5 RITES/CP/JNU/ ph-iii/2013 Construction of RCC Retaining Wall & External Development Work for Annex Building at jawahar Lal Nehru University, New Delhi 6 RITES/CP/JNU/ Renovation of Main CSH RENOVATION Liabrary,Seminar Hall &Computer /2013 center, Toilets in Aminstrative Block & School,CRS Auditorium & Construction of guard room &Waitng room for Koyna & Shipra Hostel, ESS room atjnu, NEW DELHI Tender 09.01.2013 one packet 24.01.2013 2 1. Aries Construction Co. Pvt. LTD. Nil RITES/CP/JNU/ph- 2. S&S Technocrafts pvt. III/2013dated :27.02.2013 OPEN TENDER 20.02.2013 Single Packet 07.03.2013 3 1. M/S MAC Associate 2. M/S Woodfun 3. m/s Godrej& Boyce NIL RITES/CP/ TC/DTEH/ Institutiuonal campus-rohtak/ AVS/ 2011, dated: 22.07.2011 S&S Technocrafts pvt.ltd M/s MAC Associates 305 5 month 14.03.2013 in progress 339 09 month 12.06.2013 in progress 7 RITES/CP/JNU/ Ph-III/Staff Qr/2013 Construction of Staff Quarter (24 Nos), JNIAS Block, WARDEN FLATS (2 Nos) &Dining Hall in Yamuna Hostel, Hostel Block for academic sttaff colledge at jawahar Lal University, New Delhi OPEN TENDER 05.03.2013 Two packet 25.03.2013 1. M/s Rakesh Brothers, 2. M/s Surendra Kumar, 3.M/s MV Omni Projects 1. M/s Rahman Builder RITES/CP/JNU/Ph- M/S III/Staff Qr/2013, kumar Dated, 29.07.2013 Surendra 1136.76 18 Month 12.08.2013 in progress 8 RITES/CP/JNU/ Barrier Free/2013 Creation of Barrier free JNU Campus for persons with Disabilities involving construction of Lift Pits / Shafts for Installation of Lifts, Ramps, Tactile Paving, Toilets and Miscellaneous Civil works at JNU, New Delhi Tender 24.05.2013 Single Packet 07.06.2013 1 M/s Aries Construction Co. (P) NA RITES/CP/JNU/Barr M/s Aries ier Free/2013 Dated Construction 05.07.2013 Co. (P) 9 RITES/CP/ Supplying Assembling / Fixing & OPEN TENDER 02.08.2012 Two packet 24.08.2012 5 M/s. Godrej & Boyce Mfg.Co.Ltd Godrej 1.M/sSIDCO JNU/ Furniture Placing in Position Furniture in Bahawan, Sher Shah Suri Marg, Okhla, 2. M/S BP ERGO Ltd, New Annexe & Annexe Buildings for SIS,SSS-III, New Delhi-110065. (SC&IS) / 2012 SLL&CS & School of Dt 06.03.2013. Computational & Integrative Sciences at JNU. 10 RITES/CP/TC/ Construction of Undergraduate UOA/FCI/Allah abad/2009 Lecture Theatre Complex at FCI Campus,University of Allahabad OPEN TENDER 11.07.2009 Two packet 06.08.2009 3 1. M/s IVRCL Infrastructures & Projects Ltd 2. M/s Jaycon Infrastructure 3. M/s Consolidated Construction Consortium Ltd Delhi, 3. M/s Durian Industries Ltd, Mumbai/ New Delhi, 4. M/s WIPRO Ltd, New Delhi/ Banglore RITES/CP/ JNU/ M/s. Godrej & Furniture Annexe & Boyce (SC&IS) / 2012 Dt Mfg.Co.Ltd 06.03.2013. Godrej Bahawan, Sher Shah Suri Marg, Okhla, New Delhi-110065. M/s IVRCL Infrastructure and Projects NIL No: RITES/CP/TC/UOA /FCI/Allahabad/200 9 Dated:11.11.2009 627.96 09 month 19.07.2013 in progress 706.00 12 month 26th Dec 2012 in progress 3665 03.06.2011 04.12.2009 In progress Pending decession of client for HVAC work.

11 RITES/CP/TC/ NIT- HAMIRPUR/H OSTAL/PKG- I/2010 Project Management Consultancy Services for Construction of 1500 Seated Hostel Building at NIT, Hamirpur campus. OPEN TENDER 30.08.2010 Two packet 04.12.2010 8 (i) M/s IVRCL Infrastructures & Projects i) M/s SVEC Constructions Ltd ii) M/s Unity ii) M/s Era Infra Engineering Infra Project iii) M/s Simplex iii) M/s Ramky Infrastructures Infrastructure Ltd iv) M/s Sam India Built Well Pvt. Ltd v) M/S B.L Kashyap & Sons RITES/CP/TC/NIT- HAMIRPUR/HOST AL/PKG-I/2010 dated: 31.01.2011 SAM INDIA Builtwell (P) 6619 17.11.2012 27.05.2011 Substantial work Due To Delay By Client Architecture, additional completed work given by the client & site hindrance. 12 RITES/CP/TC/I nstitutional Campus- Rohtak/ 2008 Construction of Instituional Campus at Rohtak, Haryana OPEN TENDER 13.09.2008 Two packet 10.10.2008 5 1. M/s Ahluwalia Contractor India 1. M/s RDS Projects, New New Delhi 2. Delhi 2. M/s Odeon Builders M/s Nagarjuna Const. Gurgaon Pvt New Delhi. 3. M/s Gupta Brothers India, New Delhi 13 RITES/CP/TC/ Interior Works in Institutional OPEN TENDER 22.01.2011 Two packet 17.02.2011 6 1. SACRED Const. Pvt. 2. 1. M/s Manu Lal & Sons DTEH/Institutio Campus, Rohtak, Haryana M/s MAC Assosciated 3. M/s 2. M/s Consolidated Interior nal campus- Ahluwalia Contractor India 3. M/s SIDCO Rohtak/ Interior/ 2011 14 RITES/CP/TC/ Supplying, Installing, Testing & OPEN TENDER 21.04.2011 Two packet 12.05.2011 5 1. M/s Electrorama 1. M/s Elgin Electronics DTEH/Institutio Commissioning of Audio Visual 2. M/s Modern Radio House (India) pvt ltd. 2. M/s Modern stage service nal campus- facility comprising Data/Video 3. M/s A V Science & Technologic Pvt Rohtak/ AVS/ Projection, Sound reinforcement, 2011 Confrerence s and Stage Lighting to be installed in Institutional Campus at Rohtak, Haryana 15 RITES/CP/TC/ Fabrication, Supply, Open tender 29.06.2012 Two bid 16.07.2012 4 M/s Godrej & Boyce Mfg. co. Ltd 1) M/s SIDCO DTEH/INSTIT Fixing/Placement of Furniture at 2) M/s MAC Associates UTIONALCAM Institutional Campus, Rohtak, 3)M/s India Furniture Pvt. PUS- Haryana ROHTAK/FUR NITURE/2012 16 RITES/CP/TC/ Appointment of Architect for C/o DTEH-ARCH- Insitututional campus, Rohtak, ROHTAK/2007 Haryana 17 RITES/CP/TC/ Providing and Fixing Signages at DTEH/Institutio Institutional Campus, Rohtak, nal Campus- Haryana Rohtak/signages /2013 limited Tender Open tender 10.10. 