RFP Corrigendum No. 01

Similar documents
India Trade Promotion Organisation (A Govt. of India Enterprise) Gate No. 3, Pragati Bhawan, Pragati Maidan New Delhi

TENDER NOTICE Description Qty. Earnest Money As per Annexure General Terms & Conditions:-

AMENDMENT OF SOLICITATION

jk"vªh; eqdr fo ky;h f'k{kk lalfkku

1) SUB: ENVIRONMENT AWARENESS & STRESS MANAGEMENT RETREAT (12 th 14 th AUGUST, 2016)

Sub:- Rate Inquiry for Supply and installation of Fixtures for Visual Merchandising & Photography Lab of FC department at NIFT Patna.

FREQUENTLY ASKED QUESTIONS (FAQs)

Airports Authority of India EDI- nt Hub Department of Airport System Operational offices, New Delhi

Request for Proposal for Hiring of Ground Support Equipments for All Airports of Pakistan

DETAIL NOTE ON PROJECT

Supply /Installation of Conveyor Belt System at Air India Domestic Departure Cargo, I.G.I. Airport Terminal II, New Delhi. Request for Quote (RFQ)

Date: 8 th June Document Reference. No. Tender Specifications

BEFORE THE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

Aluminium hangar structures of minimum 4 mtr side height fire retardant roof and side covers for area 25m x 40m (exhibition)and 25m x 40m (dining

AIRLINE ALLIED SERVICES LIMITED (A wholly owned subsidiary of AIL)

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID

RFP Schedule No: DACAW/Delivery Financing/787-8/Junior Loan/2017/60 Date: 29 November 2017

Kerala State Electricity Regulatory Commission

TCAA-AC-AWS007C. March 2013 CERTIFICATION OF A FOREIGN APPPOVED MAINTENANCE ORGANISATION (AMO) 1.0 PURPOSE

STAR CRUISES SUPER STAR LIBRA 01 NIGHT CRUISE

Corrigendum No. 1. for

AIR TRANSPORT CIRCULAR NO. 01/2016

PSEG Long Island. Community Distributed Generation ( CDG ) Program. Procedural Requirements

TERMS OF REFERENCE (TOR) FOR PROVISION OF MOBILE ACCESSIBILITY SERVICE - RFQ/UFAA/015/

Ref: RFQ NO.RO/MM/18/CABIN TAGS/ENQ-001 June 07, 2018

AIRPORTS AUTHORITY OF INDIA

VoIP RADIO CONSOLE SYSTEM FOR MACON COUNTY EMERGENCY MANAGEMENT

AIR INDIA CHARTERS LIMITED

Application /Recommendation for the Issue of a National Airworthiness Review Certificate in accordance with BCAR A3/B3-1

TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION

GOL Airline s Debit Memo Policy

Appendix No.5 List and Status of SEZ Proposals in Uttar Pradesh and on

Sub: - Supply & installation of 20 fiber / porta cabins with attached toilets at Nashik for C.P.Nashik for the ensuring Sinhastha Festival.

Aeroplanes Application for Renewal of a Single or Multi-Pilot Class or Type Rating Including Powered Lift Aircraft

NIAGARA MOHAWK POWER CORPORATION. Procedural Requirements

TENDER DOCUMENT FOR SUPPLY & INSTALLATION OCTONORM STALLS ON HIRE BASIS NATIONAL SCIENCE CENTRE, DELHI

TERMS OF REFERENCE. Operations of Shop Stops, Service Stations and Tyre shops at PSO COCO retail outlets

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

Before Mr Justice John MacRobert IN RE: UNCLAIMED BENEFITS

AIRPORTS AUTHORITY OF INDIA

COMPANY PROFILE. Quality & Work, Speaks.

NOTICE INVITING TENDERS FOR

Terms of Reference: Introduction

REGULATIONS FOR DECLARATION AND DISPOSAL OF UNCLAIMED ITEMS OF THE PIRAEUS CONTAINER TERMINAL S.A. IN THE PIRAEUS FREE ZONE

IN THE MATTER OF. SCOTTISH WIDOWS LIMITED (Transferor) and. RL360 LIFE INSURANCE COMPANY LIMITED (Transferee)

CONSOLIDATED MAY 8, 2017 CITY OF CAMPBELL RIVER PROVINCE OF BRITISH COLUMBIA BYLAW NO. 3211

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

ACI EUROPE POSITION PAPER. Airport Slot Allocation

Relevant Experience In the Field. Approx. Emoluments per month [ CTC ] OPERATIONS DEPARTMENT. Qualification

