BHP BILLITON IRON ORE PTY LTD

Similar documents
BHP Billiton Iron Ore Western Australia. Iron Ore. Mining Operations. Phil Price Vice President Integrated Planning

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

BHP Billiton Iron Ore Western Australia. Iron Ore. Presentation to Analysts June Ian Ashby, President and COO BHP Billiton Iron Ore

BHP Billiton Iron Ore. Asset Development Projects

Haoma Mining NL A.B.N

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

- A Growth Story. Michiel Hovers Vice President, Iron Ore Marketing 28 th February 2012

BHP Billiton Iron Ore Western Australia. Iron Ore. Port & Rail Operations. Mick Evans Vice President Port & Rail

LOCAL BUYING. Supporting Western Australia through local buying. PROGRAM BUILDING OUR FUTURE TOGETHER

For personal use only

Overview. Mining projects map

The Evolution to a Formidable Tier One Iron Ore Major. Goldman Sachs JB Were Sixth Annual Australasian Investment Forum

To: Australian Securities Exchange cc: New York Stock Exchange AUSTRALIAN JOURNAL OF MINING GLOBAL IRON ORE AND STEEL FORECAST CONFERENCE

Recent Exploration of the Olympic Dam

Presentation to Melbourne Mining Club. 23 April 2015 Mitsui & Co., Ltd.

BHP Billiton Iron Ore Section 46 Amendment to Ministerial Statement 433 Upgrade Dust Management at Finucane Island and Nelson Point, Port Hedland

39 th Annual Conference Istanbul June 2013

Pilbara Iron Ore Project WESTERN AUSTRALIA

STOCK EXCHANGE ANNOUNCEMENT

BHP Billiton Limited - Strategy, SWOT and Corporate Finance Report

December Quarterly Report 17 February 2014

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

Worsley Alumina. Julius Matthys, General Manager

BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2004

BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 31 MARCH 2003

CUMULATIVE NOISE IMPACT ASSESSMENT FOR THE STRATEGIC PROPOSAL

Iron Ore Update. Ian Ashby President Iron Ore 6 May 2009

Iluka s Iron Ore Royalty

Newman, Australia. Goldman Sachs JBWere Australasian Investment Forum

For personal use only

For personal use only

For personal use only

BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2002

BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 31 MARCH 2004

For personal use only

BHP BILLITON EXPLORATION AND DEVELOPMENT REPORT FOR THE QUARTER ENDED 31 DECEMBER 2011

December 2018 Quarterly Production Report

Bumper Quarter for Atlas as Production Hits 10Mtpa

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2005

BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2006

Responding to India s Growing Steelmaking Raw Materials Needs Don Carroll President BHP Billiton India

For personal use only

For personal use only

AGR MATTHEY AUSTRALIA

China Iron Ore New opportunities for industry growth. Sam Walsh AO. Chief executive, Iron ore & Australia 24 March 2011

For personal use only

Haoma Mining NL A.B.N

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July 2002 September 2002

Presentation for Southern Mongolia Infrastructure Strategy Group Study Tour. Local knowledge International experience Focused on success

BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2001

Department of Employment, Economic Development and Innovation. Current Queensland coal infrastructure developments

Assessing key trends in the Australian maritime economy

State of the Market: Latin America

the right place at the right time the right place at the right time Atlas Iron Limited - Overview

JUNE 2017 QUARTERLY ACTIVITIES REPORT

INCIDENT AT SAMARCO. The audio recording of the briefing and the transcript will be available on the BHP Billiton website.

Annual Earnings Report 30 June 2002

Curragh Operational Tour

BALL MILL COMPLETED AHEAD OF SCHEDULE

JUPITER MINES LIMITED Q4 FY2019 QUARTERLY ACTIVITIES REPORT

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

Visit to METSO Alwar (22Mar.2014) A Brief Review

Results presentation. 21 & 22 February for the half-year ended 31 December 2017 *

An emerging Pilbara Iron Ore Company Investor Presentation March 2012

Rev2.0-7 October 2011

MINARA UPDATE ENDS. 25 February 2004

Minara Presentation. Agenda. Peter Johnston. Achievements in 2005 Financial performance Challenges/opportunities for 2006 Growth Summary

Corporate Presentation March 2015

BHP Billiton Carbon Steel Materials. June 2002

BHP BILLITON PRODUCTION REPORT FOR THE NINE MONTHS ENDED 31 MARCH 2010

highlights Record Results Over $500m new contracts won since December 2005 Capacity increased; workforce over 3,000 >50%

