RESPONSIBLE EXPLORATION CHECK LISTS

Similar documents
GUIDE FOR ORGANIZING AND CARRYING OUT A COMMUNITY CLEANUP BLITZ

EXPORT AIRWORTHINESS APPROVALS

Minimum Impact Suppression Tactics Implementation Guidelines

SECTION 32. Airfield and Aircraft Operations

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Initiated By: AFS-400

USE OF TENTS Guide. Frederick County Fire and Rescue Services Division. Office of the Fire Marshal

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008

Temporary Structure/Use Checklist

CIVIL AVIATION PUBLICATION CAP 08 CERTIFICATE OF AIRWORTHINESS

(i) Adopted or adapted airworthiness and environmental standards;

SERVICE LETTER. This service letter applies to the models and serials that have 12,000 or more flight hours as follows

50miler.com Outing Resource Center on Facebook

Program Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA

AIRWORTHINESS ADVISORY CIRCULAR

SERVICE LETTER. Conquest. WARNING: Further flight with a cracked carry through spar cap is prohibited. The carry

PACIFIC AEROSPACE CORPORATION, LTD.

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

Camp Trips Activity- Specific Plan

50miler.com Outing Resource Center on Facebook

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

PART 3. RESPONSE SPILL PREPARATION

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

Aircraft Leasing Manual

Technical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand

[Docket No. FAA ; Directorate Identifier 2013-CE-046-AD; Amendment. Airworthiness Directives; Dornier Luftfahrt GmbH Airplanes

SUMMARY AUDIT REPORT OF THE DIRECTORATE OF CIVIL AVIATION OF BURKINA FASO

Third Parties/Crossing

GUIDELINES ON BUNKERING OPERATIONS AND SHIP TO SHIP CARGO TRANSFER OF OILS, SUBJECT TO ANNEX I OF MARPOL 73/78, IN THE BALTIC SEA AREA

Airworthiness Standards Department CAMO Approval Process Form. S/N Activity Started Completed Initial Remarks*

Eaton ET Hydraulic Hose Saw INSTRUCTION MANUAL

DEVILS LAKE MUNICIPAL AIRPORT AERIAL APPLICATOR OPERATING PERMIT

AEROSPACE RECOMMENDED PRACTICE

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

ARTICLE 7 MOBILE HOME AND RECREATIONAL VEHICLE PARKS AND CAMPGROUNDS

SKILL TEST REPORT FOR INITIAL or REVALIDATION OF COMMERCIAL PILOTS LICENCE (HELICOPTER)

E PIAGGIO AERO INDUSTRIES S.P.A (PIAGGIO)

Building Permit Application

M&EE Stabling Point Safety Survey

BAE SYSTEMS (OPERATIONS) LIMITED

STEMME GMBH AND CO. KG

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012

[Docket No. FAA ; Directorate Identifier 2007-NM-031-AD; Amendment ; AD ]

STEPS REQUIRED TO OBTAIN A BUILDING PERMIT. 1. Obtain copy of Building Guidelines for River Ridge and Building Permit application.

CHECKLIST FOR ATO ANNUAL INSPECTION Personnel Licensing Office

NATIONAL PARK SERVICE CERTIFICATION OF COMPLETED SEGMENTS OF THE NORTH COUNTRY NATIONAL SCENIC TRAIL

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

[Docket No. FAA ; Directorate Identifier 2011-NM-039-AD; Amendment

GUIDELINES FOR FILING ADJUSTMENT OF STATUS APPLICATIONS

[Docket No. FAA ; Directorate Identifier 2014-NM-112-AD; Amendment ; AD ]

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE: FORTHWITH

Permit Application Requirements For Temporary Tents, and Membrane Structures

[Docket No. FAA ; Product Identifier 2018-NM-089-AD; Amendment ; AD ]

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

Chapter 12 Protective Clothing

Equipping a Patrol for Cooking and Camping

Guidelines for Evaluation of Quality Control for Manufacturing

BOMBARDIER, INC (FORMERLY CANADAIR)

Poly Shelters. Instruction Manual. Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC. Note: Photo may be of a different but similar model

BOULDER CREEK CATTLE FENCING FOR KOKANEE HABITAT ENHANCEMENT 2010

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

[Docket No. FAA ; Product Identifier 2018-NM-039-AD] AGENCY: Federal Aviation Administration (FAA), DOT.