Requirement for bonding and other forms of security

ADM Policy Ticketing Audit Scope Including But Not Limited To

Notice for Empanelment of Agencies to Provide Drivers

ADVERTISEMENT - WEBSITE AIR INDIA CHARTERS LIMITED POST OF : CO-PILOTS / TRAINEE CAPTAINS / CAPTAINS (TYPE-RATED) - EXAMINERS / INSTRUCTORS

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

Aircraft Maintenance Prof. A.K Ghosh Prof. Vipul Mathur Department of Aerospace Engineering Indian Institute of Technology, Kanpur

1. Material terms of the major related-party transaction (a series of interrelated transactions).

British Airways PLC. Agreement to Supply Group Nett Rates. Terms and Conditions

Investment Opportunities DMIC UP Region

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

Civil Aviation Authority of Nepal, Civil Aviation Regulation, 2058 (2002)

TRAINING & LICENCING DIRECTORATE FLIGHT CREW LICENSING CIRCULAR No. 1/2010

INDEMNITY APPLICATION FORM

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Application for Approval for Lithium Cells/Batteries

EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT

NEW AND IMPROVED. ROYAL CARIBBEAN Scope & Changes DEPOSITS AND FINAL PAYMENTS DEFINITIONS, SIZE REQUIREMENTS AND LIMITS

Guidelines and Application Form

Relevant Experience In the Field

TENDER DOCUMENT: B737NG EXPAT PILOTS FOR AICL

Official Record Series 5

MORMUGAO PORT TRUST ENGINEERING MECHANICAL DEPARTMENT

AIRPORTS AUTHORITY OF INDIA REGIONAL CONNECTIVITY SCHEME (RCS) / UDAN SCHEME VERSION 2.0 RESPONSES TO QUERIES

MATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z2

Tender Notice for Hotel Layover Services

Subpart A General Purpose... 7

Master Minimum Equipment Lists/Minimum Equipment Lists. Amendment Summary PART-MMEL/MEL. Amendment No. Effective Date Subpart Paragraph

TAMILNADU TOURISM DEVELOPMENT CORPORATION LIMITED O/O THE REGIONAL MANAGER (NORTH): UDHAGAMANDALAM.

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

THE AIRBUS PURCHASE AGREEMENT

Transmission Investment Programme

Refund Rules and TDR Filing w.e.f. 12-NOVEMBER-2015

No /2003-VAS Dated the 11th Nov., SUB: GUIDELINES FOR UNIFIED ACCESS(BASIC & CELLULAR) SERVICES LICENCE.

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND

Scheme for enhancing air connectivity between Indian states and international destinations

:As per Government Guidelines and will be based on post-based roster as per the prevailing cadre strength. SC ST OBC GENERAL

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

STAR CRUISES SUPER STAR LIBRA EX PHUKET ITINERARIES

RFP 1-12-C069 ELECTONIC SECURITY SYSTEM (ESS) MAINTENANCE & REPAIR SERVICES AT WASHINGTON DULLES INTERNATIONAL & RONALD REAGAN WASHINGTON

Annex 5: Technical Terms and Conditions for Lot IV: Committee of the Regions

Domestic Travel Policy CMS

BISHKEK FIXED DEPARTURE ITINERARY (29 Sept-03 Oct) and (29Dec-02Jan) Package Price : INR 38888/- per person

Terms and Conditions Group Fare: Domestic Saver Fare

Own a Property Nr. Airport

Phone: FAX:

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

Transcription:

RFP Corrigendum 01 The RFP document for selection of Transmission Service provider for the Package- 2 against tender specification ESD-765/4 has been modified to the extent below: S. Clause / Page 1. Definition of: Successful Bidder Transmission Service Agreement Clause no. 1.2 Annexure 2 : Para 1, line 2 Annexure 9: Subject & Para 1, line 2 Annexure 10A: Para 1, line 3 Instead of Build, own, operate and transfer 2 Definition Bid Bond shall mean the unconditional and irrevocable bank guarantee for Rupees 49 Crores (Rs Forty Nine Crores only) to be submitted along with the Bid by the Bidder under Clause 2.20 of this RFP, Read as Build, Own, Operate & maintain and Transfer (BOOT) Bid Bond shall mean the unconditional and irrevocable bank guarantee for Rupees 49.09 Crores (Rs Forty Nine Crores Nine Lacs only) to be submitted along with the Bid by the Bidder under Clause 2.20 of this RFP, as per the format prescribed in Uttar Pradesh Power Transmission Corporation Limited Page 1

