Airport Noise Advisory Panel (ANAP)
Scheduled Daily Passenger Airlines Departures * 2012 - Reno-Tahoe International Airport (RNO) April (60 + 1 non-stop departures) Continental discontinued their non-stop service (1) to Houston, TX United discontinued one (1) non-stop to San Francisco, CA Southwest added one (1) non-stop to Portland, OR May (57 non-stop departures) United discontinued One (1) non-stop to Los Angeles, CA One (1) non-stop to San Francisco, CA (Saturday only service) Southwest discontinued service (-2) to San Jose, CA on April 10, 2012 June (66 + 1** non-stop departures) The following seasonal flights returned in June, 2012: Alaska non-stop flight (1) to Seattle, WA American non-stop flight (1) to Dallas, TX Continental non-stop service (1) to Houston, TX Delta non-stop flight (1) to Salt Lake City, UT Southwest non-stop flight (1) to Seattle, WA United non-stop flight (1) to Denver, CO United non-stop flight (1) to San Francisco, CA United non-stop flight (+1**) to San Francisco, CA Alaska Airlines launched service (2) to San Jose, CA * Not all flights operate seven days a week. ** Specifically designated as weekends only 2
Scheduled Daily Passenger Airlines Departures * 2012 - Reno-Tahoe International Airport (RNO) - Continued July (65 +1** non-stop departures) Delta temporarily discontinued their non-stop service (-1) to Minneapolis, MN August (66 +1** non-stop departures) Continental resumed their non-stop service (1) to Houston, TX American added one (1) non-stop flight to Los Angeles, CA *Not all flights operate seven days a week ** Specifically designated as weekends only 3
Scheduled Daily Passenger Airline Departures* Annual Trends - Reno-Tahoe International Airport (RNO) *Not all flights operate seven days a week. 4
Scheduled Cargo Flight Operations* April June 2012 FEDEX (A300 and B757) UPS (B757) Ameriflight (Chieftain, Beech99, Metroliner) SCHEDULE 12 am 3 am 3 am 5 am 1 - B757 Arrival 1 Arrival 5 am 7 am 1 - A300 Arrival 1 - A300 Departure 1 Arrival 1 - Metroliner Arrival 7 am 9 am 1 - Chieftain Arrival 9 am 12 pm 1 - Beech99 Arrival 12 pm 3 pm 3 pm 5 pm 1 - A300 Arrival 5 pm 8 pm 1 - A300 Departure 2 Departures 3 Departures 1 - Chieftain, 1 - Beech99 1- Metroliner 8 pm 10 pm 1 - B757 Departure 10 pm 12 am *Not all flights operate seven days a week. 5
Table 1: RNO Runway Use by All Aircraft Runway Operation Type % of Operations North Flow 34L Arrival 12.89% 34L Departure 13.05% 34L Touch & Go 0.02% 34R Arrival 6.44% 34R Departure 6.22% 34R Touch & Go 0.00% 16L South Flow Arrival 9.27% 16L Departure 8.62% 16L Touch & Go 0.03% 16R Arrival 19.25% 16R Departure 20.95% 16R Touch & Go 0.15% 7 East Flow Arrival 0.11% 7 Departure 0.57% 7 Touch & Go 0.00% West Flow 25 Arrival 1.61% 25 Departure 0.79% 25 Touch & Go 0.03% Aircraft Runway Use April June 2012 Table 2: RNO Runway Use by All Aircraft North Flow South Flow East Flow West Flow Arrivals Arrivals Runway 34L & 34R All Ops Runway 16L & 16R All Ops Runway 7 All Ops Runway 25 All Ops North Flow South Flow Departures 38.6% 58.3% 0.7% 2.4% Departures West Flow 2.4% Exhibit 1: RNO Runway Use by All Aircraft North Flow 38.6% 13.05 6.22% 19.25 9.27% 0.11% 0.79% 0.57% 1.61% 12.89 6.44% 20.95 8.62% South Flow 58.3% East Flow 0.7 % 6
