IPENZ Engineering Heritage Newsletter June 2007

Similar documents
Ngati Maniapoto and the North Island Main Trunk

Revolving airline seats that are swung round to always face forward

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

Raurimu Spiral. IPENZ Engineering Heritage Register Report. Written by: C. McPherson and K. Astwood Date: 8 February 2012

Shaky Suspension Bridge, Alexandra

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

RE: PROPOSED STRATEGIC ALLIANCE AGREEMENT BETWEEN AIR NEW ZEALAND AND SINGAPORE AIRLINES

The Goldfields Express

6 Road infrastructure

AVALON 2009 AUSTRALIAN INTERNATIONAL AIRSHOW AND AEROSPACE & DEFENCE EXPOSITION

GARFIELD BRIDGE. Building A Bridge to No-Where

Airports (Cost Recovery for Processing of International Travellers) Bill

Tel: Newsletter. September The Australian Cruise Association (ACA)

Megan Williams & Lynn Robinson Sustainability Advocates

Tim Hunter Chief Executive. CCT Business Partner Update 3 March 2015

Rakaia Gorge Bridge, Windwhistle

Netball NZ U17 Champs 2016 Draw Monday 18 th Thursday 21 st July 2016 North Canterbury Netball Centre, Rangiora

Freight Movements in the Upper North Island

Airport forecasting is used in master planning to guide future development of the Airport.

Whether travelling on two wheels or two feet, we help communities stay active and sustainable.

TVRM Steam Trip with Engine #630 Heading south out of Ludlow, KY

THE BUILDERS CHOICE Westfield Carousel Shopping Centre

NZ SHOWCASE THE OFFER OCEAN VIEW STATEROOM $2999 VERANDAH STATEROOM $3399. BUY ONLINE: CALL: TRIP (8747)

D R O N E T R A C K E R. making your world possible

TOURISM NEW ZEALAND OUR VISITORS UNDERSTANDING HISTORIC VIEW TOTAL ARRIVALS YE JUNE 2016

KANSAS STATE UNIVERSITY INTERNATIONAL SEMINAR TO NEW ZEALAND MAY 19-MAY TRAVEL ITINERARY

WELLINGTON AIRPORT ANNUAL REVIEW

Meat & Wool Sector General Outlook embargo until 14 august 2009

SEVEN SUMMITS TRAINING COURSE NEW ZEALAND 2017 / 2018 COURSE NOTES

Unravelling regional insight

SAMPLE. SITTGDE002A Provide arrival and departure assistance. Learner guide. SIT07 Tourism and Hospitality Training Package.

NEW ZEALAND IN THE 19TH CENTURY PART TWO. ECONOMIC AND POLITICAL CHANGE

Regional summary - Wellington

The Holes Creek Bridge Replacement By Bradley McClelland

about us trading with integrity.

ESTABLISHING THE OATLEY-COMO BIKEWAY/WALKWAY ALAN FAIRLEY


Name of organisation NZ Historic Places Trust

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Market Watch. April 2017

Park-specific management and policies Wainuiomata Recreation Area

Rover Car Club Of Otago Tribune December THE OFFICIAL NEWSLETTER OF THE ROVER CAR CLUB OF OTAGO Web Site:

NEW ZEALAND REGIONAL TOURISM FORECASTS

NEW ZEALAND REGIONAL TOURISM FORECASTS

NEW ZEALAND REGIONAL TOURISM FORECASTS

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

NEW ZEALAND REGIONAL TOURISM FORECASTS

JOURNAL PUBLISHED BY FEDERATION OF RAIL ORGANISATIONS NZ INC : P O BOX 13771, ONEHUNGA, AUCKLAND 1643

Auckland Open Day. The Strand Railway Station, Ngaoho Place, Parnell 10am 4pm, Sunday 29 September 2013

