Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX

Similar documents
National Rail Passenger Survey East Midlands Trains TOC Report Spring 2016 (Wave 34)

National Passenger Survey TOC Report for Chiltern Railways Autumn 2011

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX

National Passenger Survey TOC Report for East Midlands Trains Spring 2011

National Rail Passenger Survey Heathrow Connect TOC Report Spring 2017 (Wave 36)

National Rail Passenger Survey Heathrow Connect TOC Report Autumn 2017 (Wave 37)

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38)

National Rail Passenger Survey Autumn 2015 Main Report

National Rail Passenger Survey Arriva Trains Wales TOC Report Spring 2016 (Wave 34)

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey Southeastern TOC Report Autumn 2017 (Wave 37)

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey Autumn 2013 Main Report

National Passenger Survey PTE Report for West Midlands Autumn 2011

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

National Rail Passenger Survey Main Report Spring 2018

National Rail Passenger Survey Arriva Trains Wales TOC Report Autumn 2017 (Wave 37)

National Rail Passenger Survey Arriva Trains Wales TOC Report Spring 2017 (Wave 36)

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Autumn putting rail passengers first

National Passenger Survey Autumn putting rail passengers first

Railway performance and subsidy statistics

Improving stations: improving passenger satisfaction. October 2016

Anglia Winter Key Route Strategy (KRS) 2017/18

National Rail Passenger Survey

Tram Passenger Survey

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

Rail passengers priorities for improvement November 2017

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)

National Rail Performance Report - Quarter /16 (January-March 2016)

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Tram Passenger Survey (TPS) All networks

Bus Passenger Survey

CAA Passenger Survey Report 2017

A passenger perspective on the TransPennine. Sharon Hedges May 2014

West Midlands and Chiltern. Route Utilisation Strategy. Research Findings

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April

Glasgow Queen Street Station Redevelopment research

National Rail Performance Report - Quarter /14

Timetable Change Research. Re-contact survey key findings

National Station Improvement Programme. Halifax Station - Final report

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive

Network Rail 2014 Customer Survey Report

National Station Improvement Programme. Uckfield Station Final report

Regional Spread of Inbound Tourism

Bus Passenger Survey spring 2015 results Centro - West Midlands PTE area

Civil Aviation Authority:

Bringing clarity, delivering breakthroughs. Transport Focus Surface Access to Airports - Research Report August 2018

Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings

Report. Passengers' Priorities for Improvements in Rail Services. Report for Passenger Focus. June 2007

Caledonian Sleeper Passenger satisfaction report. Quarter Rail Period 12, 13 and 14

CAA Passenger Survey Report 2005

Mystery shop of rail ticket retailing research summary

What passengers want from the InterCity West Coast rail franchise: A submission from Passenger Focus

CrossCountry Future Timetable Consultation

City employment: An overview from the Business Register & Employment Survey (BRES)

Mystery shop of rail ticket retailing. Internet checks

NATIONAL PASSENGER SURVEY - WAVE 23 Autumn 2010 REPORT FOR GREATER MANCHESTER PTE

Total ABC1 C2DE Total

Summary of questions and discussion

SURVEY OF U3A MEMBERS (PART 1)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

TIMETABLES ETC in the collection of John Hinson

Airport accessibility report 2016/17 CAP 1577

London Area Travel Survey National Rail Results

Still waiting for a ticket? Ticket queuing times at large regional rail stations. Foreword

1.1 We note that the following WCML access applications have been made:

YouGov PlaceIndex results

How to read this timetable

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

DC240 TO LET. 10,515 sq ft (980 sq m) high quality offices with exceptional car parking. high quality offices

Early May Bank Holiday Travel Summary 2012

East Midlands rail franchise: Consultation response. October 2017

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Current Contents of Website, and Version History V5.17

RAILFUTURE. campaigning by the Railway Development Society. A I R P O R T L I N K S

Making Rail Accessible Helping our Older and Disabled Guests

Rail delays and compensation

East Midlands Rail Franchise Public Consultation

Heritage Line Community Rail Partnership Darlington to Bishop Auckland Railway Line Survey of Users and Non-Users January to March 2010

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY

grade A space grade a location FOR SALE TO LET

Leicester. Leicester. Commercial Park. 95,978 sq ft of warehouse / distribution space

Oriel 2018 (2019intake) Hospital and Health Board Employers

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009

Letting Rail Franchises

Cambrian Line Railcard. Pwllheli - Machynlleth - Aberystwyth - Shrewsbury. Take your children for 2 each! Valid to 13 October 2018

Christmas Engineering Works

The Pennine Class 185 experience

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results

Most regions saw price falls during 2012

Census 2011: City snapshot

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere)

Quarterly Progress Report

Happiness is a town called Harrogate destination named happiest place to live for THIRD year running

2015 Metro User Christchurch

Transcription:

National Rail Passenger Survey TOC Report 16 (Wave 34) Due to a technical query sector scores may need to be revised slightly at a future date - as such current scores should be treated as provisional Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk Rebecca Joyner BDRC Continental Kingsbourne House 229-231 High Holborn London, WC1V 7DA Tel: 74 9148 Email: rebecca.joyner@bdrc-continental.com

Contents 1 Introduction Weekday/weekend satisfaction 1.1 Methodology 2.1 Weekday/weekend satisfaction for 29 1.2 Issues affecting fieldwork 3.2 Weekday/weekend peak satisfaction for 2 Key results 6 Passenger experience with service 2.1 Overall satisfaction and station factor results for Heathrow Express 6.1 Passenger experience of delays 31 2.2 Train factor results for 7 6.2 Passenger experience relating to disability 32 2.3 Overall satisfaction and station factor results for London and South East 9 2.4 Train factor results for 11 7 Sample profile 2. versus performance 13 7.1 Sample profile for versus London and South East 33 2.6 Results by route for 14 7.2 Station sample sizes for 3 3 Passenger satisfaction trend charts 3.1 Overall satisfaction and station factor results for Heathrow Express 1 3.2 Train factor results for 21 7.3 Weighted sample composition for all TOCs 36 7.4 Unweighted sample composition for all TOCs 37 8 Technical appendix 4 Managed versus non-managed stations 8.1 Standard reports produced for NRPS 38 8.2 Rail sectors 39 Network Rail categorisation and station factor results for 4.1 28 8.3 How routes are defined 1

