Minutes. WestConnex Community Reference Group

Similar documents
M4 M5 Link Tunnels Community guide to the M4-M5 Link Modification Report September 2018

Concord Road Interchange. Standard hours of work

State Environmental Planning Policy (Sydney Region Growth Centres) Amendment (Catherine Fields Precinct) 2013

Submission to NSW Koala Strategy Consultation Process. March 2017

Dublin Airport Update Presented by Pat Molloy

Technical Paper 1 Traffic report

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

STAKEHOLDER AND COMMUNITY ENGAGEMENT

Regulatory Working Group Revised Final Minutes

When. Presentation A visual presentation of the proposed Grade Separation Works was

West Gate IAC Hearing. Review of vibration and regenerated noise from construction

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

Increase the occupant load from 160 patrons to 200 patrons,

Service charter incident reporting

Planning Approval Consistency Assessment Form

Gladstone Region LNG Community Consultative Committee Meeting Minutes

Minutes of the 5th Joint Meeting of the CAA and ACAG, held Tuesday 13 February 2007, Miramar Links Conference Centre, Wellington Airport.

RE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.

INTERNATIONAL UNION FOR THE PROTECTION OF NEW VARIETIES OF PLANTS

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

AIDA COMMITTEE MEETING FRIDAY 2 AUGUST 2013 CORRESPONDENCE REPORT

Dublin Airport Update Presented by Pat Molloy

Broula Mine Community Consultative Committee

Newcastle Transport Program Newcastle Light Rail Determination Report

Draft Greater Sydney Region Plan

Suffolk EfW Community Liaison Group Minutes. Great Blakenham Village Hall Tuesday 31 January pm-8.30pm

Cairns Airport Aircraft Noise Information Report

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

For personal use only

The minutes from the previous meeting were signed-off by the Group.

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Health and Safety Report 2016

Sydney CBD - Partnering with the coach industry for solutions

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

Sydney Airport is a strong supporter of the local community, working with a range of local schools, community groups, local councils and charity

EXHIBIT LIST. No Exhibit Name Page. 1 R391 HS2 Residents Charter.pdf (R391) R392 Response to Select Committee

CHATSWOOD TO SYDENHAM CENTRAL WALK MODIFICATION SUBMISSIONS REPORT

CUMULATIVE IMPACTS CHAPTER TWENTY-SIX

Wick High Parents Council. RB Wick Community Council. Disability Access Panel Caithness Ruan Peat. Head Teacher Hillhead Primary School

4 Transport projects underway in Western Sydney

Noise Abatement Committee Minutes

Liaison Group Forum. 1. Introduction GE opened the meeting and welcomed members of the public in attendance.

Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer

PERTH AIRPORT AIRCRAFT NOISE MANAGEMENT CONSULTATIVE COMMITTEE MINUTES OF MEETING (FINAL)

NSW GOVERNMENT RESPONSE TO THE VISITOR ECONOMY TASKFORCE REPORT

Liverpool Airport Consultative Committee Friday, 11 September Additional Papers

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016

Committee. Presentation Outline

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

Air Operator Certification

Draft Western District Plan

Quarterly Report to the Minister for Planning

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT

New free City connector bus service

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

draft planning controls

Busselton-Margaret River Regional Airport Development Project. Consultative Group. Meeting 5 Minutes

Caistor St Edmund Parish Council

Aeronautical Studies (Safety Risk Assessment)

AIRPORT TRANSPORT FORUM MEETING NOTES

AGENDA 14:00 16:00, 3 rd September George Street, Glasgow, G1 1RX. 14:00 Welcome & apologies GD

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

Sydney Motorway Corporation

HARBOR BRIDGE PROJECT COMMUNITY ADVISORY BOARD MEETING MINUTES April 5, 2018

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE

Apologies: Phillip Chan (PC) Jim Eaton (JE) Non Attendance :

Rangitikei District Council

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

STAFF REPORT ACTION REQUIRED

Terms of Reference. Canberra Airport Community Aviation Consultation Group

EYDON PARISH COUNCIL. 1. Councillors present: Cllrs K Simmons (Chairman), R Collins, W Coy, C Henson and J Walker. The Clerk was in attendance.