Noise Complaints 2008 2012 2 nd Quarter 2012 April - June Jan Feb Mar April May June July Aug Sept Oct Nov Dec Total 2009 63 70 98 71 86 52 49 60 67 72 29 24 741 2010 26 62 122 88 52 93 115 86 52 44 35 41 816 2011 20 15 35 45 27 72 81 144 367 182 115 66 1169 2012 82 83 88 82 223 175 733 400 350 300 250 200 150 100 50 2009 2010 2011 2012 0 1 2 3 4 5 6 7 8 9 10 11 12 Total Complaints = 480 7
Noise Complaints by Location April June 2012 South Hills 4 0.8% Sparks 65 13.5% Stead 0 0.0% Virginia City Highlands 0 0.0% Virginia Foothills 0 0.0% Donner Springs 1 0.2% Smithridge 0 0.0% Double Diamond 3 0.6% Other 121 25.2% Mt. Rose Hwy 2 0.4% Huffaker 283 59.0% NE Reno 1 0.2% Total 2 nd Quarter 2012 Complaints = 480 8
Noise Complaint Location Summary Quarterly Counts 2008 2012 2 nd Quarter 2012 April - June 40 30 20 10 29 15 7 11 38 33 18 27 21 25 32 16 21 10 2009 2010 2011 2012 0 1st Q 2nd Q 3rd Q 4th Q 480 Complaints Received from 27 Locations 9
10
11
Noise Complaints Day vs. Night Night 12% NIGHT 29% Day 88% Apr Jun 2012 DAY VS. NIGHT* AVG. DAILY AIRLINE OPERATIONS = 90 DAY 71% Apr Jun 2012 DAY VS. NIGHT* AVG. DAILY CARGO OPERATIONS = 11 Night 25% ` Day 75% Apr Jun 2012 DAY VS. NIGHT* NOISE COMPLAINTS TOTAL NOISE COMPLAINTS = 480 * Day 0700 2200 Night 2200-0700 12
Complaints vs. Operations * Distribution by Hour April June 2012 * Operations = Airline and Cargo Operations Only 13
Airport Noise Advisory Panel (ANAP) PANEL QUESTIONS 14
Sound Insulation Program Construction 2012 Construction Season 2012 Construction season scheduled for May - November 2012 501 Total Residences Under Construction Phase 19.5 58 residential apartment units in Sparks, scheduled to be completed in late September 2012 Phase 20.3 288-unit apartment complex in Sparks, scheduled to be completed in late September 2012 Phase 21.2 65 single, multi-family & condominium residential units located in Reno, Sparks & Washoe County, scheduled to be completed in late October 2012 Awaiting Materials Delivery Phase 21.3 90-unit apartment complex in Sparks, scheduled to begin construction in mid October with completion in November 15
Sound Insulation Program Design 2012 Design Season Looking Toward the Future Staff is in the design stages for 2013 construction Grant for 7 million dollars anticipated to be received this summer/fall for Phase 22 2 Bid Packages planned for 2013 Construction (476 total units) Phase 20.4: 72 single, multi-family & condominiums located in Reno, Sparks & Washoe County Architectural Measurements scheduled September 4 October 4, 2012 Construction to take place fall 2013 Phase 22.1: The Village at Iron Blossom Apartment Complex (404 Units) located south of the Airport Floor Plan Review completed Advertise for bid scheduled for October 9, 2012 Construction to take place in summer/fall 2013 16
Sound Insulation Program Status Completed to Date (Through Year 2011) 4,103 residences City of Sparks: 1,899 residences City of Reno: 1,726 residences Unincorporated Washoe County: 478 residences In Progress (Calendar Year 2012) 501 residences City of Sparks: 456 residences City of Reno: 35 residences Unincorporated Washoe County: 10 residences Planned Construction 2013 476 residences City of Sparks: 29 residences City of Reno: 415 residences Unincorporated Washoe County: 32 residences Estimated Remaining Residences 333 residences City of Sparks: 139 residences City of Reno: 53 residences Unincorporated Washoe County: 141 residences 17
Airport Noise Advisory Panel (ANAP) PANEL QUESTIONS 18