For personal use only

December 2017 Quarterly Report

Manganese Industry Outlook and Opportunities. Elsabe Muller General Manager, Manganese Marketing May 2014

BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2010

BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2008

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. September 2002 December 2002

For personal use only

Mine Production and Shipping

DOCKING AND ROUTING PLAN

Haoma Mining NL A.B.N

For personal use only

FUTURE DEVELOPMENT OF THE PILBARA

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133

Gruyere Project Development Update

BHP Billiton Limited. IBISWorld Company Report Premium Report. Balance Date: 30 June 2013

PORT WARATAH COAL SERVICES

REPORT TO REPORT PREPARED FOR THE PORT HEDLAND INDUSTRIES COUNCIL AN ECONOMIC STUDY OF PORT HEDLAND PORT

BASELINE GROUP (PERSONNEL) PTY LTD

For personal use only

We can offer following LPG Tanker, about 1,663 DWT, built 1985;

BHP BILLITON PRODUCTION REPORT FOR THE YEAR ENDED 30 JUNE 2010

(m)

FIRST PUBLIC REPORT. BHP Billiton Limited

Alberto Calderon Group Executive and Chief Executive Aluminium, Nickel and Corporate Development

COSCO CORPORATION. (SINGAPORE) LTD FY2003 Full Year Results. Presentation

HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP)

Original artwork commissioned by DeGrey Civil and completed by employee Carl Garlett. Boodarie Contracting.

Golden Ocean Group Limited Q results March 1, 2007

BHP Billiton: A Strategy of Diversification

Transcription:

BHP BILLITON IRON ORE PTY LTD COMPANY REPORT SUMMARY Company name: Company type: Metals/Minerals: Location: Year established: BHP Billiton Iron Ore Pty Ltd Miner Steelmaking raw materials 1968 (start of Mt Newman Joint Venture) Headquarters Address: 225 St George's Terrace, State, Perth,, : Postcode: 6000 Telephone: +61 8 6224 4444 Fax: +61 8 6224 4178 Email kathryn.ackroyd@bhpbilliton.com Website http://www.bhpbilliton.com/bb/ourbusinesses/ironore.jsp BHP BILLITON IRON ORE PTY LTD Ownership BHP Billiton plc Main Products Annual Output (tonnes) 134,406,000 Managing Director: Jimmy Wilson Number of employees: 5,001-10,000 BACKGROUND Established in Perth (Western ) in 1968, BHP Billiton Iron Ore is a producer of iron ore products. With operations in (Pilbara region) and Brazil (50:50 joint venture with Vale at Samarco), BHP Billiton Iron Ore is one of the world s leading iron ore producers. www.mbdatabase.com Page 1 / 11

KEY PERSONNEL Jimmy Wilson President, BHP Billiton Iron Ore jimmy.wilson@bhpbilliton.com Chris Allen Supply Manager, Purchasing Tony Maramara Technical Specialist Jeremy Bower Principal, Approvals Planning Chris Klopper Project Manager, Sustaining Capital Mines Chris Watson Project Manager, Iron Ore Melissa Rothnie Mine Manager - Yandi Neil Bisland Mine Manager - Jimblebar Iron Ore Mine Michael Rose Mine Manager - Yarrie michael.j.rose@bhpbilliton.com www.mbdatabase.com Page 2 / 11

SUBSIDIARIES Company name /Province/State Percentage owned BHP Billiton Minerals (Mt Newman Joint Venture) Pty 85 BHP Billiton Minerals (Mt Goldsworthy Mining Associates Joint Venture) Pty BHP Billiton Minerals (POSMAC Joint Venture) Pty 85 BHP Billiton Minerals (Yandi Joint Venture) Pty 85 BHP Iron Ore (Jimblebar) Pty Ltd 85 BHP Direct Reduced Iron Pty Ltd 100 Samarco Mineracao SA Belo Horizonte 85 MG Brazil 50 Business type www.mbdatabase.com Page 3 / 11