1 1.1 Methodology 1.28 Questionnaires are normally handed out at stations to customers about to board a train. A reply paid envelope is provided for returning questionnaires. Each Train Operating Company (TOC) is sampled separately. Interviewers are given a number of questionnaires to hand out at a station. At Gatwick and Heathrow Airports and for some shifts at certain London termini and other large stations, questionnaires are handed out to passengers of a specific TOC. From 3 onwards, at all other stations, questionnaires are handed out to passengers of any TOC (in the past, these were also targeted). The number of questionnaires handed out will depend on: - the size of station - time of day - length of shift. TOC data is compiled to provide a national sample. Fieldwork takes place each (February/March) and (September/October); until 3 fieldwork duration was 3 weeks. In 3, fieldwork was extended to an 11 week period, from 26 August to 9 November, to provide a better representation of journeys. Quotas for returned questionnaires are set overall and by weekday/weekend, journey purpose and station size. All data for a TOC in this Report is weighted up to the number of passenger journeys annually on the TOC and the profile of those journeys by: - weekday/weekend - journey purpose (Commuter, Business, Leisure) - station size (this profile is applied for each TOC building block). The data for number of journeys and profiles by these variables was generated from ORR data (-13), and informed by ticket sales information and some consultation with TOCs. The stations for each TOC were stratified by number of passengers and a number of stations in each size stratum is sampled. This sample design and weighting ensures that data is representative of all passenger journeys made on each TOC. National results are constructed by combining data for all TOCs together, weighting by number of journeys. From 7 standard region definitions have been used replacing older rail regions. Analysis for the old regions is available on request. For more details of NRPS methodology, visit www.transportfocus.org.uk 1.1 Methodology 2

1 1.2 Issues affecting 1.28 fieldwork 16 (Wave 34) Fieldwork for Wave 34 (including boosts) was undertaken between the 11th January and th March 16. Due to poor weather and a resulting landslide affecting particular routes during fieldwork, a small number of fieldwork shifts were unable to be completed and were replaced. Service suspension of Heathrow Connect services for about two weeks towards the end of fieldwork meant that quite a large number of shifts could not be completed for this TOC. This means that the sample size is lower than normal, although the results are still robust at TOC level. As with previous waves, planned and unplanned engineering works/problems meant that some other shifts were also rescheduled (this particularly affected shifts during weekends). As usual, shifts were only rescheduled if the engineering work caused a station or line closure. Whenever possible the shifts went ahead as planned if there were still train services running. Southeastern scores are the subject of technical query and may need to be revised at a future date - as such the current scores should be treated as provisional. (Wave 33) Fieldwork for Wave 33 (including boosts) was undertaken between the 1st September and 12th November. As with previous waves, planned and unplanned engineering works/problems meant that some other shifts were also rescheduled (this particularly affected shifts during weekends). As usual, shifts were only rescheduled if the engineering work caused a station or line closure. Whenever possible the shifts went ahead as planned if there were still train services running. 1.2 Issues affecting fieldwork 3

1 1.2 Issues affecting 1.28 fieldwork (Wave 32) Fieldwork for Wave 32 was undertaken between 18th January and 29th March. From 1st March Virgin Trains East Coast took over the East Coast franchise. This meant that shifts targeting East Coast were conducted prior to the operator change. Due to engineering works affecting services on South West Trains Island Line (on the Isle of Wight) up to th March, all shifts targeting Island Line had to be completed during the last week of fieldwork. As with previous waves, planned and unplanned engineering works/problems meant that some other shifts were also rescheduled (this particularly affected shifts during weekends). As usual, shifts were only rescheduled if the engineering work caused a station or line closure. Whenever possible the shifts went ahead as planned if there were still train services running. (Wave 31) Fieldwork for Wave 31 was undertaken between 1st September and 9th November. Govia Thameslink Railway took over the franchise previously operated by First Capital Connect on 14th September. This meant that fieldwork at stations operated by Govia Thameslink Railway, as well as shifts involving passengers travelling on Govia Thameslink Railway did not start until that date. Due to some additional booster samples being commissioned after the main survey fieldwork had begun, a small amount of fieldwork overran by a few days, ultimately extending the fieldwork period for some boost samples until 13th November; this affected boost samples only and not the main survey, results of which are shown in this report. As with previous waves, planned and unplanned engineering works/problems meant that some other shifts were also rescheduled (this particularly affected shifts during weekends). As usual, shifts were only rescheduled if the engineering work caused a station or line closure. Whenever possible the shifts went ahead as planned if there were still train services running. 1.2 Issues affecting fieldwork 4

2 2.1 Overall satisfaction with your journey and station factors At 9% confidence level: + significant increase - significant decrease Satisfaction results for % satisfied/good 16 Overall satisfaction with your journey 1 1 3 (11) 6 46 44 91 94 Overall satisfaction with the station 2 1 (1) 43 4 89 Ticket buying facilities 3 12 (384) 37 6 92 89 Provision of information about train times/platforms 4 1 (488) 4 13 43 39 82 84 The upkeep/repair of the station buildings/platforms 1 3 (482) 14 39 43 82 8 Cleanliness of the station 6 1 4 (48) 14 39 43 81 86 The facilities and services 7 (33) 4 6 38 32 7 73 The attitudes and helpfulness of the staff 8 1 (412) 12 46 86 84 Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied 2.1 Overall satisfaction with your journey and station factors

2 2.1 Station factors (cont'd) Satisfaction results for % satisfied/good At 9% confidence level: + significant increase - significant decrease 16 Connections with other forms of public transport 1 (382) 2 1 13 41 42 83-89 Facilities for car parking 2 (92) 9 21 36 33 7 6 The overall station environment 3 1 3 (468) 14 48 33 81 8 Your personal security whilst using the station 4 1 (429) 16 41 41 83 86 The availability of staff 1 (4) 4 18 37 77 74 The provision of shelter facilities 6 (26) 2 2 17 36 43 8 78 Availability of seating 7 (38) 6 12 14 38 68 7 How request to station staff was handled 8 2 (12) 7 2 66 91 9 The choice of shops/eating/ drinking facilities available 9 (3) 4 12 21 36 28 64 67 Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied 2.1 Station factors (cont'd) 6

