BVSR Constructions Pvt. Ltd. ANDHRA PRADESH STATE-WISE ACTIVITIES OF BVSR AT A GLANCE:

Similar documents
READERSHIP IRS DATA -2014

11 th Annual Conference Road Development in India Telangana State Initiatives

Development of Road Infrastructure in India

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)


India - State-wise Wastelands Distribution (Percentage to total geographical area)

VAMSADHARA AND EAST FLOWING RIVERS BETWEEN

SECTION DESCRPTIONS PAGE NOS.

UNIVERSITY CAMPUSES IRRIGATION CANALS PLAYING A KEY ROLE IN INFRASTRUCTURE DEVELOPMENT

SECTION DESCRPTIONS PAGE NOS.

Multimodal Logistics Professionals

SECTION DESCRPTIONS PAGE NOS.

ELECTRONIC MANUFACTURING CLUSTER - II

Article 13, clause no of the Concession Agreement states that:

DEPARTMENT OF INFORMATION AND PUBLIC RELATIONS, GOVT.OF A.P., HYD. RELEASE ORDER REGISTER

PPP Days 2010 PPPs Lessons from the Last 18 Months

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

SECTION DESCRPTIONS PAGE NOS.

RESUME. Ar. SWAYAMPAKULA JANAKI RAMA MURTHY PRINCIPAL -Acharya Nagarjuna University College of Architecture and Planning,Nagarjuna Nagar,GUNTUR-

Table-1.1 SEASONS, SOWING & HARVESTING PERIOD AND PRODUCTION. Five year Average Production ( to Harvesting Period.

15-18 May 2018 Proposal for Government of Andhra Pradesh to participate in GES 2018

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016

DATA BOOK IV : COST ESTIMATE

2 NEW INDIAN EXPRESS Per Square Centimeter B&W

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

TO BE INTRODUCED IN LOK SABHA. Bill No. 93 of 2006

VOLLEYBALL FEDERATION OF INDIA

DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No.

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

GMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.)

INDUSTRY-ACADEMIA PARTNERSHIP

ROAD DEVELOPMENT IN INDIA 2015

PROFILE. Diploma in Civil Engineering with first division in the year 1992 & B.A (maths)

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID

Ports in India 2014 Dredging in India 2014

Alternatives Study of Alignment

DETAILS OF COCO OUTLETS- UPDATED AS ON 03 APR 2017

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

Video Coverage s by Information and Public Relations Department, For the Month of DECEMBER 2017.

NOVEMBER 2016 For updated information, please visit

BY Saurabh Pandey Junior research fellow(jrf) NET, MA, B.TECH 3 Years teaching experience UPSC Faculty

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314)

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

DISTRICT-WISE NEWSPAPERS LIST EMPANELLED IN I&PR DEPT. AS ON

Biggest Dams in India

East Goshen Township Capital Improvement Program

17. Ganga-Jamuna doab is the largest doab region of India. 18. The eastern and western coastal plains meet at Kanyakumari. 19. Kerala Coast is also

Issue 10. micrometer. data as of 30 th June 2014

Issue 10. micrometer. data as of 30 th June 2014

S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun

ANDHRA PRADESH THE RICE GRANARY OF INDIA

Denmark/Chennai Sunday 15 June 2014 Trident Hotel Chennai Monday 16 June 2014 Meeting at CWET Programme: Meeting with Mr. A.

Key Projects Carmichael Rail Line (CRL)

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

Newsletter HIGHLIGHTS OF THIS ISSUE. July,09 to Dec,09 OVERVIEW MAJOR PROJECTS COMPLETED / RECEIVED BY GROUP IBA APPROVAL & MTO LICENSE

ICT LIBRARY UPDATE. Bi-monthly Sept. Dec Vol. 14 : No Contents

IDOL OF NANDI IN LEPAKI, ANDHRA PRADESH ANDHRA PRADESH THE RICE GRANARY OF INDIA

MPSEZ Operational Achievements

MANUAL REVISION TRANSMITTAL Manual 165A ( ) Illustrated Tool and Equipment Manual. REVISION 21 dated October 2017

Reference List for Cathodic Protection of LPG Mounded Bullets using AnodeFlex

Tranche 3

M.P. POLICE HOUSING CORPORATION LTD. Multi-Storey Residential Complex for Police Personnel At 15 th Battalion, INDORE (Madhya Pradesh)

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI

G.O.Ms.No.142 Dated:

January 2018 Air Traffic Activity Summary

PRELIMINARY ACCOUNTS FOR 2012

CORPORATE OFFICE : 3 rd Floor, Nukkula Arcade, Above Canara Bank, Near Masabtank, Vijayanagar Colony, Hyderabad-57 M: ,

Sub. Rev Eng. Ad. Rev Hin. Ad. Rev Ver. Ad. Rev.

