TORONTO TRANSIT COMMISSION REPORT NO.

Similar documents
TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

New Streetcar Program - Request for Information (RFI) for 60 Additional Streetcars

MEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT

TORONTO TRANSIT COMMISSION REPORT NO.

MATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z2

TORONTO TRANSIT COMMISSION REPORT NO. SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN

York Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand

TORONTO TRANSIT COMMISSION REPORT NO.

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

YORK UNIVERSITY BUSWAY SERVICE CHANGES

Ridership Growth Strategy (RGS) Status Update

14 YORK REGION TRANSIT (YRT/VIVA) SOUTHWEST DIVISION OPERATIONS AND MAINTENANCE CONTRACT EXTENSION

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.

Advisory Circular. Aircraft Certification Authority Based on Foreign Qualifications

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension

Toronto-York Spadina Subway Extension - Schedule and Cost Status Update -

STAFF REPORT INFORMATION ONLY

TORONTO TRANSIT COMMISSION REPORT NO.

RFP 1-12-C069 ELECTONIC SECURITY SYSTEM (ESS) MAINTENANCE & REPAIR SERVICES AT WASHINGTON DULLES INTERNATIONAL & RONALD REAGAN WASHINGTON

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

Update on the Thameslink programme

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES

TORONTO TRANSIT COMMISSION REPORT NO.

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT

(i) Adopted or adapted airworthiness and environmental standards;

TORONTO TRANSIT COMMISSION REPORT NO.

York Region Rapid Transit Corporation Board of Directors

TORONTO TRANSIT COMMISSION REPORT NO.

York Region Rapid Transit Corporation Board of Directors

Improving Transit Service to Major Music Festivals

Memorandum of Understanding

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

Department of Legislative Services Maryland General Assembly 2009 Session

TORONTO TRANSIT COMMISSION REPORT NO.

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

GOVERNMENT PARTNERSHIP CELEBRATES LAUNCH OF ZÜM BUS RAPID TRANSIT SERVICE IN BRAMPTON

TORONTO TRANSIT COMMISSION REPORT NO.

TERMS OF REFERENCE (TOR) FOR PROVISION OF MOBILE ACCESSIBILITY SERVICE - RFQ/UFAA/015/

STAFF REPORT FOR ACTION

TORONTO TRANSIT COMMISSION REPORT NO.

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS

Better regulation for general aviation (update July 2010) July 2010 Better regulation for General Aviation 1

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

3.6 Surveillance Data Exchange Activities. (Presented by the United States of America) SUMMARY

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Advisory Circular. Changes to the Type Design of an Aeronautical Product

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

The type rating of test pilots having flown the aircraft for its development and certification needs to be addressed as a special case.

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

Design Meeting Presentation

TORONTO TRANSIT COMMISSION REPORT NO.

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

Our Focus: Your Future AWARD OF TENDER FOR ROAD RESURFACING HOT MIX ASPHALT CONTRACT IS.07RSRF (H)

INVITATION FOR EXPRESSION OF INTEREST

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0

[Docket No. FAA ; Directorate Identifier 2007-NM-047-AD; Amendment ; AD ]

YRT/VIVA PROPOSED FARE INCREASE

Capacity Improvements on Bus and Subway Services

[Docket No. FAA ; Product Identifier 2018-CE-006-AD] AGENCY: Federal Aviation Administration (FAA), Department of Transportation

Grab Some Good: TTC Pop Up Market Program - Amendment and Extension of Purchase of Service Agreement

EXPRESSION OF INTEREST EOI 0008

COMMISSION IMPLEMENTING REGULATION (EU)

2015/2016 The BCSF Snowmobile Excellence Awards

Aircraft Maintenance Organisations - Certification. Contents

AGENDA SPECIAL COMMUNITY SERVICES COMMITTEE

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

STAFF REPORT ACTION REQUIRED

Construction Staging Adelaide Street West

Passenger Facility Charge Application #1

Short-Haul Operations Route Support Scheme (RSS)

Technical Standard Order

TORONTO TRANSIT COMMISSION REPORT NO.

communication tower means a tower or structure built to support equipment used to transmit communication signals;

Official Journal L 362. of the European Union. Legislation. Non-legislative acts. Volume December English edition. Contents REGULATIONS

DETAILS AND PRINCIPLES REGARDING PROPOSED REVISED SERVICE CHARGES OCTOBER 1, 2000

Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval

TORONTO TRANSIT COMMISSION REPORT NO.

