Better Access to Tokyo Metropolitan Gateways

Similar documents
Haneda Airport Int l Terminal Station 羽田空港国際線ターミナル

Commission on the Promotion of Business Jets. Interim Report

Ministry of Land, Infrastructure, Transport and Tourism. Civil Aviation Bureau. Improvements in Business Aviation in Japan

EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport

Reference Material. Year Ended FY09 Earnings Explanatory Meeting

ARRIVAL INSTRUCTIONS

First Half-Year Earnings Explanatory Meeting April 1 to September 30, Reference Material

Introduction of HANEDA and Infrastructure investment by Japan. Oct 18, 2014 Japan Airport Terminal Co., Ltd.

Improvements for Business Aviation in Japan

Outline of Japan Schedule Coordination (JSC)

Chapter 4 Noise. 1. Airport noise

Research on Flight Operational Efficiency for Fuel and Noise

Aviation Policy for the Advent of the LCC Age. Akihiko TAMURA. January 8 th 2013 Director-General, Civil Aviation Bureau,

Notice Concerning Change the Lease Contract of IIF Haneda Airport Maintenance Center, Tokyo

Narita International Airport Today and Outlook for the Future

Background of the project

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

30th IBSC Conference - Stavanger, Norway June, Takahiro TOKUI

The JITI Journal. Welcome. In This Issue: Quick Links. Upcoming Events. Our Sponsor PAST:

The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) Naha Airport Building Co., Ltd.

Earnings Explanatory Meeting April 1, 2010 to March 31, Reference Material

Asian Breeze (20) ( 亜細亜の風 )

Vision for the Next 10 Years at Narita Airport

Collaborative Decision Making at JCAB ATMC

Pre-Coordination Runway Scheduling Limits Winter 2014

2010 OCEA Award (Outstanding Civil Engineering Achievement Award)

How ATFM Assists with Disaster Recovery

Quality Transport - Key to enhance Connectivity and Sustainability -

AI AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT J-AIR CORPORATION J A J

Runway Status Lights (RWSL) in Japan. July 2015

Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector

Earnings Explanatory Meeting April 1, 2011 to March 31, Reference Material

Asian Breeze (39) ( 亜細亜の風 )

Bird Strike Control. Naoki AMITANI July 2013, Bangkok, Thailand JAPAN CIVIL AVIATION BUREAU

MGU UC Pre-Departure Information Handout (Spring Semester 2017)

ANA HOLDINGS Announces Mid-Term Corporate Strategy for FY ~Strengthening the foundations of the business and looking into the future~

Runway Scheduling Limits Summer 2015

ASSEMBLY 39TH SESSION

Case Study on Station Redevelopment in Japanese Railways

Subject: Replacing Critical parts without Spare Parts Certification for Aircraft used for International

Toward Japan-US Infrastructure Cooperation

BNA Master Plan Update Public Meeting No. 2

Regulations on Passenger Service Facility Charge for International Flights at Kansai International Airport

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

BNA Master Plan Update Community Advisory Committee Meeting No. 5

ASSEMBLY 39TH SESSION

HEATHROW NIGHT MOVEMENT AND QUOTA ALLOCATION PROCEDURES Version 3

Birmingham Airport 2033

STATUS REPORT JAPAN. (ATMC) Japan Civil Aviation Bureau. CIVIL AVIATION BUREAU of JAPAN. 6th Global Air Traffic Flow Management Conference

Implementation Policy on. the Qualified Project, etc., for Airport Operation of. the Four National Airports in Hokkaido

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

Challenges for Suriname s Air Integration with South America The way forward

GOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES DIRECTOR GENERAL OF CIVIL AVIATION OPPOSITE SAFDARJUNG AIRPORT NEW DELHI

Toward More Competitive Economy and Society

Norfolk International Airport

Flight Regularity Administrative Regulations

EXECUTIVE VICE PRESIDENT. Masaki OGATA. Copyright 2010 East Japan Railway Company. All rights reserved 1

