SOLUZIONA S.A. Servicios Profesionales de UNIÓN FENOSA. Recognition of current status on the Access Roads to El Tesoro Project Report.

Similar documents
DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

BUS 2 1. Introduction 2. Structural systems

American Conservation Experience

1. Progress of road construction of Via Limon (Limon Metal Corral)

POINT OF VIEW on the proposed solutions for improving navigation at critical points at Bechet, Corabia, Belene and Popina

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25

e. Artificial avalanche release. This usually consists of delivering explosives to avalanche starting 2.5 AVALANCHE MITIGATION

Group similar facilities together separate dissimilar facilities.

visits4u Case Studies: Historical Centre of Athens Athens, Greece

Griffith Park Trail Run Trail Guide Click for

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY

Permeable RECREATIONAL TRAILS

Why does 2010 feel like the dark ages for fare collection? Fred Combs Lextran, Planning and Technology Manager Lexington, Kentucky

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement

Presented by Dave Hiatt to attendees at the 11/6/2016 WOHVA Annual Meeting. (Mention the picture above is of the front number plate on my dirt bike)

AVALANCHES; CONTROLLED TRIGGERING OFF BY RADIO BEAMS.

Guidelines for Snow Avalanche Risk Determination and Mapping. David McClung University of British Columbia

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

at Ivato and Nosy Be

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Installation Instructions for the Rolltec Bravo Awning

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

ZIP LINE CHALLENGE. DESIGN CHALLENGE Build a device that can transport a ping-pong ball from the top of a zip line to the bottom in 4 seconds or less.

Chapter 51 DIGGING TOOLS

UNA EXPERIENCIA COLOMBIANA

Trollstigen Mountain Road

for for HotValley TM TM

CENTER PIVOT TRACK MANAGEMENT OPTIONS

4 Are you responding on your own behalf or on behalf of an organisation or group?

PUBLIC SPACE AND SAFETY REGULATIONS FOR THE PATH EL CAMINITO DEL REY

The Perfect Solution For Indoor And Outdoor Events.

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

TRANSFER OIL. thermoplastic and ptfe hoses fittings and assemblies

Airport Design-3 Geometric Design

Contents. Awnings USA - Full Protective Hood Manual Instructions ft 11" - 11ft 6" Awnings

HOME OWNER PRE- DELIVERY INSTRUCTIONS

Understanding user expectations And planning for long term sustainability 1

SitRep. United Nations System in Costa Rica. Situation Report 2 UN Disaster Management Team - Costa Rica

Property access tracks

Table of Contents. Social Studies Lessons. Science Lessons. Glossary 106 Performance Projects 107. A Productive Partnership LE7.1c 4. Teaching.

The Mount Carmel Bahá í Projects. Haifa, Israel

Slope instability along some sectors of the road to La Bufadora

Roadside Measurement of Truck Noise Source Distributions. Paul Donavan Bruce Rymer

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

AT THE END OF THE RIVER. By Dario Bosio parallelozero

Airlines costs management

2014 floods in Serbia

omgeving madrid.projects 4

THE FAIRHAVEN OPTION

Foam Systems Engineering Design Manual

AVALANCHE SAFETY PLAN

Runway Roughness Evaluation- Boeing Bump Methodology

INSTALLATION GUIDE INTRODUCTION

Runway Roughness Evaluation- Boeing Bump Methodology

ALEKO Victoria Series Retractable Awning Instructions for Installation and Operation

Wooden Koi/Octagonal Pond Instruction Manual

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions

CIVIL AVIATION AUTHORITY

DIY Suspension Trainer - Take Your Gym Anywhere - Inspired by Monkii Bars 2

Installation Instructions for the Rolltec Physique XL Awning

CITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter

Picnic Units A picnic unit is a part of a picnic area

Warwick District Council plans 100 houses in. Radford Semele

EVALUATION MANUEL PARTIE D DSA.AOC.CHKL.075

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

Proposal of constructing new tsunami shelter buildings at Mimase in Kochi City

Feasibility Study for the Improvement of the National Route 2 and Route 7 Final Report CHAPTER 8 EXISTING TRAFFIC CONDITIONS

Travel A dv en tur es: The Gr and C an yon Data A nderson Rane Anderson

STUDY OF ALAQI SECONDARY CHANNEL IN LAKE NASSER

FORM 2 PROVISIONAL SPECIFICATHOB

Tabletop Body Stabilization Training

Guatemala, Belize & Yucatan La Ruta Maya

Mighty Glaciers. Mighty Glaciers. Visit for thousands of books and materials.

