Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain

Similar documents
Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates

NEWS RELEASE. Supplemental information:

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

Kinross Production Continues on Plan

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

KINROSS GOLD CORPORATION Stanislav Borodyuk, Vice President, Head, Moscow Representative Office

growth discipline value 2009 Annual General Meeting

Kinross and Red Back Combination Creates High-Growth Gold Producer in US$7.1 Billion Friendly Transaction

dedicated to being world class

Delivering Disciplined Growth

NEWS RELEASE Orca Gold Receives Ministerial Approval for the Acquisition of the Kinross Côte d Ivoire Property Portfolio

GROWTH DELIVERING DISCIPLINED. The Kinross Difference. Increased Margins, Cash Flow & Leverage to Gold Price. Kinross Gold Corporation January 2008

Exploration. General Manager Minerals Development

For personal use only

For personal use only

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10.

Quinto Resources Inc. (TSX-V: QIT)

Market Release 11 March 2019

ASPIRING TO BE WORLD CLASS. BMO Nesbitt Burns Gold Conference March 3, 2004

Denver Gold Forum September 27, 2006

KINROSS GOLD CORPORATION Scotiabank Senior Precious Metals Day

GOLD RESOURCE CORPORATION REPORTS 2017 ALTA GRACIA EXPLORATION DRILL RESULTS, INCLUDING 1.29 METERS GRADING 4.33 G/T GOLD AND 1,710 G/T SILVER

PRESS RELEASE CANADIAN ZINC SUPPORTS EXPANSION OF NAHANNI NATIONAL PARK

dedicated to being world class New York Institutional Gold Conference June 2-3, 2004

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

Delivering Disciplined G R O W T H. D e c e m b e r

The CIS Precious Metals and Stones Summit

Genius Properties / Cerro de Pasco Resources Merger Opportunity. June 2018

Quarterly Activities Report Period Ended 31 March 2018

Ramelius Resources Limited ASX:RMS

Newcrest Mining Limited

Australian Mines increases Marymia ground holding

NEWCREST Newcrest to acquire potential Tier 1 orebody in Canada Sandeep Biswas Managing Director and Chief Executive Officer

Corporate Presentation March 2015

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

dedicated to being world class Denver Gold Forum September 28, 2004 Robert M. Buchan President & Chief Executive Officer

For personal use only

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

Delivering Value Together From Assets, People & Projects

AIR CANADA REPORTS THIRD QUARTER RESULTS

For personal use only

For personal use only

MGM Resorts International Reports Second Quarter Financial Results

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

Candelaria and Ojos del Salado Chile

GAMING INVESTMENT FORUM AT G2E. September 26, 2016

Innovative, Long Term Copper Producer in Chile

INNOVAT MINERAL PROCESS SOLUTIONS LIMITED. INN16CO-CS-001 July 21, INNOVAT Case Study 5M t/a Heap Leach Northern Canada Project

Jazz Air Income Fund. presented by Allan Rowe, Senior Vice President and Chief Financial Officer

Australian Resource Reviews Gold 2016

Cadia Valley. Peter Smith Executive General Manager Australian Operations

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

Lorena Gold Project Malachite AGM 29 November 2017

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

Quarterly Activities Report Period Ended 31 December 2017

NEWCREST LOOKING TO THE FUTURE

For personal use only

Annual & Special Meeting of Shareholders

E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018

Inca de Oro Copper-Gold Project and Carmen deposit sale process

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

PROJECTS & TECHNICAL SERVICES

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133

Kidman agrees to acquire 1Moz Mt Holland gold field in WA

BHP Billiton: A Strategy of Diversification

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG

Australian Securities Exchange Notice

Investor Update Issue Date: April 9, 2018

Adjusted net income of $115 million versus an adjusted net loss of $7 million in the second quarter of 2012, an improvement of $122 million

Ramelius Resources Limited ASX:RMS

MARCH 2018 QUARTERLY ACTIVITIES REPORT

Annual Mineral Resources and Ore Reserves Statement - 31 December 2016

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

QUARTERLY ACTIVITIES REPORT

HYATT HOTELS CORPORATION 2012 ANNUAL MEETING OF STOCKHOLDERS JUNE 13, 2012

Anglo Pacific Group PLC Acquisition of a Royalty on the Cañariaco Copper Project

On The Road To Silver Mining In Mexico

Annual Mineral Resources and Ore Reserves Statement - 31 December 2017

Denver Gold Forum Sept 25-28, 2005

For personal use only

For personal use only

THE NEW HIGH- GRADE AUSTRALIAN GOLD DISCOVERY

Investor Relations Update January 25, 2018

Quarterly Report for the Period Ending 30 September 2014

Wafi Golpu. Craig Jones Executive General Manager Australian Operations and Projects. 7 October 2014

December 2017 Quarterly Report

LD Micro Conference June 2017 FULL HOUSE RESORTS 1

Q3 FY18 Business Highlights

For personal use only

J.P. Morgan Global High Yield & Leveraged Finance Conference Miami, FL

American Airlines Group Inc.

