Route Windows Central route section

Similar documents
BLACKWALL WAY SHAFT CROSSRAIL PROPOSALS. Blackwall Way Shaft

10. Environmental baseline and assessment of impacts: Central section

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

Crossrail: Socio-Economic Technical Report

Round 2 Consultation Document August to October 2004

Chapter 7 Route Window C6 Farringdon station. Transport for London

Consultation Round 2: Results and Crossrail s Response

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 9 Route Window C8 Whitechapel station. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Crossrail Technical Report Assessment of Noise and Vibration Impacts Volume 2 of 8 Baseline Noise Monitoring Part 1

MOVING AHEAD 62% LINE TIME CROSSRAIL PROJECT AUGUST UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

SPRING/SUMMER Commercial

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

MOVING AHEAD LINE TIME 4,700 + CROSSRAIL PROJECT MAY UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT

Chapter 4 Route window W23 Taplow station. Transport for London

97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY

prime residential investment

A BUSTLING HUB OF INDUSTRY IN TODAY, WE CALL ROYAL DOCKS WEST HOME.

MOVING AHEAD ISSUE 31 SPRING 2014 LAST OF THE GREAT MACHINES LAUNCHED FREEPOST CROSSRAIL

Chapter 26 Route Window SE6A Manor Wharf. Transport for London

ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE WATCH! WATCH THE LATEST MOVING AHEAD VIDEO ON YOUTUBE.

A Soho building redefined

Ace Café Meeting Point POSTCODE: NW10 7UD

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Crossrail transforming travel across London - Infrarail

A Soho building redefined

NLA Westminster on location

CASE STUDY. Transport For London

FACT SHEET. For everything London

LONDON DO NOT ALIGHT HERE WALK SUNDAY 25 FEBRUARY 2018

The Docklands. IBM Recovery Centre. 6/7 Harbour Exchange. 6&7 Harbour Exchange Square, Isle of Dogs, London, E14 9HE

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

Maidenhead Bridge. Proposed Work

98 Manor Way, Beckenham, Kent BR3 3LR

The Brief The Brief APS

AURORA ILLUMINATING THE WAY FOR THE OCCUPIER OF TODAY AND TOMORROW.

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London

BRAND NEW FULLY-FITTED OFFICES OPPOSITE STRATFORD STATION AVAILABLE TO RENT 2,800 SQ FT

Time to discover LIFE AT

PARKSIDE BOW, LONDON E3

Time to discover LIFE AT

AURORA sits right at the epicentre of Ealing s business district.

Crossrail / Elizabeth Line An Update

London and Crossrail 2. Chris Moores Transport for London

2011 Census Update: Online Completion in London

FACT SHEET. For everything London

Meeting Minutes. Council Chamber, Camden Town Hall, Judd Street, London. WC1H 9JE Prepared by Ms Pree John Date of Issue 13 December 2011 Action

ROYAL ARSENAL, LONDON SE18

Council Tax since

MEETING REPORTS THE ALDWYCH BRANCH

Profile west. Impressive modern office environment. Excellent national and international access.

25-27 FARRINGDON ROAD, LONDON, EC1. Prime City Fringe Retail Investment for sale

ST JOHN S WOOD LONDON

THIRTY FIVE GREAT SUTTON ST. CLERKENWELL EC1

FOREWORD. A 1billion investment in the Lo

Have a look and explore something new. 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential

WESTFIELD TUES/SEPT/13 STRATFORD CITY THE LARGEST URBAN SHOPPING CENTRE IN EUROPE

EDITED PRESS RELEASES

City Road London EC1. Reversionary Multi-let Freehold Office Investment in the Heart of Tech City

London Underground Digital Campaign

FREEING UP MELBOURNE'S BIGGEST BOTTLENECK

Identifying Pro-Growth Locations in England. May 2018

Identifying Pro-Growth Locations in England. June 2018

STATE OF THE ART OFFICE ACCOMMODATION OF 9,611 SQ FT ON THE 6TH FLOOR COMPLETE WITH PRIVATE TERRACE, ONE DEAN STREET GIVES INSTANT ACCESS TO

This table is available in large print. Please contact Peabody Direct on

Have a look and explore something new. 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft

LONDON ADVISORY COMMITTEE (LAC) INDEX OF AGENDA ITEMS SEPTEMBER 1997 PRESENT

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE

Canary Wharf. Poplar Crossrail Place

APPENDIX 1 LIST OF PLANNING POLICY DOCUMENTS

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013

Newly refurbished Grade A offices

SAFFRON HILL EC1 AND THEOBALDS ROAD WC1 A PORTFOLIO OF FOUR CENTRAL LONDON REFURBISHMENT OPPORTUNITIES SAFFRON HILL LONDON EC1

The Case for the West End

Royal Oak. Crossrail Proposals (1) Helpdesk Crossing the Capital Connecting the UK

CROSSRAIL Moving London Forward

Office Space Available

2017 Rough Sleeping Statistics An analysis of 2017 rough sleeping counts and estimates

Elizabeth line readiness Maximising opportunity across London s West End

91-93 FARRINGDON ROAD

Westferry House. 11 Westferry Circus Canary Wharf

4 New Willow House 210 Plaistow Road, London E13 OAL PLAISTOW, E13

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

Revision: Date: Prepared by: Checked by: Approved by: Reason for Issue: Nick Elsden (MOLA) Nick Elsden (MOLA) Page 2

Elizabeth line Services

THE BUILDING 154A PENTONVILLE ROAD KING S CROSS LONDON N1 ENTER

INDUSTRY HOUSE. 13,500 sq ft GIA (11,345 sq ft NIA) office/b1 space in vibrant Kentish Town FOR SALE