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

2. Wages and Earnings

PRESENTATION ON INDIA JAPAN BILATERAL RELATION

MINUTES OF PROJECT REVIEW MEETING HELD ON

Helicopter Connectivity in North East

GMR Group s Airports Journey. Emerging Airports Show, Kuwait October 2015

Warm Welcome. From K.K.SHARMA EXECUTIVE DIRECTOR PROJECT PLANNING AND MONITORING

MINISTRY OF URBAN DEVELOPMENT DEMAND NO. 95 Ministry of Urban Development

Golden Ocean Group Limited Q results March 1, 2007

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August

TRAFFIC STUDY FOR JADCHERLA - KOTHAKOTA SECTION OF NH-7 (WATL) IN THE STATE OF TELANGANA

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement

Cathay Pacific Airways Interim Results for the six months ended 30 June 2012

Network Size and Growth

BHARATMALA

DCB Bank Regional Nodal Officers

The Corporation of the City of Kawartha Lakes Council Report

S.NO NAME OF THE STATE NAME OF THE COLLEGE 1 Andhra Pradesh. 2 Arunachal Pradesh. 3 Chandigarh

The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments.

City Deal in South Lanarkshire. Gordon Mackay, Head of Roads & Transportation Services

GENSOL S SOLAR PV EPC PORTFOLIO

Experimental Postmarks of India

Infrastructure Corporation of Andhra Pradesh Limited (INCAP) REQUEST FOR PROPOSAL (RFP) (International Competitive Bidding)

Colindale Gardens Site Visit

Strategic Transport Forum

No.32-5/2004-NDM-I Government of India Ministry of Home Affairs

Q1 FY18 Earnings Presentation 17 July 2017

Warehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

Transcription:

ABOUT US BVSR Constructions Pvt. Ltd is one of the leading and fast growing ISO 9001-2008 Construction Company in India having established a strong reputation at National level in executing medium to large civil projects and in providing turnkey solutions for its valued clients. BVSRCPL s cutting edge capabilities cover a wide range of Civil Engineering -Concept, Design, Construction and Commissioning on EPC and BOT modes. Highways, among Bridges, Earth Dams, Spillways and Aqueducts etc, remain our core competence. At BVSRCPL we combine financial soundness, technological competence, quality and safety oriented construction methodology, good resource planning and an efficient construction management. The Streamlined, cost-effective systems & processes have enabled the company to deliver projects within time and budget, adhering to strict quality control and safety measures. BVSRCPL has contributed to the many prized land marks of the Andhra Pradesh & Telangana - some of the exquisite Roads, ROBs, Earthen bunds, Canals and Spill ways having been executed by BVSRCPL. Notable projects also have been executed in other states which have earned laurels for the Company. BVSRCPL has PAN India operations; some of Infrastructure projects being handled by BVSRCPL are spread over states of Tamilnadu, Madhya Pradesh, Odisha, Sikkim and Karnataka. BVSRCPL is also adjudged in Andhra Pradesh as one of the best managed and a respected Company on various attributes of client delight.

STATE-WISE ACTIVITIES OF BVSR AT A GLANCE: ANDHRA PRADESH COMPLETED PROJECTS ONGOING PROJECTS HIGHWAY PROJECTS Forming Four Lane road to Krishnapatnam port with expansion of Six Lane in Nellore District. Design, Construction for Improvements, Upgrading to Four Lanes Carriageway Kadapa Pulivendula Road in Kadapa District on BOT Annuity basis Formation of new Ghat road from Km 16/0 of Pulivendula- Ambakapalli-Murarichintala road in Kadapa District to join Mudigubba (via) Dorigallu Design, Construction for improvements, upgrading to 2 lane carriageway Pulivendula-Ramireddypalli-Palagiri Road in Kadapa District on B.O.T. annuity basis Improvements, upgrading to 2 lane carriageway, Pulivendula-Ambakapalli-Murarichintala Road in Kadapa District on B.O.T. annuity basis Improvements and Upgradation to two lanes of road from Kamalapuram to Ayyavaripalli (via) Payasampalli including by pass roads in Kadapa Dist. Strengthening of Nellore - Krishnapatnam Road in SPSR Nellore District. FLYOVERS AND BRIDGES Construction of ROB at Milk Project at LC No.315A, 315B of Vijayawada Vissannapet road. Construction of Road Over Bridge at Kovur gate (near polytechnic college) in Lieu of L.C. No. 119 of Nellore Bellary Bombay Road in Nellore District Construction of Road Over Bridge at LANKELAPALEM in lieu of L.C. No. 490 of Parawada Asakapalli road in Visakhapatnam District Construction of HLB across Penna river in Km. 16/0 to 2/4 of the road from GNR college at Chennur village to kondapeta in Kadapa District Construction of ROB @ Yerraguntla yard in lieu of L.C. No. 138 of Yerraguntla - Prodddutur Road in Kadapa District Construction of ROB at Kolakaluru in lieu of LC No. 255 of Guntur - Hanumanpalem road in Guntur District Construction of 2nd R.O.B in Tadepalligudem Municipal limits in West Godavari District Construction of HLB across Chennaimadugu at Km. 16/4-6 of Gudur - Varagali Road in Nelllore District 3 Widening and Strengthening of Pedana-Nuzvid-Vissannapet Road in Krishna District. Widening and Strengthening of Kurnool-Devanakonda Road in Kurnool District. Rehabilitation and Upgradation of National highway 565 from Davulapally to Markapuram Road section to Two lanes with paved shoulders under NHDP-IV on EPC Basis Output and Performance Based Road Contracts for the Maintenance of Package 29, roads in Nellore District. Improvements and Upgradation to two lanes of road from Km 44/2 on Vempalli-Rayachoti Road up to Kadapa Dist border of Batrepalli Talupulla Gandi road including bypass road in Kadapa District. Construction of High Level Bridge across River Nagavali in Km 1/8 of Etcherla - Ponnada in Srikakulam town limits in Srikakulam District Construction of ROB @ Bobbili in lieu of L.C. No. RV/306 of Chilakalapalem- Ramabhadrapuram Rayaghada road Construction of major Bridge across river Vattigadda at Km 492/2-4 of Raipur-Visakhapatnam section of NH - 43 (New NH No. 26) including its Approaches Reconstruction of Bridge at Km 118/8 and 132/4 of Anantapur - Chennai Road NH-205 Construction of ROB at Km 3/6-8 of Gooty - Pathikonda - Adoni Road (LC NO 179 A) in Anantapur District. Construction of Skew Bridge near Karlapudi across Vamsadhara left canal in Km 2/0 of NH5 to NP Road in Srikakulam District.