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices

DEVELOPMENT OF A MANDATORY POLAR CODE UPDATE ON PROGRESS

TOPIC = CAMP SITE SELECTION

Minimum suggested standards for handling food grade hoses during tank washing. cargotanksafety.org

Cooking Booth Construction and Location (See Figure 1 and 2 for diagrams):

Business License Application ALL LICENSES EXPIRE MARCH 31

(1) Camping: what personal stuff should I take along? Things you ll find in your Scout handbook

GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OC No. 02 of 2018 O/O DIRECTOR GENERAL OF CIVIL AVIATION DATE : 11 June 2018

EUROCOPTER FRANCE (EUROCOPTER)

Indonesia Business visa Application

MAINTENANCE AND INSPECTION OF LIFE SAVING APPLIANCES

Contents. Part Amendments 7

Captain J. Ashley Roach, JAGC, USN (retired)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

09 LBL Turkey Bay Off-Highway Vehicle Area Rules & Regulations

BOR005. 8kg BASE BOLLARD BOR001. 6kg BASE BOLLARD SPRING LOADED BOLLARD BOR003 BOR002. 5kg BASE BOLLARD EXPANDING SAFETY BARRIER.

SURVEILLANCE CHECK LIST RENEWAL OF CERTIFICATE OF AIRWORTHINESS (GLIDER) S/N ITEMS OF INSPECTION SAT/UNSAT SIGNATURE

FILE: /PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT:

Shadow Boards. Market leading, bespoke, full colour shadow board systems to enhance your workplace. A place for everything and everything in its place

MANASSAS REGIONAL AIRPORT

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/26/13

SUPERSEDED. [Docket No. FAA ; Directorate Identifier 2015-SW-014-AD; Amendment ; AD ]

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

R1 BOMBARDIER, INC.

Aeronautical Studies (Safety Risk Assessment)

AIRWORTHINESS PROCEDURES MANUAL CHAPTER 26. Modifications and Repairs

IMO. RESOLUTION A.882(21) adopted on 25 November 1999 AMENDMENTS TO THE PROCEDURES FOR PORT STATE CONTROL (RESOLUTION A.787(19))

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

APPROVAL REPORT. Project No: Supplements Project No.: N/A. Class: 2510 Product Name:

[Docket No. FAA ; Product Identifier 2018-CE-006-AD] AGENCY: Federal Aviation Administration (FAA), Department of Transportation

Combined CAME & MOE INITIAL / AMENDMENT* COMPLIANCE CHECK LIST

REGISTRAR OF PASSENGER TRANSPORTATION MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE

Section 13. Job Safety Analysis

Temporary Campground Plan Review Application

Transcription:

15.0 Check Lists The following check lists are intended to serve as templates that can be customized for corporate purposes, for specific jurisdictions and for specific geographical areas. We stress that these templates have been intentionally composed to be as generic as possible and may require revision to conform to your corporate guidelines and legal requirements. They are not intended in any way to supersede local regulations. Figure 53: Explorationists have a great respect for the beauty of the wilderness. These check lists will provide tools for preserving the beauty. BHPBilliton 15.1 Camp Site Check List Figure 54: Miramar Page 259 of 297

(Office Name) 1 of 2 ENVIRONMENTAL COMPLIANCE FORM CAMP SITES Please use ink Project Name & Number: Work Permit #: s Camp in Use: Type of Occupied Camp: Contractor: (Geology, Geophysics, Drilling, Fly-in, etc.) (For example if it was a drilling camp indicate the drilling company name) Location of Camp (attach map): (UTM co-ordinates) Field Geologist/Geophysicist Responsible for Program: Geologist/Geotechnician Responsible for Site Inspections: Reclamation Complete (Completed by whom and the date) Further Work Required (Type of further work required and when should it be done) I, certify that this camp was operated according to company exploration guidelines and has met all terms and conditions of all government permits. Contractor's Signature (or representative) I, certify that this camp site was inspected by me on the of, 20, after the camp had been vacated, and that to the best of my knowledge all company and government permit standards have been met. Page 260 of 297

Site Inspector's Signature COMMENTS: 2 of 2 Attachments (Photos are mandatory - described, initialled and dated): Photos: Field Notes: Maps: Other: Signatures: Geologist in charge of program (in field) Project, Senior Project or Senior Geologist (if applicable) Regional Manager (mandatory) Page 261 of 297