Jazz Air Income Fund presented by Joseph Randell, President and Chief Executive Officer National Bank Financial Transportation & Logistics Conference

On The Road To Silver & Gold Mining In Mexico

Minara Resources Limitedit Sydney February Peter Johnston

For personal use only

Transcription:

25 York Street, 17th Floor Toronto, ON Canada M5J 2V5 NEWS RELEASE Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain Toronto, Ontario June 29, 2016 In advance of an analyst tour of its Bald Mountain and Round Mountain mines in Nevada on June 29 and 30, Kinross Gold (TSX: K; NYSE: KGC) provided an update on development plans and exploration activities at both operations. Highlights: Bald Mountain o Kinross believes it can substantially increase the site s current mineral reserve estimate and extend estimated life of mine by developing two sets of deposits in the near-term. o 2016 exploration budget increased by 50% to US$9 million, as promising results reaffirm Kinross confidence in the site s significant upside potential. Round Mountain o The Process Solution Management (PSM) heap leach program is expected to produce approximately 200,000-230,000 Au eq. oz. over life of mine at a low cost of $200 - $400 per Au eq. oz., which includes production cost of sales and capital expenditures. o The completion of the Phase W expansion scoping study adds approximately 2.4 million Au oz. to the Company s estimated inferred mineral resource 1. Bald Mountain update Near-term upside potential Since acquiring Bald Mountain approximately six months ago, developing the mine s upside potential continues to be a top priority for the Company. Kinross is now focused on developing two sets of deposits that can substantially increase the current 1.1 million Au oz. mineral reserve estimate 2 and extend estimated life of mine. The first set of deposits, the Vantage Complex 3, is well-drilled and located in the 100% Kinross-owned South area of the property. The Company plans to conduct a modest infill and metallurgical drilling program to potentially convert a significant portion of the Vantage Complex s current estimated measured and indicated mineral resources of approximately 600 Au koz. and estimated inferred mineral resources of approximately 125 Au koz. to estimated mineral reserves in the first quarter of 2017. Studies have also commenced regarding heap leach and carbon-incolumn infrastructure for the deposit. There are more than 1,200 pre-existing drill holes at the Vantage Complex, which was last mined in 1996. At the second set of deposits, the Saga and Duke 3 pits, located in the 100% Kinross-owned North area of the property, the Company plans to conduct additional drilling to potentially convert a significant portion of the deposits current estimated measured and indicated mineral resources of approximately 550 Au koz. and estimated inferred mineral resources of approximately 76 Au koz. to estimated mineral reserves by year-end 2016. A drilling program was recently completed at the Saga pit, where the vast majority of the ounces are located, and is expected to improve its economics. Recently mined from 2007-2011, Saga is a well-understood deposit with approximately 470 Au koz. of estimated measured and indicated mineral resources 2 situated within the current permitted area of the site. Mine plan optimization and exploration work completed at Saga has been promising and indicates potential for improved value and mineral resource growth compared with prior expectations. 1 See Phase W scoping study section regarding incremental additions to Round Mountain s mineral resource estimates, which were calculated using a $1,400/oz. gold price assumption. 2 For more information regarding Kinross 2015 mineral reserve and mineral resource estimates, please refer to the Company s Annual Mineral Reserve and Mineral Resource Statement as at December 31, 2015 contained in its Annual Information Form filed March 30, 2016, which is also available at www.kinross.com. 3 Although work is ongoing at the two deposits, there can be no assurance that the actual work will permit the conversion of mineral resources to mineral reserves. The figures noted regarding the two deposits are estimates based on Kinross work completed to date and the programs expected to be completed and constitute forward-looking statements. Key assumptions of potential future mineral reserves are based on a gold price of US$1,200/oz. and cut-off grade of 0.2 g/t. www.kinross.com