COMPLETED PROJECTS ONGOING PROJECTS RAILWAY PROJECTS Proposed new BG line between Obulavaripalle and Construction of New BG Line from Nandyal to Yerraguntla Venkatachalam in South Central Railway station in Phase II Works between Nossam (EXCl. Yard) and Banaganapalli. IRRIGATION PROJECTS Construction of Viaduct from Km 36.062 to Km 38.262 of Right Main Canal of Vamsadhara Project Improvements to 4 Nos of Aqueducts in Reach I of K.C. Canal (Package No. ICB 07A) Formation of D bund (balance portion) including protection works from Km.0.00 to Km.0.900 of TGP main canal Excavation and construction of surplus escape for subsidiary Reservoir-II of TGP Main canal Construction of river training walls on left and right flanks of Nagarjuna Sagar Tail Pond Dam across river Krishna near Satrasala(V), Guntur District Rehabilitation and Modernization of Canals Distributory system of Nagarjunasagar Lal Bahadur & jawarlal Nehru Canals, A.P. Dredging works in Krishna & Godavari Delta in Krishna, Guntur, E.Godavari and W.Godavari Districts. APILIP JBIC Modernization of Canal System and System tanks under Lower Sagileru Project (Medium Irrigation) in Kadapa District. Formation of Reservoir across Gangamma Sirassu vanka near Nalagampalle in Chittoor District. Modernization of Araniar Proejct near Pitchatur Village and Mandal, Chittoor District. TELANGANA COMPLETED PROJECTS ONGOING PROJECTS HIGHWAY PROJECTS Two-Laning of Bhadrachalam-Chandupatla road in Khammam District under LWE scheme. Widening and Strengthening of Mudigonda to Vallabhi road from Km 5/9 to 24/0 in Khammam District. Re-construction of major bridge @ Km 124/10 of Vijayawada-Jagadalpur road on NH 221 in Kammam District BRIDGES IRRIGATION PROJECTS Construction of HLB across river Manjeera at Birkur Village in Nizamabad District. Construction of Aqueduct across Peddavagu @ Km.16.150, of Flood Flow Canal from S.R.S.P in Karimanagar S.B.B.R Construction of OGEE spillway from Km 0.668 across Maganur Vagu in Mahaboobnagar District. Formation of earth dam of Jonnalaboguda balancing reservoir from km.0.450 of Kalwakurthy lift irrigation scheme Mahaboobnagar District. Investigation, Design and execution of Mothe Vagu Reservoir including all other allied works across Mothe Vagu near Koratpalli(V), Ramadugu (M) of Karimnagar District. Formation of Gouravelly Reservoir with gross capacity of 1.410 TMC near Gouravelly (Village), Husnabad (Mandal), Karimnagar District. APILIP JBIC Modernization of Dindi Medium Irrigation Project, Dindi Village and Mandal, Nalgonda District. 4

Formation of Earth Dam from Km. 1.900 across Maganur Vagu near Sangambanda (V), Makthal (M), Mahaboobnagar District. Rehabilitation and Modernization of Canals Distributory system of Nagarjunasagar Lal Bahadur canals. Formation of New Tank across local stream near Itikyala (V), Asifabad (M), Adilabad (Dist.) TAMIL NADU COMPLETED PROJECTS HIGHWAY PROJECTS Upgradation of Cement Concrete Pavement road at Devanampattanam, Manjakuppam, Thiruppapuliyar, Chellankuppam, vandipalayam & old town in Cuddalore Municipal town limits ONGOING PROJECTS Upgradation of Cement Concrete Pavement road at Sonankuppam, Akkarai ghori old town in Cuddalore municipal town limits IRRIGATION PROJECTS Formation of a reservoir across Cheyyar river near Kuppanatham village with allied component works diversion road, construction of cross masonry works Construction of Rubble mound seawell along Ennore Expressway in North Chennai for a length of 2270m (LS 12/6800 to 13/950 & 14/280 to 14/740 & 14/960 to 15/200 Km) MADHYAPRADESH COMPLETED PROJECTS HIGHWAY PROJECTS Sausar-Mohagaon-Mordongri road under DBFOT ( Annuity) Basis. Sonapipiri - Umreth - Monari - Umba road under DBFOT (Annuity) Basis. Gadarwara Tendukheda road Under DBFOT (Annuity) Basis Harda - Chipanner Road Under DBFOT (Annuity) Basis. Betul - Atner road under DBFOT (Annuity) Basis. Improvements to South Buckingham Canal to Muttukkadu back water (North Lock) Reach III, Tamilnadu. ONGOING PROJECTS ODISHA COMPLETED PROJECTS HIGHWAY PROJECTS Rairangpur-Jashipur road in Mayurbhanj District under Vijayawada - Ranchi Corridor. Gunupur - Kashinagar-Parlakhemundi road in Gajapati District under LWE scheme. ONGOING PROJECTS 5

