Welcome. Let s talk! Salton Road Bike Facility and Pedestrian/Cycle Bridge Project

Similar documents
FOR LEASE. Retail and Office Space Clearbrook Plaza Clearbrook Rd, Abbotsford, BC LOCATION

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

2016 events calendar.

2015 Service Implementation Plan

2014 events calendar.

Mayor and Council Daniel Fok, Manager, SCADA and Electrical Award of Request for Proposal Seasonal Street Light Decorations

AB-LT_PC11-B1_H488 Project Cargo Corridor - Pre-Approved Permit Conditions

FOR LEASE nd Street, Surrey, BC

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

Welcome. Green Line in Your Community

South of Fraser Transportation Priorities March 2017 Engagement

Alliant Energy Center Visioning Workshop Input Madison, WI July 20, 2017

Minutes of the Regular meeting of Council held Monday, June 15, 1998, at 8:00 p.m. in the Matsqui Centennial Auditorium

Pattullo Bridge Replacement Project

Have your say... on the Ian McKinnon Drive Cycleway Project

River First Initiative and Waterworks Park

Pattullo Bridge Replacement Project

South Westminster and Bridgeview

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services

Public Open House. Chief Peguis Trail Project

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

City Manager General Manager Parks, Recreation and Culture Services. Subject: Coquitlam Crunch Trail and Expansion Plan ( )

Downtown Mobility Hub: Draft New Precinct Plan. Art Gallery of Burlington September 7, 2017

Committee. Presentation Outline

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

Where to buy Snappy Grains Barley in BRITISH COLUMBIA

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Ground Transportation Strategy. Victoria Airport Authority

Transportation Advisory Committee Meeting to be held at City of Penticton, Room B 171 Main Street, Penticton, B.C.

26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA

move up York Mills Centre Toronto, ON

A BOAT RAMP TO NOWHERE

NEIGHBOURHOOD PARKING ISSUES AND SOLUTIONS.

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

1.2 Corridor History and Current Characteristics

County of Peterborough Active Transportation Master Plan

e: w: remingtoncorp.com Quarry Park News More on page 1 & 2.

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

SR 934 Project Development And Environment (PD&E) Study

Aurora Hills. Getting There

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

2.1 Site Location. Site Location. Harbouside Waterfront Rezoning Submission - November 2012

Route 29 Solutions Projects

DIRECTOR, ENVIRONMENT, FLEET, & SOLID WASTE UPDATE: REGIONAL RIDESHARE PROGRAM RECOMMENDATION

// Atlanta Streetcar System Plan

1.0 INTRODUCTION Purpose of Trails Master Plan Study Process The Need for Trails in Wilmot... 2

PROJECTS. Otonabee South Monaghan. Active Transportation Master Plan Proposed Ultimate Network

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

Mechanized River Valley Access Public Engagement Report. April 2015

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

The Narrows Waterfront Park A Crown Jewel for Southern Brooklyn

EAST-WEST STITCH. Connecting the Western Edge of the City to the Centre

Non-Motorized Transportation

GREATER DES MOINES WATER TRAILS AND GREENWAYS PLAN

CD-1 Rezoning: 777 Pacific Blvd (NEFC Sub-area 10C)

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths.

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

The purpose of this Open House is to share the third draft of the Area Concept Plan and supporting studies before the drafts are finalized.

DAY 3: Huntleys Point Wharf to Balmain East Wharf

Atlas of a regional transportation network: Oregon Metro's Mobility Corridor Atlas

AGENDA. September 1, 2016 MEMORANDUM. Members, Transportation Technical Committee. Mark McCaskill, AICP, Director of TPO Programs

Municipal and Regional District Tax Imposition Bylaw No and Metro Vancouver Letter of Support

October 23, 2017 Council Workshop

business performs Where th Avenue SW Calgary, AB

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

MAC Meeting. February 2, 2017

Appendix VII TTC Routes

RE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.

METRONext PUBLIC INVOLVEMENT PHASE I

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Draft for approval by TCC on 2/3, TAQC on 2/9 and ARC Board on 2/22. Regional Trail Plan. Mike Alexander, Director, Center for Livable Communities

City of Grand Island Tuesday, December 12, 2017 Council Session

SITKA SEA WALK CRESCENT HARBOR TENNIS COURTS TO SITKA NATIONAL HISTORICAL PARK

Broomhill Park - 10 Year Vision Document

2. STAKEHOLDER FEEDBACK // What We Heard

New free City connector bus service

RE-JUVENATING CHINATOWN ENSURING A GREATER VISITOR EXPERIENCE

WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan.

