Strategy - The Big Picture

Similar documents
Balloch Charrette Report. Final Issue 16th May 2016

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Introduction 3. Part 1: Defining and Measuring a High Quality Planning Service 4. Part 2: Supporting Evidence 34

Borders Railway - Scottish Borders Work Plan

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

20th November 2013 CONTACT OFFICER: GENERAL MANAGER (TELEPHONE )

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

HUNTLY MULTI SPORTS HUB: FEASIBILITY STUDY

National Park Authority Board Meeting

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Tourism Development Plan for Scotland Questionnaire

Working Towards Sustainable Tourism in England s AONBs

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

Rail Update Station Usage Statistics and Network Rail Performance

GLASGOW CITY REGION CITY DEAL

Research Briefing Flood and Coastal Erosion Risk Management in Wales

Scottish Pilgrim Routes Forum Scottish Charitable Incorporated Organisation - SC045212

Strategic Transport Forum

Tourism and the Cairngorms National Park // Update 2006

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

ScotRail. Launch Speech by Jeff Hoogesteger, CEO Abellio Group

Update on implementation of Taking Revalidation Forward recommendations

Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY. Regional Air Service Development Study

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

IAT Annual Conference 'Driving Forward

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

Draft Marine and Harbour Facilities Strategy

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

Part 005 Implementation Strategy _

Copyrighted material - Taylor & Francis

BD- Legacy Steering Group Agenda

Loch Rannoch Conservation Association Strategic Development - 5 Year Action Plan

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Millport Charrette. Moving forward What do you think? Where are the opportunities? What are the priorities?

Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Local authority Main catchment Tay Estuary and Montrose Angus Council, Dundee coasta

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

Committee. Presentation Outline

VICTORIA QUAY COMMERCIAL PRECINCT PLAN

The Strategic Commercial and Procurement Manager

Council Briefing Minutes

ENVIRONMENT ACTION PLAN

Map showing location of public transport projects in vicinity of railway station

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

Living & Working Tourism

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Economic Development Sub- Committee

Hotel and Hospitality Services. Capita Real Estate

COMMUNITY ACTION PLAN. Strathfillan GARTMORE 1

Transport Delivery Committee

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Part B: General Meeting of Rail North Limited

West Dunbartonshire Transport Outcomes Report 2009/10. Working in partnership to deliver transport solutions

DUMFRIES AND GALLOWAY Regional Tourism Strategy

Section A: Scheme Summary

Sustainable Procurement Policy for Heathrow Airport Limited

West of England. Priority Places Requiring Public Investment

Place Standard Where are we now? John Howie Organisational Lead Health Equity (Physical Activity & Place) NHS Health Scotland

Agenda item no 7. Strathclyde Bus Alliance - Proposal. Committee. Strategy and Programmes. Date of meeting 20 May 2016 Date of report 25 April 2016

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

British Horse Society-Scotland Developing Falkirk s Access Network- In the Hoof Prints of the Kelpies!

Getting our Priorities Right

City Deal City Centre Enabling Infrastructure Public Realm. Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL

The overarching aim of this strategy is to ensure that Devon can achieve its potential to be a first class visitor destination.

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

SUBMISSION FROM RENFREWSHIRE COUNCIL

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Aspirations and Ambitions...our development opportunities

Infrastructure for Growth

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013

Minute of Meeting held in John Rae Room, The Warehouse, Stromness, Orkney on Friday 27 November 2015 at 9.00am.

Message from the Managing Director... r...

Community Transport update

Review of the Scottish National Tourism Strategy

Events and Festivals Plan

Annex 2 - Borders Railway Blueprint: Action Plan Projects and Finance Overview

It s Time to Facilitate Growth. Global Eco Asia-Pacific Conference Ms Karla Way-McPhail Director, NAIF

Enhancing customer service Offering the right services Improving integrated journeys Facilitating local

Opportunities to Get Involved

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

Scotland - Round 3 Awards - Rest of Scotland

What will you be doing this August?

