BRIEF ENVIRONMENT REPORT

Similar documents
CTY CP TVTK GTVT PHÍA NAM - TEDI SOUTH

Known Producers/Exporters of Vietnamese Laminated Woven Sacks

Transport Infrastructure Investment in Viet Nam

Location map and area relationship of Viet Phat Industrial Zone and Urban Area

ANNEX 1 Subprojects List and Location Maps. Table A1.1: List of the first phase subprojects under Component 4 (5 provinces, 5 basins)

TERMS & CONDITIONS HOME&AWAY OFFERS. Offer Detail: - 15% off on mooncake bill

THÀNH PHỐ HỒ CHÍ MINH A Nguyen Van Nghi Street, Ward 7, Go Vap District. 4 1C Nguyen Anh Thu Street, Trung My Tay Ward, District 12

The Second Annual Coastal Forum Building Resilience to Climate Change Impacts: Coastal Southeast Asia

TECHNICAL SPECIFICATION (OBJECTIVES, PROJECT SCALE)

COMPANY PROFILE THIEN VU ADVERTISING JOINT STOCK COMPANY

AMATA VN Public Company Limited

FLC GROUP JSC. INTRODUCTORY PRESENTATION

TRAVEL & STAYS OFFERS

AMATA VN Public Company Limited

Ghi chú. Công ty TNHH MTV Dầu khí TP.HCM. 27 Nguyễn Thông, Phường 7, quận 3, TP.HCM. SP Saigon Petro

New Challenge & 22 Years Experiences of Consumer Products in Vietnam

Don t believe everything you read in the media about the Vietnam Property Market

APPENDIX 5C Profile of Key Projects

CHAPTER 3 PROVINCIAL PERFORMANCE IN 2012

MINISTRY OF TRANSPORT VIETNAM MARITIME ADMINISTRATION DEVELOPMENT OF CONTAINER PORTS VIETNAM

Building hotel, entertainment, conference and exhibition center, approximate area of 130 ha 1,500

LIST OF CO-MERCHANTS WITH DISCOUNT RATE FOR IVB'S CARDHOLDERS

The Viet Nam Provincial Governance and Public Administration Performance Index (PAPI) Measuring Citizens Experiences

Belgium Address: Tel.: Fax: E-m ail: Website: Schedule: Consulate in Ho Chi Minh City Address: Tel.: Fax: E-m ail: Website: Schedule:

TOKYU BINH DUONG GARDEN CITY

- Borrowing short term loans from State Bank under the form of regranting - Borrowing loans from credit institutions and financial companies.

Figure Huong River Irrigation Scheme. The Study on Nationwide Water Resources. in the Socialist Republic of Vietnam. Development and Management

Viet Nam Situation Report No. 3 Floods Central Vietnam October 8, pm (Viet Nam time)

TPP ADVANTAGES INDUSTRIAL ESTATE SOLUTION. By Nguyen Chi TOAN Marketing Manager of VSIP JV 27 November 2015

OVERALL EXISTING CONDITION AND DEVELOPMENT STRATEGY OF EXPRESSWAY IN VIETNAM. BANGKOK - 13 June 2016

SAIGON NEWPORT CORPORATION

ULTIMATE RESORT LIVING IN THE HEART OF THAO DIEN

National project list for attracting foreign direct investment until 2020 (Enclosed to prime ministerial Decision 631/QD-TTg on April 29, 2014)

07-11 November 2016 Ho Chi Minh City, Vietnam. Program for the Australian delegation to Vietwater November proudly supported by:

INDOCHINES CONSULTANT & COMMERCIAL JSC

Figure 5C.15 Sai Gon Moc Hoa Route. Grade Width Depth Present Target Present Plan Present Plan mainly III & partially I

BẢN TIN THÁNG 04/2015 1Q 2018 EARNINGS CALL

diverse demands of the market and fields of manufacture, industries, construction and lifestyle.