The current mine plan conservatively assumes an approximate 30% conversion of Bald Mountain s current estimated mineral resources to mineral reserves upon receipt of permits and completion of modest infill drilling at the Vantage Complex and additional drilling at Saga. Kinross anticipates that completion of the proposed drill programs will provide sufficient information to declare new mineral reserve estimates at year-end 2016 for Saga and Duke and at Q1 2017 for the Vantage Complex. The permitting process to allow expansion of exploration and mining activities is entering its final days of completion with no substantive issues remaining. The permit covers the expanded mine plan, numerous under-explored pits (including the Vantage Complex and Yankee, another promising target in the South area), and provides significant flexibility for future growth, such as allowing for extensive heap leach capacity. Exploration and long-term upside potential Exploration at Bald Mountain continues to progress well, with initial results reaffirming the Company s confidence in the site s significant upside potential. Kinross has increased Bald Mountain s 2016 exploration budget to US$9 million, from the previous US$6 million, to focus on the Vantage Complex, Saga and Duke, and other promising targets aimed at increasing the mine s estimated resource base and converting a substantial portion of the mine s estimated mineral resources to mineral reserves. Located in Nevada, one of the world s most attractive mining jurisdictions, and along the Carlin Trend, one of the world s most prolific gold producing regions, Bald Mountain offers multiple opportunities to add to its mineral reserve estimates and transform it into a long-life mine in Kinross portfolio. Kinross is taking a renewed approach to exploration at Bald Mountain by drilling deeper and testing for both intrusion-related and Carlin-type mineralization. Kinross has now identified more than 20 target areas believed to have high potential, the majority of which are located on 100%-owned Kinross property. Several known deposits are also open in multiple directions and are relatively under-explored. The exploration team currently has three rigs on site, and has completed approximately 15,000 metres of reverse circulation and core drilling since the close of the acquisition. The majority of exploration activity continues to be focused in the North area of the property at the Saga, Top and Redbird pits and is expected to turn to the South area at the end of the third quarter. In 2016, the team is also considering initiating surface exploration work such as geologic mapping and geochemical and geophysical surveys in the joint venture area of the property, with drilling expected to commence in 2017 4. Operational update As previously disclosed in Q1 2016, production at Bald Mountain will be lower than expected for the first half of 2016. While the Company expects improvements in the second half of the year, 2016 production and costs will be impacted by short-term integration issues, including a higher than anticipated level of stripping from the adopted mine plan, harsh winter conditions in Q1, and the replenishment of ADR plant inventory. As the planned stripping campaign is completed this year, Kinross expects to almost double production for 2017 and 2018, compared with expected 2016 production, while reducing production costs, as mining will be focused in the optimal portion of the Top pit orebody. As full integration is completed, the Company is also exploring continuous improvement projects at Bald Mountain, including applying Round Mountain s Process Solution Management program principles (see section below) to the mine s heaps, while optimizing shift changes, blasting schedules and other areas to increase efficiency. 4 Subject to approval by the Kinross Barrick JV committee. p. 2 Kinross Nevada tour highlights growth potential www.kinross.com

Round Mountain update Process Solution Management (PSM) program At Round Mountain, the Company continues to realize benefits from the PSM program, a continuous improvement initiative aimed at enhancing heap leach performance. Launched at the end of 2014, PSM contributed more than 20,000 Au eq. oz. to the mine s strong production performance in 2015, its best year since 2009. The PSM program is expected to produce approximately 200,000-230,000 Au eq. oz. over life of mine at a low cost of approximately $200 - $400 per Au eq. oz., which includes production cost of sales and capital expenditures. Leaching is expected to continue until 2027 at Round Mountain, with milling forecast to end in 2022 and mining forecast to end in 2019. Kinross continues to study options to both increase and accelerate recovery of high-margin PSM ounces at Round Mountain s large heap leach pads, which have almost 800 million tonnes of ore stacked on two 450-foot high heaps. The PSM program, which began by creating models of the heaps to gain a better understanding of how to increase recovery and maximize cash flow, comprises three stages: The first stage, started in 2014, includes adding new solution piping to increase solution grade and recovery, optimizing the flow of gold-loaded solution to the carbon columns (CIC), implementation of side-slope leaching to reach under-leached areas, re-grading areas of the heap, and implementation of a ph enhancement system. The second stage, planned for 2016 and 2017, includes implementing improvements to the CIC and ADR plants to further increase recovery by reducing leach pad solution inventory. For the third stage, the Company is examining additional opportunities to increase recovery, including implementing solution wells to increase solution flow to sections of the pad that are hard to reach. Phase W scoping study 5 Kinross recently completed a scoping study for a potential expansion called Phase W, a large zone of known mineralization that extends to the west of the main Round Mountain pit and is part of the same deposit that has been mined for the past 38 years. As a result of the scoping study, which included a rebuild and reinterpretation of the geological model of the Phase W deposit, Kinross has added approximately 98 million tonnes of estimated inferred resources at an average grade of 0.8 g/t, resulting in approximately 2.4 million Au oz. 6 This estimated inferred mineral resource is an incremental addition to Round Mountain s previously reported estimated mineral resources as at December 31, 2015, and exclusive of estimated mineral reserves 2. Kinross is targeting infill and geostatistical drilling for the second half of 2016 with the goal of converting a portion of the new inferred mineral resource estimate to an indicated mineral resource by year-end 2016. The Phase W scoping study focused primarily on 1.3 million Au oz. of this recent addition to the inferred mineral resource estimate and may potentially extend estimated mine life. Initial results of the study are encouraging and Kinross plans to continue studying options to optimize the Phase W mine plan and capital spend. Kinross intends to include the additional inferred resources in an updated mineral resource and mineral reserve estimate for the Round Mountain property by year-end 2016. 5 A scoping study is preliminary in nature and is based on inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the results of the scoping study will be realized. 6 See Appendix 1 for additional information regarding incremental additions to Round Mountain s mineral resource estimate. p. 3 Kinross Nevada tour highlights growth potential www.kinross.com