2012 Two bid 26.10.2012 4 M/s Rachna Vishwanathan & Associates 1) M/s VIBGYOR Industries 2) M/s Prolote Autoglo 3) M/s Descon Infrastructure Pvt. RITES/CP/ TC/Institutiuonal campus-rohtak/ 2008, dated: 30.01.2009 M/s Ahluwalia Contracts (India) RITES/CP/ M/s MAC TC/DTEH/ Institutiuonal campus-rohtak/ Associates Interior/ 2011, dated: 30.06.2011 RITES/CP/ M/s AV Science TC/DTEH/ & Technology Institutiuonal Pvt. campus-rohtak/ AVS/ 2011, dated: 22.07.2011 RITES/CP/TC/DTE H/INSTITUTIONA LCAMPUS- ROHTAK/FURNIT URE/2012 dated 06.03.2013 RITES/CP/TC/DTE H-ARCH- ROHTAK/2007 dated 26.09.2007 RITES/CP/TC/ DTEH/Institutional Campus- Rohtak/signages/201 3 M/s Godrej & Boyce Mfg. Co., Godrej Bhawan, Shershah Suri Marg,Okhla,Ne w Delh 110065 M/s Raj Rewal Associates, S-7, Triveni, DDA Commercial Complex, Shiek Sarai phase-i, New Delhi- 110017 M/s Rachna Vishwanathan & Associates, 955, Vikas Kunj, Vikas Puri, New Delhi-110018 12125.23 13.02.2011 13.02.2009 In progress Major part of the work completed. The ancillary works like AC, interiors etc are being executed by other agencies. The progress of these ancillary works is delayed due to pending decisions/approvals from client. The progress of main work is dependent on ancillary works and hence delay is occuring. 967.56 14.04.2012 15.07.2011 In progress Delay is due to non-availability of working front due to pending decisions/ approvals from client. 389.74 05.02.2012 06.08.2012 In progress Delay is due to non-availability of working front due to pending decisions/ approvals from client. 105.00 (Original) 350.00 (revised) 680.55 30.06.2013 01.11.2012 work in progress Delay is due to non availibility of working front 25.03.2010 26-09-2007 work in progress The delay is due to changes in drawings due to site conditions, requirement of clients, pending decisions from clients etc. 52.99 31.10.2013 01.05.2013 work in progress 18 RITES/CP/DTE H/ Institutional Campus Rohtak/Speciali zed Furniture/2013 Providing Specialized Furniture at Institutional Campus, Rohtak Haryana 21 RITES/CP/TC/ GGV- Hostel/2013 22 RITES/CP/TC/ DU/RENOVAT ION/WH/2012 23 RITES/CP/TC/ JMI/ Resi.Coaching Academy/2012/ dt.04.06.2012 Chhattisgarh Construction of Boys Hostel at Guru Ghasidas Vishwavidalya Campus, Koni, Bilaspur, Chaattisgarh Renovation P.G. Woman Hostel at OPEN TENDER North Campus, University of Delhi, Delhi Construction of Residential Coaching Academy for Minorities,SC,ST and Women at Jamia Millia Islamia,New Delhi. Open tender 21.03.2013 Two bid 17.04.2013 4 1) M/s Royal safe Co. (K.B.) 2) M/s Kings Furnishing & Safe Co. 3) M/s Raghav Construction 4) M/s Godrej & Boyce Mfg. Co. OPEN TENDER 20.12.2012 03.01.2013 3 1. M/S Singhal Enterprises, 2. m/s DKD Projects Pvt. Open Tender 21.03.2013 Two bid 12.04.2013 4 1. M/s Mundeshwari Construction, 2. M/s Rajendra Kumar Poddar, 3. M/s Nabin Designers & Constructions (P) Ltd, 4. M/s SBEC Projects Private Open Tender 08.02.2013 Two Pcket 22.03.2013 2 1. M/s Gupta Enterprises, 2. M/s Sam India Builtwell Pvt LIMITED TENDER 04.12.2012 Two packet None RITES/CP/DTEH/ M/s Royal Safe Institutional Campus Company (KB), Rohtak/ Specialized Furniture/2013 Dated 1309.2013 Plot No.4, Furniture block, Kirti Nagar, New Delhi- 110015 1. M/S Mans Builder India Pvt.Ltd 31.12.2012 5 1) M/s MAC Associates 1) M/s Nanad Kishore Anil kumar 2) M/s Bhavan Enterprises 3) M/s Fortuna Foundation Engg (P) Ltd _ Single Packet 09.11.2011 4 1. M/s Sood and Sood 2. M/s Aries Construction 3. M/s Garg Builders 4. M/s BCC Developers 19 RITES/CP/GGV-Construction of Accelerator Accelrator Building at Guru Ghasidas Building/2012 Vishwavidalya Campus,Koni, Billaspur, Chhatisgarh 20 RITES/CP/GGV-Construction of Zoology and Chem & Chemistry Department Building at Zoology Guru Ghasidas Vishwavidalya Bldgs/2013 Campus, Koni, Bilaspur, RITES/CP/GGV- Accelrator Building/2012 dated:25.02.2013 RITES/CP/GGV- Chem & Zoology Bldgs/2013 dated 25.06.2013 M/S Singhal Enterprises, M/s Mundeshwari Construction RITES/CP/TC/GGV-M/s Gupta Hostel/2013 Dated Enterprise 09.09.2013 RITES/CP/TC/DU/ M/s MAC RENOVATION/WH Associates /2012 dated: 19.03.2013 Tender RITES/CP/TC/JMI/ Resi.Coaching Academy/LOA/2011 dt. 22.12.2011 M/s Aries Construction Co. (Pvt.) 175.11 27.03.2014 28.09.2013 work in progress 504.616 5 month awarded on 85 % Work 25.2.13 Completed 1765.68 12 Month Awarded on 15% work 25.06.2013 completed 2777.76 12 month awarded on 12.08.2013 Contractor the work. 623.2 25.04.2014 26.04.2013 Work in progress No Delay Additional work, Changes Heavy Rain fall, Vidhan Sabha Election. Short supply of sand due to ban of mining start Non Finalizations of Plinth Level, Heavy Rain fall, Vidhan Sabha Elections. 404.51 6/1/2013 7/1/2012 Work in progress Due to increase in value of work