ITE HCMC, Vietnam s Premier International Travel Trade Event, Returns To Impact World s Travel Patterns For 14 th Edition

SHOW REPORT THE 10TH VIETNAM INTERNATIONAL EXHIBITION ON CHEMICAL INDUSTRY VINACHEM EXPO Time: December 02-05, 2015

Vietnam Marine Protected Area Management Effectiveness Evaluation

SPONSORSHIP PACKAGES SMART CITY

The 7 th Da Nang Urban Development Forum. Date & Time: December 22th 8:30-17:00 Venue: Da Nang Administration Center

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID

Subject to minor changes

Region/ Province/ State/ City 122 Phan Xich Long Str, Phu Nhuan District, HCM. STT Branch Name Branch Address

PORTCOAST CONSULTANT CORPORATION 92 Nam Ky Khoi Nghia, District 1

2.3 Seismic Conditions

Welcome to Opportunity Day Financial Performance Result for the 9 months period ended Sep 30, 2018

TOKYU GROUP INTRODUCTION OF BECAMEX IDC CORPORATION INVESTMENT AND INDUSTRIAL DEVELOPMENT CORPORATION. Tokyu Binh Duong Garden City

Nguyễn Ngọc Lan

Facts about the Hai Phong coal-fired power plant project in Vietnam

Vietnam: Typhoon WUTIP VIETNAM: Situation Map

STRENGTHENING INTERNATIONAL COOPERATION IN BAMBOO DEVELOPMENT IN THANH HOA PROVINCE VIET NAM

- - PORTCOAST CONSULTANT CORPORATION PORT COAST. December 2018 GEOTECHNICAL SURVEY

REDEMPTION CATALOGUE

Binh Duong New City. Development Update. Mapletree Business Binh Duong

THE 6 th INT L EXHIBITION ON METALWORKING & WELDING TECHNOLOGY IN VIETNAM

November 1 st, 2018 TOKYU CORPORATION BECAMEX TOKYU CO., LTD. MITSUBISHI JISHO RESIDENCE CO., LTD.

The main points of the MOU concluded by Tokyu Corporation with Becamex IDC Corp. are as follows:

6 Where we re located. 7 Binh Duong Factories. 11 Hanoi Factory

Ex-Ante Evaluation (for Japanese ODA Loan)

Binh Minh Electronics Co.,Ltd.

BUNKHOUSE ASSESSMENT REPORT

Ex-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project

VIETNAM TRAVEL MART BRIEF INTRODUCTION. Best Travel Deals in Vietnam!

The Current Status and Conservation of Bears in Vietnam

SHIP RECYCLING. Your guide to compliance. Move Forward with Confidence

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2

Secondary Evaluation Report on Tan Son Nhat International Airport Terminal Construction Project in the Socialist Republic of Vietnam

D E V E L O P M E N T TRACKRECORD

FACTSHEET Paradise Elegance. Halong Journeys Of Distinction

MASTER COLLECTION

REPORT ON CORPORATE GOVERNANCE OF LISTING COMPANY (the first 6 months of 2016)

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Code of Practice for filming in East Lothian

Project Manager/ Architectural Planner. 4 Hitoshi ITO/Mr. Architectural Designer Nihon Sekkei, Inc.

DETAILED LIST OF CUSTOMERS I. BUSINESS VALUATION

จ ดท าโดยสถานกงส ลใหญ ณ นครโฮจ ม นห พฤษภาคม 2556

Viet Nam. Situation Report No. 6 Typhoon #11 Mirinae November 9, pm (Viet Nam time) I Summary

PAÍS SECÇÃO. Vietname Produtos da pesca. Em vigor desde 15/02/2018 Data de publicação 02/02/2018. Lista em vigor. Número de aprovação

Cau River. Map of River. Table of Basic Data. Vietnam 5

UPDATED LIST OF 479 ESTABLISHMENTS NAFIQAD HAS APPROVED (Up to 07 May 2010) Commercial Name of Establishments

The Viet Nam Provincial Governance and Public Administration Performance Index (PAPI) Measuring Citizens Experiences

Vietnam Member s report on activities to ICRI. Presented by Nguyen Van Long. Reporting period November April 2007

Investor Presentation December March 2012 INVESTOR PRESENTATION

Technical Explanation Introduction

Conservation And Aquatic Resources Development in Vietnam

Global estimation of material required. Enclosure

The foundation for the sustainable development Welcome to KINHBACCITY

Vietnam Insight. Duration: 14 days / 13 nights Overview: Hanoi - Halong - Hue - Hoian - Saigon - Mekong - Phu Quoc