BRIDGES High Level Bridge across river Baitarani in Jajpur District High Level Bridge across river Brahmani in Dhenkanal District. High Level Bridge across river Ramial in Dhenkanal District. High Level Bridge across river Subarnarekha in Balasore District. IRRIGATION PROJECTS Construction of Earth Dam (Left Flank) of RET Irrigation Project in Bhawanipatnam Construction of Earth Dam (Right Flank) of RET Irrigation Project in Bhawanipatnam COMPLETED PROJECTS COMPLETED PROJECTS COMPLETED PROJECTS SIKKIM ONGOING PROJECTS HIGHWAY PROJECTS Melli-Nayabazar & Nayabazar-Namchi road in South Sikkim District KERALA ONGOING PROJECTS HIGHWAY PROJECTS Construction of Roads & Drains including Earthwork in Pathanam mitta District. HYDRO POWER PROJECTS Execution of balance civil works of chimmony small hydro electric project WEST BENGAL ONGOING PROJECTS RAILWAY PROJECTS Execution of foundation & Substructure of Br No.3, No.11, Br No.21 & Br No.52 in connection with Bowaichandi-Arambag new line under the jurisdiction of Dy. Chief Engineer, Construction, Bardhaman. 6

FINANCIAL CAPABILITY In Millions Description 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Authorised Capital 10 30 30 30 30 30 30 Paid up Capital 10 30 30 30 30 30 30 Reserves &Surplus 158.1 238.3 339.2 510.5 580.3 751.8 846.6 Turnover 1213.8 2067.8 1799.2 2929.9 3139.9 4435.2 4046.4 Profit before tax 91 152.8 154.2 359.7 208.7 254.3 166.5 Profit after tax 59.6 100.2 101.7 242.5 142 171.5 110.1 Current Assets 366 600.9 825.5 1434.7 1238 1375.6 1381.5 Total Assets 501.9 734.6 1195.4 1847.6 2122.3 2532.9 2610.5 Current Liabilities 119.6 339.8 288.6 606.2 1020.7 1099.5 1070.6 Net worth 168.1 268.2 369.2 540.5 610.2 781.8 876.6 Working Capital 246.4 261.1 536.9 828.5 217.3 276.1 310.9 FINANCIAL TURNOVER In Millions Financial Year 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Rs. In Millions 1213.8 2067.8 1799.2 2929.9 3139.9 4435.2 4046.4 4435.2 4046.4 2929.9 3139.9 2067.8 4046.4 1213.8 7

Description Qty. in No.s Excavators 21 Dozers 11 Sensor Pavers 6 Back hoe loader - JCB 3DX 4 Motor Graders 8 Vibratory Earth Compactors 13 Loaders 7 Tandem Vibratory Roller 6 Bitumen Sprayer 4 Dumpers 69 Water Tankers 8 Trailers 4 Diesel Tankers 4 Transit Mixers 14 Crane 4 Kerb Casting Machine 6 Wet Mix Plant 6 Hot Mix Plant 2 Hot mix Plant Batch Type 2 Concrete Pneumatic Pump 7 Bitumen Hot Mix Plants 6 Pad foot Roller 1 Power Generator 34 Concrete Batching Plants 9 Weigh Bridge 60 MT 14 Slope Compactors 9 Earth Rammers 12 Vibrators 56 Steel shuttering Plates 23000 Sqm WM- 6 HES- 4.5M width Power Finisher (Mechanical) 2 IMS Dredgers 2 PLANT AND EQUIPMENT OWNED 8 BVSR Constructions Pvt. Ltd.