S. Clause / Page Instead of Read as as per the format prescribed in Annexure 2; Annexure 2; 3 Clause 1.2 List of Works (Annexure A) Revised List of Works (Annexure B) 4. Clause 1.4 At the expiry of the TSA, the SPV along with the assets will be transferred to the Long term Transmission Customer(s) or nominee of Long term Transmission Customer(s) at the depreciated value. 5. Clause 1.5 (a) a) Provide to the Bidders a Survey Report for the Project at least thirty (30) days prior to the Bid Deadline. The Survey Report will contain information regarding the transmission line, i.e. voltage level, line configuration (i.e., S/C or D/C), indicative route alignment, conductor type, conductor configuration and type of terrain likely to be encountered. 6. Clause 2.15.1 Project Schedule (Annexure C) Scheduled COD for overall Project: 5th May, 2012. 7. Clause 2.16.1 2.16.1 The Bidders should submit the Bids so as to reach the address specified in Clause 2.18.4 by 14.00 Hrs. on 15th October 2009: 8 Clause 2.16.2 2.16.2 Important timelines are mentioned below: Date Event 10 th Aug 2009 Issuance of RFQ and RFP At the expiry of the TSA, all the assets of the SPV including Substations, Transmission Lines and other related physical assets will be transferred to the permitted nominee of the State Government at zero value. a) Provide to the Bidders a Survey Report for the 765kV line which has already been provided at the RFQ stage. The Survey Report will contain information regarding the transmission line, i.e. voltage level, line configuration (i.e., S/C or D/C), indicative route alignment, conductor type, conductor configuration and type of terrain likely to be encountered. However, Survey for all other lines will be the responsibility of the Bidders. Revised Project Schedule (Annexure D) Scheduled COD for overall Project: 31st December, 2012. 2.16.1 The Bidders should submit the Bids so as to reach the address specified in Clause 2.18.4 by 14.00 Hrs. on 30 th March 2010: 2.16.2 Important timelines are mentioned below: Date Event 10 th August 2009 Issuance of RFQ and RFP Uttar Pradesh Power Transmission Corporation Limited Page 2

S. Clause / Page Instead of Read as 19 th Aug 2009 Submission of written clarifications/ amendments, if any, on the RFQ by Bidders so as to reach BPC by 1700 hours. Such written clarifications/ amendments shall be in the format provided in Annexure-7. 21 st Aug, 2009 Pre-bid meeting for any clarification on the RFQ 28 th Aug 2009 Submission of response to RFQ 4 th Sept 2009 Short listing based on responses received for RFQ and issue of additional information related to the project 16 th Sept 2009 Submission of written clarifications/ amendments, if any, on the balance RFP Project Documents only, by Bidders so as to reach BPC by 1700 hours. Such written clarifications/ amendments shall be in the format provided in Annexure-7. 23 rd Sept 2009 Pre-bid Meeting for any clarification on the RFP 30 th Sept 2009 Issue of final RFP Project Documents 15 th Oct 2009 Submission of Bid 15 th Oct 2009 Opening of Non-Financial Bid 20 th Oct 2009 Opening of Financial Bid 26 th Oct 2009 Selection of Successful Bidder Submission of written clarifications/ amendments, if any, on the RFQ by Bidders so 19 th August 2009 as to reach BPC by 1700 hours. Such written clarifications/ amendments shall be in the format provided in Annexure-7. 7 th October, 2009 Public hearing for any clarification on the RFQ 11 th November 2009 15 th February 2010 22 nd February 2010 Submission of response to RFQ Short listing based on responses received for RFQ and issue of additional information related to the project Submission of written clarifications/ amendments, if any, on the balance RFP Project Documents only, by Bidders so as to reach BPC by 1700 hours. Such written clarifications/ amendments shall be in the format provided in Annexure-7. Public Hearing for any clarification on the RFP 26 th February, 2010 5 th March 2010 Issue of final RFP Project Documents 30 th March 2010 Submission of Bid 30 th March 2010 Opening of Non-Financial Bid 15 th April 2010 Opening of Financial Bid 22 nd April 2010 30 th April 2010 Selection of Successful Bidder and issue of LoI Signing of RFP Project Documents and transfer of Western U.P. Power Transmission Company Ltd. Uttar Pradesh Power Transmission Corporation Limited Page 3