Countries» Sourcing From Guides» About» Contact us

Red River Delta Provinces. Phủ Lý, Hà Nam, 24/05/2013. A policy monitoring tool for middle-income Viet Nam

South Fremantle Solar Farm Agenda 1 March 2018

ITE HCMC 2017 Closed with a Record of Attendance & Meetings

Classic Vietnam. Duration: 12 days / 11 nights Overview: Hanoi - Halong - Hue - Hoian - Saigon - Mekong

Network of Airports in Vietnam

Domestic Flights Ho Chi Minh City - Da Nang and Hue - Hanoi (Economic Class of Vietnam Airline)

SUTTER COUNTY. General Plan Update Technical Background Report

Vietnam s Transport Sector Outlook and Engineering Opportunities

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PEOPLE COMMITTEE OF HOCHI MINH CITY WORLD BANK HO CHI MINH CITY DEVELOPMENT PROJECT HDP E2122 V3 BRIEF ENVIRONMENT REPORT HA NOI HIGHWAY FROM SAIGON BRIDGE TO THU DUC CROSSROAD INVESTOR: HA NOI HIGHWAY INVESTMENT AND CONSTRUCTION COMPANY (HNHC) 50 Ton That Dam St, Nguyen Thai Binh Ward, Dist.1, Ho Chi Minh City May 2010 1

BRIEF REPORT ON THE COMPLIANCE WITH THE ENVIRONMENTAL GUIDELINE OF HFIC DEVELOPMENT PROJECT (HDP) THE SUB PROJECT OF HA NOI HIGHWAY ENLARGEMENT FROM SAI GON BRIDGE TO THU DUC CROSSROAD 1. OVERVIEW 1.1 Introduction Ha Noi Highway, the section of National Highway linking two southern key economic regions are Ho Chi Minh city and Bien Hoa city, which is one of the most important traffic lines ensure the transportation in the southern Vietnam. However it is now overloaded with the traffic jam is daily occurred. The subproject of Ha Noi Highway Enlargement, section from Sai Gon Bridge to Tan Van Crossroad with the number of lanes is 2-3 times of the present one will contribute to solve basically the traffic jam for the more and more future traffic increase in this key economic region. The subproject is decided to invest by HCMC People Committee upon the Decision number 101/Q -TTg dated 22 nd January 2007 of Prime Minister approved for the master plan of Traffic and Transportation in HCMC to 2020 and the vision after 2020. It is realized under the BOT form and the anticipated time of refund is 27 years. The agency, the investor which formed EIA is Ho Chi Minh city joint-stock Company for Infrastucture Investment (CII). After EIA was approved, CII has established HA NOI HIGHWAY INVESTMENT AND CONSTRUCTION COMPANY (HNHC) with the license issued by Department of Planning and Investment (DPI) dated 14 July 2009 and the first registered change dated 15 December 2009 to manage and realize this project. The project basic content is to enlarge the Ha Noi Highway section from Sai Gon Bridge to Tan Van Crossroad with the length of 16.2km and the planned cross section of 153.5m (section from Sai Gon Bridge to Binh Thai Crossroad) and 113.5m (section from Binh Thai Crossroad to Tan Van Crossroad) having the scale of the main city street followed to TCXDVN 104-2007. The project passes the area of District 2, 9, Thu Duc and Di An District of Binh Duong Province from the beginning point at the North of Sai Gon Bridge (km 0+197.43), Thao Dien Ward, HCMC to the end point at Tan Van Crossroad (km 16+200.00), Binh Thang Commune, Di An District, Binh Duong Province. 2

