Intercontinental Consultants and Technocrats Private Limited

Similar documents
Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Development of Road Infrastructure in India

LAND VALUE CAPTURE FOR RAILWAY STATION DEVELOPMENT. Changing perception of Railways

Implementing TOD Challenges and opportunities for Railway Stations Redevelopment WRI Workshop

RAILWAY STATION REDEVELOPMENT

TRANSPORT INFRASTRUCTURE Edition: February - April 2017

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)


PPP Days 2010 PPPs Lessons from the Last 18 Months

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

Maha Metro comes into existence

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

M.P. POLICE HOUSING CORPORATION LTD. Multi-Storey Residential Complex for Police Personnel At 15 th Battalion, INDORE (Madhya Pradesh)

Indian Railway Stations Development Corporation Ltd. (IRSDC) Development of Bijwasan Railway Station, New Delhi

Honorable Minister for Industries inspection at CMRL Metro Stations from AG-DMS to Washermanpet

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2

IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICTION I.A. NOS.61 & 62 OF WRIT PETITION (C) No.657 of 1995

Japan India Cooperation on Railway Sector

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

Daily Current Affairs Capsule 16 th February 2019

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID

JAIPUR METRO. One of the world s fastest project completions. A presentation by. Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation

5 million. TARGET ACHIEVED 100+ Railway Stations Became RailWire Wi-Fi Zone in Stations/week. Fact Files.

GMR Infrastructure Limited (GIL) FY17 Performance Highlights

ASX Announcement. Appointment of Preferred Contractor for CHPP Construction at Colton Mine

Key Projects Carmichael Rail Line (CRL)

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

August 30, Revised Cost Estimate for setting up of India Post Payments Bank from Rs. 800 crore to

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

ROAD DEVELOPMENT IN INDIA 2015

GOVERNMENTOF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO.141 TO BE ANSWERED ON RE-DEVELOPMENT OF RAILWAY STATIONS

RailTel Celebrates its 17th Foundation Day

LEAD-UP EVENT, PORT AND COASTAL INFRASTRUCTURE AT VISAKHAPATNAM (APR 3-4, 2018) FOR AIIB ANNUAL MEETING 2018 Mumbai

IRONTON-RUSSELL BRIDGE REPLACEMENT

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

TORONTO TRANSIT COMMISSION REPORT NO.

Trieste, 26 th September 2012

integrated ANNUAL report 2012

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

Intercontinental Consultants and Technocrats Private Limited. Innovative, Creative & Technologically Sustainable Infrastructure Solutions.

For personal use only

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

Construction of Sardar Mandir at Surat. Urban development. Government of Gujarat

Related Expertise Concession Projects - PPP

Vizag could be India s new scuba diving hotspot. Infosys signs pact with U.S. Internal Revenue Service. PIOs make mini-world Parliament

National Conference on

Pragati Maidan, New Delhi May 2019

A SMARTER HOTEL INVESTMENT

Indore blooming with the Vibrancy of Gujarat

TENDER NO: KCAA/038/ EXPRESION OF INTEREST (EOI)

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

VOLLEYBALL FEDERATION OF INDIA

AIRPORTS AUTHORITY OF INDIA

15-18 May 2018 Proposal for Government of Bihar to participate in GES 2018

Subnational Reform in the Business Regulatory Framework Experiences and Challenges in Select Indian States

2-3 B Action taken on decisions of previous meeting 4 C To consider the following :

ICT LIBRARY UPDATE. Bi-monthly March June 2016 Vol. 14 : No. 2 & 3. Contents

AIRPORTS AUTHORITY OF INDIA

New Domestic Cruise Terminal in Mumbai Inaugurated by Union Minister Shri Nitin Gadkari and Chief Minister of Maharashtra

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference.

INVITATION TO PRE-QUALIFICATION FOR PARALLEL PROJECTS. +One

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE

ORDER. Subject : Constitution of the Working Group on Tourism for the Twelfth Plan ( ).

June 26 - International Day against Drug Abuse and Illicit Trafficking

Sub. Rev Eng. Ad. Rev Hin. Ad. Rev Ver. Ad. Rev.

Provincial Railway Technical Standards

Network Size and Growth

Metrolinx Board of Directors. President, Union Pearson Express Date: September 22, 2015 UP Express Quarterly Board Report

TERMINAL DEVELOPMENT PLAN

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Indian Small Scale Paint Association EVOLUTION THROUGH INNOVATION

The Cabinet approved the consent memorandum between India and Canada for cooperation in science and technology.

