QMS for AIS/MAP Service Implementation Workshop

Similar documents
30 SEP - 02 OCT, 2014

AIXM/WXXM CONFERENCE 2010

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

MIDAD Project IDS Vision

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

Introduction to Amendment 40 to Annex 15

ICAO GANP Requirements and Evolution

Avitech GmbH AIXM Capabilities & Experiences

TWELFTH AIR NAVIGATION CONFERENCE

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

AIM in support of ATM

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

International Civil Aviation Organization. Second Meeting (AIM SG/2) (Kish Island, Iran, 31 August-2 September 2015)

AIS/AIM System in South Africa (ATNS)

International Civil Aviation Organization. Performance Framework for AIM implementation in the MID Region

Technical Resources - Automation European AIS Database (EAD)

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

2012 Performance Framework AFI

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

TWELFTH AIR NAVIGATION CONFERENCE

Aeronautical Information Management

Airspace User Forum 2012

AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016

ADQ Regulators Working Group

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

AIS-AIM Study Group Working Status

SAMPLE TEMPLATE APPENDIX 3.5C-1

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

Development of the Global AIM Strategy (AIM Projects)

AIM AUTOMATION. Raul Martinez, RO/AIM International Civil Aviation Organization North American, Central American and Caribbean Office

Quality Management System (QMS)

Work Programme of ICAO Panels and Study Groups

-2- IFAIMA Global AIM 2013 & ICAO EUR/MID AIM/SWIM Seminar SUMMARY OF DISCUSSIONS

Global Air Navigation Planning

COSCAP CAAM COOPERATION

Curriculum for AIM Training Module 2: ARO Officer

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

The Importance of AIM and the Operational Concept

Sharing UAE experience in. AIM implementation

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

FOLLOW UP TO APIRG/17 CONCLUSION 17/86 (AIM)

AERONAU INFORMATION MANAGEM. International TENTH MEETING THE QUALITY OF SUMMARY. such quality added). global ATM 1.3. regard, the.

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

Airport AIM as a Service Presented at World ATM Congress 2016

Managing Aeronautical Data

INTERNATIONAL CIVIL AVIATION ORGANIZATION

- Implementation and use of European AIS Database (EAD) -

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

Global Operational Data Link Doc 10037

EAD 2019 Annual Plan

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

MID Region Air Navigation Strategy

AIXM Coding guidelines for the ICAO data sets

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE

International Civil Aviation Organization. Aerodrome Certification Implementation Task Force (ADCI TF/1)

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

Trajectory-Based Operations (TBO)

METEOROLOGY PROJECT.1. Programme Title of the Project Start End

Aeronautical Information Services Update on Aeronautical Information Exchange Model (AIXM)

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

NCLB-AIM Workshop (Cairo, Egypt, September 2017) Your complete AIS/AIM Training baseline

Legal regulations in transport policy

The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009

ICAO Regulatory Framework and Universal Safety Oversight Audit Programme

Regional Annex 19 Safety Management

EAD 2018 Annual Plan

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

Terms of Reference for a rulemaking task

TWELFTH AIR NAVIGATION CONFERENCE

FLIGHT OPERATIONS PANEL (FLTOPSP)

PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management)

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

FOLLOW UP TO APIRG/17 CONCLUSION 17/86 (AIM)

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018)

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

Packaging Tomorrow s Aviation System

On Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

Providing the Context Air Navigation Integrated Work Programme

International Civil Aviation Organization

NOTICE OF PROPOSED RULE MAKING

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

Lufthansa Systems AIM from a navigation data house perspective

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

Safety Management 1st edition

SERVICE LEVEL AGREEMENT. Aeronautical Information Service (AIS) NAME Page 1 of 26 AGREEMENT. Aeronautical Information Service

Status of Implementation of the Integrated Aeronautical Information Package. (Presented by the Secretariat) Summary

Transcription:

TITLE DP-9 QMS for AIS/MAP Service Implementation Workshop AIS to AIM transitions: The AFI challenges The global evolution from AIS to AIM capability is considered an essential and over-arching objective guiding global and Regional developments related to ICAO s Efficiency and Safety Strategic Objectives. The Roadmap for the transition from AIS to AIM proposed as Guidance material to assist States in planning the scope and prioritizing projects and actions for the transition to AIM. 2 J-M Galais, ICAO AINF, MET/AIM 1

OVERVIEW The 2003 11th ICAO Air Navigation Conference (AN-Conf/11) established that aeronautical information would be required to be managed efficiently and shared on a system-wide basis, making it available to any participant in the ATM environment whenever and wherever it was required. AN-Conf/11 called upon ICAO to define requirements for safe and efficient global Aeronautical Information Management (AIM), adopt a common Aeronautical Information Exchange (AIXM) model, and develop new specifications for ICAO Annex 4 Aeronautical Charts and Annex 15 Aeronautical Information Services (AIS) that would govern the future availability of aeronautical information and charts. 3 AFI transition from AIS to AIM ICAO recognized that not all States or Regions could make the transition immediately to AIM, and that implementation would be evolutionary based on Regional needs and capabilities. The Organization accounted for transition requirements in its Global Air Navigation Plan, and worked to ensure that the plans of all States and Regions would be coordinated to ensure, to the greatest extent possible, that solutions will be internationally harmonized and integrated. ICAO Annex 4, Annex 15 and associated guidance material will also require further amendment to support new digital requirements and the standardized presentation of aeronautical information to the end-user. This will include provisions for electronic Aeronautical Information Publications (eaips) and charts. The development of these requirements will need to take into account that, though the transition from a product-centric (current AIS) to a data-centric (AIM) service is essential. The provision of traditional AIS products during the transition phase will also be required. Notwithstanding this caveat, the quality, consistency, and timeliness of data within the AIM framework must meet stringent new digital requirements, substantially exceeding those currently considered acceptable. 4 J-M Galais, ICAO AINF, MET/AIM 2