RESOURCES Key Personnel in Nos Years of Experience S.No. Category 20 & Above 15-20 10--15 Below 10 1 Administrative Executive 15 10 5 3 2 Technical Staff 30 40 58 80 3 Administrative staff 12 26 34 36 Manpower in Nos Years of Experience S.No. Category 20 & Above 15-20 10--15 Below 10 1 Mechanical Crew 16 13 6 4 2 Skilled Persons 28 46 54 80 Major Works On Hand (HighWays) S.No Name of Work Client 1 Widening and Strengthening of Kurnool - Devankonda Road from KM 4/400 TO 65/300 in Kurnool Dist., AP CE (R&B) CRN & MD, APRDC, Hyderabad Value in Rs. Millions 1335.40 2 Rehabilitation and Upgradation of NH-565 from Km 154.900 to 198.694 (Design Chainage from Km 153.939 to km 197.318) i.e., Davulapally to Markapuram on Nakrekal-Erepedu Road section to two lanes with paved shoulders in the State of Andhra Pradesh. SE NH, R&B Circle, Vijayawada 1129.80 3 Widening and Strengthening of Pedana Nuzvid Vissannapet road from Km. 62/250 to Km.95/460 in Krishna district, A.P, under invitation of Bids No. APRDC/APRSP/ICB/PNV-09 CE (R&B) CRN & MD, APRDC, Hyderabad 824.63 4 Improvement and upgradation of Road Section of Melli- NayaBazar (Section from K17.10 to Nayabazar (SK01) and nayabazar to Namchi (SK02) (Tranche-1 roads in the state of Sikkim) 5 Output and Performance based road contracts for the Maintenance of Package-29 roads in Nellore District of Andhra Pradesh PD-ADB projects, PIU Roads and Bridges Department, Gangtok, Sikkim. CE (R&B) CRN & MD, APRDC, Hyderabad 696.76 349.93 9

Major Works Completed (Highways) BVSR Constructions Pvt. Ltd. S.No Name of Work Client Value in Rs. Millions Year of Completion 1 Intermediate / Two - Laning three Major District Road under Package - V ( Construction of 3 Major District Roads under Package - V(i) Sausar - Mohgaon - Mordongri (29.58 Km) (ii) Sonapipari - Umereth - Monari - Umbah (22.25 Km) (iii) Gadarwara - Tendukheda (32.12 Km) ( Total Length 83.95 Km) in the State of M.P on Design, Build, Finance, Operate and Transfer (DBFOT) on Annuity Basis. Managing Director Madhya Pradesh Road Development Corporation Ltd., 1456.10 March 2014 2 Forming Four Lane Road from Venkatachalam (Km 151/4 of NH 5) to Krishnapatnam Port from Km 0/0 to 19/380 with a Provision for expansion of Road to 6 Lane in future. 3 Design, Construction for Improvement and upgrading to Four lane carriageway, Finance, Operation and Maintenance of Kadapa - Pulivendula road(kp-03) from Km. 28/0 to 46/2 in Kadapa District in Andhra Pradesh on BOT Annuity Basis 4 Intermediate - Laning / Two - Laning of 2 Major District Roads under package - VII ( Construction of 2Major District Roads under Package - VII Harda - Chhipaner (29.30 Km) & Betul - Atner (34.50 Km) in the state of M.P. on Design, Build, Finance, operate and Transfer (DBFOT) on Annuity Basis. 5 Widening to Two Lane and Improvements from Km 51/0 to 98/620 of Bhadrachalam - Chandrupatla road in Khammam District under LWE Project 6 Widening To 2-Lane and improvement from KM 25/2 To 102/0 KM excluding 40/2 KM To 48/0 KM and 52/8 To 57/0 KM of Gunupur-Kashinagar Paralakhemundi Road (SH-4) under LWE Scheme 7 Design, Construction for Improvement and upgrading to two lane carriageway, Finance, Operation and Maintenance of Pulivendula - RamiReddy Palli - Palagiri road(prp) from Km. 2/5 to 27/0 in Kadapa District in Andhra Pradesh on Build, Operate and Transfer(BOT) Annuity Basis 8 Implementation of R&R package for Providing Relief and Rehabilitation benefits to the Project affected Families / Project Displaced families of Kodurupaka, Neelojipally H/O of Kodurupaka villages of Boinpally Mandal Providing Infrastructure facilities at R&R Colony in Karimnagar District Laying of internal roads (C.C. Pavements) and construction of C.C. Drains Engineer R&B Circle, Nellore Chief Engineer (R&B), and MD APRDC, Hyderabad Managing Director Madhya Pradesh Road Development Corporation Ltd., Engineer R&B Circle, Khammam Executive Engineer (R&B), Paralakhemundi, Orissa Chief Engineer (R&B), and MD APRDC, Hyderabad Engineer R&B Circle, karimnagar 1108.85 March 2009 880.00 Aug 2010 820.00 March 2014 776.30 June 2011 701.90 Nov 14 366.10 May, 2010 277.87 March, 2014 10