CLEM7 Project South Community Liaison Group Meeting #29

National Park Authority Board Meeting

1. Passenger Locator Form 2. Universal Safety Oversight Audit Programme

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am.

Darwin Airport Aircraft Noise Information Report

Applewood Heights Community Open House

Participant Presentations (Topics of Interest to the Meeting) GASP SAFETY PERFORMANCE INDICATORS. (Presented by the Secretariat) EXECUTIVE SUMMARY

Minutes and Action Items Bundeena/Maianbar Tourism Promoters Working Group

Minutes of the Tourist Attraction Signposting Assessment Committee

Shoalhaven City Council

INFRASTRUCTURE SUMMIT Capturing the value of our growth cities

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

FAI EMS Code. Environmental Management System (EMS) for FAI Air Sports Activities. FAI Environmental Commission

Appendices. Appendix A Schedule of Consultation. Appendix B SCA Public Participation Program Report (dated September 2006)

International Civil Aviation Organization. Regional Aviation Safety Group - Middle East

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

2010 SPP SPRING PLANNING WORKSHOP ENTERGY SPP RTO REGIONAL PLANNING PROCESS

M4 East. Volume 2E. Environmental Impact Statement. Appendices M-O

ULDA Update Yarrabilba Project The Developers Perspective Tanya Martin Project Planner Communities Lend Lease June 2011

Athens International Airport

It was still imperative that we had a complete list of businesses in Staplehurst for any valid mailing when it came to consultation.

PAL Management Centre, Building 18, Tigermoth Lane, Parafield Airport, South Australia 5108

The role of the Community Liaison Group & review agreed Terms of Reference

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

SUMMARY OF MEETING 1. Curtin Group Centre Master Plan. Community Panel - 25 July Attendees. Tuesday 25 July 2017, 6.30pm 8:30pm.

Transcription:

WestConnex Community Reference Group Suite 801, 50 Berry Street North Sydney NSW 2060 Phone: (02) 8912 9001 Web: idplanning.com.au Minutes Location: Time Facilitator: Minutes Ashfield Council Chambers, Level 6, Ashfield Service Centre, 260 Liverpool Road, Ashfield Tuesday 22 August 2017, 6:00pm 8.00pm Gabrielle Martinovich (GM) Fiona Morrisby Attendees: Lance Butler (LB) Sharon Laura (SL) Rhea Liebmann (RL) Cynthia Louise Moore (CLM) Sherrill Nixon (SN) Christina Valentine (CV) Catherine Gemmell (CG) Geoffrey Douglas (GD) Terry Chapman (TC) Kylie Cochrane (KC2) SMC Matt Webb (MW) SMC Nicole Ryan (NR) - SMC Rob Sherry (RS) DPE Katie Withers (KW) - DPE Peter Warmington (PW) - CoS Elise Webster (EW) CoS Dan Silburn-Evans (DSE) Kendall Banfield (KB) IWC Peter Jones (PJ) - SMC Apologies: Simon Manoski (SM) IWC David Kelly (DK) SMC Liza-Jayne Loch (LJL) Trevor Stolz (TS) RMS Observers: Liz Johnstone (LJ) WestConnex Community Reference Group - Minutes 1

2 AGENDA MINUTES Ref # Item Actions 1 Welcome and reminder to members regarding Terms of Reference and behavior standards required for CRG meetings. 2 Review actions from previous meeting Updates as per pages 6-7 3 Accept minutes from previous meeting To be confirmed at September meeting Projects 4 M4-M5 Link a) CV asked PJ about truck marshalling. PJ stated SMC would respond when this information is confirmed b) KC2 to send web link to EW on concept design c) SL requested PJ provide details on options (a) and (b) d) LJ asked PJ to meet with PJ s team of experts e) SL clarified she would like information about truck movements on Liverpool Rd 5 New M5 a) RL asked why there is still no map of park provided at the meeting after fourth request. NR apologised and explained it was not yet available. b) CRG members asked GM to provide a list of questions which had been completed and provide this list back to the CRG. c) RL said a Stage 2 Director has not attended the CRG to date. SN concurred and requested GM to invite Stage 2 Project Director to September meeting. d) SL requested NR amend the EPA statement to state the investigation was ongoing. e) RL and LB queried property acquisition process and insurance claims procedure. Want to see greater transparency of process and determinations in order to improve process. NR noted the issue was closed on the properties in question by the Project Director and the independent technical report has been accepted. a) PJ to respond back to the CRG on truck marshalling when this information is confirmed. b) KC2 to send web link to EW on concept design c) PJ to provide details on options (a) and (b) in the week commencing 28 August 2017. d) PJ to confirm access to his team of experts e) PJ to respond to the CRG regarding truck movements on Liverpool Rd. Note: PJ left the meeting at 7:10pm a) NR to provide map of park when it is available. b) GM to provide a list of complete community actions to the CRG at the next meeting. c) GM to request a Stage 2 Project Director to attend the CRG as soon as practicable. d) NR to amend EPA statement to state the investigation is ongoing. Note: CV left the meeting at 7:15pm 6 New M4 WestConnex Community Reference Group - Minutes 2