S. Clause / Page Instead of and issue of LoI 5 th Nov 2009 Signing of RFP Project Documents and transfer of Western U.P. Power Transmission Company Ltd. 9 Clause 2.17.1 2.17.1 The Bidders shall submit the Bid which shall remain valid up to 12th April, 2010. The BPC reserves the right to reject any Bid which does not meet the aforementioned validity requirement. 10 Clause 2.19.2 2.19.2 The cost of this RFQ including RFP is Rs. 11,250/- (Rupees eleven thousand two hundred fifty only) including VAT (12.5%) or USD 225 (US Dollars two hundred twenty five only) including VAT (12.5%) which shall be non-refundable. This amount shall be payable by a crossed demand draft or banker s cheque drawn in favour of Executive Engineer (A) Electricity Transmission Design Circle, UPPTCL payable at Lucknow. 11 Clause 2.22.1 Opening of Envelope I (Non-Financial Bid): 15:00 hours (IST) on 15th October, 2009 Opening of Envelope II (Financial Bid): 15:00 hours (IST) on 20th October, 2009 12 Annexure 1 List of Long Term Transmission Customers Read as 2.17.1 The Bidders shall submit the Bid which shall remain valid up to six months from the date of submission. The BPC reserves the right to reject any Bid which does not meet the aforementioned validity requirement. 2.19.2 The cost of this RFQ including RFP is Rs. 11,250/- (Rupees eleven thousand two hundred fifty only) including VAT (12.5%) or USD 225 (US Dollars two hundred twenty five only) including VAT (12.5%) for both the packages 1&2, which shall be non-refundable. This amount shall be payable by a crossed demand draft or banker s cheque drawn in favour of Executive Engineer (A) Electricity Transmission Design Circle, UPPTCL payable at Lucknow. Opening of Envelope I (Non-Financial Bid): 15:00 hours (IST) on 30th March, 2010 Opening of Envelope II (Financial Bid): 15:00 hours (IST) on 15th April, 2010 List of Long Term Transmission Customers Sl. Name of the Long Term Transmission Customers Allocate d Project Capacity in MW Sl. Name of the Long Term Transmission Customers Allocate d Project Capacity in MW 1 Paschimanchal Vidyut Vitran Nigam Ltd. 33% 1 Paschimanchal Vidyut Vitran Nigam Ltd. 40% Uttar Pradesh Power Transmission Corporation Limited Page 4

S. Clause / Page Instead of Read as 2 Dakshinanchal Vidyut Vitran Nigam Ltd. 27% 3 Purvanchal Vidyut Vitran Nigam Ltd. 23% 2 Dakshinanchal Vidyut Vitran Nigam Ltd. 15% 3 Purvanchal Vidyut Vitran Nigam Ltd. 20% 4 Madhyanchal Vidyut Vitran Nigam Ltd. 17% 13 Annexure 4 - Scheduled COD 5th May, 2012 - (25th Anniversary of the Grant of License) 4th May, 2035 14 Annexure 6 Point 8 4 Madhyanchal Vidyut Vitran Nigam Ltd. 5 Kanpur Electricty Supply Company Ltd. 20% - Scheduled COD 31st Dec, 2012 - (25th Anniversary of the Grant of License) 30th Dec, 2035 Scheduled COD for the Project: 5 th May, 2012 Scheduled COD for the Project: 31st December, 2012 15 Annexure 16 -- Annexure 16: Details of the Work (Attached as Annexure E) 5% All other terms & conditions shall remain unchanged. (P.K. Gupta) Superintending Engineer Uttar Pradesh Power Transmission Corporation Limited Page 5

ANNEXURE A: LIST OF WORKS RFP Corrigendum 01 Transmission System for 765 kv S/C Mainpuri-Hapur & Mainpuri-Greater Noida Line S. with 765 kv/400 kv AIS at Hapur & Greater Noida and Associated Schemes/Work I. Transmission Lines: 1) 765kV SC Mainpuri - Hapur with Quad Bersimis (250kms) 2) LILO of 400 kv Moradabad - Muradnagar Line at 765kV Hapur with Twin Moose (20kms) 3) 400kV DC Hapur Indirapuram with Twin Moose (60kms) 4) 765kV SC Greater Noida - Hapur with Quad Bersimis (63kms) 5) 765kV LILO of Meerut(PG) Agra(PG) at 765kV Gr. Noida with Quad Bersimis (40kms) 6) 765kV SC Mainpuri - Greater Noida with Quad Bersimis (207kms) 7) 400kV DC G. Noida (765kV) - Noida Sector 137 with Twin Moose (20kms) 8) LILO of one CKT of 400kV G. Noida (765kV) - Noida Sector 137 at 400 kv Indirapuram with Twin Moose (20kms) 9) LILO of 400kV Muradnagar-Muzaffarnagar at 400kV Atour Substation with Twin Moose (40kms) 10) 400kV DC (Quad Moose) Greater Noida(765kV)-Sikandarabad (40kms) 11) LILO of 400kV Rishikesh-Kashipur at 400kV Nehtaur Substation with Twin Moose (10kms) 12) 400kV SC Dasna-Indirapuram with Twin Moose (30kms) 13) 400kV LILO of one Ckt of Hapur - Indirapuram at 400kV Dasna with Twin Moose (10kms) 14) 400kV DC(Quad Moose) Indirapuram-Atour (25kms) II. Sub-Stations: 1) 2X1500MVA, 765/400kV, 2X500MVA, 400/220kV AIS at Hapur 2) 2X1500MVA, 765/400kV, 2X315MVA, 400/220kV AIS at Greater Noida 3) 2X500MVA, 400/220kV, 3X60MVA, 220/33kV AIS at Autor (Gaziabad) 4) 2X500MVA, 400/220kV AIS at Sikandarabad 5) 2X200MVA, 400/132kV AIS at Nehtaur 6) 2X315MVA, 400/220kV, 2X100MVA, 220/132kV AIS at Dasna 7) 2X500MVA, 400/220kV, 3X60MVA, 220/33kV GIS at Indirapuram III. Switching-stations: 1) Hapur: One & half breaker scheme for 765&400kV sides and two main and transfer scheme for 220kV side 2) Greater Noida: One & half breaker scheme for 765&400kV sides and two main and transfer scheme for 220kV side 3) Autor (Ghaziabad): One & half breaker scheme for 400kV and two main and transfer scheme for 220kV & single main bus transfer scheme for 33kVside 4) Sikandarabad: One & half breaker scheme for 400kV and two main and transfer scheme for 220kV side 5) Nehtaur: One & half breaker scheme for 400kV and single main and transfer scheme for 132kV side 6) Dasna: One & half breaker scheme for 400kV, two main transfer bus scheme for 220kV and singlemain and transfer scheme for 132kV side 7) Indrapuram: One & half breaker scheme for 400kV, two main transfer bus scheme for 220kV and single main and transfer scheme for 33kV side Uttar Pradesh Power Transmission Corporation Limited