The Ha Noi Highway Enlargement Project using the loan of WB via HDP of HFIC for the section of project from the North of Sai Gon Bridge (km 0+197,43) to Thu Duc Crossroad (km 8+100) (Loan project for short) invested by HNHC. This enviromental compliance report includes the following contents: 1) Background; 2) Appraisal on complying with the ES requirements of the project compared with those in ES guideline of HDP and 3) Develop the RMP of subproject if necessary. It is prepared after reviewing the ES related documents, proofs; listing the differences, shortcomings of documents (if any) compared with SS and ES guidelines of HDP and developing a RMP of subproject to meet the ES requirements of HDP if necessary. 1.2. Methods 1.2.1 Desk review and site visiting In the considering the EIA of the subprojects and visiting Ha Noi Highway participating in HDP and working with 2 HNHC s officers are: Mr. Duong Quang Chau, Member of HNHC Management Board; Mr. Huynh Thai Hoang, Officer of Technical Department of HNHC with the participation of Mr. Nguyen Ha Lam expert of Department of Investment Promotion of HFIC. In visiting the Highway and the local areas in which the project goes through, the construction site are right as in the EIA presented. discussing with these HNHC officers to make clearer the investor s requirements to the contractors and getting more relating documents. 2. APPRAISAL THE APPROPRIATENESS OF COMPLIANCE OF ENVIRONMENT REQUIREMENTS OF THE SUBPROJECT WITH ES REQUIREMENTS OF HDP 2.1 Introduction of the subproject, impact on the atmosphere, waste solid, waste water and other impacts 2.1.1 Ha Noi Highway Enlargement Subproject The construction items of the subproject includes: enlarge the main road (the centre is at the present highway centre), new construction 2 parallel roads (width is 10.5-12m) and construct the auxiliary works (drainage, technical infrastructure, tree ). In the scope of the project do not have the different level crossroad as well as the bridge (Rach Chiec Bridge). These belong to the other projects which are realized at the different time with the subproject. 3

2.1.1.1. Geographical location of the subproject The beginning point of the subproject is at the North Crossroad of Sai gon Bridge (km 0+197.43; co-ordinate 10 0 47 57 N- 106 0 43 41 E) and the end point at Tan Van Crossroad (km 16+200,00, co-ordinate 10 0 53 58 N- 106 0 49 41 E). The line of subproject coincides with the line of present highway goes through 13 wards which are: Binh An, Thao Dien, An Phu (District 2), Tan Phu, Hiep Phu, Long Binh, Phuoc Long A, Phuoc Long B (District 9), Truong Tho, Binh Tho, Linh Trung (District Thu Duc)- HCMC and Dong Hoa, Binh Thang, Di An - Bình Duong province. 2.1.1.2. Scale and Design Standards The level and designed speed of the route are followed to the current Vietnam Standards: 2.1.1.2. Road direction The road direction of all the project is concided with the present Ha Noi Highway direction and enlarged both sides includes 4 sections with the total length is 16.2km: - Section 1: North Sai Gon Bridge - South Rach Chiec Bridge (3.4km); - Section 2: North Rach Chiec Bridge South Binh Thai Crossroad (2.77km); - Section 3: South Binh Thai Crossroad North Station 2 (5.56km) - Section 4: North Station 2 South Tan Van Crossroad (4.47km) In the frame of HDP loan includes section 1,2 and a part of section 3 from South of Binh Thai Crossroad to Thu Duc Crossroad. 2.1.1.3. Cross section The planned cross section of Ha Noi Highway is planned and approved by HCMC People Committee in Decision No 373/Q -UB dated 26/01/2005 is 153.5m (from Sai Gon Bridge to Binh Thai Crossroad) and 113.5m from Binh Thai Crossroad to Tan Van Crossroad. 2.1.1.4. The road-bed All the road-bed of the project is essentially with soil and sand which are suitably treated. 2.1.1.5. Crossroads At the present Ha Noi Highway has 8 large crossroads and many loacal roads, small roads, the company gates intersects with the parallel roads. The innovation of these crossroad is planned does not include in the Ha Noi Enlargement Project. 2.1.1.6. The auxiliary works: 4

1) Sidewalk: The planned width of the sidewalk is 5m. 2) Separation band and sidewalk, corridor: These are concrete and higher than the road surface is 0.3m. In the middle band is the grass and trees. 3) Inclined roof and retaining wall: With the inclined roof and the base to plant the grass to project the base of highway and the digging road is over the boundary of site cleaning will be constructed with bricks. 4) Drainage: Along the highway, on the 1 st section from Sai Gon Bridge to Rach Chiec Bridge had the drainage for rain water flows to the canals and to Sai Gon River. On the remaining sections there are no drainage system along the highway and the rain water flows through bothe sides by horizontal sewers. 2.1.2. The environment issues of Ha Noi Highway Enlargement Subproject In the construction and exploitation of the Ha Noi Highway Enlargement Project must concern the following environment issues: 1) Air pollution All the construction activities with or without the machines are specified to emit the dust and hazardous gas. 2) Noise and Shaking Impacts: The construction activities cause noise, shaking includes the site clearance, digging and soil transportation as calculated in EIA. 3) Waste water impacts: The waste water created from the construction and domestic activities from the workers, in which the waste water from the operation, maintenance of the machines, construction equipments contains the large quantity of organic substances, oils, and suspended solids. Waste solid impacts: The waste solid including chemical and domestic waste from the construction machines and equipments and from the worker activities 2.2. Appraisal of the compliance of environment safety of the Ha Noi Highway Enlargement Subproject 1) Review the environment safeguard documents provided by the investor before building the subproject, particularly the approval decisions and appraisals of the authorities; 2) Compare the availlable ES documents to the requirements of HDP; 3) Visit the subproject site. Below is the consultant s detailed assessment. 5