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

The benefits of opening Japan s sky for competition

REVITALISATION OF OUTBOUND TOURISM

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Classification: Public

Asian Breeze (23) ( 亜細亜の風 )

CORPORATE STEVE BOOKING SMITH CHANNELS

The entry into force of the EU-US. US Open Skies Agreement. Pablo Mendes de Leon Airneth Annual Conference, 17 April 2008

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010

(i) Adopted or adapted airworthiness and environmental standards;

Asia Pacific Initiative to Reduce Emission. Brian Bagstad Senior ATO Representative, FAA

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

TERMINAL DEVELOPMENT PLAN

Station Development Eki-naka concept and practice. Hironori Tsujimura East Japan Railway Company London Office

ANA s Growth Strategy

50th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS, Bangkok, Thailand, 1 4 July 2013

CASE STUDY The New Guayaquil International Airport

Data Extracted from the Air Navigation Services Department s Database Becomes Available

AIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT

Land Use Policy Considerations

Thank you for participating in the financial results for fiscal 2014.

Long-term Strategic Vision

Master Plan Update Community Advisory Committee Kick-off Meeting

Applewood Heights Community Open House

Promoting Civil-Military Dual-Use of Yokota Air Base

Recent Developments on International Aviation and Climate Change

National Coordination Committee

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

Exhibitor Prospectus

AIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT

REPUBLIC OF LATVIA. State Joint-stock Company Latvijas Gaisa Satiksme Aeronautical Information Service Riga Int. Airport, LV-1053, Latvia

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

JCAB Circular No

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI

NARITA INTERNATIONAL AIRPORT OVERSEAS

Japanese Inbound & Outbound Travel Market Update

Ultra s Experience with A-CDM

Language Proficiency Certification System in Japan

II.J. 14 CFR and Publications

Transcription:

Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU, JAPAN Better Access to Tokyo Metropolitan Gateways Facility Improvement, Procedural Improvement, and Capacity Increase at Narita & Haneda Int l Airports 20 June 2009 Shigeru TAKANO Civil Aviation Bureau of Japan

Narita Airport -Facility Improvement - Extension of B R/W 2,180m 2,500m Including Installation/ Relocation of Nav. Aids and Aeronautical Lighting Open on 22 October 2009 (5 months in advance of the original plan ) Improvement of Taxiways New eastern taxiway of B R/W (July 2009) Improvement of the existing taxiway relating to B R/W. New Apron to provide more Parking Spots Open in March 2010 1

Facility Improvement at Narita Airport New Taxiway (Open in July 2009) +320m Unacquired Land Original Parallel Runway (2500m) Interim Parallel Runway 2180m Cross Runway 3200m New Parallel Runway 2500m (Open on 22 nd October 2009) PTB2 Maintenance Area Cargo Area PTB1 Runway A 4000m 2

Facility Improvement will result in: Q Improved Capability of the Airport in case of Emergency (Closure of A R/W) When the A R/W was closed due to the aircraft accident in 2009, many flights were cancelled due to the physical limitations of the current B R/W. Q Relaxation of Restrictions on Aircraft Type to be Operated on B R/W In principle, all large-capacity, long-haul aircraft type except A380 can be accommodated. Q Capacity Increase (from S2010) 3

Narita Airport -Procedural Improvement - Current Procedures on the use of runways Take-offs and Landings shall be conducted using the preassigned runway. (Time slots are allocated specifying the runway to be used.) Improved Procedures (from S2010) Restrictions mentioned above will be lifted, in principle. (Time slots will be allocated without specifying runway. Runway to be used will be assigned by ATC in the course of operations.) Exceptions due to noise problems 0600-0700JST: Only A runway may be used 2000-2300JST: Current procedures will remain as they are 4

MLIT Improved Handling Capability, which may lead to; Q Q Q increased airport capacity, more flexibility for airlines to obtain their desired time slots reduced fuel consumption resulted from elimination or reduction of waiting/ holding time; and Change of U/L rule, as follows; Q Q Procedural Improvement will result in: Until W2009: U/L rule will be applied on the basis of preassigned runway. (Use of runway different from preassigned runway will be considered as non-use.) From S2010: Runway used will not affect the application of U/L rule, except for 2000 2300 JST, during which the current practice will continue to apply. 5