24 Tender NO. RITES/CP/TC/J MI/Addl. Construction of additional Accoimmodation for Girl Students ( Block-A) at Jamia Millia Islamia, Accommodation New Delhi Tender 06.02.2013 Girl Students/Block- A/2013 25 RITES/CP/TC/J MI/Addl. Construction of additional Accommodation Accoimmodation for Girl Students Girl Students/Block- ( Block-B) at Jamia Millia Islamia, New Delhi B/2013 26 RITES/CP/TC/J Construction of Hostels for MI/R/Coaching Coaching Academy & Urdu Academy & Academy at Jamia Millia Islamia, Urdu New Delhi. Academy/Hostel /2013 27 RITRES/CP/TC/ Construction of Marketing MDBP/NSIC/Pk Development cum Business Park g-i/r-l/2010 Including Lifts And Ancillary Works at NSIC Complex at Okhla Industrial State, New Delhi- 110020 28 RITES/CP/TC/II T/CLASSROO M/Block- B/2009 Construction of Nalanda Class Room Complex,Block-B at I.I.T, Kharagpur (West Bengal) LIMITED TENDER OPEN TENDER 06.02.2013 27.03.2013 Single Packet One Packet (1) M/s S & S Technocrats Pvt. 01.03.2013 3 (2) M/s Gupta Enterprises (3) M/s Aries Construction Co. Pvt. 1) M/s S & S Technocrats Pvt. 26.02.2013 4 2) M/s Sam (I) Builtwell Pvt. 3) M/s Gupta Enterprises 4) M/s Aries Construction Co. Pvt. 12.04.2013 3 1) Aries Construction Co. Pvt. 2) M/s Rakesh Brothers 1) M/s Rehman Builders Open Tender 23.11.2010 Two bid 16.12.2010 8 i) M/s. IVRCL Infrastructures & Projects (i)m/s URC Construction (ii) Nagarjuna Private Construction Co. (iii) Ahluvalia (ii) M/s JMC Projects (India) Contracts (India),New Delhi (iv) (iii) M/s Era Infra M/s Sam (India) Built Well Pvt Ltd Engineering (v) M/s Unity Infra Projects Open Tender 25.04.2009 Two bid 05.06.2009 8 i. ) M/s.Simplex Infrastructures (i) M/s.ROMA Builders Pvt.Ltd,,Kolkata, ii) Mumbai, (ii)m/s Consolidated M/s. IVRCL Infrastructures & Projects Construction Consortium,Kolkata, iii),chennai, (iii) M/s.Ahluwalia Contracts(India),New OMAXA Infrastructures & Delhi, iv) Projects Pvt.Ltd M/s.Nagarjuna Construction Company,Hyderabad, v) M/s. Engineering Project (India),Kolkata RITES/CP/TC/JMI/ Addl. M/s S & S Accommodation Technocrats Pvt. Girl Students/Block- A/LOA/2013 dt 09.04.2013 RITES/CP/TC/JMI/ Addl. M/s Sam (India) Accommodation Builtwell Pvt. Girl Students/Block- Ltd B/LOA/2013 dt:02.05.2013 RITES/CP/TC/JMI/ R/Coaching & Urdu Academy/Hostel/LO A/2013/642 dated 17.06.2013 M/s Aries Construction Co. (Pvt.) RITRES/CP/TC/MD M/s.IVRCL BP/NSIC/Pkg-I/Rl/2010 dt 12.05.2011 & Projects Infrastructures RITES/CP/TC/IIT/C M/s.Simplex LASSROOM/Block- Infrastructures B/2009,Kolkata Dt.07.10.2009 916.28 912.03 23.04.2014 24.04.2013 Work in progress LOA issued to Agency on 09.04.2013 911.91 16.05.2014 17.05.2013 Work in progress LOA issued to Agency on 02.05.2013 01.09.2014 02.07.2013 work in progress LOA of Contractor Issue on Dt. 17.06.2013 7635.48 26.08.2012 27.05.2011 40.25% progress Second/third floor level slab casting in progress, achieved as on reinforcement of column at Second/third floor 30.11.2013 level, works of Shuttering/reinforcement laying for SF/TF level slab under progress. The foundation work got the set back due to existing underground services such as three trunk water line of DJBs, existing supply water line of NSIC, HT cable of NSIC & Telephone lines which were shifted by respective agencies.the building for External Sub Station was relocated due to adoption of 33 KVA external supply line for entire NSIC Campus causing re-location of building. The work of ESS building is in progress. The work of external electrification for 33 kv supply line has been awarded in August 2012 and is in progress. M/s IVRCL is being persued to augment resources to complete the job at highest level. 5967.87 18.06.2011 19.12.2009 97.0% progress Due to intense dominance of labour unions the achieved as on augmantation of skilled labour resources badly 30.11.2013 affected and thereby planned progress. Due to syndicates of basic material supplier, the supply was affected. Due to poor financial backing of contractor timely procurement of materials suffered. 29 RITES/CO/CP/I Construction of 2000 Bedded IT-K (2000 Hostel For Boys at IIT Kharagpur BEDDED (West Bengal) HOSTEL)/ 8849-53/2009 Open Tender 18.12.2009 Two bid 18.01.10 6 i. ) M/s.Simplex Infrastructures NIL RITES/CO/CP/IIT- M/s.Simplex,Kolkata, ii)m/s. K (2000 BEDDED Infrastructures East coast construction & Industries, HOSTEL)/ 8849-,Kolkata iii) M/s.Ahluwalia Contracts(India) 53/2009 Dtaed,New Delhi, 06.05.2010 iv) M/s.Nagarjuna Construction Company,Hyderabad, v)m/s. Era Infra Engineering vi) OMAXA Infrastructures & Projects Pvt.Ltd 5768.45 10.12.2011 10.06.2010 86.0% progress Due to syndicates of basic material supplier, achieved as on the supply was affected. Due to poor financial 30.11.2013 backing of contractor the timely procurement of materials and augmentation of skilled manpower deployment suffered which caused the setback in progress of work. 30 RITES/CP/TC/ Construction of 152 DUs (G +3) MAP/SHILLON OR s Quarters at ARC-III & 72 G/5/2008 DUs (G +3) JCO s Quarters at ARC-IV for MOD work at Shillong (Meghalaya) Open Tender 05.11.08 Two bid 03.12.08 2 1. M/S OBER CONSTRUCTION 1. Pushkar raj Const. Pvt., ENTERPRISES (P) LTD., Kolkata Guwahati. RITES/CP/TC/ 1. M/S OBER MAP/Shillong/5/200 CONSTRUCTI 8/ Dated 23.03.09 ON ENTERPRISES (P) LTD., Kolkata 3465.87 22.01.11 23.03.2009 95.80% progress Set back in progress of work due to mansoon achieved as on period, constraint on account of net work of 30.11.2013. underground services, restricted space for stock of materials & due to lack of availability of materials / manpower resources at Shillong. Retention of labour is difficult due to local weather conditions and restricted entry. The progress is being monitored on regular basis. 