15.2 Trenching Check List Figure 55:.14.6.2. Page 262 of 297

(Office Name) 1 of 4 ENVIRONMENTAL COMPLIANCE FORM TRENCHING (STRIPPED AREA) SITES Please use ink Project Name & Number: Work Permit No. s Excavated: Trench No.: Location (attach map): Contractor: Field Geologist responsible for program: Geologist/Technician responsible for site inspections: Reclamation Complete Further Work Required I, certify that all trenching procedures were done according to corporate exploration guidelines and have met all terms and conditions of all government permits and that the site was left in a clean condition, in compliance with all corporate and government work permit standards. Contractor s Signature I, certify that I have inspected the trench site and access road on the of, 20, after the trench had been excavated and reclaimed (where applicable) and that to the best of my knowledge all corporate and government permit standards have been met. Site Inspector's Signature Page 263 of 297

2 of 4 COMMENTS: Attachments (Photos are mandatory - described, initialled and dated): Photos: Field Notes: Maps: Other: Signatures: Geologist in charge of program (in field) Project, Senior Project or Senior Geologist (if applicable) Regional Manager (mandatory) Page 264 of 297

TRENCH (STRIPPED AREA) SITE INSPECTION LIST 3 of 4 Overall Appearance of Site: Clean: Unclean: Comments: Trench: Filled in Yes No Comments Reclaimed (i.e. reseeded) Yes No Comments Picket with Tag Inscribed With Trench Number Yes No Comments Debris Left: (check) Leaners Fill/Dirt Metal/Wire/Cans Containers (e.g. oil) Tools, machine parts Other (Specify) (amount/severity, etc.) Comments: Comments: Comments: Comments: Comments: Comments: Spills: Comments: (severity/area) Oil Yes No Comments: Soil Yes No Comments: Page 265 of 297

4 of 4 of Inspection: First Second Other Inspected by: First Second Other Further Cleanup Required: Yes No by Contractor by Company (Specify Work) Inspected by Government Officials: Yes No Is Ministry Sign-off Required: Yes No Cleared by Government Ministry: Yes No Page 266 of 297

15.3 Drill Site Check List Figure 56: Noranda/Falconbridge Page 267 of 297

(Office Name) 1 of 8 ENVIRONMENTAL COMPLIANCE FORM DRILL SITE - COLLAR & WATER SUPPLY HOLE No: Region: Contractor: (Drilling company responsible of drilling program) Project Name & No. s Drilled: ( drilling started and date drilling finish for this hole) Location: General Work Permit # (UTM co-ordinates) Grid (Grid co-ordinates if drill hole located on a grid) Geologist Responsible for drill: Geologist/Geotechnician responsible for site inspection: Reclamation Complete YES NO Further Work Required YES NO I, certify that all drilling procedures were carried out according to company exploration guidelines and have met all terms and conditions of all government permits and that the site was left in a clean condition, in compliance with all company and government work permit standards. Contractor's Signature (or representative) I, certify that I inspected the drill site and access road on the of, 20, after the drill had been removed, and that to the best of my knowledge all company and government permit standards have been met. Site Inspector's Signature Page 268 of 297

2 of 8 COMMENTS: Attachments (Photos of collar and water supply site are mandatory - described, initialled and dated): Photos: Field Notes: Maps: Other: Signatures: Geologist in charge of program (in field) Geologist (if applicable) Project, Senior Project or Senior Regional Manager (mandatory) Page 269 of 297

(Office Name) 3 of 8 COLLAR SITE INSPECTION CHECKLIST HOLE No: Overall appearance of the drill collar site - clean unclean Comments: Drill collar Casing pulled/date -yes no Hole cemented/date -yes no Capped -yes no Making water -yes no Casing damaged -yes no Picket with aluminium tag affixed -yes no Drill cuttings comments - Were drilling additives used? -yes no If yes, specify additives used Were oil licks used (absorbent carpeting)? -yes no Debris left (specify/check) Metal, wire, rods, cans, cable comments - Fuel drums comments - Containers for oil, kutwell, grease comments - Tools, machine parts comments - Hose comments - Core boxes comments - Plastic tarps comments - Burlap, work gloves, clothing comments - Garbage bags comments - Food containers/wrappers comments - Absorbent padding/mud comments - Leaning trees comments - Other comments (amount/area/severity etc.) Spills (amount/area/severity etc.) Oil - yes no comments - Fuel - yes no comments - Page 270 of 297