MINES DATA Mine 1 - Mt Newman Mt Newman Pilbara Region Telephone +61 8 9175 3204 Fax +61 8 9175 3232 Proven reserves (tonnes) 371,000,000 Probable reserves (tonnes) Mine ownership percentage Railway? Railway destination Railway distance (km) 840,000,000 Primary and secondary crushers located at Mt Whaleback mine and Tertiary crusher and screening plant located at Nelson Point port. Lump re-screening plant also located at Nelson Point port 85 Yes Nelson Point, Port Hedland 426km Mt Newman Ores/minerals mined Estimated Annual Output (tonnes) Annual Capacity (tonnes) 51,326,000 Mine 2 - Mt Goldsworthy - Area C Mt Goldsworthy - Area C Address 1 100 km north-west of Newman Pilbara Region Proven reserves (tonnes) 275,000,000 Probable reserves (tonnes) 468,000,000 Mine ownership percentage 85 Crushing and processing facilities for final product production at the mine Railway? Yes Railway destination Yandi Railway distance (km) 38km spur, linking Mining Area C operations Ores/minerals mined Estimated Annual Output (tonnes) Annual Capacity (tonnes) 42,425,000 50,000,000 Mine 3 - Mt Goldsworthy - Northern www.mbdatabase.com Page 4 / 11

Mt Goldsworthy - Northern Pilbara Region Mine Manager S. Harrison Proven reserves (tonnes) 8,500,000 Probable reserves (tonnes) 17,000,000 Mine ownership percentage 85 Ores/minerals mined Estimated Annual Output (tonnes) Annual Capacity (tonnes) 768,000 768,000 Mine 4 - Yandi Yandi Address 1 100 km north-west of Newman Pilbara Region Telephone +61 8 9158 2541 Fax +61 8 9158 2540 Mine Manager Melissa Rothnie Proven reserves (tonnes) 593,000,000 Probable reserves (tonnes) 273,000,000 Mine ownership percentage 85 Crushing and screening plants located at Yandi mine Railway? Yes Railway destination Point Nelson Railway distance (km) 310km from Yandi Ores/minerals mined Estimated Annual Output (tonnes) Annual Capacity (tonnes) 53,536,000 Mine 5 - Orebody 18 Iron Ore Mine Orebody 18 Iron Ore Mine Address 1 Outside the town of Newman Newman Proven reserves (tonnes) 127,000,000 primary and secondary www.mbdatabase.com Page 5 / 11

Railway? No Mine 6 - Orebody 23 Iron Ore Mine Address 1 Railway? Orebody 23 Iron Ore Mine Outside the town of Newman Newman primary and secondary crushing No Mine 7 - Jimblebar Iron Ore Mine Jimblebar Iron Ore Mine Pilbara Region Mine Manager Neil Bisland Proven reserves (tonnes) 92,000,000 Probable reserves (tonnes) 413,000,000 Ores/minerals mined Estimated Annual Output (tonnes) Annual Capacity (tonnes) 4,913,000 Mine 8 - Yarrie Address 1 Yarrie 200 km East of Port Hedland Telephone +61 8 9176 5287 Fax +61 8 9176 5916 Email Mine Manager Concentrating/beneficiation plants Railway? Railway destination Railway distance (km) michael.j.rose@bhpbilliton.com Michael Rose Primary crushers at Yarrie and Nimingarra mines and idle - Yarrie is using a mobile crushing plant. Secondary and tertiary crushers at Finucane Island port Processing plant and beneficiation plant at Finucane Island port Yes Finucane Island 208km From Mt Goldsworthy www.mbdatabase.com Page 6 / 11

PORTS Location Unloading capacity (metric/long tons per hour) Stocking capacity (metric/long tons) Loading capacity (metric/long tons) Loading rate (metric/long tons) Maximum Vessel Displacement (deadweight metric/long tons) Depth of water (metres alongside pier) Nelson Point 5.8m tonnes 63m tonnes/year max 10,000 tonnes/hour (average 5,500 tonnes) 250,000 dwt 19.2 metres Finucane Island 800,000 tonnes 16m tonnes/year max 4,000 tonnes (average 3,200 tonnes) 170,000 dwt 17 metres EXPANSION PLANS Project 1 - IO Jimblebar Mine Expansion Project Type Modernization Ownership BHP Billiton (96%), Hebei Iron & Steel Group Co Ltd (4%) Investment (USD) 3,300,000,000 Estimated Annual Production Capacity 35,000,000 tonnes (iron ore) Expected Production Start Date 2014 Q1 Jimblebar Mine Project 2 - IO Port Hedland Inner Harbour Expansion Project Type Modernization Ownership BHP Billiton (85%) Investment (USD) 1,900,000,000 Estimated Annual Production Capacity 220,000,000 tonnes (iron ore) Expected Production Start Date 2012 H2 Port Hedland Project 3 - IO Port Blending and Rail Yard Facilities Project Type Modernization Ownership BHP Billiton Iron Ore Pty Ltd Current Status The overall project is 11% complete. Investment (USD) 1,400,000,000 Expected Production Start Date 2014 H2 www.mbdatabase.com Page 7 / 11

