LIST OF WORK PERFORMED AT INDIAN OIL CORPORATION LIMITED

Similar documents
Reference List for Cathodic Protection of LPG Mounded Bullets using AnodeFlex

VOLLEYBALL FEDERATION OF INDIA

Table-1.1 SEASONS, SOWING & HARVESTING PERIOD AND PRODUCTION. Five year Average Production ( to Harvesting Period.

S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun

MINISTRY OF PETROLEUM & NATURAL GAS ECONOMIC DIVISION

Bridge & Roof Co.(India) Ltd. COMPANY PROFILE

TENTATIVE VACANCIES OF S.S.O. IN ALL OFFICES 1st October, 2017

AVIATION. List of airports, where HPCL is extending refueling services are given below:

Pedro B. Ortiz MEGA-MUMBAI / MAHARASHTRA SOUTH ASIA S CAPITAL REGION

2 AGATTI Airports Authority of India, Agatti Airport Controller

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

WESTERN INDIA REGIONAL COUNCIL OF THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA

DCB Bank Regional Nodal Officers

Bridge & Roof Co.(India) Ltd. COMPANY PROFILE

LIST OF ESIC HOLIDAY HOME

PART I Issue 2 Rev. 3 Chapter 4 January 2017 Page 1 of 12

TABLE TENNIS FEDERATION OF INDIA

Integrated Design Services (IDS), NID, Ahmedabad. List of Clients

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

2. Wages and Earnings

SITREP NO-110/ hours 32-20/2007-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 18 TH September, 2007

Approved Master (layout) Plan (as on ) S. No. State Name of the Zoo Category. 3. Pillalamarri Deer Park, Mahabubnagar, Andhra Pradesh

ELEGANCE THAT CARRIES POISE

DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No.

TABLE TENNIS FEDERATION OF INDIA

DETAILS OF COCO OUTLETS- UPDATED AS ON 03 APR 2017

12027/1/2014-SSS Ministry of Statistics & Programme Implementation SSS Division OFFICE MEMORANDUM

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

Experimental Postmarks of India

Subnational Reform in the Business Regulatory Framework Experiences and Challenges in Select Indian States

National Biodiversity Strategy and Action Plan, India

Important National park of India

Anna University Asia s Largest Technological University offers Distance Mode Professional Degree Programmes

Installation & Commissioning Report

DAINIK EXPRESS. Largest, Highest and Biggest in India. Team of DAINIK EXPRESS

Sagarmala Development Company (SDC)

Bridge & Roof Co.(India) Ltd. COMPANY PROFILE

RAILWAY RECRUITMENT BOARD (RRB) EXAM - QUESTION PAPER SOLVED

Railway Recruitment Board (RRB) Exam - Question Paper Solved

PAWAN HANS HELICOPTERS LTD. Bank Payments To Suppliers

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

New Domestic Cruise Terminal in Mumbai Inaugurated by Union Minister Shri Nitin Gadkari and Chief Minister of Maharashtra

India - State-wise Wastelands Distribution (Percentage to total geographical area)

Presentation on City Gas Distribution (CGD) Pipeline Network Projects in Smart Cities

Multimodal Logistics Professionals

List of Life members of IWP as on 4 th July 2016.

Micro Brewery. can also supply piping, ladder and platform. We could also customize varied tanks according to customers requirements.

Foam Systems Engineering Design Manual

ANDHRA PRADESH. Murty ASSAM. President Dr. Umesh Ch.Sarma Off. (0361) Res: Mobile:

S.NO NAME OF THE STATE NAME OF THE COLLEGE 1 Andhra Pradesh. 2 Arunachal Pradesh. 3 Chandigarh

NATIONAL POLICE MISSION List of Members of Micro Mission: 03 Communication & Technology

CORPORATE PROFILE 2017

INDIA CALLING 2009 RAHUL ASTHANA MUMBAI PORT TRUST, CHAIRMAN, BRUSSELS, 1st OCTOBER 2009 PORT LOGISTICS AND INFRASTRUCTURE DEVELOPMENT IN INDIA

REVIEW OF THE PERFORMANCE OF STATE ROAD TRANSPORT UNDERTAKINGS (PASSENGER SERVICES) FOR APRIL, 2014 MARCH, 2015

2017 STI/SPFA Product Awards

Sl. No. Proposed Project. 11:00 11:30 Hrs.