PRESENTATION ON INDIA JAPAN BILATERAL RELATION

An Overview of Airport Infrastructure in India. By V.P.Agrawal, Chairman, Airports Authority of India

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

YWCA Townsville Townsville

Under the patronage of:

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres

MANOMAV SHOWCASE PROJECTS PORTFOLIO

ASX RELEASE. Erdenet to Ovoot Concession Agreement Executed

TORONTO TRANSIT COMMISSION REPORT NO.

Home About us Contact

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

World s Premier Marine Specialist. Page 1

S.No 1. 4 Gujarat. JJ PV Solar Pvt Ltd 1000 Amogeo Ites India Limited Haryana Artheon Electronics Pvt Ltd 1000

Movement Strategy. November On behalf of Barton Oxford LLP

Delhi Airport Metro Express A Case of Public Private Partnership Project

AUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH

TCS-Nielsen India's Biggest IT Outsourcing Deal. Australia discovered missing submarine 103 years after World War I

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY

MINUTE of a MEETING of the Board of Directors of Culture and Sport Glasgow held at the Mitchell Library, Glasgow on 31 March 2010 at 10.30am.

TORONTO TRANSIT COMMISSION REPORT NO.

Transcription:

Intercontinental Consultants and Technocrats Private Limited ISO 9001 Innovative, Creative & Technologically Sustainable Infrastructure Solutions Volume 19 Issue 4 N E W S L E T T E R OCTOBER, 2016 EDITOR'S DESK Mr. K. K. Kapila, our CMD, wishes all our readers and eir families a very happy and prosperous Deepawali. May is festival of lights bring you all tons of happiness, good heal and joy. Let us sincerely hope and pray at is festival will usher in reaffirmation of hope and renewed commitment to friendship and goodwill roughout e world. Our CMD, Mr. K. K. Kapila was bestowed IBC Life Time Achievement Award 2015 on 06 October 2016 for his valuable contribution, dedication and outstanding service to e Indian Buildings Congress. The award was presented by Shri Venkaiah Naidu, Hon'ble Union Minister of Urban Development at NDMC Convention Centre, New st Delhi during e Inaugural function of 21 Annual Convention and National Seminar on Towards Building Smart & Sustainable Infrastructure in Urban Development of Indian Buildings Congress. Anoer feaer to an already crowded cap of our CMD!! Our heartiest congratulations to Mr. Kapila!! Habibganj Bhopal Railway Station under West Central Railway is e first railway station in India to be redeveloped into a world class railway station wi state-of-e-art facilities togeer wi efficient passenger movement and traffic management systems. More details in is Newsletter. Congratulations to all e ICTians involved wi is project for eir dedication and perseverance in making is project a success. Before I close, time has come for me to bid adieu. This is e last Newsletter I have edited. I have been in is hot seat for nearly two decades and believe you me I enjoyed every moment of it!! The Newsletter has undergone many changes in shape, size and content since it was first published in July 1998. I would like to express my heartfelt gratitude for your support and appreciation of e Newsletter. It is now perhaps an opportunity for a fresh point of view and a new look for e Newsletter. I am confident at my successor will take is Newsletter to newer heights. Last but not e least, I would like to put on record my gratitude and anks to my Secretaries and Design & Layout experts for eir help and support all rough enabling me discharge is onerous but enjoyable responsibility in publishing numerous Newsletters to my fullest satisfaction. While bidding farewell, I am reminded of William Shakespeare's quote from e play Julius Caesar : Happy Reading!! And wheer we shall meet again I know not. Therefore our everlasting farewell take : Forever, and forever, farewell friends!! If we do meet again, why, we shall smile; If not, why, en is parting was well made. - Editor