9 Design, Construction for Improvement and upgrading to two lane carriageway, Finance, Operation and Maintenance of Pulivendula - Ambakapalli - Murarichintala road(pam) from Km. 5/2 to 16/0 in Kadapa District in Andhra Pradesh on Build, Operate and Transfer(BOT) Annuity Basis 10 Forming of new Road from Km 16/0 of Pulivendula Ambakapalli - Murari chintala Road in Kadapa District to join Mudigubba (Via) Dorigallu in Km 57/6of Anantapur - Chennai road (NH - 205) Sub work Formation of new Road from Ch. 0.000 to 11.215 from Km 16/0 of PAM to Dorigallu. 11 Improvements and upgradation to two lanes of road from Kamalapuram to Ayyavaripalli via payasampalli including Byepass road in Kadapa District 12 Upgradation Cement Concrete Works and cross Drainage work and Providing Street Lights and Timer Switches for affected roads at Devanmapaltinam. Manjkuppam, Thirupapuliyar, Chellankuppam, Vandipalem and Old Town in Cuddalore Muncipal Limit (Package no. TNMA/RD/04/ TEAP/003) 13 Formation of Two Lane Road of Venkatachalam (Km 151/ 400 of NH - 5) to Krishnapatnam Port Road from km 0/0 to 23/325 Sub work Reach -1, from Km6/2 to 10/850. 14 Improvements to Rayachoti - Angallu Road from Km. 39/500 to 60/200 in Chittor District 15 Upgradation Cement Concrete Pavement with cross Drainage work and Providing Street Lights, Energy Savers and Timer Switches for affected Roads at Sonamkuppam, Singarathoppu, Akkarighori and old Town in Cuddalore Muncipal Limit (Package No. TNMA/RD/004/TEAP/004). Chief Engineer (R&B), and MD APRDC, Hyderabad Engineer R&B Circle, Kadapa R&B Circle, Kadapa Muncipal Commissioner, Cuddalore Muncipality, Cuddalore R&B Circle, Nellore R&B Circle, Chittoor Muncipal Commissioner,Cuddalore Muncipality, Cuddalore 265.00 March, 2010 219.08 March 2009 212.04 March, 2012 100.98 Apr 2009 99.30 March 2009 94.05 March, 2012 78.90 Oct 2008 Major Works On Hand (Bridges) S.No Name of Work Client 1 Construction of High Level Bridge across Manjeera River at Birkur in Nizamabad District. 2 Construction of ROB at Km 3/6-8 of Gooty-Pathikonda-Adoni Road (LC No.179 A) at Railway Km 415/5-6 of Gooty-Guntakal at LC No.179/A in Anantapur District 3 Construction of high level bridge across Nagavali in Km 1/8 of Etcherla-Ponnada road connecting Ponnada road with Kalingapatnam - Srikakulam - Parvathipuram road in Srikakulam town limits in Srikakulam District (3rd call) 4 Constuction of major bridges across river Vattigadda at Km 492/2-4 of Raipur - Vishakhapatnam section of NH-43 (New NH No.26) including its approaches in Andhra Pradesh. (R&B) Circle, Nizamabad (R&B) Circle, Ananthapur (R&B) Circle, Srikakulam (R&B), National Highways Circle, Vijayawada Value in Rs. Millions 363.87 260.51 203.57 68.15 11

Major Works Completed (Bridges) BVSR Constructions Pvt. Ltd. S.No Name of Work Client 1. Construction of Road Over Bridge at Kovur gate (near polytechnic college) in Lieu of L.C.No.119 at Railway Km.176/12-15 of Gudur - Vijayawada section at Km. 0/2 of Nellore Bellary Bombay Road in Nellore District 2 Construction of ROB at Milk Project, Vijayawada at LC No. 315 A, 315 B, & G6 at railway Km.581/20-22, 581/01-03 of Kazipeta - Vijayawada at Km. 5.640 of Vijayawada - Vissannapet road in Krishna district 3 Construction of 2nd ROB in Tadepalligudem Municipal Limits in WG district at 160 m towards Tadepalligudem Railway station from LC No. 371(At Railway Km. 534/28-31) at Km. 112/8 of old NH - 5 and ends at Km. 60/10 of NA Road 4 Construction of ROB @ Lankelapalem in Lieu of LC No. 490 @ railway Km 755/3-6 of Vijayawada - Visakhapatnam section @ Km 7/ 4 on Parawada - Asakapalli Road in Visakhapatnam District 5 Construction of ROB at Kolakaluru in lieu of LC No. 255 at Railway Km. 403/14-16 of Vijayawada - gudur at Km. 19/2 of Guntur - Hanumanpalem road in Guntur district 6 Construction of ROB in lieu of L.C.No.487 at Km 1/2 of Anakapalli - Sabbavaram Road corresponding to Railway Km 747/5-8 in Visakhapatnam District 7 Construction of Four lane Road Over Bridge in Guntur Town Limits at L.C.No. 250 A on Guntur - Vijayawada Road in Guntur District, AP R&B Circle, Nellore R&B Circle, Vijayawada R&B Circle, Eluru Engineer, R&B Circle, Visakhapatnam R&B Circle, Guntur Engineer, R&B Circle, Visakhapatnam R&B Circle, Guntur Value in Rs. Millions 309.61 205.80 203.11 172.50 92.60 79.10 8 Construction of ROB near Ayyappagudi in Nellore town limits in lieu of L.C.No.110 on Mini Bypass Road in Nellore District, A.P., 9 Construction of ROB at TANUKU at Km 131/914 of old Vijayawada - Visakhapatnam road in lieu of L C No.153 at Railway Km 138/6-7 of Bhimvaram - Nidadavolu section in West Godavari District. 10 Construction of ROB at Peddavadlapaudi at LC No.301 on Tenali- Mangalagiri road in Guntur District, AP R&B Circle, Nellore R&B Circle, Eluru R&B Circle, Guntur 72.10 65.18 56.20 Major Works On Hand (Dredging) S.No Name of Work Client 1 Modernization - Krishna Delta System Krishna District Drainage - Modernization of Dredging of Pedalanka major drain from Km (-)5.50 to (+)4.50 including Detailed Investigation, Sub-Soil Exploration, Preparation of H.Ps, Preparation of L.P. Schedules, and Operation and Maintenance of the System for Two years after completion of the work on E.P.C. Turn Key System Engineer, Irrigation Circle, Vijayawada Value in Rs. Millions 213.19 12