2 2.2 Train factors At 9% confidence level: + significant increase - significant decrease Satisfaction results for % satisfied/good 16 Overall satisfaction with the train 1 1 () 4 6 47 43-9 The frequency of the trains on that route 2 1 3 (12) 6 89 Punctuality/reliability (i.e. train arriving/departing on time) 3 (12) 32 61 94 94 The length of time the journey was scheduled to take (speed) 4 1 3 (4) 67 97 96 Connections with other train services 13 (37) 7 41 48 86 The value for money for the price of your ticket 6 (7) 23 26 27 14 41 36 Cleanliness of the train 7 2 (11) 7 1 91-9 The upkeep and repair of the train 8 3 (493) 8-96 The provision of information during the journey 9 1 3 (47) 11 44 8 88 The helpfulness and attitude of staff on the train 1 (436) 1 33 1 84 87 Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied 2.2 Train factors 7

2 2.2 Train factors (cont'd) Satisfaction results for % satisfied/good At 9% confidence level: + significant increase - significant decrease 16 The space for luggage 1 (492) 3 6 9 42 82 - The toilet facilities 2 (163) 3 9 9 36 43 8 81 Sufficient room for all the passengers to sit/stand 3 (496) 2 4 7 37 1 88-93 The comfort of the seating area 4 (496) 2 3 8 37 49 87-9 The ease of being able to get on and off 1 (497) 4 39 6 9 9 Your personal security whilst on board 6 1 (48) 7 34 9 93 94 The cleanliness of the inside 7 2 () 43 49 93 96 The cleanliness of the outside 8 2 (464) 7 4 46 91-9 The availability of staff 9 4 () 18 37 41 78 78 How well train company dealt with delays (37) 3 8 2 44 64 2 Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied 2.2 Train factors (cont'd) 8

2 2.3 Overall satisfaction with your journey and station factors At 9% confidence level: + significant increase - significant decrease Satisfaction results for % satisfied/good 16 Overall satisfaction with your journey 1 (17249) 3 6 12 48 78 78 Overall satisfaction with the station 2 2 (172) 6 16 26 77 77 Ticket buying facilities 3 (9111) 4 8 1 4 28 73 72 Provision of information about train times/platforms 4 (167) 3 6 12 47 33 8 79 The upkeep/repair of the station buildings/platforms (169) 3 9 19 47 22 69 68 Cleanliness of the station 6 (16737) 2 6 18 49 2 74 73 The facilities and services 7 (1427) 14 21 38 16 4 6 The attitudes and helpfulness of the staff 8 (12638) 3 19 33 72 72 Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied 2.3 Overall satisfaction with your journey and station factors 9

2 2.3 Station factors (cont'd) Satisfaction results for % satisfied/good At 9% confidence level: + significant increase - significant decrease 16 Connections with other forms of public transport 1 (12836) 3 6 1 4 31 7 7 Facilities for car parking 2 (84) 22 14 19 1 4 46 The overall station environment 3 (16636) 3 8 23 49 18 67 67 Your personal security whilst using the station 4 (1193) 2 3 26 46 24 69 69 The availability of staff (1489) 22 41 21 62 61 The provision of shelter facilities 6 (13791) 6 12 42 62 63 Availability of seating 7 (1194) 12 23 22 31 12 43 44 How request to station staff was handled 8 (2494) 4 6 27 7 83 8 The choice of shops/eating/ drinking facilities available 9 (13933) 13 18 24 32 13 4 47 Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied 2.3 Station factors (cont'd)

2 2.4 Train factors At 9% confidence level: + significant increase - significant decrease Satisfaction results for % satisfied/good 16 Overall satisfaction with the train 1 (17193) 3 6 16 2 24 76 76 The frequency of the trains on that route 2 (17182) 6 12 4 28 72 73 Punctuality/reliability (i.e. train arriving/departing on time) 3 (1712) 11 9 37 33 7-73 The length of time the journey was scheduled to take (speed) 4 (17) 3 6 12 42 36 78-8 Connections with other train services (13) 4 19 43 29 72 73 The value for money for the price of your ticket 6 (1) 16 21 22 26 1 41 Cleanliness of the train 7 2 (17214) 9 1 1 24 74 + 73 The upkeep and repair of the train 8 (16639) 2 8 16 24 73 73 The provision of information during the journey 9 (1471) 4 8 43 2 68 69 The helpfulness and attitude of staff on the train (8) 6 6 32 34 22 6 Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied 2.4 Train factors 11

2 2.4 Train factors (cont'd) Satisfaction results for % satisfied/good At 9% confidence level: + significant increase - significant decrease 16 The space for luggage 1 (1297) 9 18 2 37 13 49 49 The toilet facilities 2 (638) 29 17 23 23 9 32 33 Sufficient room for all the passengers to sit/stand 3 (16719) 12 11 14 38 24 62 63 The comfort of the seating area 4 (1669) 4 9 19 48 68 69 The ease of being able to get on and off (163) 3 6 14 48 29 77 78 Your personal security whilst on board 6 (1914) 2 3 21 46 28 74 7 The cleanliness of the inside 7 2 (17139) 8 1 2 23 74 73 The cleanliness of the outside 8 2 (14264) 6 21 1 21 72 71 The availability of staff 9 (111) 17 17 32 24 11 3 36 How well train company dealt with delays (378) 14 17 37 24 8 31 Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied 2.4 Train factors (cont'd) 12

2 2. TOC versus sector performance versus Overall sample size 27168 TOC Sector TOC Index Overall satisfaction with your journey 91 78 116% STATION FACILITIES Overall satisfaction with the station 89 77 116% Ticket buying facilities 92 73 127% Provision of information about train times/platforms 82 8 3% The upkeep/repair of the station buildings/platforms 82 69 119% Cleanliness 81 74 1% The facilities and services 7 4 1% The attitudes and helpfulness of the staff 86 72 119% Connections with other forms of public transport 83 7 1% Facilities for car parking 7 4 1% Overall environment 81 67 122% Your personal security whilst using the station 83 69 119% The availability of staff 77 62 12% The provision of shelter facilities 8 62 128% Availability of seating 68 43 17% How request to station staff was handled 91 83 9% The choice of shops/eating/drinking facilities available 64 4 1% TRAIN FACILITIES Overall satisfaction with the train 76 118% The frequency of the trains on that route 89 72 124% Punctuality/reliability (i.e. the train arriving/departing on time) 94 7 134% The length of time the journey was scheduled to take (speed) 97 78 123% Connections with other train services 72 12% The value for money of the price of your ticket 41 41 1% Cleanliness of the train 91 74 122% Upkeep and repair of the train 73 123% The provision of information during the journey 8 68 12% The helpfulness and attitude of staff on train 84 12% The space for luggage 82 49 166% The toilet facilities 8 32 % Sufficient room for all passengers to sit/stand 88 62 141% The comfort of the seating area 87 68 127% The ease of being able to get on and off 9 77 124% Your personal security on board 93 74 12% The cleanliness of the inside 93 74 12% The cleanliness of the outside 91 72 127% The availability of staff 78 3 226% How well train company deals with delays 64 31 2% 2. TOC versus sector performance 13