Visit West Lothian Strategic Action Plan

Adelaide Shores. Presentation to Recreation and Parks Conference 8 April How to become a world class Tourism, Recreation and Sport precinct

APSE Parks Seminar 2016 Make Haigh while the sun shines! Developing and delivering a sustainable solution for Wigan s Destination Parks.

APPLICANT NAME PROJECT DESCRIPTION AWARD

TOURISM IN WESTLAND MARCH 2012

Bus Services Framework for subsidised local bus service contracts

1.1. The purpose of this report is to seek approval for the adoption and publication of the Sports Pitches Strategy for East Dunbartonshire.

KICKING FOR 22. BOPRU Strategy July 2017

ROCHESTER RIVERSIDE. City of learning, culture, tourism and enterprise.

Active Travel Strategy for Perth and Kinross

SERVICE LEVEL AGREEMENT (SLA) FOR THE DELIVERY OF TOURISM MARKETING SERVICES IN NEWQUAY

Transcription:

Appendix 1 Strategy - The Big Picture Cameron House Balloch Castle Maid of the Loch and Watersports Hub Loch Lomond Shores Walled Garden Development Site East Riverside Path West riverside Walk Moss O Balloch Station Square 24 Page 78 of 217 Village Square

The purpose of this Charrette report is to provide a template for local stakeholders to take forward a package of improvements to transform Balloch and deliver the vision outlined in this report. This provides a start point and once these are examined in detail there may be further refinement and update. Many of the individual projects will need further feasibility study and design work as specified in the action plan. The Charrette report is intended to inform this further work, as well as complementing the emerging Local Development Plan (LDP) by setting parameters for how key LDP opportunity sites in Balloch could be developed (particularly sites MU1 The Old Station, VE1, VE2 East Riverside, VE3 Balloch Castle and VE4 Woodbank House). The following action plan breaks down all the projects mentioned within the report into actionable steps in the short term (next 2 years), medium term (2-5 years) and long term (beyond 5 years). Priority projects have been identified as Balloch Castle; West Riverside; Parking Strategy; Station Square and Events/Activity Strategy. New riverside walkway connecting village centre, Balloch Pier and Loch Lomond Shores Secure a viable use for Balloch Castle that is compatible with long term sustainability, funding potential and ownership constraints; include café/toilets for public use. Maximise local skills/ PP Work up scheme design (to be integrated with proposals), agree funding package in conjunction with wider riverside proposals PP Options appraisal to find appropriate use of Castle building. Develop West Riverside site PP Prepare development proposals for land owned by Scottish. Agree local employability package as part of development delivery Implement as early phase of wider West riverside proposals. Appoint delivery partner to develop and implement viable proposal, business plan and funding package, proposals and local employability package Every project will depend on effective collaborative action to be brought to fruition; the action plan suggests who the lead and support players should be and where there might be for other organisations to be positively involved. In addition to the project-specific actions identified in the action plan, it is important that appropriate governance and communication arrangements are put in place to keep the momentum of the Charrette, and ensure that there is demonstrable progress towards action during 2016. This should take place in discussion with the community, establishing a mechanism for local communication. At its simplest, this could be a steering group comprising a range of partners to lead and monitor implementation of the Charrette action programme. There may also be scope for targeted local organisations to be established, such as a business association (to undertake collective efforts like marketing and events programming) and a Community Development Trust (to deliver or contribute to the delivery of projects which would benefit from community involvement such as riverbank management and events programming in public spaces). Organisations like DTA Scotland can provide useful advice and experience on which models might be most appropriate for Balloch. Preferred bidder for Glasgow City Preferred developer for Economic Development 58 Page 79 of 217 PP - Priority Project