Mercer Island Town Center Stakeholder Meeting E. June 10, 2015

Transit Fare Review Phase 2 Discussion Guide

PEMBERTON VALLEY RECREATIONAL TRAILS MASTER PLAN UPDATE Community Open House. April 2018

University Region Non-Motorized Plan 2015

RIVERFRONT PROPERTIES

CBP Highway Ports. The article is about CBP Highway Ports, for CBSA Highway Ports visit CBSA Highway Ports.

FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC BUILDING 9 THE BREWERY DISTRICT JOIN :

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019

2016 Development Cost Charges (DCC) UPDATE

Colorado Springs & Pikes Peak Region Destination Master Plan

Lot Lot 25. Lot 24. Lot 23. Lot 22. congregate housing as a site specific permitted use at 633 Winnipeg Street (RD2 Zone).

A link to heritage by connecting the community to its history.

Pattullo Bridge Replacement Project

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

November Prepared by HB Lanarc Consultants Ltd.

TORONTO TRANSIT COMMISSION REPORT NO.

British Columbia. Shoppers Drug Mart SEVENOAKS SHOPPING CENTRE SOUTH FRASER WAY, UNIT 143 ABBOTSFORD, BC, V2S 5A1 Phone:

This Executive Summary highlights the results of a multi-year planning process and includes recommendations of the New Jersey Trails Plan.

Welcome to the Cross County Trail Public Input Session!

The Scoop. No Tax Increase for Residents; Rates and Fees to Remain the Same Budget 2019 at a Glance. December 20, 2018

Transcription:

Welcome Salton Road Bike Facility and Pedestrian/Cycle Bridge Project Let s talk!

What s Happening? New pedestrian bridge and bike overpass Located at Salton Road over Highway 1 Project start date: Spring 2017 Project completion: Within a year Project cost: $3.9 million including a Bike BC Grant for $ 1 million

Why are we building this? Through the UDistrict public consultation process in 2015/2016 we ve heard from residents that more cycling and walking options are needed. The project fits with the City s updated Official Community Plan (OCP) vision of making biking and walking more delightful. The project enhances our existing cycling network and meets Council s goal of building a complete community. The project improves public safety, reduces green house gases and supports healthy active living.

Neighbourhood plan The key feedback we received from residents as part of the UDistrict plan: 1 Integrate the community and the campus. 81% of people were in favour of a new bike/pedestrian overpass 2 3 4 Provide more housing and shopping. Improve walking, cycling and transit. opportunities. Make it safe and easy. Create neighbourhood gathering places. across Highway 1 to support safe walking and cycling in the U District.

Building a complete community A complete community is one of the four cornerstones of Council s 2015-2018 Strategic Plan. The City is working to make Abbotsford a community of inclusive, safe and green neighbourhoods, connected to convenient and affordable transportation and vibrant commercial centres, built on the foundation of our cultural heritage and natural beauty. We recognize that an efficient and effective transportation system affects a number of key city priorities and we work closely with other levels of government to support community mobility. That means we capitalize on projects like this one that provide an opportunity to improve the transportation network in the city. 604-864-5514 eng-info@abbotsford.ca

Cycling is part of our big picture One of the visions in our updated OCP is to make walking, biking and transit delightful! Residents will choose to get around by foot, bike, and transit because they will be convenient. We do that by prioritizing active transportation options. This project realizes this vision. The OCP target is that 25% of all trips in the city are made without a vehicle, which is only 7% today!

What will it look like? This project will be built using a Legsby Road, Calgary design/build process. The designer will develop the bridge to meet our budget. These are some examples of other similar projects. Public art will be incorporated into the project. Highway 17, Victoria Leverett Circle Bridge, Boston

What will Salton Road look like? Existing Street view North of Highway 1 * Parking allowed from Marshall Rd. to Fern St. 6.1m Boulevard 10m Proposed Street view North of Highway 1 with new developments 11.7m 4.4m Boulevard with future1.5m sidewalk between Marshall Rd. and Fern St.