2 2.6 Results by route Building block/route data for Overall sample size 27168 Heathrow Express Overall satisfaction with your journey 91 STATION FACILITIES Overall satisfaction with the station 89 Ticket buying facilities 92 Provision of information about train times/platforms 82 The upkeep/repair of the station buildings/platforms 82 Cleanliness 81 The facilities and services 7 The attitudes and helpfulness of the staff 86 Connections with other forms of public transport 83 Facilities for car parking 7 Overall environment 81 Your personal security whilst using the station 83 The availability of staff 77 The provision of shelter facilities 8 Availability of seating 68 How request to station staff was handled 91 The choice of shops/eating/drinking facilities available 64 TRAIN FACILITIES Overall satisfaction with the train The frequency of the trains on that route 89 Punctuality/reliability (i.e. the train arriving/departing on time) 94 The length of time the journey was scheduled to take (speed) 97 Connections with other train services The value for money of the price of your ticket 41 Cleanliness of the train 91 Upkeep and repair of the train The provision of information during the journey 8 The helpfulness and attitude of staff on train 84 The space for luggage 82 The toilet facilities 8 Sufficient room for all passengers to sit/stand 88 The comfort of the seating area 87 The ease of being able to get on and off 9 Your personal security on board 93 The cleanliness of the inside 93 The cleanliness of the outside 91 The availability of staff 78 How well train company deals with delays 64 2.6 Results by route 14

3 3.1 Overall satisfaction and station factors trend charts Percentage satisfaction with aspects of station where boarded Overall satisfaction with your journey (11) Percentage of passengers satisfied 11 to 16 9 11 16 Overall station satisfaction (1) Percentage of passengers satisfied 11 to 16 9 11 16 8 8 7 7 6 6 4 3 2 1 8 8 7 7 6 6 4 3 2 1 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Overall satisfaction and station factors trend charts 1

3 3.1 Station factors trend charts Ticket buying facilities (384) Percentage of passengers satisfied 11 to 16 Provision of information about train times/platforms (488) Percentage of passengers satisfied 11 to 16 The upkeep/repair of the station building/platforms (482) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Station factors trend charts 16

3 3.1 Station factors trend charts Cleanliness of the station (48) Percentage of passengers satisfied 11 to 16 The facilities and services at the station (33) Percentage of passengers satisfied 11 to 16 The attitudes and helpfulness of the staff at the station (412) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Station factors trend charts 17

3 3.1 Station factors trend charts Connections with other forms of public transport from the station (382) Percentage of passengers satisfied 11 to 16 Facilities for car parking at the station (92) Percentage of passengers satisfied 11 to 16 Overall station environment (468) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Station factors trend charts 18

3 3.1 Station factors trend charts Your personal security whilst using the station (429) Percentage of passengers satisfied 11 to 16 The availability of staff at the station (4) Percentage of passengers satisfied 11 to 16 The provision of shelter facilities (26) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Station factors trend charts 19

3 3.1 Station factors trend charts Availability of seating (38) Percentage of passengers satisfied 11 to 16 How request to station staff was handled (12) Percentage of passengers satisfied 11 to 16 The choice of shops/eating/drinking facilities available (3) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Station factors trend charts

3 3.2 Train factors trend charts Percentage satisfaction with aspects of the train Overall satisfaction with the train () Percentage of passengers satisfied 11 to 16 11 16 The frequency of trains on that route (12) Percentage of passengers satisfied 11 to 16 11 16 9 9 8 8 8 8 7 7 7 7 6 6 6 6 4 4 3 3 2 2 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.2 Train factors trend charts 21

3 3.2 Train factors trend charts Punctuality/reliability (i.e. train arriving/departing on time) (12) Percentage of passengers satisfied 11 to 16 The length of time the journey was scheduled to take (speed) (4) Percentage of passengers satisfied 11 to 16 Connections with other train services (37) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.2 Train factors trend charts 22

3 3.2 Train factors trend charts The value for money for the price of your ticket (7) Percentage of passengers satisfied 11 to 16 Cleanliness of the train (11) Percentage of passengers satisfied 11 to 16 Upkeep and repair of the train (493) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.2 Train factors trend charts 23

3 3.2 Train factors trend charts The provision of information during the journey (47) Percentage of passengers satisfied 11 to 16 The helpfulness and attitude of staff on the train (436) Percentage of passengers satisfied 11 to 16 The space for luggage (492) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.2 Train factors trend charts 24

3 3.2 Train factors trend charts Toilet facilities on the train (163) Percentage of passengers satisfied 11 to 16 Sufficient room for all the passengers to sit/stand (496) Percentage of passengers satisfied 11 to 16 The comfort of the seating area (496) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.2 Train factors trend charts 2

3 3.2 Train factors trend charts The ease of being able to get on and off the train (497) Percentage of passengers satisfied 11 to 16 Your personal security whilst on board (48) Percentage of passengers satisfied 11 to 16 The cleanliness of the inside of the train () Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.2 Train factors trend charts 26

3 3.2 Train factors trend charts The cleanliness of the outside of the train (464) Percentage of passengers satisfied 11 to 16 The availability of staff on the train () Percentage of passengers satisfied 11 to 16 How well train company dealt with delays (37) Percentage of passengers satisfied 11 to 16 11 16 11 16 11 16 9 9 9 8 8 8 8 8 8 7 7 7 7 7 7 6 6 6 6 6 6 4 4 4 3 3 3 2 2 2 1 1 1 N.B. Benchmarks and targets are only shown for applicable factors 3.2 Train factors trend charts 27

4 4.1 Managed versus non-managed Managed versus non-managed stations for At 9% confidence level: + significant increase - significant decrease (% of passenger journeys originating from each type of station) Overall Total Stations managed by TOC Stations not managed by TOC A = National hub B = Regional hub C = Important feeder D = Medium staffed E = Small staffed F = Small unstaffed % Not categorised 6% % % (% of passengers saying satisfied/good) Stations managed by TOC significant difference Stations not managed by TOC Overall satisfaction with the station 93 + 8 Ticket buying facilities 93 92 Provision of information about train times/platforms 81 82 The upkeep/repair of the station buildings/platforms 94 + 74 Cleanliness 93 + 73 The facilities and services 74 68 The attitudes and helpfulness of the staff 88 8 Connections with other forms of public transport 8 81 Facilities for car parking 69 71 Overall environment 93 + 73 Your personal security whilst using the station 88 + 79 The availability of staff 79 76 The provision of shelter facilities 86 + 7 Availability of seating 72 6 How request to station staff was handled 91 91 The choice of shops/eating/drinking facilities available 62 64 4.1 Managed versus non-managed 28