4 of 8 Grease - yes no comments - Mud - yes no comments - All reportable spills Authorities notified? MOE/Dept. of Environment (or equivalent) yes no MNR/Dept. of Natural Resources (or equivalent) yes no Company (which one?) yes no Fire pit Applicable - yes no All contents burnt - yes no Contents remaining unburned: Wire - yes no Cans - yes no Foil - yes no Other - yes no Specify Page 271 of 297

(Office Name) 5 of 8 HOLE No: COLLAR SITE INSPECTION CHECKLIST Water Proximity of collar to running water or lake Approximate slope of ground Condition of sump or berm Would silt clay run off into water if heavy rain occurred? Yes No Uncertain Should the site be re-examined when snow has melted, water level lower, etc.? Yes No Uncertain Suggested date: Reclamation Hay spread yes no Trees planted yes no Site seeded yes no Other (specify) WATER SUPPLY SITE INSPECTION CHECKLIST Overall appearance of the water supply site - clean unclean Comments: Debris left (specify/check) Metal, wire, rods, cans, cable comments - Fuel drums comments - Containers for oil, kutwell, grease comments - Tools, machine parts comments - Hose comments - Core boxes comments - Plastic tarps comments - Burlap, work gloves, clothing comments - Garbage bags comments - Food containers/wrappers comments - Absorbent padding/mud comments - Leaning trees comments - Other comments (amount/area/severity etc.) Page 272 of 297

Spills (amount/area/severity etc.) Oil - yes no comments - Fuel - yes no comments - Grease - yes no comments - Mud - yes no comments - 6 of 8 All reportable spills Authorities notified? MOE/Dept. of Environment (or equivalent) yes no MNR/Dept. of Natural Resources (or equivalent) yes no Company Office (which one?) yes no Fire pit Applicable - yes no All contents burnt - yes no Contents remaining unburned: Wire - yes no Cans - yes no Foil - yes no Other - yes no Specify Page 273 of 297

(Office Name) 7 of 8 HOLE No: WATER SUPPLY SITE INSPECTION CHECKLIST Water Proximity of collar to running water or lake Approximate slope of ground Condition of sump or berm Would silt clay run off into water if heavy rain occurred? Yes No Uncertain Should the site be re-examined when snow has melted, water level lower, etc.? Yes No Uncertain Suggested date: Reclamation Hay spread yes no Trees planted yes no Site seeded yes no Other (specify) DATE OF INSPECTION first second other INSPECTED BY first second other IS FURTHER CLEANUP OF COLLAR AREA REQUIRED? No Yes By contractor by Noranda IS FURTHER CLEANUP OF WATER SUPPLY AREA REQUIRED? No Yes By contractor by Noranda If yes specify what needs to be done and when: Page 274 of 297

(Office Name) 8 of 8 HOLE No: DRILL SITE INSPECTION PHOTOGRAPHS DATE: DESCRIPTION: DATE: DESCRIPTION: Page 275 of 297

15.4 Stream Crossing Check List Figure 57: Golden Band Page 276 of 297

(Office Name) 1 of 3 ENVIRONMENTAL COMPLIANCE FORM STREAM CROSSING (Required For Drill/Mechanized Trenching Programs) Please use ink Project Name & Number: Work Permit #: s Crossing in use: Type of Crossing: Contractor: (Ford, Bridge, Ice, etc.) Temporary Crossing Removed: Location of Crossing: Field Geologist Responsible for program: Geologist/Geotechnician responsible for site inspection: Reclamation Complete Further Work Required I, certify that this stream crossing was done according to company exploration guidelines and has met all terms and conditions of all government permits. Contractor's Signature I, certify that this stream crossing was inspected by me on the of, 19, after all crossings had been completed, and that to the best of my knowledge all company and government permit standards have been met. Site Inspector's Signature Page 277 of 297

2 of 3 Has the water crossing been approved in the original work permit? Yes No Has a supplemental crossing permit been issued? Yes No If verbal permission has been given to use a water crossing, By Whom: Ministry: : Page 278 of 297

(Office Name) 3 of 3 ENVIRONMENTAL COMPLIANCE FORM STREAM CROSSING Please use ink Are others using this crossing? Yes No If yes, details What equipment has used the water crossing and with what frequency? COMMENTS: Attachments (Photos are mandatory - described, initialled and dated): Photos: Field Notes: Maps: Other: Signatures: Geologist in charge of program (in field) Project, Senior Project or Senior Geologist (if applicable) Regional Manager (mandatory) Page 279 of 297