31 RITES/CP/DP/P Construction of Police Station at S(1)- Barakhamba Road, New Delhi BARAKHAMB A ROAD/NEW DELHI/2009 32 RITES/CP/TC/ DP-PSBKR- FURNITURE/2 011 Supply & Fixing of Furniture in Police Station at Barakhamba Road, New Delhi Open Tender 26/02/2009 Open Tender 18/04/2011 19.03.2009 3 M/S Consolidated Construction Consortium Ltd 09.05.2011 5 1. M/s Godrej and Boyce Mfg. Co. 2. M/s B.P. ERGO i.m/s Dewan Chand ii. M/s I.V.R.C.L. Infrastructures & Project Ltd 1. M/s NSIC 2. M/s Ashwin Enterprises 3. M/s UM Enterprise RITES/CP/TC/DP/P M/s. S(1)- Consolidated BARAKHAMBA Consortium ROAD/NEW, New Delhi DELHI/2009 dated 25/05/2009 RITES/CP/TC/DP- PSBKR- FURNITURE/2011 dated 08/11/2011 M/s. Godrej & Boyce Mfg. Co., New Delhi 2270.92 24/11/2010 14/06/2009 30.07.2013 Contractor delayed the work and penalty being imposed. 212.39 22/02/2012 23/11/2011 In progress Due to the delay in completion of civil work.

33 RITES/CP/DP/T Construction of Police Station & C/HARI Residences at Hari Nagar, New NAGAR/BLDG/ Delhi 8903-53/2012 OPEN TENDER 07.06.2012 28.06.2012 11 1. M/s MBL Infrastructure Ltd 2. M/s Gupta Enterprises 3. M/s Agarwal Company 4.M/s Iqbal Construction Co. 5.M/s BCC Developers & Promotors Pvt 6. M/s Kashyapi Infrastructures Pvt. 7. M/s Narain Dass R. Israni & Co. Pvt 8. M/s Adhar Stumbh Township Pvt 9. M/s Mittal Construction Unit. 10. M/s P.S. Constructions. 11. M/s Garg Builders Nil RITES/CP/DP/TC/H ARI NAGAR/BLDG/890 3-53/2012 dated 13.12.2012 M/s MBL Infrastructure Ltd 1887.73 26.02.2014 27.12.2012 In progress 34 RITES/CP/DP/2 Appointment of Architect for 2 Construction of Delhi Police Works/Architect-projects for Group-3 North West Consultant/2010 Delhi Works OPEN TENDER 19.03.2010 07.04.2010 28 1. M/s R.K. Associates 2. 1. M/s PEE Consultants M/s Muralage 3. M/s 2. M/s Astro Archeeners 3. Goel Associates 4. M/s M/s SMEC India P. 4. Nivedita & Uday Pande Cosultant M/s Sanjay Prakash & 5. M/s Kapoor & Associates 6. Associates 5. M/s DDF Consultants P. M/s KNY Projects Pvt. 7. M/s G.C. Sharma 8. 6. M/s Mathur Ugam & M/s Datta & Datta Associates 9. M/s Associates STUP Consultant 10. M/s Limba Associates 11. M/s Creative Consotium 12. M/s Sanreen Designer 13. M/s Buildcon Solutions 14. M/s SEMAC 15. M/s CNA Architect 16. M/s Enarch Consultant P. Ltd 17. M/s Kothari Associates P. 18. M/s Ghezzi Eastern 19. M/s Mukesh & Associates 20. M/s Adlakha Associates 21. M/s Fountainhead 22. M/s Dynamic Project RITES/CP/DP/22 Works/Architect- Consultant/2010 dated 24.05.2010 M/s Nivedita & Uday Pande Cosultant 52.32 Depend on the works awarded to the contractor 24.05.2010 In Progress 35 RITES/CO/CP/ DP/ROHINI (SEC11)/BLDG/ 8844-53/2011 Construction of Delhi Police Housing at Sector-11, Rohini, New Delhi 36 RITES/CP/DP/T Construction of Police station & C/PUNJABI Residences at Punjabi Bagh, New BAGH/BLDG/8 Delhi 898-53/2012 Open Tender 31/08/2011 OPEN TENDER 09.05.2012 30.09.2011 13 1. M/s MBL Infrastructures Ltd 2. M/s Apex Construction Co 3.M/s Gannon Dunkerley & Co. Ltd 4. M/s B.L. Goel & Co. 5. M/s Shri 1.M/s Globe Civil Projects Pvt. Ltd 2.M/s Winner Construction Private 3. Pal Goel 6. M/s Ramky M/s Agarwal Company 4. Infrastructure Ltd 7.M/s RSB Projects 8.M/s Aadhar Stumbh M/s Avant Developments Pvt. Ltd 5. M/s Township Pvt. Garg Builders 9. M/s Radha Construction Co. 22.06.2012 10 1. M/s MBL Infrastructure Ltd 2. 1. M/s Amba Oxy Enterprises M/s Gupta Enterprises 3. M/s (P) Agarwal Company 4.M/s N.S. Associates Pvt. 5.M/s BCC Developers & Promotors Pvt 6. M/s Kashyapi Infrastructures Pvt. 7. M/s Narain Dass R. Israni & Co. Pvt 8. M/s Adhar Stumbh Township Pvt 9. M/s Freyssinet Pre-Stressed Concrete Company RITES/CO/CP/DP/R M/s. Apex OHINI (Sec- Construction 11)/BLDG/8844- Co., New Delhi 53/2012 dated 28/0/2012 RITES/CP/DP/TC/P M/s N.S. UNJABI Associates Pvt. BAGH/BLDG/8898-53/2012 dated 16.01.2013 2089.62 13/03/2014 14/03/2012 In progress 2335.86 29.05.2014 30.01.2013 In progress 37 RITES/CP/DP/2 Appointment of Architect for 2 Construction of Delhi Police Works/Architect-projects for Group-4 North West Consultant/2010 Delhi Works OPEN TENDER 19.03.2010 07.04.2010 28 1. M/s R.K. Associates 2. 1. M/s PEE Consultants M/s Muralage 3. M/s 2. M/s Astro Archeeners 3. Goel Associates M/s SMEC India P. 4. 4. M/s Kapoor & Associates 5. M/s Sanjay Prakash & M/s DDF Consultants P. Associates 5. 6. M/s G.C. Sharma 7. M/s KNY Projects Pvt. M/s Datta & Datta Associates 8. M/s 6. M/s Mathur Ugam & STUP Consultant 9. M/s Associates 7. Limba Associates 10. M/s M/s Nivedita & Uday Pande Creative Consotium 11. M/s Cosultant Sanreen Designer 12. M/s Buildcon Solutions 13. M/s SEMAC 14. M/s CNA Architect 15. M/s Enarch Consultant P. Ltd 16. M/s Kothari Associates P. 17. M/s Ghezzi Eastern 18. M/s Mukesh & Associates 19. M/s Adlakha Associates 20. M/s Fountainhead 21. M/s Dynamic Project RITES/CP/DP/22 Works/Architect- Consultant/2010 dated 24.05.2010 M/s Creative Consotium 60.40 Depend on the works awarded to the contractor 24.05.2010 In Progress