Sub. Rev Eng. Ad. Rev Hin. Ad. Rev Ver. Ad. Rev.

Newsletter HIGHLIGHTS OF THIS ISSUE. July,09 to Dec,09 OVERVIEW MAJOR PROJECTS COMPLETED / RECEIVED BY GROUP IBA APPROVAL & MTO LICENSE

PORTS. November 2010

¾Ö ÖÖÖÖ¼ÜÖ Ö ÖÖÊ ÔÜ ÒÜÃ Ü / VISAKHAPATNAM PORT TRUST {ÉÊ Ú{ÉJÉ / CIRCULAR NO. 338

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

DESPITE GLOBAL ISSUES, TOURISM IS ON A GROWTH PATH

Changes to India GST impacting all airlines issuing tickets where travel commences in India

STATEMENT - 14 RANKING OF CPSEs IN TERMS OF PROFIT/LOSS BEFORE EXCEPTIONAL, EXTRAORDINARY ITEMS & TAX (PBEET) IN

Vikram & Co.

VOLUME AND PRICE OF ELECTRICITY TRADED BY TRADING LICENSEES ( RTC )

DETAILS OF CONTRACT AWARDED DURING THE MONTH OF OCTOBER ( ABOVE RS. 5 LAKHS) Nos. and names of parties qualified after technical evaluation

GENSOL S SOLAR PV EPC PORTFOLIO

Issue 10. micrometer. data as of 30 th June 2014

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF JAN, 2017

Firefighting Group Foam Systems. 1. Foam Pourer 2. Foam Makers 3. High Back Pressure 4. Bladder Tanks 5. Foam Porportioner 6.

17. Ganga-Jamuna doab is the largest doab region of India. 18. The eastern and western coastal plains meet at Kanyakumari. 19. Kerala Coast is also

Details of existing Regulation

LIST OF DGCA APPROVED AME TRAINING INSTITUTES. (as on )

2. Alpha Test House, New Delhi Delhi Private Suspension revoked w.e.f

VAMSADHARA AND EAST FLOWING RIVERS BETWEEN

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF MARCH, 2017

Best State/UT Comprehensive Development of Tourism (North East, Jammu and Kashmir ) Jammu & Kashmir

General Knowledge Related To Indian Railways (Doonedin.com)

A Brief Company Profile

(Valid, not Valid, No 80G) 6072 Abhinav Social Services Uttar Pradesh

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF AUGUST, 2015

MUMBAI 4 6 Sept member of. Show Report

SLAB. SCIENTIFIC LAB We create healthy laboratory at its best! History

SOUTHWEST MONSOON-2010: DAILY FLOOD SITUATION REPORT SUMMARY OF IMPORTANT EVENTS AS ON

8. Karnataka Cooperative Consumers Federation Ltd. No. 4, Pampamahakavi Road, Chamarajpet, Bangalore (Karnataka)

Issue 10. micrometer. data as of 30 th June 2014

SBIBRCODE CIRCLE BRANCH CITY 847 HYDERABAD HYDERABAD MAIN HYDERABAD 3257 HYDERABAD YELLAREDDYGUDA HYDERABAD 4031 HYDERABAD CB SECUNDERABAD HYDERABAD

Q1 FY18 Earnings Presentation 17 July 2017

ORDER. Subject : Constitution of the Working Group on Tourism for the Twelfth Plan ( ).