Sr. (I) RFP Corrigendum 01 ANNEXURE B: REVISED LIST OF WORKS Transmission System for 765 kv S/C Mainpuri-Hapur & Mainpuri-Greater Noida Line with 765 kv/400 kv AIS at Hapur & Greater Noida and Associated Schemes/Work 1 Transmission Lines: 1) 765kV SC Mainpuri - Hapur with Quad Bersimis (250 kms) 2) LILO of 400kV Moradabad - Muradnagar line at 765kV Hapur with twin Moose (20kms) 3) 400kV DC Hapur (765) - G. Noida (765) with Quad Moose (140kms) 4) 765kV SC G.Noida - Hapur with Quad Bersimis (50kms) 5) LILO of 765kV Meerut (PG) - Agra (PG) at 765kV G.Noida with Quad Bersimis (2xSC) (40kms) 6) 765kV SC Mainpuri - G.Noida with Quad Bersimis (270kms) 7) LILO of 400kV Muradnagar - Muzaffarnagar at 400kV Ataur S/S with Twin Moose (40kms) 8) 400kV DC G.Noida(765kV) - Sikandrabad with Quad Moose (40kms) 9) LILO of 400kV SC Rishikesh - Kashipur at 400kV Nehtaur S/S with Twin Moose (10kms) 10) Quad LILO of 1st Ckt of 400kV DC (Quad) Hapur (765) - G. Noida (765) at 400kV Indirapuram (2kms) 11) 400kV DC (Quad) Hapur (765) - Dasna (23kms) 12) Quad LILO of 2nd Ckt of 400kV DC (Quad) Hapur (765) - G. Noida (765) at 400kV Ataur (2kms) (II) Sub-Stations : (III) 1) 2x1500MVA (765/400kV),2x500MVA (400/220kV) AIS at Hapur 2) 2x1500MVA (765/400kV),2x315MVA (400/220kV) AIS at Greater Noida 3) 2x500MVA (400/220kV), 3x60MVA (220/33kV) GIS at Ataur (Ghaziabad) 4) 2x500MVA( 400/220kV), AIS at Sikandarabad 5) 2x200MVA ( 400/132kV), AIS at Nehtaur 6) 2x315MVA (400/220KV), 2x100MVA (220/132kV) GIS at Dasna 7) 2x500MVA (400/220kV), 3x60MVA (220/33kV) GIS at Indirapuram Bus Switching-Arrangement: 1) Hapur : One & half breaker with double main bus scheme for 765&400kV side & Double Main & Transfer Scheme for 220kV side 2) Grater Noada : One & half breakerwith double main bus scheme for 765&400kV side & Double Main & Transfer Scheme for 220kV side 3) Ataur: Double Main Bus scheme for 400kV, 220kV & 33kV side 4) Sikandarabad : One & half breaker with double main bus scheme for 400kV & Double Main & Transfer Scheme for 220kV side 5) Nehtaur: One & half breakerwith double main bus scheme for 400kV & single main & tranfer scheme for 132kV side 6)Dasana :Double Main Bus scheme for 400kV, 220kV & 132kV side 7) Indirapuram : Double Main Bus scheme for 400kV, 220kV & 33kV side 1 Details of the work list is attached as Annexure 16 Uttar Pradesh Power Transmission Corporation Limited