2 Modernization-Krishna Delta System Krishna District Drainage - Modernization of Dredging of Gunderu major drain from Km 0.00 to Km 15.00. including Detailed Investigation, Sub-Soil Exploration, Preparation of H.Ps, Preparation of L.P. Schedules, and Operation and Maintenance of the System for Two years after completion of the work on E.P.C. Turn Key System 3 Modernization- Krishna Delta System Guntur District Drainage - Dredging of Romperu Right Arm from km 30.450 to 37.600 in Prakasam Distirct. including Detailed Investigation, Sub-Soil Exploration, Preparation of H.Ps, Preparation of L.P. Schedules, and Operation and Maintenance of the System for Two years after completion of the work on E.P.C. Turn Key System 4 Modernization - Krishna Delta System Guntur District Drainage - Dredging of Nallamada diversion from km (-) 1.300 to km 2.900 including Detailed Investigation, Sub-Soil Exploration, Preparation of H.Ps, Preparation of L.P. Schedules, and Operation and Maintenance of the System for Two years after completion of the work on E.P.C. Turn Key System 5 Modernisation of Godavari Western Delta System-Improvements to Yenamadurru Drain From Km 54.000 to 60.330 (Dredging) in W.G.District 6 Modernisation of Tulyabhaga Major drain from Km.(-)2.300 to 7.400 by dredging in Tulyabhaga basin in G.E. Delta Engineer, Irrigation Circle,Vijayawada The Engineer, Irrigation Circle, Guntur The Engineer, Irrigation Circle, Guntur Irrigation Circle, Eluru The Engineer,I&Cad, Dawaleswaram, East Godavari District 183.76 146.94 116.68 104.67 93.00 Major Works On Hand (Irrigation) S.No Name of Work Client 1 Investigation, Design and execution of Mothe Vagu Reservoir including all other allied works across Mothe Vagu near Koratpalli(V), Ramadugu (M) of Karimnagar District. SE, IFFC Circle-1, Dharoor Camp, Jagtial Value in Rs. Millions 1398.08 2 Improvements to South Buckingham Canal to Muttukkadu back water (North Lock) Reach III, Tamilnadu Engineer WRD, Palar Basin Circle, Chennai 857.20 3 Rehabilitation and Modernisation of Distributory system under Musunuru Distributory committee of Nagarjunasagar Lal Bahadur Canal, A.P.India Pkg No.LC-KRI-DC-32 4 Formation of Gouravelly Reservoir with gross capacity of 1.410 TMC water including Construction of H.C Weir, Forming Earth Dam, Head Regulators on Left and Right Side, Formation of Diversion Road including construction of DLR Bridge, Investigation, Designing and Estimation, near Gouravelly(Village), Husnabad (Mandal), Karimnagar District The Engineer, NSLBC, O&M Circle, Tekulapally, Khammam District Engineer,FFc Circle-II,LMD Colony, Karimnagar. 466.36 431.33 13

S.No Name of Work Client 5 APILIP JBIC Modernization of Canal System and System tanks under Lower Sagileru Project (Medium Irrigation) in Kadapa District 6 Rehabilitation and Modernisation of Distributory system under Distributory committee No. 6 Tangeda of Canal, Andhra Pradesh. India vide Package No. RC-GNT-DC-38 7 Rehabilitation and Modernisation of Distributory system under Janapadu Distributory committee of Nagarjunasagar Lal Bahadur Canal, A.P.India Pkg No.LC-NLG-DC-5 8 Rehabilitation and Modernisation of Distributory system under Distributory committee No.5, Piduguralla of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT- DC-37 9 Rehabilitation and Modernisation of Distributory system under Distributory committee No.24, Rompichirla of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT- DC-56 10 Rehabilitation and Modernisation of Distributory system under Distributory committee No.17,Guntur of Nagarjunasagar Jawahar Canal, Andhra Pradesh. India vide Package No. RC-GNT-DC-49 11 Construction of Earth Dam from RD 720m to 1054m (Right flank) of RET Irrigation Project 12 Rehabilitation and Modernisation of Distributory system under Distributory committee No.20, Chilakaluripet-1 of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT- DC-52 13 Rehabilitation and Modernisation of Distributory system under Distributory committee No.28, Inavolu of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT-DC-60 14 Rehabilitation and Modernisation of Distributory system under Distributory committee No.09,Chamuru of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT-DC-41 Irrigation Circle, Kadapa The Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District The Engineer, NSLBC, O&M Circle, Miryalaguda, Nalgonda District The Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District The Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District The Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District Executive Engineer, Ret Irrigation Division, Bhabanipatna The Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District The Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District The Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District Value in Rs. Millions 172.8 145.04 129.42 103.40 98.78 91.68 76.14 63.72 62.39 59.12 14