38 RITES/CP/DP/T Construction of Police Line & C/KONDLI/BL Residential Quarters at Kondli DG/8842- Check Post, Delhi 53/2012 Open Tender 14/12/2011 06.01.2012 6 1.M/s SAM India Built Well Pvt. 2.M/s BL Goel & Co 3.M/s MBL Infrastructures Ltd 4.M/s IVRCL 5. M/s Anurag Enterprises 6. M/s Unity Infraprojects NIL RITES/CP/DP/TC/K M/s. MBL ONDLI/BLDG/8842-Infrastructures 53/2012 dated 17/05/2012 4060.32 16/05/2014 17/05/2012 In progress 39 RITES/CP/TC/ Construction of STP of 250 KLD DP/STP/Dwarka Capacity based on FAB Reactor Sec-9/IR/2013 for Delhi Police at DAP Lines, at sec-9, Dwarka, New Delhi 40 RITES/CP/TC/ NIT- HAMIRPUR/ HOSTEL/PKG.- 2/2012 Tender 31/01/2013 Single Packet 11.02.2013 2 i)m/s Sima Labs ii) M/s ECO Paryavarn Eng. & consultant Pvt. Supply and placing of steel Almirah in newly constructed Boys hosel (G+7) at NIT Hamirpur, Himanchal pradesh Open Tender 22.10.2012 Two Bid 12.11.2012 4 no's 1. M/s Royale Safe Co., New Delhi-15 2. M/s Godrej & Boyce Mfg. Co., New Delhi-65 3.M/s Kings Furnishings & Safe Co., New Delhi-55 41 RITES/CP/TC/ Construction of Phase-A Buildings NVS/ Tuensang/ for Jawahar Navodaya Vidyalya at Phase-A/Pkg- II/2005/2R Village - Charre, District Tuensang, Pkg.-II, (Nagaland) NA RITES/CP/TC/DP/S TP/Dwarka Sec- 9/IR/2013 dated 08/04/2013 1 M/s Ashwin Enterprises Financial bid was opened only for the one qualified bidder based on sample display and thereafter reccomme ndation of the i RITES/CP/TC/NIT- HAMIRPUR/HOST EL/PKG.-2/2012 dated 01.05.2013 M/s. Sophisticated Industrial Materials Anlytic Labs. Pvt., New Delhi M/s Godrej & Boyce Mfg. Co. Open tender Two bid RITES/CP/TC/NVS/ M/s. T.L. Tuensang/ Phase- Constructions, C- A/Pkg-II/2005/2R dated 20.05.2005 26/3, Half Nagarjan, Dimapur, Nagaland. 5020000.00 22/08/2013 23/04/2013 In progress Delay in approval of drawings. 1,83,19,433.00 16.09.2013 16.05.2013 In progress 436.01 30.03.2006 30.05.2005 work in progress Contract with contractor terminated w.e.f. 12.08.2013 due to poor performance by the contractor. Further action is being taken. 42 RITES/PO/CP/T Construction of School Building, C/NVS/ Kitchen and Dining Building and WOKHA/Ph Dormitory and Development Work A/2002 for Jawahar Navodaya Vidayalaya at Village - Chukitong - District Wokha (Nagaland) Open tender Two bid 23.01.2003 RITES/PO/CP/TC/N M/s. Benathung VS/ WOKHA/Ph Odyuo, A/2002 Dated Zuvotong 22.01.2004 Colony, Wokha Town, Wokha, Nagaland 822.46 03.07.2004 04.09.2003 work in progress Due to severe milittancy/ insurgency in the area work was abondoned by the contractor and Restarted after Nov. 09. Slow progress due to bad weather conditions, remoteness of site, insurgency. Letter written to client for accord approval for termination of the contract further action will be taken after approval of client. School building, OHWT, UG, Pump House, ESS, boundary wall and santry hut completed. 43 RITES/CP/TC /NVS /Pampumpare/P h-a/2006. Construction of Phase-A buiuldings for Jawahar Navodaya Vidyalaya at Village - Gumto district- Papumpare, ( Pradesh) Open tender 21.10.2006 Two bid 14.11.2006 RITES/CP/TC / M/s. Tama NVS /Pampumpare/ Fabrication phase-a/2006. dated works, 19.07.2007 Naharlagun, Pradesh. 1090.72 29.01.2009 29.07.2007 work in progress Work delayed consirably due to land dispute and change in layout plan. The new layout plan was approved by GM/NVS on 01.04.08. Slow progress due to bad weather conditions, land dispute with locals, remoteness of site, non availbilty of approach road. School building, Kitchen Dinning, Type IV residence, UG tank and related development works completed. Work stopped due to land dispute w.e.f 14.02.2013. 44 RITES/ CP/TC/NVS/ Construction of School Building, Kitchen and Dining Building and MOKUKCHUN Dormitory and Development Work G/ PH- A/1R/2007/ for Jawahar Navodaya Vidayalaya at Village - Khensa, Distt. Mokukchung (Nagaland) Phase. - A. Open tender 23.09.2007 Two bid 24.10.2007 RITES/ CP/TC/NVS/ MOKUKCHUNG/ M/s. Ganesh Tamoli, Near Maharishi Vidya PH- A/1R/2007/ Mandir, G.N.B. dated 25.04.2008 Road, Silpukhuri, Guwahati, ASSAM 1444.38 05.11.2010 05.05.2008 work in progress Work delayed due to change in the location of site by NVS due to land dispute. Slow peogress due to abnormal rains, remoteness of site, insurgency in the area, local disturbance and non availablity of unskilled and skilled labourer.