Sr. No I II Name of the Transmission Element/Project ANNEXURE C: PROJECT SCHEDULE Transmission Lines: 1) 765kV SC Mainpuri - Hapur with Quad Bersimis (250kms) 2) LILO of 400 kv Moradabad - Muradnagar Line at 765kV Hapur with Twin Moose (20kms) 3) 400kV DC Hapur Indirapuram with Twin Moose (60kms) 4) 765kV SC Greater Noida - Hapur with Quad Bersimis (63kms) 5) 765kV LILO of Meerut(PG) Agra(PG) at 765kV Gr. Noida with Quad Bersimis (40kms) 6) 765kV SC Mainpuri - Greater Noida with Quad Bersimis (207kms) 7) 400kV DC G. Noida (765kV) - Noida Sector 137 with Twin Moose (20kms) 8) LILO of one CKT of 400kV G. Noida (765kV) - Noida Sector 137 at 400 kv Indirapuram with Twin Moose (20kms) 9) LILO of 400kV Muradnagar- Muzaffarnagar at 400kV Atour Substation with Twin Moose (40kms) 10) 400kV DC (Quad Moose) Greater Noida(765kV)-Sikandarabad (40kms) 11) LILO of 400kV Rishikesh-Kashipur at 400kV Nehtaur Substation with Twin Moose (10kms) 12) 400kV SC Dasna-Indirapuram with Twin Moose (30kms) 13) 400kV LILO of one Ckt of Hapur - Indirapuram at 400kV Dasna with Twin Moose (10kms) 14) 400kV DC(Quad Moose) Indirapuram- Atour (25kms) Sub-Stations: 1) 2X1500MVA, 765/400kV, 2X500MVA, 400/220kV AIS at Hapur 2) 2X1500MVA, 765/400kV, 2X315MVA, 400/220kV AIS at Greater Noida 3) 2X500MVA, 400/220kV, 3X60MVA, 220/33kV AIS at Autor Scheduled COD in months from Effective Date 24 months Percentage of Quoted Transmissio n Charges recoverable on Scheduled COD of the Element of the Project 100% Element(s) which are pre-required for declaring the commercial operation (COD) of the respective Element/ project Approval of State Govt under section 68 of Electricity Act 2003. Transmission License from Uttar Pradesh Electricity Regulatory Commission (UPERC) Clearance from Electrical Inspector. Statutory Consents, Clearances and Permits (way leave, environment & forest, civil aviation, railway/ road/river/canal/pow er crossing/ptcc, etc.) Uttar Pradesh Power Transmission Corporation Limited

Sr. No III Name of the Transmission Element/Project (Gaziabad) 4) 2X500MVA, 400/220kV AIS at Sikandarabad 5) 2X200MVA, 400/132kV AIS at Nehtaur 6) 2X315MVA, 400/220kV, 2X100MVA, 220/132kV AIS at Dasna 7) 2X500MVA, 400/220kV, 3X60MVA, 220/33kV GIS at Indirapuram Switching-stations: 1) Hapur: One & half breaker scheme for 765&400kV sides and two main and transfer scheme for 220kV side 2) Greater Noida: One & half breaker scheme for 765&400kV sides and two main and transfer scheme for 220kV side 3) Autor (Ghaziabad): One & half breaker scheme for 400kV and two main and transfer scheme for 220kV & single main bus transfer scheme for 33kVside Scheduled COD in months from Effective Date Percentage of Quoted Transmissio n Charges recoverable on Scheduled COD of the Element of the Project Element(s) which are pre-required for declaring the commercial operation (COD) of the respective Element/ project 4) Sikandarabad: One & half breaker scheme for 400kV and two main and transfer scheme for 220kV side 5) Nehtaur: One & half breaker scheme for 400kV and single main and transfer scheme for 132kV side 6) Dasna: One & half breaker scheme for 400kV, two main transfer bus scheme for 220kV and singlemain and transfer scheme for 132kV side 7) Indrapuram: One & half breaker scheme for 400kV, two main transfer bus scheme for 220kV and single main and transfer scheme for 33kV side Scheduled COD for overall Project: 5th May, 2012. Uttar Pradesh Power Transmission Corporation Limited