33 WELBECK STREET PRESTIGIOUS, NEWLY REFURBISHED OFFICE BUILDING PRIME MARYLEBONE LOCATION

Avoiding stairs Tube guide

Transcription:

Route Windows Central route section

Route Window index Central route section Route Window Crossrail station Worksites / temporary features Shaft sites Permanent project C1 Royal Oak Portal Royal Oak Worksite West C2 C3 C4 C5 C6 Paddington Hyde Park and Park Lane Shafts Bond Street Tottenham Court Farringdon Paddington (Lawn and Western Ticket Halls) Royal Oak Worksite East Platform 1a Worksite (part) Eastbourne Terrace Worksite Platform 1a Worksite (part) Red Star Deck Worksite Paddington Central Worksite Circle Line Link Worksite Hyde Park Worksite Bond Street Tottenham Court Eastern Ticket Halls, Dominion Corner and Centre Point Plaza Entrances) Farringdon Park Lane Worksite Bond Street Lorry Holding Area Davies Street Worksite Hanover Square Worksite Davies Street Sewer Diversion Worksite Fareham Street Worksite Newman Street Worksite Astoria Worksite Goslett Yard Worksite Charing Cross Worksite Fisher Street Worksite Dean Street Sewer Diversion Worksite Tottenham Court East Lorry Holding Area Tottenham Court West Lorry Holding Area (labelled as Newman Street Worksite) Fisher Street Shaft Lorry Holding Area Cardinal House Worksite Fox and Knot Street Worksite Lindsey Street Worksite Smithfield Market Basement Worksite Farringdon Crossover Worksite Aldersgate Street Sewer Diversion Worksite Farringdon Lorry Holding Area Westbourne Bridge Shaft Westbourne Park Reversing Facility Royal Oak Portal, Royal Oak Cut and Cover Box Royal Borough of Kensington & Chelsea Edenham Way (eastern arm) Westbourne Bridge (eastern Hyde Park Shaft Park Lane Shaft Park Lane lorry holding area Stanhope Terrace Westbourne Bridge (eastern Stanhope Terrace Park Street Park Street Poland Street Fisher Street Shaft Goslett Yard Shaft Fareham Street Shaft Shaft within Western Ticket Hall (EIP and ventilation) Construction of Eastern Ticket Hall to include separate shaft (EIP and ventilation). Charterhouse Street Shaft (Emergency Escape) London Borough of Camden LB of Camden LB of Islington City of London Poland Street Bedford Row Bedford Row Moor Lane

Route Window Crossrail station Worksites / temporary features Shaft sites Permanent project C7 Liverpool Street Liverpool Street Moorgate Worksite Finsbury Circus Worksite Liverpool Street Worksite Bloomfield Street Shaft 89-134 Moorgate Box Liverpool Street Box City of London Moor Lane Wilkes Street Blomfield Street Worksite Moorgate Sewer Diversion Worksite Moorgate Sewer Diversion Worksite Provision of replacement Finsbury Circus Pavilion on completion of construction works Liverpool Street Lorry Holding Area Finsbury Circus Lorry Holding Area C8 Whitechapel Whitechapel (Eastern Ticket Hall) Hanbury Street Worksite Durward Street Worksite District Line Link Worksite Sainsbury s Car Park Worksite Pedley Street Worksite Shaft within New Ticket Hall (EIP and Ventilation) Hanbury Street Shaft (EIP and Ventilation) Durward Street Shaft (EIP and Ventilation) Wilkes Street Hannibal (E) and Braintree Street (NE) Pedley Street to Mile End Conveyor Worksite Temporary Tunnel (Pedley Street to Hanbury Street) Mile End Conveyor Corridor (part) Sainsbury s Car Park Temporary Shaft Pedley Street Temporary Shaft C8A Mile End Conveyor Corridor Pedley Street to Mile End Conveyor Worksite Mile End Park Excavated Material Handling Site Mile End Conveyor Corridor (part) (temporary only) Braintree Street Grove C9 Stepney Green Shafts Stepney Green Worksite Stepney Green Shafts Hannibal Rhodeswell (NE) and Yorkshire (SE) C10 (SE Lowell Street Shaft Lowell Street Worksite Lowell Street Shaft Lorry Holding Area Lowell Street Shaft Yorkshire Westferry (western side of western carriageway) C11 (SE Isle of Dogs Isle of Dogs Hertsmere Worksite North Quay Worksite Billingsgate Worksite Bellmouth Passage Spoil Conveyor Worksite Hertsmere Shaft Westferry (western side of western carriageway) Blackwall Way (northsouth arm) Bellmouth Passage Spoil Conveyor Hertsmere Shaft Lorry Holding Area C12 (NE Mile End Park and Eleanor Street Shafts Mile End Park Shaft Worksite Eleanor Street Worksite Eleanor Street Shaft Lorry Holding Area Mile End Park Shaft Eleanor Street Shaft Rhodeswell A11

Route Window Crossrail station Worksites / temporary features Shaft sites Permanent project C13 (NE Pudding Mill Lane Portal Bow Midland Yard Worksite Bow Midland Yard Worksite West Pudding Mill Lane Worksite Abbey Mills and Wick Lane Sewer Diversion Worksites Electricity Cable Diversion at River Lea Worksite Diversion of Overhead Electricity Cables Worksite (Pudding Mill Lane) C13A Abbey Mills Abbey Mills and Wick Lane Sewer Diversion Worksites Pudding Mill Lane Portal and Cut and Cover Box New Pumping at Abbey Mills LB of Newham A11 LB of Newham Bigger Street (northern arm, western