45 RITES/CP/TC/ NVS/ UPPER SIANG/ PH- A/2007/ 46 RITES/CP/TC /NVS/DARJEE LING/Ph- A/1R/2007 47 RITES/CP/TC /NVS /West Kemeng/Ph- A/2008 Construction of School Building, Kitchen and Dining Building and Dormitory and Development Work for Jawahar Navodaya Vidayalaya at Village - Geku, Distt. Upper Siang ( Pradesh) Phase. - A. Construction of Phase-A buiuldings for Jawahar Navodaya Vidyalaya at Distt. - Darjeeling (West Bengal) Construction of Phase-A buiuldings for Jawahar Navodaya Vidyalaya at West Kemang ( Pradesh) Open tender 06.07.2007 Two bid 07.08.2007 RITES/ CP/TC/NVS/ M/s. Tama Fabrication UPPER SIANG/ PH-works, Sector-A, A/2007/ dated Naharlagun- 23.05.2008 791110, Pradesh. Open tender Two bid 21.11.2007 2 RITES/CP/TC /NVS/DARJEELIN G/Ph-A/1R/2007 dated 13.08.2008 M/s. Shrinath Construction & Merchants Co (P) Ltd 4-C, Vardhaman Apartments, Janki Path, Near Jain Mandir, Ganeshguri Guwahati- 781006 Open tender Two bid 18.03.2008 RITES/CP/TC/NVS/ M/s. Tama West Kemeng/Ph- Fabrication A/2009. dated works, Sector-A, 26.06.2009 Naharlagun- 791110, Pradesh. 1393.62 02.12.2009 02.06.2008 work in progress Work could not be started earlier due to change in layout. Slow progress due non clearance of hindrances by client, bad weather conditions, remotemness of site and local disturbance. 1398.34 22.02.2010 23.08.2008 work in progress Work delayed due to delay in handing over site by NVS due to local agitation as well as dispute between local authorities.land dispute is over on 26.11.2009. Contractor has commence the work at site on 30.06.2010. Slow progress due to bad weather conditions, non relese of GFC drawings by client. Work stopped by the contractor due to non settelemnt of dispute relating to price variations. Show cause notice issued to the contrcator on 02.07.2013 followed with reminder on 12.08.2013. Contract terminated w.e.f 21.10.2013 further action is being taken. 1772.39 20.12.2010 21.06.2009 work in progress GFC drgs. received from NVS on 24.08.2009. Slow progress due to abnormal rains, bad weather conditions, delay in issuance of GFC drawings by Client, remoteness of site, insurgency / law & order problem in the area. 50 RITES/CP/TC/ NVS/EAST SIANG/Ph.- A/2009. Construction of Phase-A buildings at Distt. - East Siang ( Pradesh) Open tender 05.08.2005 Two bid 09.09.2005 RITES/CP/TC /NVS/DHEMAJI/Ph.-B/2005. dated 07.06.2006 Open tender 19.06.2009 Two bid 15.07.2009 3 i) M/s Tama Fabrication Works, A- Sector, Naharlagun -791110, (A.P.) ii) M/s Chukhu Bablu, Constructions,P.O/P.S- Doimukh Distt. Papum Pare, M/s Mesnia Enterprises E- Sector, P.O./ P.S.-Nirjuli, District-Papum Pare (Arunchal Pradesh) 48 RITES/CP/TC/ NVS/UPPEER SUBANSIRI/(L eft Over Works)/ Phase- A/2007 Left Over Works pertaining to Construction of Phase-A buildings at Dist. - Upper Subansiri ( Pradesh) 49 RITES/CP/TC Construction of Phase-B buildings /NVS/DHEMAJ I/Ph.-B/2005 at Distt. - Dhemaji (Assam)) Open tender 27.10.2007 Two bid 30.11.2007 RITES/CP/TC/NVS/ UPPEER SUBANSIRI/(Left Over Works)/Ph- A/2009 dated 16.01.2009 M/s. Tama Fabrication works, Sector-A, Naharlagun- 791110, M/s. Kenik Enterprises, Room No. -1, 2nd Floor, Basar Commercial Complex RITES/CP/TC/NVS/ M/s. Chukhu EAST SIANG/Ph.- Bablu, A/2009 dated 23.04.2010 Constructions, P.O./P.S. - Doimukh, Distt. - Papumpare, Pradesh. 1027.00 24.01.2010 25.01.2009 work in progress Slow progress due to land slides, heavy rainfall, difficult site condition, land dispute with locals and non availbilty of labour. School building comopletd and handede over. 330.11 15.10.2006 16.02.2006 work in progress Contractor has re-commenced work at site w.e.f Apr. 2010 in response RITES Show cause notice. Slow progress due to abnormal rains, remoteness of site. Girls dormitory completed and handed over on 15.09.2013. 1354.12 09.10.2010 10.04.2010 work in progress Work could not be commenced due to land problem on the part of client. Clearance for commencement received from NVS on 09.12.2010 contractor has commenced the work at site however again stopped by locals from 01.11.2011. Site handed again over on 22.05.2012. Slow progress due to non availabilty of encubrance free /dispute free site/ land dispue with locals and non availbilty of labour. 