Deep Stall And Big Ears - Nigel Page

Twin Lakes Avalanche Incident 1/31/2016

Seven Wonders of the Modern World

in the nineteen eighties, France built a freeway linking Paris directly with Spain 5:26

ROAD AND TRAIL PROJECT APPROVAL

ISOM & ISSOM forbidden symbol comparison

Fire safety in camping sites. CFPA-E Guideline No 20:2012 F

Chapter 12. Travel Skills: Foot Travel for SAR Personnel

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL

Installation Instructions for the Rolltec Adalia X3M Extenda Awning

glacier Little Ice Age continental glacier valley glacier ice cap glaciation firn glacial ice plastic flow basal slip Chapter 14

Watch Outs! Will Your Home Survive? The Homeowner s Watch Outs! will allow you to evaluate your situation and set a plan to correct any concerns.

Maximising Beneficial Reuse through the use of a Novel Dredging Contract

HIGHWAY 17 WILDLIFE and REGIONAL TRAIL CROSSINGS

Pergola Model: NOMO & RIALTO Self Supporting & Wall Mounted Retractable Pergola Awning

SRT system stabilizes levee at power plant


NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Project Report Volunteer Trip Torres del Paine National Park, Patagonia, Chile December 3-15, Executive Summary

An introduction to travel & transport with a focus on canals and waterways.

CONSTANTINE GONDOLAS- CONSTANTINE, ALGERIA SKIKDA GONDOLAS- SKIKDA, ALGERIA TLEMCEN GONDOLAS- TLEMCEN, ALGERIA SOLVE CONGESTION REDUCE TRAVEL TIME

Bear Creek Habitat Improvement Project

Transcription:

SOLUZIONA S.A. Servicios Profesionales de UNIÓN FENOSA Recognition of current status on the Access Roads to El Tesoro Project Report. July 22nd, 2002

Part 1 Meeting with Luis Verdugo Repetto, S.A. Beginning of the route from Los Encuentros Km. 128 Ruta C-A 1 On Wednesday July 17th 2002, at 11:00 p.m., the beginning of the route with the Companies Luis Verdugo Repetto, S.A., represented by Mr. Vicente Jeréz and Soluziona Ingeniería S.A. represented by Mr. José Ademar Cruz and Augusto Fernando Toledo. The recognition of the potentially problematic places to transport heavy equipment like a 30MW Transformer and Turbines between 40 and 32 tons and other similar equipment came first. Finding difficult to get trough Chichicastenango s entrance as well as its downtown which has an antique arch, for 40 feet platforms or Low Boy, vehicles used to transport those kinds of equipments; according to Repetto s personnel this could be solved using short platforms in order to turn in these reduced spaces. Picture No. 1 This picture shows the narrow of the street (4.00 m) and the low of the roof (4.00m) which can be a problem when transporting equipment. It can be solved with shorter transport.

Picture No. 2 Opposite site from picture 1, it can be seen the narrow of the street taking the car on it as reference. Picture No. 3 The 40 feet platform in the picture is having problems, with the white house, to turn in the corner. 2

Picture No. 4 Same corner described on picture 3 see from a different angle. It can be seen the damage vehicles had caused to the white house when they turn. Picture No. 5 Corner in front of Hotel Santo Tomás (Chichicastenango s downtown) there is not possible to turn with equipment with a width larger than 3.00 meters. 3

Picture No. 6 This is the last difficult turn on Chichicastenango s exit. Picture No. 7 Bridge between Chichicastenango and Santa Cruz del Quiché, which does not have enough reinforcement to resist the weight of the heaviest equipments plus the transport weight, but it can be solved by using long platforms so the weight is not concentrated (2 shafts). 4

Picture No. 8 There are no main problems on turning in Santa Cruz del Quiché. Picture No. 9 Exit to Sacapulas, the perpendicular street to the central line of the cross sectional line for the bridge is too narrow, consequently it is not possible to turn with a long platform because the street is under filler; it can be solved by extending the stuffed. 5

Picture No. 10 There are approximately 6 sections like this where is very difficult to transit with heavy equipment, reason why it is necessary to extend the width of the curve from the outside. Also due to the steep slopes it was suggested to use a frontal shipper, for example to push the transport of the equipment where necessary, this picture taken in kilometer 4 after Sacapulas and before arriving to Nebaj. Picture No. 11 Picture taken from the front of the truck of picture 10, the narrow curve can be observed. 6

Picture No. 12 Cuts on slopes will be needed in order to help platforms to turn. Picture No. 13 There are some stone cuts, which make necessary to determine whether to use explosives or not in such areas. Pictures (12 and 13) were taken on kilometer 8, From Sacapulas to Nebaj. 7

Picture No. 14 According to Luis Verdugo Repetto, S.A. and Soluziona Ingeniería, there are some areas where material can be extracted. Kilometer 12 from Sacapulas to Nebaj. Picture No. 15. There are also some sections from Sacapulas to Nebaj which are in very good condition. 8

