Southeastern contingency timetable Issue 1

Similar documents
May 2019 Timetable. Highlights and Response to Feedback

To provide the best possible service during the Thameslink construction work at London Bridge;

Focused on partnership

Open for business Multi-billion pound modernisation of London Bridge is complete

Adapting to the future. Southeastern Sustainability Report 2018

Delivering a better railway for a better Britain Network Specification 2016 South East Route

London TravelWatch has commissioned two pieces of research on this issue. These can be found at :-

Business Forum. 16 March 2016

SOUTHEASTERN ENVIRONMENTAL & SOCIAL REPORT 2007

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

Peterborough. Bedford. Stevenage. Luton. St Albans. Finsbury Park. Kentish Town. St Pancras International. Farringdon. London Blackfriars

Liberty Park Hoo Road Wainscott Kent

School Transport & Travel Guide

The Hastings Line 2017 Capital-to-Coast Walk Information Pack

GTR 2018 Timetable Consultation Phase 3 weekends & late night trains ( )

eureka park ASHFORD KENT M20 J9

GTR December 2015 timetable consultation

Accession Company Reference Archive Digitised Operative Date Type Description RailRefs Comments

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017

33 MONSON ROAD, ROYAL TUNBRIDGE WELLS, TN1 1LS WELL SECURED RESTAURANT INVESTMENT LET TO ASK RESTAURANTS FOR A FURTHER 17 YEARS

GTR 2018 timetable proposals

Elwick Place, Ashford

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Elwick Place, Ashford

In Partnership For Britain s Prosperity South East London and Kent

Why invest in Kent? The optimum destination for business. October 2017

HS11/HS12 Mk2 Route Loadings

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Out of Station Interchanges (October 2010)

Recent Lettings to. The Brewery. Romford, RM1 1AU. a nuveen company

South East. Initial proposals

TO LET. To be refurbished to GRADE A SPECIFICATION OFFICE SPACE STARTS from 1,647 SQ FT (153m 2 ) to 16,838 SQ FT (1,564m 2 ) with SECURE CAR PARKING

COMPASS NORTH MODERN OFFICE ACCOMMODATION WITH COMFORT COOLING 7,334 SQ. FT. (681.3 M²) PLUS 37 ON SITE CAR PARKING SPACES

VISITING KENT CANTERBURY CAMPUS 2011/12

railse no. 111 March 2011

London TravelWatch response to the Southeastern franchise extension consultation

Information Pack. The Home of local media

National Rail Passenger Survey Southeastern TOC Report Autumn 2017 (Wave 37)

Feasibility Study July 2017

Phase II of The Bread Factory development on the site of the historic Grade II listed former Hovis flour mill is underway; Consisting of 41 new build

The historical Grade II Listed former Hovis Flour Mill in central Ramsgate is being transformed into a mix of contemporary residences.

Passenger Train Services over Unusual Lines

356,500 people commuted to jobs in the City of London. 40 per cent from inner London, 29 per cent from outer London, 31 per cent from outside London

Photographic Collection

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Meridian - Midweek Madness - Participating Store List - expires 15/06/2017 Shop Number Address City Zip

Proposed changes to bus services in the Orpington area

Kent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch

Havelock Place. Next phase of Priory Quarter, Hastings Offices from 1,353 to 24,192 sq ft Completing summer 2014 PRIORY QUARTER

Questor60 DARTFORD KENT DA1 1JG

Plot 3B Former Samas Roneo Site, Questor, Hawley Road, Dartford, Kent DA1 1JG 4.31 acres

Num. Address City Zip Num. Address City Zip

Meridian Region Tradesmen Campaign - Participating Store List - valid until 31/12/2018. Num. Address City Zip Num.

DETAILED DESIGN (Business Case Approved) OUTLINE DESIGN (Business Case Approved) FEASIBILITY (Business Case Approved - Scheme deferred until 2017/18)

Lacuna Place HAVELOCK ROAD, HASTINGS TN34 1BP LONG LET TOWN CENTRE INVESTMENT SECURED AGAINST THE DEPARTMENT OF WORK AND PENSIONS & TESCO

Chevening and the North Downs

Passenger Train Services over Unusual

Description Camera direction Highway authority

J1A M25. exceptional new office accommodation at crossways business park. a new direction for business

Rail Travel Summary for Week 21: August

Fleet Lists - Kent, England

Canterbury. 24 St Margaret s Street, Canterbury, CT1 2TH Prominent South East High Street Retail Investment

orpington business park FARADAY WAY BR5 3QW

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009


Rochford Road

BROADWAY CORNER HIGH STREET & 1-3 ELMFIELD ROAD BROMLEY, KENT, BR1 1JY PRIME HIGH STREET RETAIL INVESTMENT & DEVELOPMENT OPPORTUNITY

WELL SECURED, PRIME, SOUTH EAST, RETAIL INVESTMENT OPPORTUNITY 20/21 ST MARGARET S STREET CANTERBURY, CT1 2TH

FROM 1,200 SQ FT+ 8XW

DARTFORD. Four unique waterside commercial opportunities

NWKFHS Library Catalogue Section 8 - Report of Catalogue Maps.