ROAD DEVELOPMENT IN INDIA 2015

ROAD ACCIDENTS IN INDIA 2012

A Brief Company Profile

Newsletter HIGHLIGHTS OF THIS ISSUE. Jan,09 to June,09 OVERVIEW MAJOR PROJECTS COMPLETED BY GROUP ISO 9001 : 2000 CERTIFICATION NEW TECHNOLOGY

38 Delhi Integrated Multi-Modal Transit System Limited (Dimts) 39 Delhi Jal Board 40 Department Of Commercial Taxes Government Of Jharkhand 41 DGFT -

Civil Aviation. LTI The Trusted Training Institute for Competitive Exams (

10/1/2013

PAWAN HANS HELICOPTERS LTD. Bank Payments To Suppliers

W20 Containerized Power Plant

TECHNICAL SPECIFICATIONS OF TRAILER MOUNTED MOBILE BIO-TOILET (10 SEATER)

Transcription:

LIST OF WORK PERFORMED AT INDIAN OIL CORPORATION LIMITED 2005 Mathura BDFP I. O. C. L 2005 Mourigram Terminal I. O. C. L Construction/Fabrication of Cone Roof Vertical Storage Tanks, Pipeline Work including Supply of Materials Heat Tracing Thermal Insulation Etc. Supply, Fabrication, Erection of Fixed Foam System & Sprinkler System for Existing Tanks 2006 Paradeep Terminal I. O. C. L Laying of MS Pipe Line of Marine 2006 Vadinar-Jamnagar 79 M Dia Floating Roof Tank I. O. C. L. 2007 NRL SMTP SILIGURI I. O. T. L. 2008 Siliguri Terminal I. O. C. L 2010 Viramgam (Gujarat) I. O. C. L 2010 Chaksu (Rajasthan) I. O. C. L 2010 Mathura Refinery I. O. C. L. 2010 Chandrapur (Tadali Depot) 2011 CHAKSU RAJASTHAN I. O. C. L. Design, Engg,Supp, Instalation and Commissioning of Sec. Rim Seal Fabrication, Erection, Welding, Testing and Commissioning of Cone Roof and Floating Roof Storage Tanks Laying of Pipeline, Installation of Pumps & Allied Works Maintenance and Inspection of 79 Mtr Dia D/D Crude Oil Storage Tank Maintenance and Inspection of 79 Mtr Dia D/D Crude Oil Storage Tank "Mechanical works for tank M &I on ARC basis at Mathura Refinery" I. O. C. L. Fabrication & Erection of Tank Supply and Installation of Foam Pourer System for Crude Oil Storage Tank at Chaksu Pumping Station UPSO/ENG/W.O.997 /05-06 Dt. 24.11.2005 WBSO/ENG/2004-2005/LT/138/233/71 02/45 Dt. 08.03.2005 OSO/ENG/LT-18 dt. 20.12.06 P.O. No.: 17498507 Dt. 30.11.2006 P.O. No.: 200700960 dt. 26.12.2007 P.O. No.: 17742149 dt. 03.04.2008 P.O. No.: 23088356 Dated 04.02.2010 P.O. No.: 23088367 Dated 04.02.2010 P.O. No.: 23116064 Dated 19.03.2010 P.O. No.: 23176611 Dated 01.07.2010 P.O. No.: 23290628 Dated 06/01/2011 3,50,30,179.36 06 Months Successfully Completed 1,20,47,247.99 07 Months Successfully Completed 19,38,630.00 04 Week Successfully Completed 70,98,360.0 08 Months Successfully Completed 1,27,03,430.49 12 Months Successfully Completed 2,33,38,991.00 6 MONTHS Successfully completed 3,25,51,490.69 7.5 Months Successfully Completed 23,930,136.26 7.5 Months Successfully Completed 2,25,11,527.39 7.5 Months Successfully Completed 67,78,410.51 8.0 Months Successfully Completed 1,45,11,127.29 3.0 Months Successfully Completed Contend P/2