What will Salton Road look like? Existing Street view South of Highway 1 10m Proposed Street view South of Highway 1 Future 1.5m Sidewalk and planting strip 12.3m

OLUND RD. GLADWIN RD. TOWNLINE RD. BO ANGUS CAMPBELL RD. ST. RD. TOWNSHIPLINE RD. PEARDONVILLE RD. FRASER HWY. MT. LEHMAN RD. MT. LEHMAN RD. MT. LEHMAN RD. H FRASER WAY BLUE JAY ST. PEARDONVILLE RD. MACLURE RD. HWY. NO. 1 PEARDONVILLE RD. TOWNLINE RD. BATES RD. DOWNES RD. BLUERIDGE DR. UPPER MACLURE RD. M ACLURE RD. MARSHALL RD. WALMSLEY LAKE LAXTON LAKE SUMAS WAY Enhancing our Cycling network MCCALLUM RD. VYE RD. RIVERSIDE RD. CLEARBROOK RD. OLD YALE RD. SOUTH FRASER WAY CLEARBROOK RD. JUDSON LAKE GLENMORE RD. SUMAS WAY WHATCOM COUNTY, WASHINGTON. U.S.A. TRETHEWEY ST. MACLURE RD. GEORGE FERGUSON W AY PEARDONVILLE RD. MARSHALL RD. EMERSON ST. GLADWIN RD. SOUTH FRASER WAY MARSHALL RD. TOWNSHIPLINE RD. OLD RIVERSIDE RD. AFALGAR TR URQUIN MILL LAKE HWY. NO. 1 KING RD. MACLURE RD. GEORGE FERGUSON WAY C R. WARE ST. ANGUS CAMPBELL RD. DOWNES RD. HUNTINGDON RD. DeLAIR RD. MCCALLUM RD. MCCALLUM RD. OLD YALE HWY. NO. 11 SUMAS WAY GEORGE FERGUSON WAY SOUTH FRASER WAY VYE RD. CLAYBURN RD. IR #1 SAHH-A-CUM RESERVE BATEMAN RD. ELMWOO D R D. HWY. NO. 1 DR. RIVERSIDE RD. L A SUMAS WAY BURNUM WRIGHT ST. AVE. MCMILLAN RD. OLD CLAYBUR N OLD YALE RD. SUMAS WAY WHATCOM COUNTY, WASHINGTON. U.S.A. YORK RD. MCKEE RD. OLD CLAYBURN RD. RD. VYE RD. MARSHALL RD. DeLAIR RD. WH A TCOM RD. WHATCOM RD. OLD YALE STRAITON RD. MCKEE RD. R D. HWY. NO. 1 YORK RD. RD. WHATCO M WILLET RD. LOWER SUMAS VYE RD. WH A TCOM RD. WHATCOM RD. BLA U SON BLV D. FADDEN RD. MOUNTAIN RD. 0 250 500 1,000 1,500 2,000 DAWSON Meters FADDEN RD. RD. SUMAS MOUNTAIN RD. F IR #6 UPPER SUMAS RESERVE LAMSON RD. Bylaw 2600-2016, being "Official Community Plan Bylaw, 2016" Schedule "A" SUMAS M OUNTAIN RD. LAMSON RD. City of Abbotsford Legend City of Ab Map 6 - Bike Routes Legend Urban Development Boundary Bike Lanes Paved Pathway Proposed Bike Route City Boundary Airport Master Road Plan. Railway Shore Map 6 - Bi NEW OVERPASS LOCATION Urban Development Boundary Bike Lanes Paved Pathway Proposed Bike Route City Boundary First Nations Boundary Airport Road Railway Shore Note: All proposed bike routes to First Nations Boundary be confirmed by Transportation 0 250 500 1,000 1,500 2,000 Meters Note: All proposed bike routes to be confirmed by Transportation Master Plan.

Project Schedule Public consultation: January 2017 Review resident feedback: Jan/Feb 2017 Award design/build contract: Early Spring 2017 Start project: Spring 2017 Completion: Within a Year

We want to hear from you! You live here, and your opinion is important. How you can weigh in: Feedback forms: hard copies are available today Online feedback: Stay in the loop: Project information will be updated on our website: Email our engineers: eng-info@abbotsford.ca Call our engineers: 604-864-5514