51 RITES/CP/TC/ NVS - Baksa Ph. A/2009 52 RITES/CO/CP/ NVS - Khurda Ph-B/8907-53/Tender/10 53 RITES/CO/CP/ NVS-Tawang Ph B/8912-53/Tender/11 54 RITES/CO/CP/ NVS-Fatehpur PhB(Leftover works)/8788-53/gen/09 Construction of Phase-A buildings at Distt. - Baksa (ASSAM). Construction of Phase-B buildings at Distt. -Khurda (Orissa) Construction of Phase-B buildings at Distt. - Tawang ( Pradesh) Leftover works for Construction of Phase-B buildings for Jawahar Navodaya Vidyalaya at Distt. - Fatehpur (U.P.). Open tender 08.12.2009 Two bid 04.01.2010 3 M/s T&T Projects i and M/s Zakirul Hussain Open tender 09.08.2010 Two bid 03.09.2010 3 M/s Ottis Associates Pvt., M/s B.N. Parida & Co. and M/s CMM Infraprojects Open Tender 12.06.2011 Two bid 07.07.2011 6 i. M/s Peerless Builders ii. M/s Tama Fabrication Works iii. M/s Shambhala Traders, Open Tender 08.12.2009 Two bid 23.12.2009 2 M/s Fortuna Foundations Engineers & Consultants Private and M/s Srinath Builders & Housing Co. (Pvt.) M/s Dihang Edutech Infrastructure Pvt., RITES/CP/TC / M/s. T&T NVS - Baksa/ Ph- Projects A/2009 dated, T-3, 05.07.2010 Parmeshwari Building 3rd M/s B.N. Parida Khurda Ph-B/8907- & Co, Indoo, 53/Tender/10 dated A/12, Surya 23.05.2012. Nagar, Bhubaneswar 751003, Odisha RITES/CO/CP/NVS- M/s Shambala non RITES/CO/CP/NVS - i. M/s Rustam Enterprise ii. M/s NTY Company iii. M/s Abhiram Infra Projects Pvt. Ltd Tawang Ph B/8912-53/Tender/2011 dated 12.03.2012 Nil RITES/CO/CP/NVS- Fatehpur PhB(Leftover works)/8788-53/gen/09 18 10 2010 dated Traders, Old Bazar Line Tawang, P d h M/s. Srsrinath Builders & Housing Co Pvt, Guwahati (Assam) 1307.38 19.01.2011 20.07.2010 work in progress Work delayed due non issuance of GFC drawings, non removal of hindrance by NVS. Slow progress due to local (underground) disturbance. 500.53 07.06.2013 08.06.2012 work in progress Approval lowest tender recived from client on 17.05.2012 and work awarded on 23.05.2012. Slow progress due to abnormal weather conditions after award of the work and non availbilty of labour. 1061.72 28.03.2013 27.03.2012 work in progress Bad weather conditions, remoteness of site and non availbilty of labour. 225.36 03.06.2011 04.11.2010 work in progress Work delayed due non payment of dues by previous contractor. Slow progress due to non availabilty of labour. Girls dormitory completed.

55 RITES/ROC- Construction of Phase-B buildings II/CP/NVS-Mon Ph B/8937- at Distt. - Mon (Nagaland) 53/Tender/13 limited tenders 03.04.2013 Single bid 03.05.2013 4 i) M/s Srinath Constructions & Merchants Co. (P), Guwahati (Assam); ii) M/s Bright Construction Corporation, Guwahati (Assam); iii) M/s Rustom Enterprises, Itanagar ( Pradesh); iv) M/s Ansari & Co., Dimapur (Nagaland); v) M/s M. Shongsir & Sons Enterprises, Chandel (Manipur); vi) M/s Rishabh Construction (P), Jaipur (Rajasthan); vii) M/s Fortuna Foundations Engineers & Consultants Pvt.Ltd, Lucknow (UP); viii) M/s Neeraj Construction Co., Chandigarh; ix) M/s Real Uttam Builders, Kanpur (U.P.) and x) M/s Garg Builders, Delhi. i) M/s Srinath Constructions & M Work is yet to be awarded M/s Ansari Con Com, Dimapur, Nagaland. 1072.89 09.12.2014 10.12.2013 work in progress 56 RITES/ROC- II/CP/NVS- Amritsar-II Ph A/8941-53/Tender (Building work) /12 Copnstruction of Phase-A Buildings (School Buildin, Kitchen & Dinning, Girls Dormitory and Type IV Residence) for Jawahar Navodaya Vidyalaya-II at Distt. - Amritsar (Punjab.). limited tenders 20.12.2012 Single bid 10.01.2013 5 i) M/s Srinath Constructions & Merchants Co. (P), Guwahati ; ii) M/s Rishabh Construction (P), Jaipur ; iii) M/s Real Uttam Builders, Kanpur i v) M/s Neeraj Construction Co. Sirsa ; vi) M/s Garg Builders, Delhi Nil RITES/ROC- M/s. Neeraj II/CP/NVS-Amritsar-Construction II Ph A/8941- Company 53/Tender (Building work) /12 dated 15.04.2013 784.33 30.10.2013 30.04.2013 work in progress Commencement of work delayed due to non issuance of revised lay out plan by client and watter logging of site (site situated in low lying area).. 57 RITES/ROC- II/CP/NVS- Mohali Additional Dormitory/8953-53/Tender/12 Copnstruction of Additional Dormitory for 96 Boys with 2 nos of warden residence at Jawahar Navodaya Vidyalaya Distt. - Mohali (Punjab.). limited tenders 26.11.2012 Single bid 19.12.2012 5 i) M/s Srinath Constructions & Merchants Co. (P), Guwahati ; ii) M/s Rishabh Construction (P), Jaipur ; iii) M/s Real Uttam Builders, Kanpur i v) M/s Neeraj Construction Co. Chandigarh and vi) M/s Garg Builders, Delhi Nil RITES/ROC- II/CP/NVS-Amritsar Mohali Dormitory/8953-53/Tender/12 dated 27.09.2013 M/s. Neeraj Construction Company 229.11 11.08.2014 27.09.2013 work in progress 58 RITES/ROC- II/CP/NVS- Amritsar Additional Dormitory/8954-53/Tender/12 Copnstruction of Additional Dormitory for 96 Boys with 2 nos of warden residence at Jawahar Navodaya Vidyalaya Distt. - Amritsar (Punjab.). limited tenders 26.11.2012 Single bid 19.12.2012 5 i) M/s Srinath Constructions & Merchants Co. (P), Guwahati ; ii) M/s Rishabh Construction (P), Jaipur ; iii) M/s Real Uttam Builders, Kanpur i v) M/s Neeraj Construction Co. Chandigarh and vi) M/s Garg Builders, Delhi Nil RITES/ROC- M/s. Neeraj II/CP/NVS-Amritsar Construction Additional Company Dormitory/8954-53/Tender/12 dated 27.09.2013 229.11 11.08.2014 27.09.2013 work in progress 59 RITRES/CP/TC/ DP/POLICE POST /SAKET DELHI/ 8884-53/ 2012 Construction of Police Post for Delhi Police at District Centre Saket, New Delhi. 