Pedestrian Safety Review Spadina Avenue

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Report to the Board of Directors

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

NEW AND IMPROVED. ROYAL CARIBBEAN Scope & Changes DEPOSITS AND FINAL PAYMENTS DEFINITIONS, SIZE REQUIREMENTS AND LIMITS

EASA PART 21 + AMC/GM. Syllabus

VoIP RADIO CONSOLE SYSTEM FOR MACON COUNTY EMERGENCY MANAGEMENT

City and County of San Francisco

TABLE OF CONTENTS 1.0 INTRODUCTION...

ASIP2 AIR SERVICE INCENTIVE PROGRAM

Transcription:

Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 24, 2014 SUBJECT: PROCUREMENT AUTHORIZATION TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT WILSON YARD CONNECTION AND WILSON YARD SIGNAL SYSTEM MODIFICATIONS CONTRACT NUMBERS A70-14 AND A70-18 ACTION ITEM RECOMMENDATION It is recommended that the Board authorize a total expenditure up to $36,109,922.25 for Wilson Yard Connection and Wilson Yard Signal System Modifications, as set out below and detailed in Appendix A, Appendix B and Appendix C. 1. The award of a Contract, designated as A70-14, to Thales Canada, Transportation Solutions (Thales) in the amount of $11,755,189.81, inclusive of HST, for Toronto-York Spadina Subway Extension - Wilson Yard Connection and Wilson Yard Signal System Modifications, which includes a credit of $3,928,800.00 to eliminate Downsview service track (Appendix A, Option 4). 2. The award of a Contract, designated as A70-18, to Thales in the amount of $24,354,732.44, inclusive of HST, for T1/TR - Wilson Yard Connection and Wilson Yard Signal System Modifications, including the following specified options: a) Re-Signalling of Wilson Yard in the amount of $12,850,182.00 (Appendix B, Option 3), and b) Relocation of Zone Control Panel in the amount of $179,704.00 Canadian dollars (Appendix B, Option 5). FUNDING Funding for the expenditures under Contract A70-14 and Contract A70-18 will be shared between the Toronto York-Spadina Subway Extension Project, the Toronto Rocket/T1 Rail Yard Accommodation Project and the Wilson Yard Re-signalling Project. Sufficient funds are available for contract A70-14 as detailed below: Toronto-York Spadina Subway Extension (TYSSE) Project: sufficient funds for 66.7% of this expenditure have been included the in the Toronto-York Spadina Subway Extension (TYSSE) project, as set out on pages 1007 to 1010 of the TTC 2014-2023 Capital Program (Category Expansion) which was approved by the Board on November 20, 2013 and by City Council on January 29/30, 2014.

PROCUREMENT AUTHORIZATION TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT WILSON YARD CONNECTION AND WILSON YARD SIGNAL SYSTEM MODIFICATIONS CONTRACT NUMBERS A70-14 AND A70-18 Page 2 Toronto Rocket/T1 Rail Yard Accommodation Project: sufficient funds for 33.3% of this expenditure have been included in the Toronto Rocket/T1 Rail Yard Accommodation project as detailed in pages 563 to 568 of the TTC 2014-2023 Capital Program (Category 3.9 Building and Structures Projects) which was approved by the Board on November 20, 2013 and by City Council on January 29/30, 2014. Sufficient funds are available for contract A70-18 as detailed below: Toronto-York Spadina Subway Extension (TYSSE) Project: sufficient funds for 31.9% of the base contract expenditures, excluding options have been included the in the Toronto-York Spadina Subway Extension project, as set out on pages 1007 to 1010 of the TTC 2014-2023 Capital Program (Category Expansion) which was approved by the Board on November 20, 2013 and by City Council on January 29/30, 2014. Toronto Rocket/T1 Rail Yard Accommodation Project: sufficient funds for 68.1% of the base contract expenditures, excluding options and for 100% of Appendix B, Option 5 Relocation of Zone Control Panel expenditures have been included in the Toronto Rocket/T1 Rail Yard Accommodation project as detailed in pages 563 to 568 of the TTC 2014-2023 Capital Program (Category 3.9 Building and Structures Projects) which was approved by the Board on November 20, 2013 and by City Council on January 29/30, 2014. Wilson Yard Re-signalling Project: sufficient funds for 100% of the expenditures for Appenix B, Option 3 Re-Signalling of Wilson Yard have been included in the Wilson Yard Re-signaling Project as detailed in pages 371 to 373 of the TTC 2014-2023 Capital Program (Category 2.4 Signal Systems State of Good Repair) which was approved by the Board on November 20, 2013 and by City Council on January 29/30, 2014. BACKGROUND The TTC is constructing a new 8.6 km long subway line from the existing Downsview Station on the Spadina Line located in the city of Toronto, to the proposed Vaughan Metropolitan Centre located in the city of Vaughan, Region of York. The work consists of two contract packages A70-14 and A70-18 which are both for a new signal system for: the TYSSE project and the interface into the existing system at Wilson Yard and the signal system to support the Wilson Yard. Each package has its own set of contract specifications and drawings and will be administered by a separate project team. As a result of TTC procuring new Toronto Rocket vehicles to alleviate congestion on the Yonge- University-Spadina subway line, the storage capacity of the YUS at Wilson Yard needs to be expanded to accommodate the increase in vehicles driven by these two projects.