ISOLATION DOES NOT MEAN AUTONOMY

New Zealand Historic Places Trust

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

Queensland State Election Priorities 2017

THE OFFER INTERIOR STATEROOM $2499 OCEAN VIEW STATEROOM $2999 VERANDAH STATEROOM $3399

Sunshine Coast Airport Master Plan September 2007

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

Expected from the initial 5-year funding package for State Highways (2006/07 to 2010/11) SH1, Cape Reinga SH1, Waitiki Land to Cape Reinga Stage 2*

QUT BlueShift Business Case Competition 2018 Business Case

Name of organisation : New Zealand Blood Service Name of CEO:

waterview connection Completing the Western Ring Route the Waterview Connection

36% 64% 57% 43% Base: Total Sample - Excluding Residents (n=2,433) Base: Total Sample (n=2,480)

For personal use only


Civil Aviation Order (Exemption from the provisions of the Civil Aviation Regulations 1988 certain ultralight aeroplanes) Instrument 2015

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

FINAL REPORT Papplewick Playing Field Skate Park Project

Transport and RWC 2011

CORNWALL WATERFRONT PLAN 2007

Whangaroa Harbour, Northland. newzealand.com. united kingdom. Market information about our Visitors and our Active Considerers

Level Crossings Configuration Standards

New Zealand s 2011 Rugby World Cup: A Tourism Perspective

K A R A L I U S B R O T H E R S. Scrap Metal Merchants Tel: KBW LTD

Urban Area Concordance

Notice of Auckland Transport s wish to be party to proceedings 3 November 2017

MANAGING RISK IN CONTEMPORARY CORRECTIONAL SYSTEMS

Commercial Accommodation Monitor: April 2017

Precinct Properties New Zealand Annual General Meeting 7 November 2014

Subnational Population Estimates

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Wonderful South. 7 Days/6 Nights Departs Daily. KENTHOLIDAYS (S) PTE LTD Tel:

Australian Forest Growers

Total mobility around New Zealand. A user s guide to the Total Mobility scheme in the different regions around New Zealand

Alexandra Bridge Piers and Towers

Commercial Accommodation Monitor: October 2017

Number of people tested

TOURISM NEW ZEALAND OUR VISITORS UNDERSTANDING HISTORIC VIEW TOTAL ARRIVALS YE SEPTEMBER 2017

CONFERENCE SUPPORTERS PROSPECTUS

Magnetic Heart of Queensland

Milford Sound, Fiordland. newzealand.com. germany. Market information about our Visitors and our Active Considerers

Authored by Cr Bob Manning Mayor

NZQA registered unit standard version 3 Page 1 of 5. Demonstrate knowledge of New Zealand as a tourist destination

Cataract s Historical Falls BY ANDREW HIND n PHOTOS BY MIKE DAVIS

ARHSnsw NORTH NEW ZEALAND TOUR Especially prepared for Guidepost Tours Version 2 as at 09 May

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

Commercial Accommodation Monitor: December 2017

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

Dufferin Jog Elimination Project

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

SELF-DRIVE TOURS TOURS FROM SYDNEY OR CANBERRA TO MILDURA

The Local Government Tourism Strategy May 2003 Local Government effective governance

Transcription:

IPENZ Engineering Heritage Newsletter June 2007 Greetings to all involved with engineering heritage around the country. It has been some time since the last newsletter but it has not meant we have been idle! 1 14 th National Engineering Heritage Conference 2007 19 21 November 2007 Trinity Conference Centre, Crawley, Western Australia MARK YOUR DIARY NOW REGISTRATIONS OPEN ONLINE ON 19 JUNE. Conference themes: Promoting Heritage Conservation Practice for Professional Engineers Preserving & Passing-on Heritage Trade Skills Industrial Heritage of the Australian Hardwood Industry Conservation of Large Timber Structures Development of Wireless Communication in Australia Engineering Heritage of Resource Development in Australia Engineering Heritage of the Water Industry For further information about the Conference and Pre-conference Tour please contact the Conference Secretariat: Debrett s Conference & Event Management PO Box 441, NEDLANDS, W.A. 6909 Phone: +61 8 9386 3282; Fax: +61 8 9386 3293 Email: engheritage@debretts.com.au Website: www.debretts.com.au/engheritage The conference will be in Perth starting with a reception in the evening on Sunday 18 November. The conference proper starts the following morning at Trinity College in the University of Western Australia, and concludes on Wednesday 21 November. And of course there is a three day pre-conference tour starting on Friday 16 November. This tour starts in Perth, travels to Albany on the first day, to Busselton on the second and returning to Perth on the third day. Inexpensive student and staff accommodation will be made available at Trinity. There is also very reasonably priced motel style accommodation. There will be at least three domestic carriers competing on flights to Perth - Qantas, Virgin Blue and Tiger Airways (parent Singapore Airlines). Details will be available on the website. Engineering Heritage Newsletter June 2007-1

2 Future engineering heritage conference to be held in Dunedin in 2009 Engineering heritage conferences are held in Australian on a biennial basis. NZ holds an engineering conference every five years with the second of these being an Australasian conference which would replace/include one of the Australian biennial conferences. This puts our next conference in New Zealand in Dunedin in 2009 (the third Australasian conference). Planning is underway for November 2009 on the University of Otago campus, with associated tours to North Otago and Central Otago heritage sites. Preliminary themes and topics are being developed (with some reflection on Perth 2007 topics), with a focus on land settlement and agricultural developments through engineering innovations and achievements. Please start considering papers for presentation at the conference now. Your contributions will be appreciated. 3 News of items on the Database being considered for the Register There are a variety of items that the National Engineering Heritage committee (NEHC) has received on the Database being considered at present for entry on to the Register. Particular emphasis is being given to marking the centenary of the completion of the North Island Main Trunk railway, for which the items being considered are: Raurimu Spiral Makatote viaduct Makohine viaduct Wellington and Manawatu railway Other items being considered include: The Mt Eden Shot Tower Hikitia floating crane Oamaru freezing works And following the recent meeting of the National Engineering Heritage Committee meeting approval was given for the following two heritage works to be included in the Register: Ruapekapeka pa (in Northland) The Kopu bridge (near Thames) Details of these two items will be given in the next newsletter. 4 IPENZ Heritage website The IPENZ Engineering Heritage website has been established for some time now and relies on volunteers to contribute their knowledge by adding additional items of interest to it. If you are interested in engineering heritage go to www.ipenz.org.nz/heritage/. Engineering Heritage Newsletter June 2007-2

5 The IPENZ Engineering Heritage Database and Register and heritage identification The procedures for entering the names and details of engineering heritage sites and works on to the IPENZ Engineering Heritage Database and Register are available by contacting the Heritage Administrator at heritage@ipenz.org.nz. People are encouraged to submit suitable works or sites for the Database and then where appropriate nominate them for the Register. The aim of the Database is to enable engineering heritage items to be identified and quickly entered on to the IPENZ heritage website. It is possible for heritage items to be added to the Database at any time by members of the Institution or members of the public. Obviously there will be a cursory review to check that inappropriate items are not being entered. Once the item is entered on to the database the aim of the Register program is to assess engineering heritage items for their heritage, social and community significance and record appropriate items and people on the Engineering Heritage Register. Following registration, arrangements may be made for special recognition by means of some or all of the following: The production of an information brochure The provision of an interpretation panel The installation of a plaque. The procedures are intended to be reasonably flexible and should be used as a guide and interpreted to suit particular situations. The items which have recently been awarded plaques are: The Rimutaka Summit & Incline Railway The Koro Koro dam The Musick Point radio station The Lower Karori dam 6 Restoration Work Begins on NIMT Hapuawhenua Railway Viaduct Work has commenced to ensure the Hapuawhenua railway viaduct near Ohakune survives for the benefit and enjoyment of future generations. Constructed in 1908 to complete the last link in North Island Main Truck railway line, the Hapuawhenua viaduct is 284m long and 45m high at its highest point. This viaduct is the larger of two curved viaducts were on this section of line. It was bypassed in 1987 by a new curved concrete viaduct located approx 100m downstream, to carry the electric locomotives on a larger radius higher speed curve. The original steel Hapuawhenua viaduct has suffered from neglect since then with timber sleepers being stolen from the deck and acidic volcanic ash from the 1995 Mt Ruapehu eruption accumulating on the steelwork. Because of its location in an isolated corner of the Tongariro National Park, the only access is via the active NIMT rail corridor which is restricted to authorised persons only. The majority of the structure remains in good condition; however the ash has accelerated corrosion of the steelwork at joints and in some horizontal surfaces. Engineering Heritage Newsletter June 2007-3

