CLIPPER COVE PROMENADE & MARINA DEVELOPMENT Treasure Island / Yerba Buena Island Citizen Advisory Board Review May 05 2015
CLIPPER COVE PROMENADE & MARINA DEVELOPMENT TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 CLIPPER COVE PROMENADE 1
VIEW OF EXISTING MARINA TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 EXISTING MARINA 2
EXISTING MARINA CHARACTERISTICS & LAYOUT SLIP LENGTH (ft) 16 20 24 32 36 55 NUMBER OF SLIPS 2 14 33 20 28 10 108 TOTAL SLIPS TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 EXISTING MARINA 3
VIEW TO THE TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 EXISTING MARINA PHOTOS 4
VIEW TO THE SOUTH TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 EXISTING MARINA PHOTOS 5
PROPOSED MARINA PROJECT OVERVIEW removal of all existing docks and piles dredging in the marina basin and entrance channel installation of: eight new docks containing approx 420 slips (ranging from 30-35 ft to 80-85 ft long) 385 square concrete piles concrete transient dock/wave attenuator additional upland components to be negotiated with the Treasure Island Master Developer, including marina offices, restrooms, locker rooms, yacht club facilities and parking PILE DRIVING SHOWING SILT CURTAIN USE TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 PROPOSED MARINA 6
PROPOSED MARINA LAYOUT (2015 PLAN) PHASE 4 PHASE 3 PHASE 2 PHASE 1 1,269 FT 1,465 FT TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 PROPOSED MARINA 7
CONSISTENT WITH BCDC BAY PLAN S APPLICABLE POLICIES TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 PROPOSED MARINA 8
EXAMPLES OF MARINA CONSTRUCTION AND CONCRETE DOCKS TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 PROPOSED MARINA 9
EXAMPLES OF MARINA CONSTRUCTION AND CONCRETE DOCKS TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 PROPOSED MARINA 10
PROPOSED PROJECT FILL IMPACTS installation of docks, piles and wave attenuator will result in: 155,120 sf of fill area 11,440 cy of fill volume net increase of approximately: 110,690 sf in fill area 8,780 cy in fill volume TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 PROPOSED MARINA 11
VIEW OF CLIPPER COVE PROMENADE & MARINA TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 CLIPPER COVE PROMENADE 12
OVERVIEW & IDENTITY FUTURE SAILING CENTER 0 20 50 100 200 CITY SIDE BALCONY bus drop off city view balcony waterfront seating rain gardens marina access CLIPPER COVE TERRACE ISLAND LOOKOUT BRIDGE OVERLOOK picnic porch cove overlook waterfront seating rain gardens marina access outdoor lounge rain gardens marina access future sailing center access cafe + seating bridge view terrace brea kwater access TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 CLIPPER COVE PROMENADE 13
ACCESS AND CIRCULATION CLIPPER COVE PROMENADE PEDESTRIAN CIRCULATION DIAGRAM to bre reak wate ter CLASS 1 BIKE ONLY CLASS 2 ONE WAY BIKE LANE CLASS 3 BIKE/AUTO TWO WAY CYCLE TRACK CLIPPER COVE PROMENADE BICYCLE CIRCULATION DIAGRAM BUS DROP OFF METERED PARKING ACCESSIBLE PARKING WITH LOADING ZONE N 0 80 160 320 CLIPPER COVE PROMENADE VEHICULAR CIRCULATION DIAGRAM TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 CLIPPER COVE PROMENADE 14
MARINA ACCESS CIRCULATION FROM LONG-TERM AND OTHER STREET PARKING 100 390 70 355 30 175 500 2240 MARINA ACCESS PROMENADE CROSSING AT NODES 0 20 50 100 200 TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 CLIPPER COVE PROMENADE 15
VIEW FROM AVENUE C TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 CLIPPER COVE PROMENADE 16
MARINA ACCESS CIRCULATION FROM STREET PARKING ON CLIPPER COVE AVENUE : 12 + 1 LOADING : 13 +1 ADA + 1 LOADING : 3 +1 LOADING : 16 +1 ADA + 1 LOADING SOUTH: 7 +1 ADA +1 LOADING SOUTH: 14 +1 ADA +1 LOADING SOUTH: 13 +1 ADA +2 LOADING SOUTH: 24 +2 ADA +2 LOADING 668 355 260 360 2240 FT MARINA ACCESS PROMENADE METERED PARKING TOTAL NUMBER OF PARKING: 102 (METERED, SHORT-TERM) 7 ADA (NOT METERED, NO TIME LIMIT) 10 LOADING (NOT METERED, SHORT-TERM) 0 20 50 100 200 TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 CLIPPER COVE PROMENADE 17
VIEW FROM AT END AVENUE OF AVENUE C C TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 CLIPPER COVE PROMENADE 18
AMENITIES LANDSIDE DEVELOPMENT STAGE 1 TI LANDSIDE DEVELOPMENT STAGE 1 PUBLIC RESTROOMS TEMPORARY RESTROOMS 5 MIN WALK 5 MIN WALK 5 MIN WALK 3.5 MIN WALK 3.5 MIN WALK P 2.5 MIN WALK 2.5 MIN WALK 2.5 MIN WALK P P 2.5 MIN WALK P PARKING WITHIN A 5 MIN WALK 105 EXISTING STREET PARKING (APPROX 150 EXISTING OFF STREET PARKING (APPROX) 43 NEW STREET PARKING 790 OFF STREET PARKING TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 TREASURE ISLAND PHASING 19
AMENITIES FULL BUILT OUT PHASE SHORT-TERM METERED PARKING (< 30 MIN) LONG-TERM PARKING STRUCTURE MARINA AMENITY LOCATIONS SHUTTLE STOP SHUTTLE ROUTE UTILITY CONNECTIONS 5 MIN WALK 5 MIN WALK P 760 5 MIN WALK P 760 5 MIN WALK (5000 SQ FT - POTENTIAL AMENITY SIZE) 2.5 MIN WALK 2.5 MIN WALK 2.5 MIN WALK 2.5 MIN WALK SAILING CENTER PARKING WITHIN A 5 MIN WALK 278 STREET PARKING 1,520 LONG-TERM PARKING TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 TREASURE ISLAND PHASING 20
OTHER BOAT ACCESS POINTS TREASURE ISLAND & YERBA BUENA ISLAND TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 PUBLIC WATER ACCESS 21
THANK YOU TREASURE ISLAND TI YBI CAB Review Meeting MAY 05, 2015 CLIPPER COVE PROMENADE 22