3 a) SL raised concern about noise vibration issues and wanted it noted the work is ongoing and the community is upset. b) SL raised concerns around extended hours on the excavation site and wanting data verification.tc stated he would bring data to the meeting about sounds levels based on the comments from SL c) SL requested a solution to residential parking/road occupancy on Dobroyd Parade relating to the Department of Housing residents. PW suggested Transport for NSW (TfNSW) via Marg Prendergast to coordinate. 7 Other business a) CG used a best practice example from London Crossrail about how they addressed the community severely impacted by noise via a noise and vibration mitigation scheme. It was agreed the Department of Planning and Environment (DPE) and Roads and Maritime Services (RMS) would review the relevant documents. b) CLM asked about the dilapidation survey and if there were any successful claims on the project. TC said he would take this question on notice with general Stage 2 statistics. c) EW wanted it noted responses to the CRG must be provided in the requested timeframes d) CG requested that TC apologise for inappropriate language used in a meeting outside the CRG. TC apologised. e) SL mentioned a recent resignation in the CRG and requested a replacement for the Ashfield area. SL agreed to provide some recommendations. NR also mentioned a there is a community meeting with Jodi Mackay MP on 26 August and there could be relevant replacements in this group. f) SL requested a neighbourhood meeting be arranged to discuss people who will be affected by EIS options (a) and (b). NR there would be a door knock which included the school area and Ashfield. a) Noted b) TC to bring sound level data to the next meeting. c) PW to assist in providing a solution to residential parking/road occupancy on Dobroyd Parade and advise TfNSW. a) DPE and RMS requested to review the London Crossrail guidelines. b) TC to respond back to the CRG on the dilapidation survey and if there were any successful claims on the project. c) Noted d) Noted e) SL to provide recommendations for a CRG representative for the Ashfield area. f) NR requested to arrange a neighbourhood meeting for impacted areas. g) SN to request PJ attend an evening meeting at the school. Meeting closed at 8:10pm. WestConnex Community Reference Group - Minutes 3

WestConnex Community Reference Group Suite 801, 50 Berry Street North Sydney NSW 2060 Phone: (02) 8912 9001 Web: idplanning.com.au Minutes Issues register Issue Mitigation Responsibility Priority By when Status Committee meeting attendees Consultation Members asked SMC for: SMC/GM to request presence of RMS, TMC, State Transport, M4 widening, other councils, JV representatives and Project Directors (decision makers) to attend future meetings as required Early engagement and timely information Longer lead times for submissions Increased hours of operation for Information/ Customer Service Centres including weekends Direct access to experts, decision makers for meetings Direct access to Place Managers on ground for day-to-day issues management Include executive summaries with progress reports and consultation documents i.e. plain English with key elements and links to sections for further information Clarify routes, tunneling impacts and boundaries on all maps Introduce a series of Town Halls with relevant experts to target specific issues SMC/GM Medium - High On notice On notice as required SMC Medium Ongoing SMC has already adopted several of these suggestions and will consider the rest for future consultation activities. Traffic modelling Invite traffic expert to committee meeting SMC High As per EIS - on exhibition from 18 WestConnex Community Reference Group - Minutes 4