Prominent High Street & Shopping Centre Investment. Angel Walk Shopping Centre & High Street Tonbridge, Kent

Innovation Workshop with switch2

Commissioned by: Visit Kent. Economic Impact of Tourism. Thanet Results. Produced by: Destination Research

Passenger Train Services over Unusual Lines

Havelock Place. Latest phase of Priory Quarter, Hastings Offices from 541 to 19,809 sq ft Ultra-flexible leases on small & medium units Available now

mhs homes at Appledown Grange Marden, Kent TN12 9HQ An exclusive collection of traditionally built homes available through Shared Ownership

Early May Bank Holiday Travel Summary 2012

Belvidere House WEST MALLING KENT

FROM ESQUIRE DEVELOPMENTS

TJFC Fiesta - 13/14 July Playing on Saturday / Register Pitches Sunday (latest)

Questor80 DARTFORD KENT DA1 1JG

No. 13 The Southern Belle and the Folkestone Flyer, Southern Railway

Cross-London Inter-Regional Connections

LIVE THE ISLAND DREAM

Permitted Development Rights

JRC. Beyond the Elephant

RAILFUTURE LONDON AND SOUTH EAST BRANCH

Kingsnorth Commercial Park

J1A M25. air-conditioned office accommodation at crossways business park, dartford

THURSTON POINT LEWISHAM LONDON S NEWEST RETAIL DESTINATION

KINGS SUTTON MILTON KEYNES C BRADFORD F SQ HOVE BROMLEY SOUTH ORPINGTON PETTS WOOD SHORTLANDS GILLINGHAM KENT ROCHESTER STROOD KENT

DA1 5FD COMPLETION MID-SUMMER 2019 A BRAND NEW FOUR UNIT INDUSTRIAL / WAREHOUSE DEVELOPMENT IN DARTFORD 8,482-45,338 SQ FT TO LET QUADRONPARK.CO.

Passenger Train Services over Unusual

Council Performance Ratings 2010

DEBENHAMS. green&partners

Medway Valley Orchards

YOUR SPACE COLCHESTER

Passenger Train Services over Unusual Lines

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT

Transcription:

Cannon Street Metro Services Cannon Street Gillingham Gillingham Cannon Street Cannon Street Dartford Dartford Cannon Street via Greenwich via Greenwich via Bexleyheath FIRST: 0705 then 05 & 35 past every FIRST: 0524 then 24 & 54 past every FIRST: 0654 then 24 & 54 past every FIRST: 0530 then 00 & 30 past every LAST: 2035 Please note the last train leaving Cannon St is 1905. The 1935, 2005 & 2035 services will start from London Bridge. LAST: 1854 Please note the last train to Cannon St will be 1654. The 1724, 1754 & 1824 services will terminate at London Bridge. LAST: 1954 Please note the last train leaving Cannon St is 1924. The 1954 service will start from LAST: 1900 Please note the last train to Cannon Street will be 1830. The 1900 will terminate at LAST: 2352 Between 2030 & 2352 services will start from Charing Cross. The 1930 & 2000 services will start from LAST: 2250 Between 2020 & 2250 services are diverted to Charing Cross. Please note the 1850, 1920 & 1950 services will terminate at Cannon Street Hayes via Lewisham FIRST: 0630 then 00 & 30 past every Hayes Cannon Street via Lewisham FIRST: 0550 then 20 & 50 past every In the evening period a service will operate from Charing Cross to Gillingham calling at all via Greenwich, Dartford & Gravesend and vice versa. Last service from Charing Cross departing 0015. Please note the last train from Cannon Street is 1924.