.1 TOC weekday/weekend satisfaction scores At 9% confidence level: + significant increase - significant decrease Weekday Weekend Overall sample size 27168 16 significant change 16 significant change Overall satisfaction with your journey 91 9 89 92 STATION FACILITIES Overall satisfaction with the station 89 89 88 92 Ticket buying facilities 93 89 91 Provision of information about train times/platforms 82 8 82 83 The upkeep/repair of the station buildings/platforms 81 84 87 Cleanliness 8 86 8 88 The facilities and services 69 73 7 74 The attitudes and helpfulness of the staff 87 84 83 82 Connections with other forms of public transport 82 88 86 91 Facilities for car parking 73 63 6 69 Overall environment 82 84 8 89 Your personal security whilst using the station 82 86 8 8 The availability of staff 78 74 74 7 The provision of shelter facilities 79 77 81 82 Availability of seating 69 68 66 77 How request to station staff was handled 96 93 92 The choice of shops/eating/drinking facilities available 62 67 68 69 TRAIN FACILITIES Overall satisfaction with the train - 9 89-96 The frequency of the trains on that route 91 93 82 79 Punctuality/reliability (i.e. the train arriving/departing on time) 94 94 94 93 The length of time the journey was scheduled to take (speed) 96 96 98 9 Connections with other train services 8 88 The value for money of the price of your ticket 34 43 4 Cleanliness of the train 91 9 89 9 Upkeep and repair of the train - 96 86-98 The provision of information during the journey 84 87 8 91 The helpfulness and attitude of staff on train 86 86 77-89 The space for luggage 83-91 79-89 The toilet facilities 82 79 72 8 Sufficient room for all passengers to sit/stand 88-93 86-94 The comfort of the seating area 88-9 83-94 The ease of being able to get on and off 9 94 93 97 Your personal security on board 93 94 93 9 The cleanliness of the inside 94 96 9 The cleanliness of the outside 91-96 92 9 The availability of staff 78 77 78 83 How well train company deals with delays 72 44.1 TOC weekday/weekend satisfaction scores 29

.2 Sector weekday/weekend satisfaction scores At 9% confidence level: + significant increase - significant decrease Weekday Weekend Overall sample size 27168 16 significant change 16 significant change Overall satisfaction with your journey 77 77 87 86 STATION FACILITIES Overall satisfaction with the station 76 76 81 8 Ticket buying facilities 72 72 76 77 Provision of information about train times/platforms 79 79 83 81 The upkeep/repair of the station buildings/platforms 68 68 73 73 Cleanliness 73 73 78 7 The facilities and services 3-6 9 The attitudes and helpfulness of the staff 72 72 73 76 Connections with other forms of public transport 7 74 78 7 Facilities for car parking 4 4 47 49 Overall environment 66 66 71 68 Your personal security whilst using the station 69 69 72 69 The availability of staff 62 61 62 9 The provision of shelter facilities 61 62 67 66 Availability of seating 42 43 1 3 How request to station staff was handled 83 84 84-91 The choice of shops/eating/drinking facilities available 44-46 4 TRAIN FACILITIES Overall satisfaction with the train 74 7 8 84 The frequency of the trains on that route 71 72 78 77 Punctuality/reliability (i.e. the train arriving/departing on time) 68-71 82 83 The length of time the journey was scheduled to take (speed) 77-79 83 8 Connections with other train services 71 72 77 78 The value for money of the price of your ticket 39 + 37 2-7 Cleanliness of the train 74 72 8 77 Upkeep and repair of the train 72 72 79 78 The provision of information during the journey 67 68 74 74 The helpfulness and attitude of staff on train 9 63 The space for luggage 48 48 7 7 The toilet facilities 31 32 36 41 Sufficient room for all passengers to sit/stand 6 6 76 76 The comfort of the seating area 67 67 78 78 The ease of being able to get on and off 76 76 83 84 Your personal security on board 74 7 78 79 The cleanliness of the inside 74 73 79 77 The cleanliness of the outside 71 71 76 74 The availability of staff 34 3 43 How well train company deals with delays 29 41.2 Sector weekday/weekend satisfaction scores

6 6.1 Passenger experience of delays Overall sample size 27168 London and South East London and South East DELAY None 87 71 Minor 8 23 Major 1 4 LENGTH OF DELAY minutes or less 4 41 6- minutes 1 24 11- minutes 16 16 21- minutes 6 8 31-6 minutes 4 More than 1 hour - 1 Don't know/no answer 13 AMOUNT INFORMATION PROVIDED ABOUT THE DELAY SPEED WITH WHICH INFORMATION WAS PROVIDED Very well 24 12 Very well 27 13 Fairly well 47 28 Fairly well Neither well nor poorly 12 21 Neither well nor poorly 23 Fairly poorly 13 19 Fairly poorly 12 1 Very poorly 4 Very poorly - ACCURACY OF INFORMATION GIVEN ABOUT THE DELAY TIME TAKEN TO RESOLVE THE PROBLEM Very well 24 13 Very well 21 9 Fairly well 44 29 Fairly well 47 21 Neither well nor poorly 17 Neither well nor poorly 24 33 Fairly poorly 1 19 Fairly poorly 8 14 Very poorly 19 Very poorly - 23 AVAILABILITY OF ALTERNATIVE TRANSPORT IF THE USEFULNESS OF THE INFORMATION TRAIN SERVICE COULD NOT CONTINUE Very well 29 13 Very well 1 Fairly well 36 26 Fairly well 3 14 Neither well nor poorly 19 26 Neither well nor poorly 2 24 Fairly poorly 1 1 Fairly poorly 12 17 Very poorly 1 Very poorly - 6.1 Passenger experience of delays 31