Page : 02 LIST OF WORK PERFORMED AT INDIAN OIL CORPORATION LIMITED 2011 WADALA II I. O. C. L. Repairing of CRVT Tank 2011 LBP Pharpur I. O. C. L. FIRE FIGHTING SYSTEM 2011 JATNI POL DEPOT I. O. C. L. 2011 MATHURA REFINERY I. O. C. L. 2011 GULBARGA DEPOT - KARNATAKA I. O. C. L. 2012 JNPT- MUMBAI I. O. C. L. 2012 WADAL II - MUMBAI I. O. C. L. FABRICATION OF STORAGE TANKS Supply & Installation of Pivot Master Type Swivel Joint FABRICATION OF STORAGE TANKS REPAIR & RPAINTING OF 40 MTR DIA STORAGE TANK REPAIR & RPAINTING OF 25 MTR DIA STORAGE TANK 2012 JATNI POL DEPOT I. O. C. L. LAYING OF PRODUCT PIPELINE 2013 SILIGURI WEST BENGAL I.O.C.L 2014 MOURIGRAM-HOWRAH I.O.C.L 2014 RAJBANDH WEST BENGAL I.O.C.L MILD STEEL FIRE WATER STORAGE AT SILIGURI TERMINAL FIRE WATER TANKS AT MOURIGRAM TERMINAL FIRE WATER TANKS AT RAJBANDH TERMINAL 3 P.O. No.: 23418044 Dated 21.07.2011 P.O. No.: 23421408 Dated 26.07.2011 HO/E/JAT-PT-26/MKR Dated 28.07.2011 P.O. No.: 23499961 Dated 29/11/2011 P.O. No.: 23501258 Dated 30/11/2011 P.O. No.: 23565921 Dated 02/03/2012 P.O. No.: 23569873 Dated 07/03/2012 HO-PJ/PT/JAT/43/11-12 Dated 13/09/2012 WBSO/ENG/13-14/PT-14/LOI Date: 04/12/2013 P.O. No.: 24058307 Date: 16/01/2014 P.O. No.: 24058307 Date: 16/01/2014 43,87,232.97 4.0 Months Successfully Completed 1,68,94,001.04 5.0 Months Successfully Completed 9,21,02,340.00 9.0 Months Successfully Completed 62,72,265.68 60 Days Successfully Completed 3,86,83,147.48 8.0 Months Successfully Completed 1,35,27,649.39 5.0 Months Successfully Completed 36,21,914.68 4.0 Months Successfully Completed 11,97,06,692.60 9.0 Months Successfully Completed 2,38,34,842.010 09 Months Successfully Completed 2,70,39,022.36 10 Months Successfully Completed 2,71,84,726.59 09 Months Successfully Completed Contend P/3

Page : 03 LIST OF WORK PERFORMED AT INDIAN OIL CORPORATION LIMITED 2015 Mathura Refinery Uttar Pradesh DOIMUKH ARUNACHAL PRADESH I.O.C.L I.O.C.L Mechanical & Civil works for Tank M&I jobs at Mathura Refinery RCC RING WALL SAND PAD FOUNDATION, FABRICATION, ERECTION & COMMISIONING OF IFR/CR VERTICAL TANKS & ALLIED CIVIL WORKS AT DOIMUKH DEPOT, ARUNACHAL PRADESH P.O. No.: 24485060 Date: 03/07/2015 P.O. No.: 24660199 Date: 02/02/ 3,74,11,376.25 12 Months In Progress 13,29,51,148.07 10 Months In Progress SILCHAR - ASSAM I.O.C.L TANK FABRICATION AT SILCHAR, CACHAR DISTRICT, ASSAM P.O. No.: 24879933 Dated: 27/09/ 16,88,93,566.06 10 Months In Progress BUDGE BUDGE WEST BENGAL I.O.C.L Reconstruction of new 5 bay TLF with six nos. of loading arms after dismantling of existing TLF at Budge Budge Terminal under West Bengal State Office P.O. No.: 24911603 DATED: 25.10. 2,22,37,565.75 01 In Progress KARGIL JAMMU & KASHMIR I.O.C.L TANK FABRICATION WORKS AT KARGIL P.O. NO.: 24936481 DATED 24.11. 1,40,32,719.00 08 Working Months In Progress BUDGE BUDGE (WEST BENGAL) I.O.C.L MECHANICAL & FIRE FIGHTING WORKS AT LPG BOTTLING PLANT, BUDGE BUDGE (WEST BENGAL) P.O. No.: 24946017 Dated: 06/12/ 4,87,17,230.52 06 Months In Progress Contend P/4