The Tongariro Natural History Society, which undertakes a range of conservation projects, has recently obtained funding from the Stout Trust for restoration work on the viaduct. This has been supplemented by funding from the Department of Conservation. The funding has enabled TNHS to clear vegetation from the base of the viaduct piers to reduce the rate of corrosion. Planning is underway to arrange for cleaning of the upper levels of the viaduct and to address the corrosion caused by the acidic ash and vegetation. Future plans include re-installation of a walkway across the viaduct. The Ohakune community is in the process of developing a walking track along the Old Coach Road which once provided a link between the north and south sections of the NIMT before the viaduct was completed. This track will provide public access to the viaduct and it is intended that it will be accessible in time for the NIMT centenary celebrations in 2008. 7 Historic Suspension Bridge in Taranaki Re-opened. In June 2006, the Bertrand Rd suspension bridge over the Waitara River in north Taranaki was re-opened after several years of closure to traffic and pedestrians. Built in 1927 the current bridge replaced an earlier bridge at the same site. The Bertrand Rd Bridge has a suspended span of 61m and is unique in that the main cables have a significant catenary in both the vertical and horizontal planes, resulting the "cradled" appearance. The cables carrying the hardwood deck are supported on hardwood timber towers, one of which is at the top of a braced timber tower rising from near river level. The bridge had undergone several modifications during its life, including the installation of steel stiffening trusses to the deck, however due to deterioration of the timbers, the bridge was closed in Engineering Heritage Newsletter June 2007-4

1995 to vehicle traffic by the owners, the New Plymouth District Council, and it was subsequently was closed to pedestrian access in 2004. It seemed likely that the bridge would be demolished. Nearby residents were keen to ensure it was retained, and hence the Bertrand Rd Suspension Bridge Trust was established and was successful in raising much of the $600,000 necessary for the restoration work. A Conservation Plan was prepared by Conservation Architect Chris Cochran of Wellington. A team from Frame Group from Auckland, led by engineer, Trevor Butler, prepared remedial work design and specifications and managed the restoration work. Extensive reconstruction was necessary which involved complete dismantling and reconstruction of the timber deck, replacement of transoms and deck joists and several other timber members with recycled hardwood and some new hardwood imported from Australia. The original main cables and anchors were retained but in one location where corrosion had weakened the cables, a specially designed and tested splice has been installed. The construction work was carried out by Mackenzie Construction Ltd of Bell Block. The work was particularly challenging due to the weight of the heavy timbers and the difficulty in removing the original steel bolts that appeared to have "grown roots" into the timber. As much of the original hardwood timber as possible was retained and installed as decking and running planks. The restored bridge has been designed to carry light vehicles up to 4 tonne maximum weight and up to 20 pedestrians on a walkway on one side of the bridge deck. A water pipe has also been installed on the upstream side of the bridge for future water reticulation in the District. The re-opening of the bridge by the New Plymouth District Council Mayor, Peter Tennant, means that the towns of Tikorangi and Huirangi are once again within easy access of each other, rather than being separated by a 10km journey via Waitara. Since being restored, the bridge has attracted local sightseers and tourists as well other unusual uses, including being the scene of a wedding at mid-span. 8 Biographical Dictionary of Civil Engineers Engineering Heritage Newsletter June 2007-5