6 6.2 Passenger experience relating to disability Overall sample size 27168 London and South East London and South East DISABILITY OR LONG TERM ILLNESS Vision 1 Hearing - 1 Mobility 1 2 Dexterity Learning or understanding or concentrating - Memory Mental health 1 2 Stamina or breathing or fatigue 1 Socially or behaviourally - Other 2 None 94 88 No answer 3 3 CONDITION OR ILLNESS HAVE AN ADVERSE AFFECT NEEDED TO MAKE SPECIAL ARRANGEMENTS IN ADVANCE ON ABILITY TO MAKE JOURNEYS BY RAIL WITH TRAIN COMPANY TO ORGANISE YOUR TRAVEL Yes, a lot 21 7 Yes - 2 Yes, a little 26 44 No 98 Not at all 3 42 STATION MET NEEDS AS PASSENGER WITH SATISFACTION WITH SPECIAL ARRANGEMENTS DISABILITY/LONG TERM ILLNESS WHEN BOOKING Very satisfied 1 33 Very satisfied - 36 Fairly satisfied 49 33 Fairly satisfied - 4 Neither satisfied nor dissatisfied - Neither satisfied nor dissatisfied - 12 Fairly dissatisfied - 8 Fairly dissatisfied - 7 Very dissatisfied - Very dissatisfied - - TRAIN MET NEEDS AS PASSENGER WITH SATISFACTION WITH SPECIAL ARRANGEMENTS DISABILITY/LONG TERM ILLNESS ON THE DAY Very satisfied 9 28 Very satisfied - 44 Fairly satisfied 23 36 Fairly satisfied - 13 Neither satisfied nor dissatisfied 18 Neither satisfied nor dissatisfied - 12 Fairly dissatisfied - 9 Fairly dissatisfied - 8 Very dissatisfied - 6 Very dissatisfied - 24 6.2 Passenger experience relating to disability 32

7 7.1 General sample profile Overall sample size 27168 London and South East London and South East GENDER ETHNIC GROUP OF PASSENGERS Male 9 44 White 83 86 Female 31 4 Mixed 2 2 Asian or Asian British 4 4 Black or Black British 1 4 AGE Chinese or other ethnic group 1 2 16-18 1 19-2 6 8 JOURNEY PURPOSE 26-34 1 14 Commuter 2 1 3-44 26 18 Business 68 1 4-4 26 23 Leisure 3-9 11 6-64 9 REGULAR TRAVELLER 6+ 3 14 Yes 29 71 No 71 29 WORKING STATUS WEEKDAY/WEEKEND Working Full Time 81 62 Weekday 79 86 Working Part Time 4 1 Weekend 21 1 Not Working 1 3 Retired 2 14 Full Time Student 2 4 TIME OF TRAVEL Peak 1 21 Off-peak 8 79 OCCUPATION OF CHIEF WAGE EARNER IN HOUSEHOLD Professional/Senior Managerial 64 41 Middle Managerial 16 16 ASKED FOR HELP OR INFORMATION Junior Managerial/Clerical/Supervisory 4 11 Yes asked for help 13 7 Skilled Manual (With Professional Qualifications/ Yes asked for information 7 Served an Apprenticeship) 1 6 Could not find anyone to ask 2 Unskilled Manual (No Qualifications/Not Served No 74 84 an Apprenticeship) 1 2 Full time student 1 2 Retired 1 13 DO YOU REGULARLY USE THE INTERNET Unemployed/between jobs - 1 Yes, at home 89 92 Housewife/house-husband - Yes, at work 81 67 Other 1 No 4 7.1 General sample profile 33

7 7.1 General sample profile (cont'd) Overall sample size 27168 London and South East London and South East TRAVELLING ALONE OR WITH OTHERS POTENTIAL IMPROVEMENTS TO ASSIST WITH PLANNING Alone 79 84 Better telephone enquiry/booking service 3 4 With other adults 16+ 19 13 Better internet enquiry/booking service 12 18 With children aged -4 1 Better information facilities at stations 8 With children aged - 1 1 Better route maps of the rail network 6 14 With children aged 11-1 1 Make timetables easier to read 8 17 Better ticket buying facilities at station ticket offices 6 17 Better ticket buying facilities at station ticket machines 8 1 TRAVELLING WITH Better promotion when advanced tickets available 14 Heavy/bulky luggage/other large items 1 11 Other 16 Pushchair 1 None of these 36 26 Folding bicycle - 1 Non-folding bicycle - 1 Dog - Wheelchair - Helper Mobility scooter - None apply 47 84 TYPE OF TICKET USED FOR JOURNEY Anytime single/return 8 8 Anytime day single/return 19 9 Off-peak/super off-peak single/return 4 8 Off-peak/super off-peak day single/return 2 7 Advance 3 3 Day travelcard 6 Oyster pay as you go 2 17 Weekly or monthly season ticket 2 17 Annual season ticket - 11 Special promotion ticket Rail staff pass/privilege ticket/police 1 1 Free travel pass (e.g. Freedom Pass) 1 8 Other 3 Don't know/no answer 4 2 7.1 General sample profile (cont'd) 34

7 7.2 Station sample sizes Station sample sizes for Station Overall sample size 27168 Unweighted London Paddington 229 Heathrow Terminal 3 Heathrow Airport T123 7 7.2 Station sample sizes 3

7 7.3 Weighted sample profile Annual journeys ('s) Journey Purpose Day of Week Station Size Commute Business Leisure Weekday Weekend Very large Large Medium Small Sample size 2777 1181 3823 12133 2343 44 28 846 6839 644 Abellio Greater Anglia 76841 48 18 34 86 14 23 23 27 28 Arriva Trains Wales 291 32 8 82 18 22 26 27 26 c2c 3736 67 6 27 86 14 32 11 26 31 Chiltern Railways 236 38 2 37 82 18 6 26 28 CrossCountry 4 1 28 7 78 22 24 18 28 East Midlands Trains 2 23 28 49 82 18 23 23 27 27 First TransPennine Express 28 26 13 61 82 18 26 18 29 26 Gatwick Express 7872 1 44 78 22 69 31 Great Northern 4963 47 28 2 89 11 24 24 26 26 Great Western Railway 99672 77 23 27 27 26 London Midland 621 13 46 8 1 31 1 28 26 London Overground 18422 6 3 41 82 18 22 24 27 27 Merseyrail 43271 37 8 8 23 2 26 26 Northern Rail 93834 38 9 3 76 24 24 2 26 2 ScotRail 86339 39 13 47 8 26 18 2 South West Trains 2226 3 1 32 8 1 28 19 27 26 Southeastern 168378 61 12 27 18 29 27 26 Southern 173441 1 1 34 29 26 2 TfL Rail 36 7 88 12 2 22 24 28 Thameslink 687 43 2 32 83 17 29 32 28 Virgin Trains 31911 11 23 66 81 19 32 7 32 Virgin Trains East Coast 194 33 7 76 24 39 7 23 31 7.3 Weighted sample profile 36

