West End State School - Stage 1 The proposed new library and general learning facility to the West End State School has been undertaken in response to recent rapid urban growth within the West End precinct. The design intent has been to provide a cost effective new facility that will enhance learning opportunities with the provision of a new resource centre, 8 general learning areas, as well as the inclusion of 4 temporary learning facilities within the undercroft of the existing J block building. A focus on enhanced green play space has been also considered, resulting in an enhanced internal forecourt, new pool change room amenities and storage areas. Consideration of the heritage aspects across the site have influenced the final design proposal with colours and textures of the proposed finishes, reflective of existing finishes within the school precinct. A staged construction programme has been outlined by the builder ADCO constructions, that will aim to limit disruption to the existing services across the site where possible, and consider the safety of students, parents and staff at all times during the construction works.
HARDGRAVE ROAD J BLOCK - STAGE 1 OF TEMPORARY FLEXIBLE SPACE AND S OVER CHRISTMAS HOLIDAYS. ESTABLISHMENT WORKS - 2016 21 NOV 2016-12 DEC 2016 HARDGRAVE ROAD PLAYGROUND J BLOCK - STAGE 1 AMENITIES PREPARATION AND HOARDING SETUP TO FOR NEW TEMPORARY CLASSS FOOTPATH CLOSURE STREET PARKING REMOVED PWD ACCESS & PARKING STAFF PARKING ESTABLISHMENT WORK- EARLY 2017 12 DEC 2016-18 JAN 2017 STUDENT AND PARENT ACCESS STUDENT DROP OFF WORKS COMPLETE AND ACCESS VECHILE ACCESS FENCE
HARDGRAVE ROAD PLAYGROUND FOR AMENITIES J BLOCK - 4 X SPECIALIST S COMPLETE FOR STUDENT USE PREPARATION AND HOARDING SETUP TO NEW TEMPORARY CLASSS FOR STUDENT USE FOOTPATH CLOSURE STREET PARKING REMOVED PWD ACCESS & PARKING STAFF PARKING MAIN WORKS 2017 18 JAN 2017-18 JAN 2018 HARDGRAVE ROAD PLAYGROUND FOR AMENITIES & SEATING NEW INTERNAL FORCOURT NEW CENTRE & 8 X GLAS J BLOCK - 4 X SPECIALIST S COMPLETE FOR COMPLETION OF STAGE 1 WORKS JAN 2018 STUDENT AND PARENT ACCESS STUDENT DROP OFF WORKS COMPLETE AND ACCESS VECHILE ACCESS FENCE
Stage 1 - J Block EXISTING STAIR Temporary flexible learning and music room facilities will be provided to the existing undercroft of the J block building which overlooks the oval. These facilities will have full openable bi-fold doors which will enable direct access to the covered walkway and oval. 1 Access to upper levels of J block will still be accomodated with a covered pedestrian walkway to the undercroft lift opening. 77m² OPERABLE WALL Existing drinking fountains will be reconfigured to enable continued access by the students. 2 These works are to be completed by January 2017. 77m² SPECIALIST FLA 1 OUTDOOR OPERABLE WALL EXISTING FLA 2 DEPARTMENTS MAINTENANCE & SERVICE New Color Scheme Entry OUTDOOR / PLAY POOL POOL AMENITIES Stage 1 - Pool Amenities The proposed new pool amenities will accomodate new male and female change rooms, a disabled compliant toilet and shower, as well as a new kiosk facility and pool store facility. A covered awning will be provided to a new external seating area. This awning will also overhang the adjacent ramped walkway within the forecourt area to provide EXISTING POOL additional covered play space for the students. KIOSK / FEMALE 27m² POOL AMENITIES AND CHANGE S POOL EQUIPMENT PWD TOILET () 7m² NEW SEATING 48m² 5m² KIOSK 11m² MALE 27m²
CENTRE GLA 05 GLA 06 68m² GLA 07 67m² GLA 08 GENERAL OUTDOOR 30m² PRACTICAL ART VOID BELOW 7m² 2m² SUPPORT OUTDOOR TEACHERS PREP 21m² STAFF & STUDENT FACILITIES Level 2 GLA 02 68m² GLA 03 OUTDOOR GLA 04 VERANDAH / 32m² 85m² PRACTICAL ART STUDIO 2m² VOID BELOW TEACHERS PREP 20m² Level 1 EXISTING SENIORS BUILDING INTERNAL COURTYARD RECEPTION 1 WORK / COLLECTION 161m² JUNIOR 41m² DATA PWD 8m² LIGHT WELL Ground Floor EXISTING SENIORS BUILDING EXISTING HALL GLA 01