The Institution of Civil Engineers in London is producing Volume 2 of the Biographical Dictionary of Civil Engineers covering the period 1830 to 1890. We have helped them by producing a number of essays for civil engineers who trained in Britain but had significant input into the engineering development in New Zealand during that period. The biographies provided were for: James Melville BALFOUR (1831 1869) Charles Napier BELL (1835 1906) John BLACKETT (1818 1893) Charles Edward FOOKS (1829 1907) John ROCHFORT (1832 1894) Joseph THOMAS (1803 -?) John Turnbull THOMSON (1821 1884) George THORNTON (1829 1914) Charles WALKDEN (1826 1900?) William WEAVER (1828 1868) James WYLDE (1824 1908) These essays are to be entered into the Engineering Heritage Database. As other biographies of significant engineers working in New Zealand come available these will also be entered there. 9 News from the Heritage Chapters 9.1 Auckland Chapter The Auckland Chapter remains very active and is involved in a wide spectrum of issues relating to Heritage within the greater Auckland area and beyond. Of particular note is the Heritage Walks The Engineering Heritage of Auckland brochure that have been produced and which are now on the web. You can view this information on www.heritagewalks.co.nz. The branch is currently working on a book Engineering in Auckland. 9.2 Wellington Chapter Discussions are underway with Walk Wellington, a non-profit organisation which guides walking tours around the inner-city. They also cater for specialist interest groups and currently have a request for a walk with an engineering heritage focus. This is an ideal opportunity for the Wellington Chapter to pursue their aim to get their own Heritage Walks brochure developed. Working with Walk Wellington is an opportunity to test both the route and the information that will go into it. The North Island Main Trunk Railway Line centenary celebration is to be held in 2008. The NEHC is providing support for this and to ensure co-ordination comments relating to this centenary should be directed to the Heritage Administrator heritage@ipenz.org.nz. 9.3 Canterbury Chapter The Canterbury Chapter needs your help. The committee has been depleted over the past few years and new members are required. Please contact the Heritage Administrator heritage@ipenz.org.nz if you would have an interest in being involved and would like more information. Engineering Heritage Newsletter June 2007-6

9.4 Otago Chapter Walks are not only healthy for our bodies but now our minds too. The wealth of information that our Chapters have in developing local engineering heritage walks is also a part of the activity being generated in Dunedin. In recognition of their efforts, funding has been received from the Dunedin City Community Grant Scheme to help with costs of printing a walks brochure. Support to and cooperation with other groups is assisting other industrial heritage tours & events. Discussions continue with interested parties in North Otago, on the possibilities of sites for recognition of engineering achievements associated with refrigeration & frozen meat export. Oamaru Harbour precinct is one of the earliest and still accessible sites in New Zealand. Planning is underway for the conference in November 2009. The History Department at the University of Otago will co-host the event with IPENZ Engineering Heritage. 10 IPENZ Centenary 2014 A committee to manage activities for the centenary will be convened in 2009. If you have a particular interest in this event, please contact the Heritage Administrator heritage@ipenz.org.nz. 11 Committee Contacts. For an up to date list of representatives on the committee of the NEHC and the Chapters in Dunedin, Christchurch and Auckland, please refer to the Engineering Heritage link on the IPENZ website www.ipenz.org.nz. Feel free to make contact if you have some information to request or share 12 Future newsletters We hope to produce newsletters on a more regular basis. Your contributions would be gratefully received - news of progress, achievements and /or concerns being experienced in each area. If you are interested in receiving an email copy of the newsletter when it comes out please register your email address with the Heritage administrator heritage@ipenz.org.nz. Above all, start thinking about the engineering heritage conference coming up in Dunedin in November 2009. Watch this space for details! Best wishes, Rob Aspden (Chair, NEHC) Engineering Heritage Newsletter June 2007-7