AFI-CAD database initiative Noting the adoption of the framework and guidance material for development of an AFI Centralized AIS Database (AFI-CAD) by the APIRG/16 meeting in 2007, the ICAO Regional Offices in Dakar and Nairobi, in collaboration with ICAO HQ, organized the third AFI-CAD Study Group meeting in Dakar, Senegal in October 2008. The main objective of the 2008 AFI-CAD event was to initiate and steer the process of developing the AFI-CAD business/financial model and associated User Requirements (URS). AFI-CAD will eventually comprise the AFI Region AIS Data Base System and the AFI Region AIS Data Operations and network provision. It will function as a single repository for aeronautical information and IAIP elements of participating States; provide data questioning enhancement through multilevel consistent data checking processes (including cross border data verification); act as a secure channel/vehicle for timely and efficient electronic distribution of aeronautical information and IAIP elements; and finally ensure harmonization and interoperability through a standardized system interface and data exchange model (AIXM) as well as a static data model (AICM). Eventual clients of the AFI-CAD system will enjoy support to edit and provide (to the system) aeronautical information, electronic access to and delivery of aeronautical information, browsing and downloading of participating States aeronautical information; and finally a report generating function. Access will be provided via dedicated Client Interface Terminals (CITs) and a web-based interface as determined by a given client s Service level Agreement (SLA). 5 ICAO Global Operational ATM The glue that binds ATM components together is the management, utilisation, and transmission of data and information : information management. A function called information services is also defined to include: Information management; Aeronautical information; Meteorological information; Other essential services (MIL, S&R, accident investigation, ). 6 J-M Galais, ICAO AINF, MET/AIM 3

Change from AIS to AIM Glue of the future ATM Network The AIS-AIM Transition Roadmap document is a plan, to manage and facilitate the global transition from AIS to AIM. Evolution, no revolution Step 1 consolidation, Step 2 databases, Step 3 information management. 7 Step 1 consolidation AOM DCB AO AUO CM TS 8 J-M Galais, ICAO AINF, MET/AIM 4

Step 1 consolidation AOM ATFCM AOP AUO SA SYN 9 Step 2 databases Integrated Aeronautical Information Database (National / Regional) 10 J-M Galais, ICAO AINF, MET/AIM 5

Step 1 consolidate Step 2 databases Integrated Aeronautical Information Database (National / Regional) 11 Step 1 consolidation Step 2 databases AOM DCB AO AUO CM TS Step 3 Manage Information 12 J-M Galais, ICAO AINF, MET/AIM 6

AOM DCB AO AUO CM TS 13 Roadmap Phase 1 - Consolidate: AIP AIRAC QMS NOTAM WGS-84 CHARTS Terrain and Obstacle Phase 2 Migration to digital databases: - Establish Integrated Aeronautical Information Database - Produce electronic version of existing products - Exchange data to and from Phase 3 Manage Information for the 14 J-M Galais, ICAO AINF, MET/AIM 7

New Products and Services Traditional: AIP Supp Amend NOTAM SNOWTAM ASHTAM Charts PIB e-files: e-aip e-charts e-pib data: AID DATAM services: WFS 15 New Standards & Guidance Phase 1 eaip Update of Doc 8126 References to automation more precise Terrain and obstacles Phase 2 Conceptual Model (based on AICM), Aerodrome Mapping Phase 3 Data Exchange model (based on AIXM) Functions and responsibilities (Staff Competencies) Quality and Training Manual (SLAs), 16 J-M Galais, ICAO AINF, MET/AIM 8

Communication Media XML A-MHS, PENS, Book CD Map ASCII Postal Mail AFS e-file HTML GML C-XML Internet Air-Ground 17 time P-10 Communication networks P-12 Aeronautical information briefing P-16 Training P-09 Aeronautical data exchange P-21 Digital NOTAM P-19 Interoperability with meteorological products P-20 Electronic aeronautical charts P-18 Agreements with data originators Phase 3 P-02 Data integrity monitoring P-01 Data quality monitoring P-15 Aerodrome mapping P-14 Obstacles P-11 Electronic AIP P-13 Terrain P-06 Integrated aeronautical information database P-07 Unique identifiers P-08 Aeronautical information conceptual model Phase 2 P-04 Monitoring of diff Annex P-03 AIRAC adherence monitoring P-17 Quality P-05 WGS-84 implementation Phase 1 18 J-M Galais, ICAO AINF, MET/AIM 9

Conclusions Conclusions Re-enforcing the value of current products by going digital will provide more functionality for current users and better availability of the information; Towards a common Information Reference Model for ATM with quality procedures for the management of the information flow between systems. 19 Roadmap Timeline December 2008 Phase 1 Consolidation November 2009 Phase 2 Going digital will begin by the development of new guidance material related (electronic AIP, aeronautical information conceptual model, training, quality) November 2010 Amendment 36 of Annex 15 and Amendment 56 of Annex 4 would become applicable. October 2011 Phase 3 Information management, will begin with the fourth meeting of the AIS-AIMSG. November 2013 Amendment 37 to Annex 15 and Amendment 57 to Annex 4 would become applicable,possible divisional-type meeting in order to finalize the transition to AIM. November 2016 Amendment 38 to Annex 15 and Amendment 58 to Annex 4 would become applicable. 20 J-M Galais, ICAO AINF, MET/AIM 10

THE END THANK YOU! MERCI! 21 J-M Galais, ICAO AINF, MET/AIM 11