5 Issue Mitigation Responsibility Priority By when Status Provide visibility of projections, bus changes and diversions Clarify rat runs and heavy vehicle routes Safety Increase onsite monitoring and compliance through regular audits Enhance emergency response to 24/7 High Medium SMC High Ongoing August to 16 October Planning and coordination Improve coordination between JVs and utilities through centralised coordination via the TMC SMC High Ongoing Truck identification SMC and JV trucks to have signage for verification and easy identification GPS location devices be used to monitor and provide locations of truck parking SMC Low Included in EIS for Stage 3 Noise and vibration mitigation CG provided a best practice example from London Crossrail about how they addressed communities severely impacted by noise. The London example demonstrates best practice tunnelling in an urban site and noise and vibration mitigation schemes for community. DPE, RMS Medium Sept DPE and RMS asked to review Property acquisition Kathy Calman insurance claim pending Fulton Hogan technical report to be finalised SMC Medium Closed WestConnex Community Reference Group - Minutes 5

WestConnex Community Reference Group Suite 801, 50 Berry Street North Sydney NSW 2060 Phone: (02) 8912 9001 Web: idplanning.com.au Minutes Actions Reference Action Responsibility Due Date Status 130617.2 NR to come back with more detailed legacy information. NR, DPE 18 July Update to be provided at Sept 17 meeting when it is released by DPE 130617.2 Advise on White Bay and truck marshalling. SMC 16 August Refer to EIS on exhibition from 18 August to 16 October 130617.2 DPE to review sub management plans regarding construction routes, noise and vibration management plans. RS 18 July Reviewed by DPE 130617.2 SMC to bring route maps to all meetings. NR Each meeting Ongoing from July 2017 meeting 130617.6 Distribute the email trail on bus route signage installation on Ramsay Street. 130617.7 Inform the CRG about the ULDP for the Campbell St land bridge and St Peters recreational area. 130617.7 Provide response to previous questions raised regarding pollution at St Peters. 130617.7 Investigate and report back to the committee on demolition of Campbell St. NR 18 July Distributed at Aug meeting and pending CLM feedback NR 18 July Update as per questions raised in August meeting. NR 18 July Ongoing refer to NR responses to RL email NR 18 July Not addressed at meeting WestConnex Community Reference Group - Minutes 6

7 Reference Action Responsibility Due Date Status 180717.7(a) Check on the issue of Darley Road and Camperdown. NR August Ongoing refer to EIS on exhibition from 18 August to 16 October 180717.7(q) 180717.8(r) 180717.10(f) Bring full response to the CRG on property acquisition for the M4/M5. Refer to hardship guidelines for further information. Bring recreational area maps as per ULDP to the next CRG meeting. MW to investigate the viability of a parking marshal on site to monitor worker parking. 130617.2 SMC to send maps to Inner West Council for recommendations on the extent of letter box drop areas. RMS September EIS chapter 12 (Dan). Out of session commentary Page 12-31. NR September On website but detailed version not available. MW August Noted for Stage 1 and 2. Track marshalling for New M4 and provide update w/c 28 August. SMC/IWC As required Noted 130617.2 RMS to review traffic management plans. TS 18 July Completed 130617.2 SMC to contact members when EIS is announced. NR Q3 2017 Closed 130617.5 RMS to determine who is carrying out the work on Hill Rd Homebush. TS 18 July Closed 130617.7 Find out the status of the Darley Rd off ramp. TS 18 July Closed 180717.5(e) Recruit a CRG member from M4 widening area. SMC August Ongoing 180717.6(a) 180717.7(k) Provide notification to residents regarding the traffic switch for Parramatta Road, Wattle St and Dobroyd Parade. SMC response as to why steel plates were left on the road at Alfred St Roselle around 10 weeks ago. NR August Closed SMC August Closed - not SMC project 180717.7(l) Request DPE provide the maximum consultation period for the EIS. RS August Closed 180717.8(n) 180717.8(y) Distribute the correct words to the CRG regarding the Campbell St Land Bridge completion date. Tunnelling website to be updated with the number of tunnellers on the M5. KC2 16 August Closed - as per EIS NR August Closed 180717.10(a) Distribute Minister response with minutes to the CRG. GM 24 July Closed WestConnex Community Reference Group - Minutes 7

8 Reference Action Responsibility Due Date Status 180717.10(c) Distribute questions on notice with minutes to the CRG. GM 24 July Closed WestConnex Community Reference Group - Minutes 8