PROCUREMENT AUTHORIZATION TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT WILSON YARD CONNECTION AND WILSON YARD SIGNAL SYSTEM MODIFICATIONS CONTRACT NUMBERS A70-14 AND A70-18 Page 3 To ensure a uniform signal control system in the yard the requirements for both of these projects were tendered together: Contract A70-14 for the TYSSE requirements, and Contract A70-18 for the Toronto Rocket/T1 Rail Yard Accommodation Project The work is located at Wilson Yard, Downsview Subway Station and the running structures of the Toronto-York Spadina Subway Extension from Downsview Station to Wilson Yard. The work includes interfaces to the existing signal system at Wilson Yard and Downsview Station. DISCUSSION The work for contract A70-14 includes, but is not limited to, detail design, manufacture, delivery, installation supervision, testing and commissioning of the Auxiliary Wayside Signal system (AWS), for the new running structure between Downsview Station and Wilson Yard, as well as the TYSSE modifications in the yard. The contract implements the latest in processor based signal control systems and is compatible with the Automatic Train Control (ATC) system currently being rolled out on the YUS. The work for contract A70-18 is similar to that provided under contract A70-14 for its portion of the yard and includes a new computer based control panel for the new signal system. A request for proposals was publicly advertised on the Merx web site as well as the TTC s web site on September 10, 2013. Twenty-three companies downloaded copies of the proposal documents out of which two submitted a proposal, as summarized in Appendix A and B. The proposal documents state that it is the TTC s intent is to award two separate contracts. The specified options submitted with both proposals are listed in Appendix A and B The evaluation process included in the proposal documents has been completed in four stages, as follows: (i) (ii) (iii) Stage 1 - evaluation of the proponents experience and capability - it was pre-determined that all proponents with a score higher than 80% will be further evaluated; Stage 2 pass/fail criteria test based on very specific technical information - it was predetermined that proponents with a pass score will be further evaluated; Stage 3 technical assessment of the proposals it was pre-determined that all proponents with a score higher than 80% will be deemed equally qualified and have their pricing envelopes opened;

PROCUREMENT AUTHORIZATION TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT WILSON YARD CONNECTION AND WILSON YARD SIGNAL SYSTEM MODIFICATIONS CONTRACT NUMBERS A70-14 AND A70-18 Page 4 (iv) Stage 4 evaluation of the separately submitted sealed pricing envelopes. Both proposals were considered qualified after stage 3, and had their pricing envelopes opened. Award of the contracts will be based on the lowest priced qualified proposal. Thales submitted the lowest price and their proposal is considered acceptable. They have satisfactorily completed work of a similar size and nature for the TTC in the past. Ansaldo STS USA, Inc. was deemed qualified; however their price was higher than the price submitted by Thales. The Agreement to Bond submitted by Thales covers both the Labour and Material Payment Bonds, and Performance Bonds, and was submitted by Zurich Insurance Company LTD, who has been verified as a Surety Company licensed to transact business under the Insurance Act of Ontario. They are considered financially capable of performing the work. The successful proponent will be required to execute one Performance Bond and one Labour and Material Bond for each contract, each bond in the amount of 50% of each contract value. JUSTIFICATION The work for the Wilson Yard Connection and the Wilson Yard Signal System Modifications is required to ensure the safe and efficient movement of trains in and around the yard and to facilitate the increased vehicle traffic being forecast. The proposal submitted by Thales is the lowest priced qualified proposal. 70-95 03-04-000127475 Attachments - - - - - - - - - - - -