ANNEXURE D: REVISED PROJECT SCHEDULE RFP Corrigendum 01 Sr. I Name of the Transmission Element/Project Transmission Lines: 1 765kV SC Mainpuri - Hapur with Quad Bersimis (250 kms) 2 LILO of 400kV Moradabad - Muradnagar line at 765kV Hapur with twin Moose (20kms) 3 400kV DC Hapur (765) - G. Noida (765) with Quad Moose (140kms) 4 765kV SC G.Noida - Hapur with Quad Bersimis (50kms) 5 LILO of 765kV Meerut (PG) - Agra (PG) at 765kV G.Noida with Quad Bersimis (2xSC) (40kms) 6 765kV SC Mainpuri - G.Noida with Quad Bersimis (270kms) 7 LILO of 400kV Muradnagar - Muzaffarnagar at 400kV Ataur S/S with Twin Moose (40kms) 8 400kV DC G.Noida(765kV) - Sikandrabad with Quad Moose (40kms) 9 LILO of 400kV SC Rishikesh - Kashipur at 400kV Nehtaur S/S with Twin Moose (10kms) 10 Quad LILO of 1st Ckt of 400kV DC (Quad) Hapur (765) - G. Noida (765) at 400kV Indirapuram (2kms) 11 400kV DC (Quad) Hapur (765) - Dasna (23kms) 12 Quad LILO of 2nd Ckt of 400kV DC (Quad) Hapur (765) - G. Noida (765) at 400kV Ataur (2kms) Sub-Stations : Scheduled COD in months from Effective Date 30 months Percentage of Quoted Transmission Charges recoverable on Scheduled COD of the Element of the Project 100% Element (s) which are prerequired for declaring the commercial operation (COD) of the respective Element/project Approval of Sate Govt under section 68 of Electricity Act 2003. Transmission License from Uttar Pradesh Electricity Regulatory Commission (UPERC) Clearance from Electrical Inspector. Statutory Consents, Clearances and Permits (way leave, Environment & forest, civil aviation, railway/ road/ river/ canal/ power crossing/ PTCC,etc.) II 1) 2x1500MVA (765/400kV),2x500MVA (400/220kV) AIS at Hapur 2) 2x1500MVA (765/400kV),2x315MVA (400/220kV) AIS at Greater Noida 3) 2x500MVA (400/220kV), 3x60MVA (220/33kV) GIS at Ataur (Ghaziabad) 4) 2x500MVA( 400/220kV), AIS at Sikandarabad 5) 2x200MVA ( 400/132kV), AIS at Nehtaur 6) 2x315MVA (400/220KV), 2x100MVA (220/132kV) GIS at Dasna Uttar Pradesh Power Transmission Corporation Limited

III 7) 2x500MVA (400/220kV), 3x60MVA (220/33kV) GIS at Indirapuram Bus Switching-Arrangement: 1) Hapur : One & half breaker with double main bus scheme for 765&400kV side & Double Main & Transfer Scheme for 220kV side 2) Grater Noada : One & half breakerwith double main bus scheme for 765&400kV side & Double Main & Transfer Scheme for 220kV side 3) Ataur: Double Main Bus scheme for 400kV, 220kV & 33kV side 4) Sikandarabad : One & half breaker with double main bus scheme for 400kV & Double Main & Transfer Scheme for 220kV side 5) Nehtaur: One & half breakerwith double main bus scheme for 400kV & single main & tranfer scheme for 132kV side 6)Dasana :Double Main Bus scheme for 400kV, 220kV & 132kV side 7) Indirapuram : Double Main Bus scheme for 400kV, 220kV & 33kV side Scheduled COD for overall Project: 31st December, 2012. Uttar Pradesh Power Transmission Corporation Limited

ANNEXURE E: DETAILS OF THE WORKS Package-2 : 765kV S/C Mainpuri - Hapur & Mainpuri - Greater Noida line with 765/400kV AIS at Hapur & Greater Noida and Associated Schemes / Work Scope of work in Substation Sl. Name of Substation 1 765/400/ 220kV Hapur 2 765/400/ 220kV Greater Noida 3 400/220/ 33kV Ataur (Ghaziabad) 4 400/220kV Sikandara bad Type Rating Bus Switching Scheme AIS AIS GIS AIS 2x1500MVA 765/400kV, 2x500MVA, 400/220kV 2x1500MVA 765/400kV, 2x315MVA, 400/220kV 2x500MVA 400/220kV, 3x60MVA 220/33kV 2x500MVA 400/220kV One & half breaker with double main bus scheme for 765 & 400kV sides and Double main and transfer scheme for 220kV side One & half breaker with double main bus scheme for 765 & 400kV sides and Double main and transfer scheme for 220kV side Double Main bus scheme for 400kV, 220kV & 33kV side One & half breaker with double main bus scheme for 400kV and Double main and No of bays 765kV 400kV 220kV 132kV 33kV Feeder Bay - 6, Tfr Bay - 4, Feeder Bay - 2, BR - 1, Spare Bay - 3 Feeder Bay - 4, BR Bay - 1, Feeder Bay - 4, Tfr Bay - 4, Feeder Bay - 4, BR - 1, BC - 1, Feeder Bay - 4, BR - 1, Feeder Bay - 7, BC -1, BT - 1, Feeder Bay - 4, BC -1, BT - 1, Feeder Bay - 6, Tfr Bay - 5, BC - 1, Feeder Bay - 2, BC - 1, BT - 1, Spare Bay - 4 Feeder Bay -12, TBC - 1, Tfr Bay - 3 Uttar Pradesh Power Transmission Corporation Limited Page 12