Page : 04 LIST OF WORK PERFORMED AT INDIAN OIL CORPORATION LIMITED Paharpur (West Bengal) I.O.C.L DOIMUKH ARUNACHAL PRADESH I.O.C.L Design, Engineering, Supply, Lying, Fixing Galvalume Profile Sheets on Warehouse Shed at Lube Paharpur PIPELINE WORKS AT DOIMUKH DEPOT. LOI NO.: LBPK/ENGG/PT/01/2 016-17 DATED: 28.11. P.O. NO.: 25015573 DATED: 18.02. 28,99,355.00 03 Months In Progress 20,84,66,752.80 10 Months In Progress F F FOR: M K ROY & BROS PROJECTS PRIVATE LIMITED

LIST OF WORK PERFORMED AT HINDUSTAN PETROLEUM CORPORATION LIMITED 1 P age 2005 Paradeep Terminal 2005 Bhitoni Depot (Jabalpur) 2006 Budge Budge Terminal 2006 Mandir Hasaud (Raipur) 2006 Bhitoni (Jabalpur) 2006 Mathura Installation (UP) 2007 Budge Budge 2007 Bharatpur IRD 2007 Dum Dum ASF 2007 Budge Budge I Terminal Laying of Tanker Discharge Pipeline at Paradeep Terminal, Mechanical Jobs including Fabrication and Erection of Mild Steel Storage Tanks, Pipelines and Mechanical Structures Dismantling and Construction of 02 Nos. Tanks 27 Mtr. Dia x 11 Mtr. HT and 22 Mtr Dia x 11 Mtr. HT Storage Tanks Fabrication 01 No. 20 Mtr Dia x 12.5 Mtr HT, 01 No. 17 Mtr. Dia x 12.5 Mtr HT. (Floating Roof) and 01 No. 13 Mtr. Dia x 12.5 Mtr. HT Fabrication, Erection of MS Storage Tank at Bhitoni, Jabalpur Depot, (MP) Fabrication, Erection of MS Storage Tanks at Mathura Installation Laying of Pipeline at Budge Budge (I) Installation Tank Fabrication at Bharatpur IRD, Bharatpur, Rajasthan Supply, Fabrication, Welding Testing and Commissioning of Cone Roof Storage Tank At Dum Dum ASF, Kolkata Painting of ATF Storage Tanks at Budge Budge I Terminal, Budge Budge EM-2656/E&P/ENG- 125/BH dt. 09.12.2004 EM2813/E&P/ENG04 0/BH dt. 28.09.2005 6000167-OQ-10002 dt. 02.11.2006 6000047-OQ-10002 dt. 19.05.2009 6000060-oq-10002 dt. 07.06.2006 6000062-OQ-10002 dt. 07.06.2006 1,49,27,040.00 08 Months Successfully Completed 1,07,56,570.00 08 Months Successfully Completed 1,37,27,200.00 10 Months Successfully completed 1,57,02,021.00 08 Months Successfully Completed 66,40,200.00 08 Months Successfully Completed 54,82,525.00 06 Months Successfully Completed 7000050-OQ-10002 19,51,450.00 04 Months Successfully Completed 6000016-OQ-10002 dt. 21.04.2006 6000213-OQ-13010 dt 09.01.2007 7000044-OQ-13010 dt. 31.05.2007 68,20,090.00 06 Months Successfully Completed 54,00,000.00 04 Months Successfully Completed 10,19,000.00 06 Weeks Successfully Completed