7 7.4 Unweighted sample profile Sample Size Journey Purpose Day of Week Station Size Commute Business Leisure Weekday Weekend Very large Large Medium Small Sample size 2777 1181 3823 12133 2343 44 28 846 6839 644 Abellio Greater Anglia 1796 38 14 48 84 16 33 2 22 Arriva Trains Wales 17 3 7 8 73 27 28 13 34 24 c2c 1138 7 24 48 11 23 17 Chiltern Railways 1122 4 17 38 88 12 46 7 22 2 CrossCountry 1236 1 8 22 17 28 32 East Midlands Trains 92 36 18 4 77 23 33 2 21 First TransPennine Express 16 37 18 4 92 8 22 24 39 14 Gatwick Express 93 23 48 9 41 Great Northern 6 4 36 83 17 41 18 21 Great Western Railway 2834 36 18 46 8 1 34 22 14 London Midland 1139 43 1 42 87 13 36 19 1 London Overground 183 3 6 41 77 23 27 12 24 38 Merseyrail 8 44 4 2 87 13 38 36 17 8 Northern Rail 1313 47 6 46 84 16 23 28 2 23 ScotRail 1 39 12 49 81 19 37 26 26 South West Trains 19 4 44 81 19 19 24 2 31 Southeastern 174 8 37 27 29 14 Southern 171 11 39 86 14 27 36 23 14 TfL Rail 262 6 4 36 86 14 22 18 39 22 Thameslink 116 8 12 31 93 7 41 11 33 16 Virgin Trains 1 22 49 83 17 29 8 26 37 Virgin Trains East Coast 117 87 14 46 9 14 31 7.4 Unweighted sample profile 37

8 8.1 Standard reports produced for NRPS The following reports are produced each wave: At a glance for each TOC Short summary reports showing headline results Full Report Summary tables for all TOCs (including comparison with one year previously), trend tables for last waves by TOC, trend charts for the main NRPS factors, peak vs off-peak analysis for LSE TOCs. Multivariate Report Multivariate analysis showing drivers of satisfaction and dissatisfaction nationally, by sector and by TOC for latest two NRPS waves combined. PTE Report NRPS reports for all PTEs (exactly the same format as TOC reports). Rankings Report Results since wave showing satisfaction score for each TOC by factor, significant changes since one year earlier, national rank and rank in TOC type. Stakeholder Report Stations Report Summary national trend charts for all main factors, trend charts by age/journey purpose & gender, summary results for leisure/business passengers & commuters, one page for each factor showing national trend and results for all TOCs, Government Office Region charts for each factor and simple tables for some questions that are not included in the main NRPS report. Percentage of passengers satisfied by each main factor for last waves for all Network Rail stations covered by NRPS during that time period. TOC Report Virtual TOC Report Tables and graphs showing results for TOC (including comparisons with one year previously and with relevant sector), trend charts for all factors (including sector and benchmark (if relevant) comparisons), summary profile of passengers surveyed, station sample sizes for TOC and sample composition & weighting. NRPS reports for TOCs that used to exist or that are planned to exist in the future (exactly the same format as TOC reports). 8.1 Standard reports produced for NRPS 38

8 8.2 Rail sectors Sector definitions The sector results used in this report contain the following TOCs (non-franchised operators are excluded): Operators Long Distance Operators Abellio Greater Anglia c2c Chiltern Railways Gatwick Express* Great Northern* Great Western Railway London Midland London Overground South West Trains Southeastern Southern* TfL Rail Thameslink* CrossCountry East Midlands Trains First TransPennine Express Virgin Trains Virgin Trains East Coast Regional Operators Arriva Trains Wales Merseyrail Northern Rail ScotRail * Part of the Govia Thameslink Railway franchise 8.2 Rail sectors 39

8 8.3 How routes are defined Arriva Trains Wales: Interurban Journeys on the route Cardiff - Manchester Piccadilly (via Hereford and Shrewsbury). CrossCountry: Birmingham - South Coast Journeys on the Birmingham New Street - Bournemouth route How are routes defined The routes have been defined in conjunction with the train companies. By TOC the areas covered by each route are as follows: Arriva Trains Wales: Mid Wales & Borders Journeys on the route Birmingham Aberystwyth/Pwllheli Arriva Trains Wales: North Wales & Borders Journeys on the routes Llandudno Manchester Piccadilly and Holyhead-Crewe/Shrewsbury, also includes Llandudno- Blaenau Ffestiniog and Wrexham Central Bidston. Arriva Trains Wales: South Wales & Borders/West Wales Journeys on South Wales mainline routes (Cheltenham-Maesteg, Ebbw Vale-Cardiff and Newport-Llanelli). Also includes routes west of Swansea and the Heart of Wales line (Llanelli Craven Arms). CrossCountry: Birmingham - South West Journeys on the Birmingham New Street - Penzance route CrossCountry: Birmingham - Stansted Journeys on the Birmingham New Street - Stansted Airport route CrossCountry: Nottingham - Cardiff Journeys on the Nottingham - Cardiff Central route Abellio Greater Anglia: Intercity London Norwich journeys, plus a few shorter workings (like an early morning Colchester to Norwich service) Abellio Greater Anglia: Main line Journeys on outer suburban Great Eastern services London - Ipswich, plus branches to Harwich, Clacton, Walton, Sudbury, Southminster and Braintree. Also includes journeys on London - Southend Victoria service. Abellio Greater Anglia: Rural Journeys on Ipswich Felixstowe, Lowestoft, Cambridge and Peterborough rail lines, plus Norwich to Lowestoft, Yarmouth, Sheringham and Cambridge lines Abellio Greater Anglia: Stansted Journeys on Stansted Express, on Greater Anglia trains which start or end at Stansted Airport where the passenger has an origin or destination of the airport Abellio Greater Anglia: West Anglia Journeys on London Hertford East, London Cambridge, London King s Lynn, Cambridge Kings s Lynn and Cambridge - Stansted Airport. Also passengers using Stansted Express for journeys not travelling to or from Stansted Airport. Arriva Trains Wales: Cardiff & Valleys Journeys on the Valley lines around Cardiff c2c: Southend line Journeys starting from any station on the main route between London Fenchurch Street and Shoeburyness (except Pitsea). c2c: Tilbury line Journeys starting from any station on the Tilbury loop lines between Dagenham Dock/Ockendon and Pitsea. Chiltern Railways: North Journeys starting from Bicester North station and stations further north Chiltern Railways: South Journeys starting from stations south of Bicester North (including services on routes to/from Aylesbury and Oxford Parkway) CrossCountry: Birmingham - Manchester Journeys on the Manchester Piccadilly - Birmingham New Street route CrossCountry: Birmingham - North East and Scotland Journeys on the Birmingham New Street - Aberdeen route East Midlands Trains: Liverpool - Norwich Journeys on the Liverpool - Norwich route East Midlands Trains: Local Journeys on rail lines around Nottingham (excluding Liverpool - Norwich and London - Sheffield) East Midlands Trains: London Journeys on the London - Sheffield route. Also includes London - Corby services. First Hull Trains: All First Hull Trains journeys First TransPennine Express: North Journeys on rail lines between Liverpool Lime Street/ Manchester/Manchester Airport and Hull, Scarborough, Middlesbrough and Newcastle First TransPennine Express: North West Journeys on rail lines between Manchester Airport & Manchester and lines to Blackpool North, Barrow-in- Furness, Windermere, Glasgow and Edinburgh 8.3 How routes are defined

