Tierrasanta 5K Runners Route & Traffic Blocks along Clairemont Mesa Blvd in Tierrasanta plus projected road block and control points

Similar documents
Section 3.6 Recreation

Street Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington &

2016 RACES AND EVENTS CITY OF LAKEWOOD

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/14/ :00:05 PM

C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION

#North. Westminster SEE BOULDER DETAIL. Arapahoe. Hwy 72. Interlocken Loop. 120th Ave. 104th Ave. 92nd Ave US 36 I-70

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

NDG-Westmount Neighbourhood Committee. November 16, 2015

October Business Owner Task Force. Matt Sanman Public Information Coordinator

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Exposition Corridor Transit Project Phase 2

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/5/2018 2:12:06 PM

PROGRESS PARK CONNECTOR

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

Traffic Guide. February 18 th, 2018, 6 AM to 3 PM. Pre-Race Day Closures. General Tips. How to Use This Guide

KING STREET TRANSIT PILOT

The following describes each route change. Each route is subject to minor adjustments prior and during implementation.

Metrobus Service Evaluation Study Bowie Lines Bowie State University (B21, 22) Bowie-Belair (B24, B25) Final Report June 2013

EXTENSION OF OPERATING HOURS FOR TRAINS AND BUS SERVICES ON CHRISTMAS EVE AND NEW YEAR S EVE

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

diagrammatic-of-proposed-improvements-grandparkway-sh99-segment-i2 2/25/ of 1

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

PRIORITIES COMMITTEE MEETING

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.

City advises public of road closures for Opening of Parliament

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

State Project Reconstruction I-84

FLORIDA DEPARTMENT OF TRANSPORTATION

2013 El Paso County Comprehensive Mobility Plan. December 16, 2013

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

CTPS staff considered roadways that carry on average more than 1,500 weekday MBTA bus passengers in one direction as candidates for dedicated bus

KING STREET TRANSIT PILOT

Constructor: Joseph B. Fay

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

Traffic Management Plan Open Streets Mitchells Plain. Full closure of Eisleben Road between Wespoort Drive and Spine Road 2 April h00-17h30

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

All closures this week happen at night, including full closures of Mesa and I-10

Route 2 - Ponce de Leon Ave/Druid Hills. Route 3 - Martin Luther King Jr Dr/Auburn Ave

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

NEW TRAFFIC SEPARATION SCHEMES

100 7: Chatsworth, Granada Hills, CA : Burbank Blvd., Woodland Hills, CA Northrup Grumann parking lot

NEW TRAFFIC SEPARATION SCHEMES

Attachment 2: Analysis of Map Content in the RTA Ride Guide Page 1. Route 3:

Main Street Station Upgrades

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10


Milestone: Bridge to Nowhere scheduled for demolition Aug 14

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

MISSION TRAILS REGIONAL PARK CITIZENS ADVISORY COMMITTEE MINUTES OF THE MEETING OF March 4, 2014

Capital Beltway HOT Lanes Project

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Alternate Access Routes to/from:

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Notice of Road Closures & Parking Restrictions

San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center

Transform66: Inside the Beltway

MINUTES OF THE MEETING OF THE MARCH 17, 2016 MISSION TRAILS REGIONAL PARK TASK FORCE

November 21, 2012 Barbara Kelleher, (954)

5.7 Local road upgrades

2 Construction Program

FUTURE FOR DOMINICAN REPUBLIC AS LNG HUB IN THE CARIBBEAN

The HOP Offers Route Refinements

REQUEST FOR INFORMATION (RFI) Bottled Water and Dispensers

Design and Construction of the Lake St. Martin Emergency Outlet

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

Important Lane Closures March 1 5, 2010

The Newsletter of the Canadian R.P.O. Study Group (B.N.A.P.S.)