Deliver and facilitate calendar of events and activities Activity/Event Strategy and Plan PP Prepare an activity and events strategy and plan Deliver and facilitate calendar of events and activities Shores New Station Square arrival point and public space Rename station Balloch Loch Lomond. New space between Station/ Sweeneys Cruises. High quality public realm. Resite historic bronze fountain. Develop Management and Maintenance Plan Maximise local skills/ Public conveniences PP Prepare detailed public realm design and management & maintenance plan. Rename station. Implement public realm improvements Sweeneys Cruises VisitScotland Network Rail/ Abellio/Scotrail/ SPT Parking strategy to maximise parking availability Undertake parking survey during summer 2016 to properly understand the situation, with community input use this to shape action plan. Increase awareness of rail travel to Balloch. Maximise number of parking spaces at Moss O Balloch,, Balloch Pier, Balloch Castle, Old Luss Road, Balloch Road and Drymen Road without damaging the area s character. Improve walking routes and signage around the village, including a bridge or ferry across the River Leven at the mouth of the loch. Investigate high-quality shuttle connecting car parks, railway station and destinations. An Event Parking Strategy should be investigated and developed During major events, maintain vehicle access to businesses in the village centre. Redesign Balloch Road in village centre to minimise indiscriminate parking. Create coach drop-off space at proposed Station Square. PP Undertake summer parking survey, with input from Community and businesses. Commission parking strategy for village as a whole, using Charrette report as the brief. Begin phased implementation of parking strategy. Continue phased implementation of parking strategy. Residents Key landowners Abellio Scotrail 59 Page 80 of 217 PP - Priority Project

Begin phased delivery of improvements and Management and Maintenance Plan, employability benefits Love Loch Lomond West Dunbartonshire Woodland Trust Management and Activity Plan for Balloch Park Improve paths into the Park along river/loch and from Moss O Balloch, and integration with new connection across river mouth. Selective woodland felling in the Park to open up vistas. Enhanced lighting in the Park. Historical interpretation on site of old castle near Walled Garden. Investment in infrastructure for outdoor events spaces below Balloch Castle and in Walled Garden. Appropriate free adventure activities in the Park. Measures to reduce erosion of river banks and lochside. Establish Friends of Balloch Park to co-ordinate proposals and ongoing management. Prepare Management Plan for Balloch Park. Agree local employability package as part of development delivery if appropriate. Establish Friends of Balloch Park to help co-ordinate events and management of Park. Continue phased delivery of improvements and Management and Maintenance Plan, Glasgow City Friends of Balloch Park New Village Square at entrance to Moss O Balloch High quality public realm. Maintain and improve as necessary Moss O Balloch: play park, paths, events/ recreation spaces, drainage and parking. Organise events and activities to bring activity to the new space. Develop Management and Maintenance Plan Maximise local skills/ Prepare detailed public realm design and management & maintenance plan. Implement public realm improvements. Signage strategy to develop clear, flexible signage hierarchy: Strategic arrival points and destinations. Individual businesses/attractions within those strategic destinations. Onward connections to other places via NCN and long distance paths. Develop Management and Maintenance Plan. Develop co-ordinated and flexible signage strategy using Charrette report as the brief. Begin phased implementation as development takes place and funding becomes available. Continue implementation. and facilities Abellio Scotrail VisitScotland Steamship Company Water Sports Association Roads 60 Collaborative review of pier area Collaborative design to maximise integration of development proposals and supporting infrastructure/facilities proposals. Page 81 of 217

West Dunbartonshire Tidy up river and manage erosion of river banks - maximising for local volunteer groups and skills/ Prepare River Leven Management Plan from Loch Lomond to barrage. Remove abandoned boats from water. Selective felling of trees on Monkey Island and banks to reveal views. Secure funding and deliver public realm improvements Implement Management and Maintenance Plan. Water SEPA Riparian Landowners Woodbank House Renovate and re-use historic A-listed building, with sensitive new enabling development in grounds to generate funding for renovation. LDP proposed use is tourism. Submit planning application. Promote opportunity through Local Development Plan delivery programme. and renovate Listed Building. Agent and Landowner New connection across River Leven between Balloch Pier and Balloch Park Feasibility study exploring all options - bridge, ferry, bus/shuttle. Investigate funding for preferred option. Integrate new/improved pedestrian/cycle routes with local path network: National Cycle Network, River Leven towpath, John Muir Way, Three Lochs Way and via Loch Lomond Shores to Cameron House Design signage and path improvements to connect riverside walkway to wider path network, including Management & Maintenance Plan. Implement signage and path connections Cameron House CSGN Helensburgh & District Access Trust West Dunbartonshire 61 Page 82 of 217