Appendix A PRICE SCHEDULE BREAKDOWN Thales* Ansaldo Contract A70-14 Base Price $15,683,989.81 $39,748,258.00 Specified Option 1 - Installation Work that requires an interface to the existing relay based signal system or any trackwork on the mainline or in the yard that supports revenue service if TTC forces do not do the work. Specified Option 2 - All Installation Work not covered by Option 1 if TTC forces do not do the work. Specified Option 3 - Provision of a separate bungalow for new control system, if required at a later date Specified Option 4 - Eliminate Downsview Service Track. This work will be added to the exiting TTC contract. Specified Option 5 - Installation of Wayside ATC Equipment, if required at a later date. $12,573,447.00 $378,830.00 $29,210,708.00 $2,925,479.00 $223,904.00 $977,279.00 ($3,928,800.00)** ($4,402,642.00) $48,599.04 $56,187.00 Contract A70-14 Award Amount 11,755,189.81 * Recommended company ** Accepted options Contract A70-14 a). Total Base Proposal Price $15,683,989.81 b). Option Price No. 1.4 Eliminate Downsview Service Track (A70-8) -$3,928,800.00 Total amount for Contract A70-14 $11,755,189.81

Appendix B PRICE SCHEDULE BREAKDOWN Thales* Ansaldo Contract A70-18 Base Price $11,324,846.44 $36,756,530.00 Specified Option 1 - Installation Work that requires an interface to the existing relay based signal system or any trackwork on the mainline or in the yard that supports revenue service if TTC forces do not do the work. Specified Option 2 - All Installation Work not covered by Option 1 if TTC forces do not do the work. Specified Option 3 - Re-signaling the rest of Wilson Yard. Convert to common system Specified Option 4 - Installation for the entire Wilson Yard. Options 1-3 inclusive, if required. Specified Option 5 - Relocate New Zone Control Panel $12,525,515.00 $500,089.00 $29,177,542.00 $2,364,038.00 $12,850,182.00** $51,142,475.00 $55,346,016.00 $6,519,359.00 $179,704.00** $5,924.00 Contract A70-18 Award Amount 24,354,732.44 * Recommended company ** Accepted options Contract A70-18 a). Total Base Proposal Price $11,324,846.44 b). Option Price No. 1.3 Re-Signalling of Wilson Yard $12,850,182.00 e). Option Price No. 1.5 Relocate Zone Control Panel $179,704.00 Total amount for Contract A70-18 $24,354,732.44 Total Value for Contract Nos. A70-14 & A70-18 $36,109,922.25

Contract A70-14 Appendix C SPECIFIED OPTIONS SUBMITTED WITH THE PROPOSALS 1. Pricing to perform the installation work described for Installer 1 in item 13 of Section 01110 Summary of Work, Contract A70-14. 2. Pricing to perform the installation work described for Installer 2 as described in item 14 of Section 01110 Summary of Work, Contract A70-14. 3. Pricing to provide a separate bungalow similar to that shown in drawing A70-8-SG5001 and specified in Section 13581A, and described in item 16.1 of Section 01110 Summary of Work, Contract A70-14. 4. Credit for eliminating the work related to A70-8 as described in paragraph 17.1 of Section 01110 Summary of Work, Contract A70-14. 5. Installation of Wayside ATC Equipment. Contract A70-18 6. Pricing to perform the installation work described for Installer 1 in item 13 of Section 01110 Summary of Work, Contract A70-18. 7. Pricing to perform the installation work described for Installer 2 as described in item 14 of Section 01110 Summary of Work, Contract A70-18. 8. Pricing to re-signal the rest of Wilson Yard. Identified herein as Future Yard R-signaling as described in item 15 of Section 01110 Summary of Work, Contract A70-18. 9. Pricing to install the whole Wilson Yard as described in item 16 of Section 01110 Summary of Work, Contract A70-18. 10. Pricing to relocate the new computer based zone control panel up to 100 meters from the Existing Wilson Yard control room as described in item 17 of Section 01110 Summary of Work, Contract A70-18.

Appendix D PROPOSAL EVALUATION CRITERIA Section I - EXPERIENCE AND CAPABILITY REQUIREMENTS Part A Proven In-Service Requirement Part B Re-signalling Experience Requirement Part C System Adaptation Experience Requirement Part D Installation Experience Requirement Section II - TECHNICAL INFORMATION Part A - Pass/Fail Design Requirements - Use of Microlok II Peer protocol to interface with ATC ZC and other PBI; and Datatrain VIII protocol to interface with existing CSS - in the proposed PBI design; - The Functional and Performance Requirements are met by the proposed design; - The Hardware Design Requirements are met by the proposed design; - Safety Certificates certifying Proponent's product meet the requirements in referenced paragraph in the specification. Part B - System Design Requirements Part C - System Design Interfaces Part D - Design Impact to TTC Part E - Systems Assurance Part F - Testing and Commissioning Section III - MANAGEMENT AND SUPPORT REQUIREMENTS