2.2.1. The appropriateness of the government environment safety When the investor met with HFIC s authorities to arrange the budget for the subproject, he had already the EIA and its approved decision. Some following assessments after consider the relating documents areas follows: The approved project EIA has also presented completely the measures to minimize the negative impacts during the construction time as well as in exploitation time. The contractors must ensure the environment safety during the transportation the materials as well as the waste to and from the construction site on the only Ha Noi Highway which may undertake the heavy transportation, the nearest distance that ensure the economical efficiency for the contractors. There are the dangerous warning boards at the deep pits and the 2m in high steel fences to ensure the safety for the people that the contractors must implement as in the tender documents. These cost to ensure the environment protection and safety for the traffic participants has been included in the tender cost and will be checked carefully by the investor s agencies. Reduce the impact of noise, shaking during the construction especially at the specified sensitive regions must implement closely with the control, supervision during the construction time and vehicles as presented in EIA. If the contractors do not implement completely or not ensure the technical conditions and safety, the investor will hire the 3 rd party to implement this work and the cost paid will be deducted in the contract. In community consultation, the investor has consulted and received enough the responses with documents of the People Committees and Fatherland Committees of 13 wards related with the project with 100% of comments agree with the impacts and the mitigation measures presented in EIA. Commitment to protect environment, the investor and its tenders have committed enough the contents presented in EIA. 2.2.2 ES requirements of HDP Apart from the compliance with the ES requirements of GOV, the subproject needs also to comply with the ES requirements of HDP. The item 2.10 ES Guideline of HDP guides to assess the appropriateness via some issues that often have the differences between the ES requirements of GOV and those of WB such as: Community consultation and information dissemination; Investor s ES implementation capacity; 6

Risk Management Plan of subproject that had EIA; Cost for implementing the mitigation measures, environmental works and monitoring plan and the investor s commitments which reserves the budget to do these activities. The assessments are as the following: Suitable community consultation and information dissemination. The investor s ES implementation capacity: Beside the budget for monitoring the investor needs to supplement the group for environment supervision in Technical Department of HNHC beside 2 environment supervisors for each package as in EIA. EMP/RMP (Environment Management Plan-EMP / Risk Management Plan-RMP): The EMP/RMP was prepared by the investor to borrow loan from HDP. However the investor has to supplement and develop this plan as follows: 1) The articles supervised during the construction and exploitation time as presented in details in the approved EIA 2) Monitoring the air pollution, noise and shaking at the specified points obey the standards (TCVN 5938-2005), (TCVN 5937-2005), (TCVN 5949-1998), (TCVN 5948-1999). Beside it must include more the monitoring parameters such as CO, NO x, HC with PM10 dust (4 parameters). Beside the specified locations as presented in EIA it must include some sensitive locations: x Ky Quang 3 Pagoda (km 0+800) x Medical center of An Phu Ward (km 3+000) x North Rach Chiec Resident area (Km 3+800 Km 4+000) x Tourist Area at Thu Duc District (km 6+500) x Sai Gon International University (km 7+600) The frequency as presented in the approved EIA and in the peak construction time and when having the feedback of the local government the frequency of the air monitoring will be monthly (in place of 3 months as in EIA). 3. CONCLUSION AND RECOMMENDATION As the above analysis it shows that the subproject of Ha Noi Highway Enlargement of HNHC meets the ES requirements of GOV. However to borrow the budget from WB via HDP, the subproject needs to comply the ES of HDP as mentioned above. 7

8