Part 2 Meeting with Tyrsa, Madisa, Constructora D.L. S.A. and Luis Verdugo Repetto, S.A. These are the companies which will make an offer to extend and fix the road from Chajul to Dam site (El Tesoro) and Power House site (Panchita). Beginning of the route From Nebaj to Panchita Site The beginning of the route was done from Nebaj s town hall to Chajul s town hall. This is the stretch which needs more extension and fixing works. Picture No. 16 Between Nebaj and Chajul there are some sections with slides due to the lack of slopes protection. Up to present the road construction works are in hold. 9

Picture No. 17 There are some clay sections which turn difficult to drive through, especially for rainy season. On the right side of this picture, slides on the slope can be found. Picture No. 18 Because of the lack of slopes protection and roadside ditches, the soil gets saturated causing slides which sometimes makes necessary to close the road. See the slide on the left side. 10

Picture No. 19 Chajul s downtown has 4 places like the one in the picture, where there are turning problems because of the houses and the narrow street. It is a must to negotiate with owners in order to extend the it. Picture No. 20 Another difficult corner to turn in Chajul. 11

Picture No. 21 There are a lot of material Banks which can be useful to fix the roads, like this one between Chajul and La Perla. 12 kilometer from Chajul. Picture No. 22 Stone cuts must be done in many sections in order to help big vehicles to turn. 12

Foto No. 23 A retention wall must be build in areas like the one describe on picture 23 due to the narrow of the road. Foto No. 24 This is one of the most difficult curves, because it has a very steep slope. 13

Picture No. 25 Complement of picture No. 24. All vehicles must go back in order to take the curve. Picture No. 26 Same curve as in pictures No. 24 and 25. It is not possible to extend the curve on its outside side because the precipice, so Repetto, S.A., said they can supply the transport equipment up to kilometer 22 from Chajul. 14

Dangerous curves beginning Curve described in pictures No. 24, 25 and 26. Concrete Bridge Picture No. 27 In this picture it is showed the most critical section for the equipment transportation. On sections described on pictures 24, 25 and 26 is not possible to extend the curve on the outside side because there is a gully and on the inside side neither because that would make a very steep slope. Picture No. 28 This view is taken after the concrete bridge, where the most of the road has big stone steep slopes. 15

Picture No. 29 Narrow of the road (1 way) Picture No. 30 The narrow curve makes difficult to turn, that is why is it s a need to cut the outside side of the curve. The curve cannot be filled because the gully is too big. 16

Picture No. 31 The landslides make difficult to drive through the road. This section is between the concrete bridge and La Perla. Picture No. 32 On the right side of this picture the narrow curve described on picture No. 30 can be observed. It is not possible to fill the gully; the slop must be cut. It is dangerous to work in that section. 17

Picture No. 33 It is frecuntly to find landslide along the road. Picture No. 34 Long platforms cannot drive through this road, just small vehicles. 18

Picture No. 35 From the concrete bridge to La Perla, the road is dangerous. Picture No. 36 This is a landslide 4 kilometers before La Perla, and it is needed to have constant fixing Works. 19

Picture No. 37 The road is full of gullies and narrow, which makes it dangerous especially with landslides, see right shore. Picture No. 38 The narrow curve situation can be fixed filling the inside side of the curve in order to have space to turn. 20

Picture No. 39 2.5 kilometers before La Perla. The constant rains caused a big landslide. Picture No. 40 2 kilometers before La Perla, there is land bump, which would block the movement for long transportations. It must be cut. 21

Picture No. 41 La Perla Square Picture No. 42 Ixtupil River (first entrance) where a bridge will be built in order to ease the access and it will be extended to prevent flooding on rainy season. 22

Picture No. 43 Ixtupil River (second entrance), it is harder than the first one, because this one is not dredged. Picture No. 44 The road tread on Ilóm town it is damaged and narrow. It would be necessary to find a new section in order to avoid enter Ilóm. 23

Picture No. 45 Near the high pressure penstock site the soil is argillaceous and that makes pretty difficult to drive through it especially on rainy season. A solution would be to build ditches to drain the rain. Picture No. 46 This is the suggested site to build the power house and at the same time the end of the route which will be extended. 24

Part 3 CONCLUSIONS Topography it is necessary in order to specify earthworks. Verdugo Repetto, S.A., and Soluziona Ingeniería S.A. agreed that the most important line is the big movement volumes for the extension and improvement of the road. According to Repetto, S.A., and Soluziona Ingeniería S.A. it is impossible to transport the electromechanical equipment to the power house site now because of the roads actual conditions. They will give their offers according to the extension and improvement of the roads. Repetto, S.A., and Soluziona Ingeniería S.A participated in the access roads and they will present their offers based on work estimated; provided by Soluziona Guatemala. 25