PROJECTS AWARDED Detailed Design Services for Development of MVDC at Cheyyar, Tamilnadu. Client : M/s Mahindra & Mahindra Ltd. The objective of e consultancy services is to prepare Detailed Engineering Design, BoQ and tender documents for Vehicle Test Track and associated buildings at Chengalpattu, Kanchipuram Dist., Tamilnadu Engagement of Road Safety Expert (RSE) for NHAI. Client : National Highways Auority of India. The objective of is Consultancy service is to assist e auority and provide requisite technical support / advice to develop a robust institutional mechanism for Road Safety, formulate policy, undertake appraisal, monitor and review e process / progress of various road safety related activities. The Road Safety Expert is expected to carry out e responsibility and e auority of NHAI while discharging its function as per is assignment on behalf of NHAI. Consultancy Services for Preparation of Detailed Project Report for e Construction of New 6-lane Bridge Parallel to existing 2-lane Bridge at Phaphamau / Near Allahabad in Uttar Pradesh. Client : Ministry of Road Transport & Highways. The main objective of e proposed consultancy assignment service is to carry out e feasibility study and DPR for Construction of Proposed Bridge adjacent to existing 2-lane bridge. The DPR shall include detailed survey, soil testing, traffic survey, finalization of alignment for approval of e Govt., land plans and preliminary design of geometrics, pavement, structures, safety devices, toll plazas, project facilities, finalization of document for environmental clearance & oer statutory clearances, estimation of probable cost of Construction etc. Consultancy Services for Auority's Engineer for Rehabilitation and Upgradation of Jabalpur Bhopal Section of NH-12 from Km 10.400 to Km 130.00 to four lanes wi paved shoulders wi Provision of Rigid Pavement on EPC mode under NHDP-III in e state of Madhya Pradesh. Client : Madhya Pradesh Road Development Corporation Limited. The objective of e study is to review e drawings, inspect & monitor construction work and assist Auority / Steering Group issue Completion / Provisional Certificates. The Auority's Engineers shall be responsible for supervising e designs, construction, maintenance and operation in accordance wi e provisions of e EPC Agreement and oer schedules. Independent Engineer for WCP-5 - Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) of Existing State Highway Hirekerur - Ranibennur in e State of Karnataka on DBFOMT Annuity Basis. Client : Karnataka Road Development Corporation Ltd. The objective of e assignment is to ensure high quality construction of all works in compliance wi e Concession Agreement and develop and implement an engineering design, which conforms wi applicable standards and technical specifications. Provision of Consultancy Services to Undertake Road Inventory and Condition Survey for Coastal Zone in Kenya. Client : Kenya Roads Board, Nairobi, Kenya. The specific objectives of e study are to (i) Establish an inventory and condition of e narrow roads network in Kenya which is currently not captured in e KRB RICS database (ii) Have ese roads assigned numbers and integrate e new data into e existing Road Inventory and Condition database (iii) Collect road condition data for e classified road network (160,886km) and update e KRB Road Inventory and Condition geo-database.

Auority's Engineer Consultancy Services for Rehabilitation and Upgrading to 2 lanes / 2 lane wi Paved Shoulders Configuration and Strengening of Faua-Harnaut-Barh Section (km 0.0 to km 69.600) of NH-30A in e State of Bihar under Phase-I of National Highways Inter-connectivity Improvement Projects (NHIIP). Client : Ministry of Road Transport & Highways. The objective of e study is to review e drawings, inspect & monitor construction work and assist Auority / Steering Group issue Completion / Provisional Certificates. The Auority's Engineers shall be responsible for supervising e designs, construction, maintenance and operation in accordance wi e provisions of e EPC Agreement and oer schedules. Engineering Consultancy work of 2 Laning / 2 Laning wi Paved Shoulder / 4 Laning of Raigarh- Punjipatara-Gharghoda-Paalgaon Road Section of SH-1AB in Chhattisgarh (Km 84.250 to Km 194.431( on DBFOT (Toll) Basis. Client : M/s Jindal Steel and Power Ltd. The objective of is assignment is to carryout Traffic Survey, Survey & Investigations, Detailed Engineering Designs and any oer design activities for e satisfactory completion of e consultancy services. Contract Package 303: Design and Construction of Civil, Structures and Track Works, involving Formation in Embankment / Cutting, Ballast on Formation, Track Works, Bridges, Structures, Buildings, Yards & Integration wi Indian Railway's Existing Railway System and Testing & Commissioning on Design-Build Lump Sum Basis of Khurja-Pilkhani Section (approximately 222 Route Km of Single Line) of Eastern Dedicated Freight Corridor. Client : M/s IL&FS Engineering and Contraction Co. Ltd. The objective of is assignment is to study & review Tender Documents and Drawings, carryout site visits, preparation of pre-bid Queries and work out conceptual design and performance parameters and its compliances as per e requirement of Tender Documents. Redevelopment of Habibganj Bhopal Railway Station Habibganj Bhopal Railway station will be a five platform station. It will have six lifts, eleven escalators, ree travellators and ree subways, one of which will be dedicated for parcels. It will have separate arrival and departure areas and dedicated parking facilities for pick-ups and drop-offs. In case of fire, e passengers can reach designated safety points in six minutes. It will also be disabled-friendly. The station will have provision for generating solar energy on its premises. On 14 July 2016 e Indian Railways revealed e first look of a world-class station expected to come up at Habibganj in Bhopal in ree years. PROJECT NEWS The concept of is unique contract at has been awarded by Indian Railway Station Development Corporation Ltd. (IRSDC) to a Consortium of M/s Bansal Construction Works Pvt. Ltd. (Lead Member) and M/s Prakash Asphaltings & Toll Highways (India) Ltd. (Consortium Member) is based upon using revenues generated rough leveraging of commercial development of surplus railway land and e air space above railway tracks. A team of consultants assisting IRSDC in is effort comprised of a Consortium of GMP International GmbH, Germany and Intercontinental Consultants and Technocrats Pvt. Ltd. India as e Architect and Technical Consultants; Ernst &