BE VE R LY HILLS CITY OF BEVERLY HILLS HUMAN SERVICES DIVISION MEMORANDUM TO: Human Relations Commission FROM:

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

1.0 Purpose and Organization of the Community Impact Assessment Addendum

Notice of Road Closures & Parking Restrictions

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Work in 2015 and Annual Mobility- Management Plan

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure

5.1 Traffic and Transportation

Maryland Route 36 (Mount Savage Road) and Maryland Route 35 (Ellerslie Road) Intersection Study. Cumberland Area Metropolitan Planning Organization

Neighbourdhood Committee NDG-Westmount. October 16, 2017

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

Colombia Venezuela Service COVE PUERTO CABELLO LOOP*

Service Summary. Winter Service Change Highlights WINTER 2019 CHANGES TRIP LEVEL DETAIL. Victoria Regional Transit Commission

Construction Staging Area 197 Redpath Avenue

Electro-Optical Imaging, Inc Fortune Place, Suite C West Melbourne, FL (321)

3529 Souris River Flood Plan (Phase MI-1)

Transcription:

Tierrasanta 5K 2016 Runners Route & Traffic Blocks along Clairemont Mesa Blvd in Tierrasanta plus projected road block and control points contact: Lisa Leonard speedosprt@yahoo.com

De Portola Middle School Rec Center Fun Run Route: CMB from Rec Center to Santo CMB from Santo to Rec Center Loop around De Portola M.S. MTRP De Portola Middle School Rec Center Event Summary: Roads closed 7:30AM Starting gun 8AM on CMB below Rec Ctr Finish line on the Rec Ctr ballfield Race done 9:30AM Roads open 10AM Course is measured at 5,000 meters MTRP

De Portola Middle School Joint-Use Fields Rec Center Required traffic blockages: 1. CMB at Santo Rd 2. CMB at Mollendo 3. CMB at La Cuenta 4. CMB at Promesa Ct MTRP De Portola Middle School Rec Center Required traffic alignments: 1. CMB westbound lanes: West of Promesa: blocked to all traffic during the run. East of Promesa: open to all traffic. 2. CMB eastbound lanes left undivided to support only e/b traffic during the run. 3. CMB westbound traffic along route must divert north to Via Valarta or south (various paths) to Tierrasanta Bl.

Traffic Block: CMB at Santo Road 1. 100% traffic block of westbound lanes of CMB at Santo Road; blockage extends from Santo Rd eastward. Closure from 7:30AM to approx 9:30AM. 2. CMB eastbound lane supports 1 way traffic eastbound. 3. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward to Via Valarta.

Traffic Block: CMB at Mollendo 1. 100% traffic block to prevent left turn from Mollendo to westbound lanes of CMB. Closure from 7:30AM to approx 9:30AM. 2. CMB eastbound lane supports 1 way traffic eastbound. 3. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.

Traffic Blocks: CMB at La Cuenta Dr and CMB at Marigot Pl 1. 100% traffic block to prevent left turn from La Cuenta northbound to CMB westbound, and from La Cuenta southbound to CMB. Closure from 7:30AM to approx 9:30AM. 2. CMB eastbound lane supports 1 way traffic eastbound. 3. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.

Traffic Block: CMB at DePortola 1. 100% traffic block to prevent all traffic into De Portola athletic fields. Closure from 7:30AM to approx 9:30AM. 2. Require managed traffic block to control access to De Portola parking lots from CMB. Traffic control required from 7:30AM to approx 9:30AM 3. CMB eastbound lane supports 1 way traffic eastbound. 4. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.

Traffic Block: CMB at Rec Center Event Area Event Parking 1. Require managed traffic block at entrance to Rec Center to separate runners from cars. Required from 7:30AM to approx 9:30AM. 2. Require managed traffic block to control access to Rec Center from CMB eastbound lanes. Traffic control required 7:30AM to approx 9:30AM. 3. CMB eastbound lane supports 1 way traffic eastbound. 4. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.

Traffic Block: CMB at Promesa Ct. Event Parking Event Parking 1. 100% traffic block to CMB westbound lanes at Promesa Ct. Closure from 7:30AM to approx 9:30AM. 2. CMB west from Promesa: WB lanes closed, EB lanes unaffected. Required from 7:30AM to approx 9:30AM. 3. CMB eastbound lane eastward from Promesa: unrestricted traffic in both directions. 4. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.

Traffic Diversions for CMB Eastbound 1. Traffic desiring to head eastbound on CMB may use the eastbound lane as usual. 2. Traffic desiring to head westbound on CMB must divert northward or southward along alternate paths: North of CMB: from Barbados to Remora and thence to Santo Rd. North of CMB: from Dominique to Via Valarta and thence to Antigua or Portobelo. South of CMB: from Portofino to internal roads either to Santo Rd or Tierrasanta Blvd. South of CMB: from Martinique west on CMB to Seda/CdeV/Rueda to Tierrasanta Blvd. South of CMB: from Trinidad to Calle de Vida and/or Rueda to Tierrasanta Blvd.