About Kinross Gold Corporation Kinross is a Canadian-based senior gold mining company with mines and projects in the United States, Brazil, Russia, Mauritania, Chile and Ghana. Our focus is on delivering value based on the core principles of operational excellence, balance sheet strength, disciplined growth and responsible mining. Kinross maintains listings on the Toronto Stock Exchange (symbol:k) and the New York Stock Exchange (symbol:kgc). Media Contact Louie Diaz Director, Corporate Communications phone: 416-369-6469 louie.diaz@kinross.com Investor Relations Contact Tom Elliott Senior Vice-President, Investor Relations and Corporate Development phone: 416-365-3390 tom.elliott@kinross.com Appendix 1: Round Mountain Incremental Additions to Mineral Resource Estimate Notes 1. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. 2. Mineral Resources are reported below the 31 December 2015 mined surface and are constrained using an optimized Lerchs- Grossman pit shell. 3. The additional inferred mineral resource is entirely external to the resource shell for the previously reported Mineral Resources in Kinross Annual Information Form dated March 30, 2016. 4. Mineral Resources are reported to cut-off grades ranging from 0.22 g/t to 0.41 g/t Au based on a gold price of US$1,400/oz. 5. The above mineral resource estimate is classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum s CIM Definition Standards - For Mineral Resources and Mineral Reserves" incorporated by reference into National Instrument 43-101 Standards of Disclosure for Mineral Projects". p. 4 Kinross Nevada tour highlights growth potential www.kinross.com

Cautionary statement on forward-looking information All statements, other than statements of historical fact in this news release constitute "forward-looking information" or "forward-looking statements" within the meaning of certain securities laws, including the provisions of the Securities Act (Ontario) and the provisions for "safe harbor" under the United States Private Securities Litigation Reform Act of 1995 and are based on expectations, estimates and projections as of the date of this news release. Forward-looking statements contained in this news release include those under the heading, or headings containing the phrases "Near-term upside potential", "Exploration and long-term upside potential" and Phase W scoping study", and include, without limitation, statements with respect to: our estimates, expectations, forecasts and guidance for production, production costs of sales, all-in sustaining cost and capital expenditures; as well as references to other possible events, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, the timing and amount of estimated future production, timing of the development of expansion development and mining activities, and permitting timelines. The words anticipate, budget, develop, estimate, expect, exploration, focus, model, opportunity, optimize, option, plan, potential, principle, priority, promising, scoping, study, target, trend, and upside, that certain actions, events or results will affect, or will occur or result, and similar such expressions identify forward-looking statements. Forwardlooking statements are necessarily based upon a number of assumptions that, while considered reasonable by Kinross as of the date of such statements, are inherently subject to significant uncertainties and contingencies. These uncertainties and contingencies can affect, and could cause, Kinross' actual results to differ materially from those expressed or implied in any forward looking statements made by, or on behalf of, Kinross. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All of the forward looking statements made in this news release are qualified by these cautionary statements and those made in our filings with the securities regulators of Canada and the U.S, including but not limited to those cautionary statements made in the "Risk Analysis" section of our full year 2015 management's discussion and analysis and the "Risk Factors" section of our 2016 Annual Information Form. These factors are not intended to represent a complete list of the factors that could affect Kinross. Kinross disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law. Other information Where we say "we", "us", "our", the "Company", or "Kinross" in this news release, we mean Kinross Gold Corporation and/or its applicable subsidiary(ies). The technical information about the Company s mineral properties contained in this news release (other than exploration activities) has been prepared under the supervision of Mr. John Sims, an officer of the Company who is a qualified person within the meaning of National Instrument 43-101 ( NI 43-101 ). The technical information about the Company s exploration activities contained in this news release has been prepared under the supervision of Mr. Sylvain Guerard, an officer of the Company who is a qualified person within the meaning of NI 43-101. p. 5 Kinross Nevada tour highlights growth potential www.kinross.com