Young LLP as e Financial Consultant & Transaction Advisor and Shardul Amarchand Mangaldas & Co. as e Legal Consultant. The Development Agreement was signed on 14 July 2016 at Rail Bhavan, New Delhi under e auspices of e Hon'ble Railway Minister, Mr. Suresh Prabhu. The oer distinguished guests present on e occasion were e MoS (Railways) - Mr. Manoj Sinha, Chairman Railway Board - Mr. A. K. Mittal, Member Engineering Railway Board - Mr. A. K. Mittal, Member Traffic Railway Board - Mr. Mohd. Jamshed, Advisor Land & Amenities, Railway Board - Mr. Rajeev Choudhry. Speaking on e occasion, Hon'ble Railway Minister called e ceremony a historic moment. The modernization, he said, will help improve e railways' finances, since it will open up commercial space. The two main sources of e Indian Railways' revenue, passenger fares and freight are not sufficient, he said. Oer stations in line for redevelopment by IRSDC are Surat and Gandhinagar in Gujarat, Bijwasan and Anand Vihar in Delhi, Shivaji Nagar in Maharashtra and Chandigarh. A model of e proposed Habibganj Bhopal Station Sone Railway Bridge at Dehri-On-Sone Hon'ble Railway Minister Mr. Suresh Prabhu being given a briefing on e model A bridge of leng 3.06 km over river Sone is under construction between Sone Nagar and Dehri-On-Sone railway stations. Dedicated Freight Corridor Corporation of India Ltd. (DFCCIL), M/s ATEPL-MGCPL (JV) and M/s ICT Pvt. Ltd are e Client, Contractor and Project Management Consultant, respectively. The project involves construction of 93 spans each of 32.926 m having 186 pre-stressed box girders. The girders are cast at yard, transported and launched at e different locations wi e help of launching girder. The cost of e project is Rs. 249.84 crores and e date of start and completion are 05 December 2013 and 04 April 2017, respectively. The progress so far is excellent and ahead of schedule by at least 2 mons. Out of 186 girders, 170 have already been cast and 158 placed in position. The overall progress is 92% and e project is anticipated to be completed by e end of February 2017. Launching and placing of girder

CMD's visit to Mongolia Mr. K. K. Kapila, CMD visited Mongolia from 12 to 15 August 2016. He visited and inspected e ongoing road and bridge construction activities of Western Regional Road Corridor Investment Program (WRRCIP) project of construction of 189.7 km road between KHOVD and ULAANBAISHINT (on border of Mongolia and Russia) in e Western Mongolian Region, being constructed rough four independent Contract Packages on 13 & 14 August 2016. Presently, e construction works are in progress in ree Contract Packages. CMD visited e entire road leng of all e ree Contract Packages and appreciated e works being carried out by e Contractors and e Consultant's supervision teams in is treacherous terrain and harsh climate at an altitude ranging from 1314 m above mean sea level (near Buyant River) to 2644 m above mean sea level (Buraat Pass) wi limited and restricted working period available for carrying out e works. CMD appreciated e beautiful landscape and e natural surroundings of e area wi lakes and snowy mountain peaks along e road alignment. CMD held review meetings wi e Contractors and Consultant's Supervision teams of each Contract Package separately. He reviewed e progress, hold-ups, obstructions and discussed ways to improve e progress. CMD advised e Contractors to follow e procedures of FIDIC Contract Conditions and e Engineer's instructions. He also advised e Consultant's supervision teams to guide e Contractors' staff wi a view to ensure at e project is completed wiin laid down time. He, however emphasized at speeding of progress should not be at e cost of quality of works. CMD's visit has certainly given a big boost to bo e Contractors and e Consultants. View of e terrain of WRRCIP project area Group photograph wi construction teams of Contract Packages CW1-1 and CW1-3 Inspecting subbase work of Contract Package CW 1-1 Holding meeting wi Consultant s and Contractor s staff in Package CW1-2 Inspecting bridge construction work of Contract Package CW 1-2 Holding meeting wi e Consultant s staff at Khovd

KUDOS Mr. K. K. Kapila speaking to e media after he was unanimously re-elected to serve a ird term as Chairman of International Road Federation, Geneva.