Narita Airport -Capacity Increase - Based on the agreement with the local community, from S2010, number of take-offs and landings per year will be increased. approx. 200,000 approx. 220,000 Accordingly, number of slots per day will be increased. 370 (A R/W) + 176 (B R/W) 604 in total In addition, number of slots per hour will be increased. 32 (A R/W) + 14 (B R/W) 54 in total (Number of take-offs and landings shall be up to 30 per hour respectively. (No changes in this respect.)) As in previous cases, JCAB has been negotiating with its bilateral partners on additional traffic rights to and from Narita. 6

Capacity Increase: MLIT Special Treatment in 2000-2300 JST As already presented, during 2000 2300JST, time slots will be allocated specifying the runway to be used. Number of slots at A R/W 2000 2055JST : 25 2100 2155JST : 16 2200 2259JST : 10 Number of slots at B R/W 2000 2055JST : 16 (currently 14) 2100 2125JST : 8 (currently 7) 2130 2259JST : 10 Firebreak Zone It will be established twice per day, as it is done currently. Number of slots during Firebreak Zone will be 21 per 30 min. 7

Narita Airport -Others - Further Increase of Capacity Narita International Airport Company (NAA), in cooperation with JCAB, started study on further increase of airport capacity up to 300,000 take-offs and landings per year. Punctuality To realize the benefit of capacity increase in 2010 and to enhance the consideration on future capacity increase, airlines are strongly requested to operate very punctually. Especially, delays during 2000 2300JST have been a serious problem for NAA, JCAB, and the local community. 8

Haneda Airport -Facility Improvement - Opening of D R/W (2,500m) (Oct. 2010) Development of Taxiways, Aprons (Oct. 2010) Construction of International Flight Service Area (Passenger and Cargo Terminals) (Oct. 2010) Extension of C R/W (3000m 3360m) (Approx. 5 years from now) 9

Facility Re-expansion Improvement Project at at Haneda Airport Extension of C Runway (open in approx. 5 years) C Runway 3,000m 360m 接続部 D Runway Construction 滑走路整備事業 (open in October 2010) D Runway 2,500m 多摩川河口法線 Connection 接続部 B Runway 2,500m Cargo 貨物ターミナル地区 Terminal Passenger 旅客ターミナル地区 Terminal 2 Domestic Flight Service Area Cargo 貨物ターミナル地区 Terminal Passenger 旅客ターミナル地区 Terminal 1 A Runway 3,000m 給油 Maintenance 整備地区 Area地区 International 国際線地区 Flight Service Area Pier 桟橋側 section Pier 桟橋部 section Reclamatio Elastic 伸縮装置 equipmentsn 埋立側 area 台座コンクリート エプロンゾーン Apron Cargo 国際貨物ゾーン Terminal International 国際線地区整備事業 Flight Service Area Development (PFI 事業 ) (open in October 2010) Passenger 国際旅客ゾーン Terminal Arterial Ring Road 環八通り NO.8 東京モノレール Tokyo Monorail 京浜急行 Keikyu Railway Line A 滑走路平行方向断面図 cross section of runway 10

Introduction of International Scheduled Services To Haneda Airport: Based on the decision made by the Cabinet, international scheduled services will be introduced at Haneda Airport from Oct. 2010, making use of additional slots, as follows: daytime hours: 30,000 slots per year will be used for short-haul passenger services covering business demand to Asian major cities late night and early morning hours: 30,000 slots per year will be used for passenger and/or all-cargo services to worldwide major cities 11

Introduction of International Scheduled Services To Haneda Airport (Cont.): JCAB has been negotiating with its bilateral partners on the traffic rights to and from Haneda Airport. Slot coordination will be done by NRT/KIX schedule coordination office. Detailed information will be presented to the next session of the Conference in November. 12

MLIT Thank you very much! Q & A 13