Charing Cross Metro Services Charing Cross Dartford Waterloo East, London Bridge, Lewisham then all FIRST: 0632 then 02 & 32 past LAST: 0002 Dartford Charing Cross to Lewisham, then London FIRST: 0552 then 22 & 52 past LAST: 2252 Charing Cross Dartford via Sidcup Waterloo East, London Bridge, Hither Green then all FIRST: 0656 then 26 & 56 past LAST: 0005 Dartford Charing Cross via Sidcup to Hither Green, then London FIRST: 0546 then 16 & 46 past LAST: 2246 Charing Cross Sevenoaks Waterloo East, London Bridge, Grove Park then all FIRST: 0636 then 06 & 36 past LAST: 0010 Sevenoaks Charing Cross to Grove Park then London FIRST: 0536 then 06 & 36 past LAST: 2306 Charing Cross Orpington Waterloo East, London Bridge, Lewisham and all FIRST: 0618 then 18 & 48 past LAST: 2048 Orpington Charing Cross to Lewisham then London Bridge & Waterloo East FIRST: 0533 then 03 & 33 past LAST: 1933 After the Charing Cross to Orpington and vice versa services finish operating, Charing Cross to Sevenoaks and vice versa services will call additionally at Hither Green & Lewisham.

Mainline Service (Southeastern Mainline) Charing Cross Ashford Ashford Charing Cross Charing Cross Tunbridge Wells Tunbridge Wells Charing Cross 1 train per Ashford Ramsgate via Canterbury West Waterloo East, London Bridge, Sevenoaks, Tonbridge and then all to Tonbridge then Sevenoaks, London Bridge & Waterloo East Waterloo East, London Bridge, Orpington, Sevenoaks, Hildenborough, Tonbridge & High Brooms Calling at High Brooms, Tonbridge, Hildenborough, Sevenoaks, Orpington, London Bridge & Waterloo East FIRST: 0645 then 15 & 45 past FIRST: 0533 then 03 & 33 past FIRST: 0730 then 00 & 30 past FIRST: 0600 then 00 & 30 past FIRST: 0742 then 42 past every LAST: 2315 no services at 1315, 1415 & 2245. LAST: 2133 no services at 1133, 1233 & 2103 LAST: 2030 LAST: 1900 LAST: 2342 1 train per Ramsgate Ashford via Canterbury West FIRST: 0640 then 40 past every LAST: 2240 1 train per Ashford Ramsgate via Dover FIRST: 0712 then 12 past every LAST: 2312 1 train per Ramsgate Ashford via Dover FIRST: 0550 then 50 past every LAST: 2150 Tonbridge Hastings then 10 & 40 past LAST: 2310 Hastings Tonbridge FIRST: 0555 then 25 & 55 past LAST: 2155 1 train per Paddock Wood Strood then 10 past every LAST: 2210 1 train per Strood Paddock Wood FIRST: 0705 then 05 past every LAST: 2205 Connections are available at Ashford from Ramsgate line into the Charing Cross services and High Speed services.

Mainline Service (Chatham Line) Victoria Ashford via Maidstone East Bromley South, St. Mary Cray, Swanley, Otford and then all FIRST: 0637 then 07 & 37 past LAST: 2307 Ashford Victoria via Maidstone East All to Otford, then Swanley, St Mary Cray & Bromley South FIRST: 0538 then 08 & 38 past LAST: 2108 Victoria Faversham Bromley South, Swanley and then all FIRST: 0722 then 22 & 52 past LAST: 2352 no services at 2222 & 2322. Faversham Victoria All to Swanley then Bromley South FIRST: 0536 then 06 & 36 past LAST: 2206 no services at 2036 & 2136. 1 train per Faversham Ramsgate FIRST: 0640 then 40 past LAST: 2340 1 train per Ramsgate Faversham FIRST: 0535 then 35 past LAST: 2235 1 train per Faversham Dover then 10 past LAST: 2310 1 train per Dover Faversham FIRST: 0605 then 05 past LAST: 2205 Connections are available at Faversham from Ramsgate & Dover line into the Victoria services and High Speed services.

Metro (Chatham Lines) Victoria Orpington via Herne Hill FIRST: 0655 then 25 & 55 past LAST: 2355 Orpington Victoria via Herne Hill FIRST: 0625 then 25 & 55 past LAST: 2255 City Thameslink Sevenoaks Via Catford FIRST: 0639 then 09 & 39 past LAST: 2343 (Note late night services start from Victoria) Sevenoaks City Thameslink via Catford FIRST: 0602 then 02 & 32 past LAST: 2232 (Note late night services are diverted to Victoria) Highspeed Service Booked service to operate minor train plan alterations to accommodate Contingency Timetable. Notes 1. No service on the Bromley North Branch line 2. No service on the Sheerness Branch 3. No service between Nunhead and Lewisham or Lewisham and Charlton 4. There will be no through services to Thameslink destinations. The through Rochester / Ashford to Bedford services will not run and a self contained Southeastern operated City Thameslink to Sevenoaks service will operate