60 RITES/CP/ Construction of Police Post at TC/DP/POLICE Bhikaji Cama Place, New Delhi POST /BHIKAJI CAMA/ 2013/R1 61 RITES/CP/TC/ DP/POLICE POST /Gulmohar Park/DELHI/ 8885-53/R1/2013 Construction of Police Post and staff quarters for Delhi Police at Gulmohar Park, New Delhi. 62 RITES/CP/CUK-Construction of Buildings for GULBARGA/P various Schools including site HASE-II/2011 development and bulk services at ( R) Central University of Karnataka at Gulbarga 63 RITES/CP/CUK Construction of Balance Works of /GUL/PKG- Administrative Building, Girl's 1A/2R/2013 Hostel, Boy's Hostel & Guest House for Central University of Karnataka at Distt. Gulbarga(Karnataka) 64 RITES/CP/CUK /GUL/PKG- 1B/2R/2013 Construction of Balance Works of Quarters of VC, Pro VC, Registrar, FO, COE, Professor, Asst. Professor etc. for Central University of Karnataka at Distt. Gulbarga(Karnataka) Package - 1B Open Tender 28.12.2012 Two bid 21.01.2013 3 i) M/s. Garg builders,ashok Vihar, Delhi (i)m/s Rakesh Brothers, New Delhi (ii) M/s Srico Projects Pvt. Ltd, Hyderabad Tender 15.03.2013(Ten Single ders were dispatched to shortlisted agencies) bid 02.04.2013 4 1. M/s Fortuna Foundation Engineers & Consultants, Lucknow 2. M/s S & S Technocrats Pvt. Ltd, New Delhi 3.M/s Neeraj Construction Company, Chandigarh 4. M/s Garg Builders, New Delhi Open Tender 16.04.2013 Two bid 08.05.2013 1 i) M/s.Agarwal Company,B-18,Sec- B,Aliganj Scheme, Lucknow-226024 Tender 18.08.2011 One Packet 06.09.2011 7 i) M/s Unity Infra Projects (ii) M/s URC Constructions Private (iii) M/s IVRCL (iv) M/s NCC (v) M/s Era infra Engineering (vi) M/s JMC Projects India (vii) M/s BE Billimoria RITES/CP/TC/DP/P M/s.Garg OLICE Builders, Ashok POST/SAKET/DEL Vihar, Delhi HI/DELHI/8884-53/LOA/2013,DAT ED: 03.05.2013 Nil RITES/CP/TC/DP/ POLICE POST /BHIKAJI 1 M/s Fortuna Foundation Engineers & CAMA/DELHI/R1/ Consultants, LOA/ 2013/42 Lucknow dated: 21.05.2013 Nil RITES/CP/TC/DP/P OLICE POST/Gulmohar Park/DELHI/8885-53/LOA/2013,DAT ED: 26.07.2013 i) M/s.Agarwal Company,B- 18,Sec- B,Aliganj Scheme, Lucknow- 226024 _ RITES/CP/CUK- Gulbarga/Phase- M/s Unity Infra Projects II/2011 ( R)/LOA/2011/74 dt 03.10.2011 Open Tender 30.01.2013 Two bid 20.02.2013 1 i) M/s KMV Projects,Hyderabad _ RITES/CP/CUK/GU L/PKG-1A/2R/2013 dated 22.04.2013 Open Tender 30.01.2013 Two bid 20.02.2013 1 i) M/s KMV Projects,Hyderabad _ RITES/CP/CUK/GU L/PKG-1B/2R/2013 dated 22.04.2013 M/s KMV Projects,Hyderabad M/s KMV Projects,Hyderabad 1271.90 lacs 27.08.2014 28.05.2013 Work in progress Work is in progress. 299.94 lacs 05.03.2014 06.06.2013 Work in progress Work is in progress. 635.55 lacs 09.08.2014 10.08.2013 Under Under mobilisation stage mobilisation stage 13576.836 17.10.2013 18.10.2011 Work in progress Due to (i) Ban for excavation of mining of Sand from Karnataka Govt. time to time, (ii) Due to heavy rain, (iii) Avaibility of Skilled & Nonskilled labour in local Market etc. 2661.56 06.02.2014 07.05.2013 Work in progress Due to (i) Ban for excavation of mining of Sand from Karnataka Govt. time to time, (ii) Scarcity of avability of water for drinking & construction work, (iii) Avaibility of Skilled & Non-skilled labour in local Market etc. 1444.91 06.01.2014 07.05.2013 Work in progress Due to (i) Ban for excavation of mining of Sand from Karnataka Govt. time to time, (ii) Scarcity of avability of water for drinking & construction work, (iii) Avaibility of Skilled & Non-skilled labour in local Market etc. 65 RITES/CP/CUK Construction of Buildings - Central /GUL/PKG- 1C/2R/2013 Library, Health Center, Shopping Center, Bank & Post Office & Staff Quarters for Central University of Karnataka at Distt. Gulbarga(Karnataka) Open Tender 30.01.2013 Two bid 21.02.2013 1 i) M/s KMV Projects,Hyderabad _ RITES/CP/CUK/GU L/PKG-1C/2R/2013 dated 22.04.2013 M/s KMV Projects,Hyderabad 3135.09 06.04.2014 07.05.2013 Work in progress Due to (i) Ban for excavation of mining of Sand from Karnataka Govt. time to time, (ii) Searcity of arability of water for Drinking & construction work, (iii) Avaibility of Skilled & Non-skilled labour in local Market etc.

66 RITES/CP/CUK-Construction of Boundary wall, at KARNATAKA/ Central University of Karnataka at GULBARGA/T Distt. Gulbarga (Karnataka) C/8874-53/2012 Open Tender 02.03.2012 Two bid 19.03.2012 1 i) M/s Kotarki Constructions Pvt. _ RITES/CP/CUK- KARNATAKA/GU M/s Kotarki Constructions LBARGA/TC/8874- Pvt. 53/2012 dated 12.07.2012 354.04 21.04.2013 22.07.2012 work in progress NIL 67 RITES/CP/TC/C Construction of Pre Fabricated UK/Pre Class Room Block at Central Fabricated Class University of Karnataka at Dist. Room Block Gulbarga Karnataka- 2 No. of Shed /Gulbarga/R/201 3 Tender _ One packet 04.06.2013 4 (i) M/s Ace Engineering Infratech (India) Pvt. (ii) M/s Prompt Engg. Ltd (iii) M/s Panchajanya Constructions (iv) M/s Armour Steel Buildings India Pvt. Ltd - RITES/CP/TC/CUK M/s Prompt /Pre Fabricated Engg. Ltd Class Room Block /Gulbarga/R/2013. Dt 02.07.2013 289 15.10.2013 17.07.2013 work in progress NIL