BRANCHES & SALES OFFICES Sales office 1 Address 1 Verheeskade 25 The Hague Postcode 2521-BE Netherlands Telephone +31 70 315 6666 Fax +31 70 315 6767 Sales office 2 Address 1 168 Robinson Tower #10-01 Address 2 Capital Tower Singapore Postcode 068912 Singapore Telephone +65 6349 3333 Fax +65 6349 4000 www.mbdatabase.com Page 8 / 11

FULL PRODUCTS BREAKDOWN Annual capacity: 129,000,000 Estimated Annual Output (tonnes): 134,406,000 Blast furnace lump Blast furnace sinter feed Direct reduction fines CHEMICAL ANALYSIS Mt Newman High grade lump High grade fines Fe (Calcined) 65.8 64.9 Fe (natural basis) 63.9 62.8 P 0.069 0.079 SiO 2 3.8 4.4 Al 2 O 3 1.5 2.2 LOI 2.9 3.2 Moisture content 3.4 6.1 Brockman type ore - Mt Newman Mineral Resources Fe 63.3 61.2 60.3 61.0 P 0.08 0.09 0.13 0.11 SiO 2 4.4 6.0 4.6 5.0 Al 2 O 3 2.0 2.4 2.7 2.5 LOI 2.3 3.3 5.8 4.6 Marra Mamba type ore - Mt Newman Mineral Resources Fe 61.4 59.7 59.5 59.6 P 0.06 0.06 0.07 0.07 SiO 2 3.1 4.1 4.0 4.0 Al 2 O 3 1.6 2.6 2.5 2.5 LOI 6.9 7.1 7.2 7.2 Brockman type ore - Jimblebar Mineral Resources Fe 61.6 60.6 60.1 60.4 P 0.09 0.11 0.13 0.12 SiO 2 5.3 4.9 4.9 4.9 www.mbdatabase.com Page 9 / 11

Al 2 O 3 2.8 3.0 3.0 3.0 LOI 3.8 4.9 5.4 5.1 Marra Mamba type ore - Jimblebar Mineral Resources Inferred Total Fe 60.2 60.2 P 0.11 0.11 SiO 2 3.3 3.3 Al 2 O 3 2.7 2.7 LOI 6.9 6.9 Nimingara type ore - Mt Goldsworthy Mineral Resources Fe 61.1 61.8 61.3 61.6 P 0.06 0.05 0.05 0.05 SiO 2 8.3 7.6 9.0 8.0 Al 2 O 3 1.4 1.1 1.2 1.2 LOI 2.4 1.8 1.5 1.8 Brockman type ore - Mining Area C Mineral Resources Fe 60.0 59.0 58.7 58.9 P 0.14 0.13 0.13 0.13 SiO 2 4.1 5.5 6.3 5.9 Al 2 O 3 2.8 2.9 2.6 2.7 LOI 6.2 6.3 6.2 6.2 Marra Mamba type ore - Mining Area C Mineral Resources Fe 62.1 60.7 61.8 61.5 P 0.06 0.06 0.06 0.06 SiO 2 3.1 4.2 3.3 3.5 Al 2 O 3 1.7 2.1 1.8 1.9 LOI 6.0 6.3 6.1 6.1 Brockman type ore - Yandi Mineral Resources Inferred Total Fe 59.3 59.3 P 0.14 0.14 SiO 2 4.8 4.8 Al 2 O 3 2.3 2.3 LOI 7.2 7.2 www.mbdatabase.com Page 10 / 11

Yandi Mineral Resources - Channel iron deposits Fe 56.7 56.1 56.7 56.6 P 0.04 0.04 0.04 0.04 SiO 2 6.0 6.8 6.2 6.3 Al 2 O 3 1.7 1.9 2.1 1.8 LOI 10.7 10.7 10.4 10.7 LUMPS/FINES/PELLET/SINTER FEED - PHYSICAL CHARACTERISTICS Lump - Mt Newman Bulk density 2.3 (loose), 2.5 (compacted) (+/- mm or microns) Percentage (%) 31.5mm 88% 25mm 68% 20mm 50% 15mm 32% 10mm 15% 10mm 15% 6.3mm 5% Fines - Mt Newman Bulk density 2.5 (loose), 2.7 (compacted) (+/- mm or microns) Percentage (%) 6.3mm 88% 3.15mm 67% 1.18mm 48% 0.6mm 37% 0.3mm 29% 0.15mm 23% www.mbdatabase.com Page 11 / 11