Using LSSIP information for ATM Master Plan and ICAO ASBU monitoring WAC Madrid Danny DEBALS EUROCONTROL Sven HALLE ICAO EUR/NAT Office 8 th and 9 th March 2017
Presentation Overview What is: LSSIP information? The European ATM Master Plan What are the ICAO requirements: GANP ASBU Mapping How to make it fit? Mapping GANP ASBU MP L3 LSSIP vs. Questionnaire ASBU Implementation Monitoring Report ASBU Implementation Monitoring Reports Dashboards, Maps Further developments Collaborative context Useful links 2
What is LSSIP information? 3
What is the European ATM Master Plan 4 4
Reporting Tools and Deployment views LSSIP Electronic Database for all Stakeholders EATM Portal: https://www.atmmasterplan.eu/depl/essip_objectives/monitoring 5
ICAO - The GANP and the 39th Assembly Increase the capacity and improve the efficiency of the global civil aviation system Continuation from ANC 2012 and the initial endorsement at the 38th Assembly A Planning Document for Implementation GANP should be the comprehensive planning tool to support the development and implementation of a harmonised global air navigation system The (5th) version of the 2016 2030 GANP - Global Air Navigation Plan: Obliges States to map their national or regional programmes against 26 May the 2016 harmonised GANP, but provides ICAO them EUR/NAT with Office far greater certainty of investment. Requires active collaboration among States through the PIRGs in order to coordinate initiatives within applicable regional Air Navigation Plans. Provides a vision of the evolution of the Global ATM system and the potential requirements to industry, for better anticipation in its products. 6 6
EANPG & ASBU Monitoring Regional planning for ASBU implementation EANPG/55 Conclusion 02: Approved the mechanism for monitoring and reporting the implementation of ASBU Block 0 modules, using the combined efforts of EUROCONTROL ESSIP/LSSIP mechanism and the ICAO EUR questionnaire. EUROCONTROL invited to consider extending the scope of the ESSIP/LSSIP reporting tool(s) to the ICAO EUR States outside of the ECAC area. Reuse existing European mechanisms to avoid duplication of reporting additional investments. Very good example of cooperation between two international organisations. EANPG/58 Conclusion 22: Include ASBU Block 0 modules (CCO and AMET) into the list of modules monitored within the ICAO EUR Region. Continue to promote the collaborative implementation monitoring approach. Report is part of eanp Vol III and of the ICAO Global Air Navigation Report 7
Mapping GANP ASBU MP L3 8
LSSIP vs. Questionnaire 9
LSSIP vs. Questionnaire (2) 10
ASBU Implementation Monitoring Report 11
ASBU Implementation Monitoring Report: The Dashboard and the Outlook for 2018 The information presented in the planning views and implementation progress are summarised by two tables, aimed at giving an overall and straightforward understanding of the ASBUs Implementation status so far. ASBU Block 0 Implementation Dashboard = number of States that have achieved implementation overall rate of Completion status by end 2015. It can be used to compare, in a simple way, the progress achieved in different ICAO Regions ASBU Block 0 Modules Implementation Outlook for 2018 = the Completion status (number of States and rates) foreseen to be achieved by end 2018, i.a.w. the planning dates reported by States 12
Examples of Implementation Progress View - Maps and Planning Status 13
Further developments Obligation for States to report the status of their ASBU implementation will continue Annual EANPG endorsement Harmonised reporting metrics Report to remain part of eanp Vol III and of the ICAO Global Air Navigation Report GANP 2019 14
A Collaborative Context Work and partnership with ICAO EUR to monitor and report on ASBUs Implementation in the EUR region ECAC State Authorities and ANSP- no additional burden: Use of existing / adapting MP L3 / LSSIP mechanism Remaining ICAO EUR State Authorities: Simplified questionnaire aligned with MP L3 / LSSIP Other ICAO Regions: Some parts of existing processes can be reused for your ASBU monitoring work The context is continuously in evolution! 15
Useful Links European ATM Master Plan Web-portal www.eatmportal.eu (www.atmmasterplan.eu) PEPR Team www.eurocontrol.int/articles/pepr-team All MP L3/LSSIP information www.eurocontrol.int/pepr ICAO EUR/NAT www2010.icao.int/eurnat/pages/welcome.aspx www2010.icao.int/eurnat/eur%20and%20nat%20documents/_eanp%20eur%20doc7754/doc7754%20eur%20eanp%20vol%203%2 0v2016-ASBU%202015%20report.pdf 16