8 8.3 How routes are defined (cont'd) First TransPennine Express: South Journeys on rail lines between Manchester Airport/ Manchester and Cleethorpes London Midland: London Commuter Journeys on London Euston Northampton services Northern Rail: Lancashire & Cumbria Journeys from stations in Lancashire and Cumbria Gatwick Express* Fast Gatwick Express services Gatwick London Victoria (including peak extensions to/from Brighton) London Midland: West Coast Journeys on London Euston Liverpool Lime Street services Northern Rail: Manchester & Liverpool Journeys from stations in the Manchester and Liverpool conurbations Grand Central: London - Bradford Journeys on London King's Cross - Bradford Interchange route London Midland: West Midlands Journeys on several rail lines in and around Birmingham New Street Northern Rail: South & East Yorkshire Journeys from stations in South and East Yorkshire, and Lincolnshire Grand Central: London - Sunderland Journeys on London King's Cross - Sunderland route London Overground: Gospel Oak Barking Journeys on the Gospel Oak Barking line Northern Rail: Tyne Tees & Wear Journeys from stations in Tyne and Wear Great Northern* Journeys on the Peterborough/King's Lynn - London King's Cross/Moorgate route Great Western Railway: Long distance Journeys on long distance services Great Western Railway: London Thames Valley Journeys on relatively short distance services in and around the Thames Valley London Overground: Highbury Croydon/ Clapham Journeys on the Highbury & Islington West Croydon and Highbury & Islington - Clapham Junction lines London Overground: Richmond/Clapham Junction Stratford Journeys on the Richmond Stratford and Clapham Junction Willesden Junction/Stratford rail lines London Overground: Watford Euston Journeys on the London Euston Watford line Northern Rail: West & North Yorkshire Journeys from stations in West and North Yorkshire ScotRail: Interurban Journeys on longer distance rail lines between urban areas ScotRail: Rural Journeys on predominantly rural rail lines Great Western Railway: West Journeys on (generally) short distance rural rail lines in the West of England London Overground: West Anglia Journeys on West Anglia routes London - Enfield Town, London - Chingford, London - Cheshunt and Romford - Upminster ScotRail: Strathclyde Journeys on local rail lines within Strathclyde Heathrow Connect: All Heathrow Connect journeys : All journeys Merseyrail: Northern Journeys on the Hunts Cross Southport/Ormskirk rail line Merseyrail: Wirral Journeys on the central Liverpool West Kirby, New Brighton, Chester and Ellesmere Port rail lines ScotRail: Urban Shorter distance journeys on predominantly urban rail lines, within urban areas that are not covered by the Strathclyde route Southeastern: High speed Journeys on high speed trains to/from London St. Pancras * Part of the Govia Thameslink Railway franchise 8.3 How routes are defined (cont'd) 41

8 8.3 How routes are defined (cont'd) Southeastern: Main line Journeys on (generally) main line routes London Kent lines Thameslink: North* Journeys starting from stations on the route between Farringdon and Bedford Virgin Trains East Coast: London - Yorkshire Journeys London King's Cross - Yorkshire services (includes services to West Yorkshire). Only passengers travelling to or from London Southeastern: Metro Journeys on rail lines that are within London Thameslink: South* Journeys starting from stations between London Bridge and Brighton. Also includes some journeys starting on the rail lines between Denmark Hill & Sevenoaks, and West Dulwich & Orpington Virgin Trains East Coast: London - North East and Scotland Journeys London King's Cross - Scotland/Newcastle services. Only passengers travelling to or from London Southern: Sussex Coast* Journeys London Sussex (and beyond) Virgin Trains: London - Birmingham Scotland Journeys on London - Birmingham Scotland services Southern: Metro* Journeys on rail lines that are within London Virgin Trains: London Liverpool Journeys on London Liverpool services South West Trains: Island line Journeys starting from stations on the Isle of Wight Virgin Trains: London Manchester Journeys on London Manchester services South West Trains: Longer distance Journeys starting on longer distance routes that generally go to or from London, but where the vast majority of the journey is outisde London South West Trains: Metro Journeys on routes that are mainly or wholly within London South West Trains: Outer Suburban and Local Journeys on routes that go outside London, but which are within commuter travelling distance of London. Also journeys on local routes that are generally not on main lines that are wholly outside London TfL Rail Journeys on London Shenfield metro service Thameslink: Loop* Journeys starting from stations on the route via Wimbledon, including stations as far north as City Thameslink Virgin Trains: London North Wales Journeys on London Holyhead/North Wales services Virgin Trains: London Scotland Journeys on London Glasgow/Scotland services. Also includes London - Blackpool services Virgin Trains: London Wolverhampton/Shrewsbury Journeys on London Wolverhampton/Shrewsbury services Virgin Trains East Coast: London - East Midlands/East of England Journeys on London - East Midlands/East of England services. Only passengers travelling to or from London Virgin Trains East Coast: Non-London journeys Passengers travelling (on any route) that are not going to or from London * Part of the Govia Thameslink Railway franchise 8.3 How routes are defined (cont'd) 42

Reference: TOC Report 16 Contacts: Rebecca Joyner BDRC Continental Kingsbourne House 229-231 High Holborn London, WC1V 7DA Tel: 74 9148 Email: rebecca.joyner@bdrc-continental.com David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk Transport Focus is the operating name of the Passengers' Council. This survey was published in June 16. Transport Focus 16.