Major Works Completed (Irrigation) S.No Name of Work Client 1 Construction of Aqueduct across Peddavagu @ Km 16.150, Earth Work Excavation 15,000 to Km. 15.985 and From Km 16.325 to Km 17.000 of Flood Flows Canal from SRSP 2 Construction of Earth Dam (Left Flank) of RET Irrigation project in Kalahandi District. Engineer, SRPS, FFC Circle Jagitial EE, RET Irrigation Division, Bhvaniptnam Value in Rs. Millions Year of Completion 1217.70 July 2008 283.3 Nov 2014 3 Formation of Reservoir across Cheyyar River near Kuppanatham Village with allied Component Works. Diversion Road and Construction of cross masonry works in Chengam Taluk of Tiruvannamalai District. 4 Nagarjunasagar Tail Pond Dam Construction of river training walls on left and right flanks of Nagarjuna Sagar Tail Pond Dam across river Krishna near Satrasala(V), Guntur Dt. A.P. 5 S.B.B.R. - Construction of OGEE Spillway from Km 0.668 to Km 0.834 N.O.F. Blocks from Km 0.648 to Km 0.668 Head Regulator at Km 0.575 and formation of left Earth Dam from Km 0.555 to Km 0.648 and Right Earth Dam from Km 0.834 to Km 1.00 across Maganur Vagu 6 Construction of Viaduct from Km 36.062 to Km 38.262 of Right Main Canal of Vamsadhara Project 7 Formation of Earth Dam of Jonnalaboguda Balancing Reservoir from Km 0.450 to Km 0.850 including Earth Work, Excavation & Forming Embankment of Gravity Canal from Km 8.000 to Km 9.000 of Kalwakurhy Lift Irrigation Scheme, Mahabubnagar District. 8 Improvements to 4 Nos of Aqueducts in reach - 1of K.C. Canal (Package No. ICB-07A). 9 Formation of D Bund (balance portion) including Protection Works from Km.0.00 to Km0.900 of TGP main canal. 10 NABARD - Formation of Earth Dam from K.1.900 to Km 2.375/2.400 across Manganurvagu near Sangambanda (V). Makthal (M), Mahaboobnagar District. 15 Engineer, PWD WRO, Project Circle,Vellore, Tamilnadu SE/CIVIL, NTPDC, AP GENCO, Nalgonda District Engineer, BLIP Circle, Pebbair Engineer, Vamsadhara Project Circle, Srikakulam. Engineer, NKLISI Circle, Mahabubnagar. Engineer, Construction Circle No.1, KCCMP, Kurnool. Engineer, T.G.P. Circle, Kadapa Engineer, BLIP Circle, Pebbair 257.28 Aug 2008 168.8 Dec 2013 146.06 May 2003 144.91 Feb 2006 131.40 Sep 2006 56.77 Oct 2004 56.29 Mar 2005 47.64 Aug 2004

Major Works On Hand (Railways) S.No Name of Work Client 1 Construction of new BG from Nandyal to Yerraguntla stations-earth work in formation, construction of minor bridges and execution of miscellaneous works in Phase-II works 2 Execution of foundation & Substructure of Br No.3, No.11, Br No.21 & Br No.52 in connection with Bowaichandi-Arambag new line under the jurisdiction of Dy Chief Engineer, Construction, Bardhaman. Major Works Completed (Railways) BVSR Constructions Pvt. Ltd. Value in Rs. Millions Chief Administrative Officer (Constructions), 66.34 Chief Engineer, SCR Secunderabad CAO (Constructions), SER, Kolkata 41.59 S.No Name of Work Client 1 Proposed new B.G. line between Obulavaripalle and Venkatachalam in South Central Railway Chief Project Manager, RVNL, Chennai Value in Rs. Millions 921.5 16

Construction of ROB at Milk Project in Vijayawada, Andhra Pradesh Dredging of Romperu Right Arm Guntur Dist., Andhra pradesh Retaining Wall Formation of Ghat Road from Km 16/0 of Pulivendula - Ambakapalli - Murarichintala Road to Join Mudigubba in Kadapa Dist., A.P. 17

Dredging of Pedalanka major Drain, Krishna District, Andhra Pradesh Aqueduct across Pedavagu in Flood Flow Canal of Sriram Sagar Project, Karimnagar Dist. Telangana 18 Construction of Viaduct from km 36.062 to 38.262 of Right Main Canal of Vamsadhara Project, Srikakulam Dist. A.P.

Pulivendula-Ambakapalli-Murarichintala Road (PAM) from Km 5/2 to 16/0, Kadapa District, Andhra Pradesh Construction of ROB at Lankelapalem in Visakhapatnam District 19 Construction of OGEE spilway from 0.668 to Km 0.834 and formation of left Earth Dam km 0.555 to Km 0.648 across Maganur Vagu near Sangambanda (V), Mahaboobnagar District., Telangana

Construction of ROB near Ayyappa Gudi in Lieu of 110 at Railway Km 166/22-24 in Nellore District, A.P., Formation of new Ghat Road from Km 16/0 of Pulivendula-Ambakapalli-Murarichintala in Kadapa District. 20 Construction of ROB at Kovur Gate in Lieu of L.C. No. 119 at Railway Km 176/12-15 in Nellore District. Andhra Pradesh