Sl. Name of Substation 5 400/132kV Nehtaur 6 400/220/132kV Dasna 7 400/220/ 33kV Indirapuram Type Rating Bus Switching Scheme AIS GIS GIS 2x200MVA 400/132kV 2x315MVA, 400/220kV 2x100MVA, 220/132kV 2x500MVA, 400/220kV 3x60MVA, 220/33kV transfer scheme for 220kV side One & half breaker with double main bus scheme for 400kV & single main and transfer scheme for 132kV side Double Main bus scheme for 400kV, 220kV and 132kV side Double Main bus scheme for 400kV, 220kV & 33kV side No of bays 765kV 400kV 220kV 132kV 33kV Feeder Bay - 3, BR - 1, Feeder Bay - 4, BR - 1, BC - 1, Feeder Bay - 2, BR - 1, BC - 1, Feeder Bay - 6, TBC - 1, Feeder Bay - 3, Tfr Bay - 4, BC - 1, Feeder Bay - 6, Tfr Bay - 5, BC - 1, Feeder Bay - 3, BC - 1, Spare Bay - 2 Feeder Bay -12, TBC - 1, Tfr Bay - 3 NOTE :- 1. All the 765kV & 400kV Sub-station shall be constructed with latest design & technology in accordance with latest IS & IEC. All the Sub-stations shall have Sub-station automation system (SAS) comprising SCADA system for transferring data to CLDS. 2. Digital PLCC cabinets shall be installed at each 765kV & 400kV sub-stations for protection and data communication. Other end digital PLCC cabinet (which are inter face points with UPPTCL, Other PPP Package & generator of Bara, Meja, Karchhana) shall also be procured by the developer. The interface would be associated for erection, testing & commissioning of these cabinets. 3. Stringing of Bus for spare bays is under the scope of developer. No equipment shall be commissioned in spare bay. Uttar Pradesh Power Transmission Corporation Limited Page 13

Scope of Work in Lines Sl. Name of line Approx. Line Provision of OPGW Length ( Km) 1 765kV SC Mainpuri - Hapur with Quad Bersimis 250 To be provided 2 LILO of 400kV Moradabad - Muradnagar line at 20 To be provided 765kV Hapur with twin Moose 3 400kV DC Hapur (765) - G. Noida (765) with Quad 140 To be provided Moose 4 765kV SC G.Noida - Hapur with Quad Bersimis 50 To be provided 5 LILO of 765kV Meerut (PG) - Agra (PG) at 765kV 40 To be provided G.Noida with Quad Bersimis (2xSC) 6 765kV SC Mainpuri - G.Noida with Quad Bersimis 270 To be provided 7 LILO of 400kV Muradnagar - Muzaffarnagar at 400kV Ataur S/S with Twin Moose 40 To be provided 8 400kV DC (Quad Moose) G.Noida(765kV) - 40 To be provided Sikandrabad 9 LILO of 400kV SC Rishikesh - Kashipur at 400kV Nehtaur S/S with Twin Moose 10 10 Quad LILO of 1st Ckt of 400kV DC (Quad) Hapur 2 To be provided (765) - G.Noida (765) at 400kV Indirapuram 11 400kV DC (Quad) Hapur (765) - Dasna 23 To be provided 12 Quad LILO of 2nd Ckt of 400kV DC (Quad) Hapur (765) - G. Noida (765) at 400kV Ataur 2 To be provided NOTE: 1. The Steady state active power flow from 765kV Bus in UP, considering Ultimate system peak load of 18957MW, has been preliminary worked out by UPPTCL and is enclosed in the CD. 2. The indicative MW & MVAR loadings of different 765, 400 & 220kV feeders as worked out by UPPTCL and enclosed in the CD. 3. The indicative ultimate system short circuit levels as worked out by UPPTCL ( as enclosed in the CD) show that short circuit levels of 40KA for 1sec will be sufficient for all substations except for Rewa Road, which should be 63KA for 1 sec. 4. OPGW shall be laid on the lines as mentioned above. 5. The repeater station, wherever required shall be commissioned by prospective Developer. Uttar Pradesh Power Transmission Corporation Limited Page 14