LIST OF WORK PERFORMED AT HINDUSTAN PETROLEUM CORPORATION LIMITED 2007 KOLKATA- RO Fabrication and Erection of SOR Canopy 2007 Kolkata RO Fabrication, Supply & Installation of Hoarding at Kolkata R. O. Tankage, Pipeline, Gantry and 2008 Karari POL Depot Pump House Works at Karari Jhansi (UP) 2008 Mathura (UP) Tank Fabrication Works 2008 Devangunthi (Karnataka) Tank Fabrication Works 2008 Mangalore (Karnataka) H. P. C. L Pipeline Laying Works at Magalore Terminal, Mangalore, Karnataka 2009 Devangunthi (Karnataka) Mechanical Jobs internal Pipeline at Devangunthi, Installation, Devangunthi Bangalore, Karnataka 2009 PAKNI (Solapur) IRD Piping Works at Pakni. Solapur, Maharastra 2009 Structural Support of PBO Kettle Budge Budge and at Budge Budge I Installation, Ramnagar Budge Budge, Kolkata -700137 2009 Budge Budge and Ramnagar 2009 Budge Budge Construction of Manufacturing 22 KL. Kettles with MS Plates For Lube Oil with Steam Jacket, Thermal Insulation for Ramnagar and Budge Budge Terminal Repair and Maintenance of MS Tank (Floating Roof) at Budge Budge I Terminal, B/Budge 7000054-OS-11600 dt. 03.08.2007 7000052-OS-11602 dt. 06.11.2007 8000011-OQ-10002 dt.: 20.05.2008 8000012-OQ-10002 dt. 20.05.2008 8000054-OQ-10002 dt. 10.09.2008 8000049-OQ-10002 dt. 20.08.2008 8000161-OQ-10002 dt. 25.02.2009 8000165-OQ-10002 dt. 06.03.2009 8000177-OQ-11644 dt. 09.02.2009 8000176-OQ-11644 dt. 09.02.2009 8000179-OP-11644 dt. 16.02.2009 1,20,00,000.00 08 Months Successfully Completed 30,00,000.00 02 Months Successfully Completed 1,10,65,775.00 06 Months Successfully Completed 1,19,36,200.00 06 Monts Successfully Completed 3,13,41,070.00 08 Months Successfully Completed 1,41,14,181.00 06 Months Successfully Completed 2,04,07,120.00 04 Months Successfully Completed 48,41,640.00 04 Months Successfully Completed 22,35,900.00 45 Days Successfully Completed 22,35,000.00 10 Weeks Successfully Completed 13,14,200.00 90 Days Successfully Completed 2 P age

LIST OF WORK PERFORMED AT HINDUSTAN PETROLEUM CORPORATION LIMITED 2009 Devangunthi Installation 2009 Guntakal (Hyderabad) 2010 Kolkata (Retail) 2010 Budge Budge 2010 Anandapur East Zone Office 2010 Budge Budge Fabrication of U/G Tanks 2010 PARADEEP TERMINAL T/T GANTRY & ALLIED WORKS 2011 PAHARPUR LPG PLANT PAHARPUR FIRE WATER TANK AT PAHARPUR 2011 PARADEEP TERMINAL PIPELINE JOB 2011 2011 BUDGE BUDGE TERMINAL BUDGE BUDGE TERMINAL LAND DEVELOPMENT WORKS @ BB-I Tank Fabrication at Bidge Budge Terminal Kolkata 8000157-OQ-10002 dt. 20.02.2009 SCZ/LOI Dt. 13.11.2009 SM/RE Dt. 08.01.2010 9000082-HD-10002 Dated 20.08.2010 Fabrication, Erection, Welding of LayingofSidingPipelineatDevangun thiinstallation,devangunthi,bangal ore, Karnataka. Tank Fabrication & Allied Facilities at Guntakal Depot: Construction of Structural Canopy and Allied Job at Verious Retail Outlet under Kolkata Retail Office Internal Pipeline and Structural TT Gantry and Pump House at HPCL- Budge Budge I Terminal Fire Protection System At East Zone Office Building, Anandapur 10000175-OQ-10002 Date 19.10.2010 10000191-oq-10002 Dated 22.10.2010 10000-OQ- 10002/KAN Dated 20.08.2010 11000049-OQ-12001 Dated 16/05/2011 11000063-OQ-10002 Dated 29.08.2011 11000057-OQ- 11600/BR Dated 23.09.2011 11000143-OQ-10002 Dated 22/12/2011 34,86,800.00 05 Months Successfully Completed 2,39,28,236.00 08 Months Successfully Completed 50,00,000.00 03 Months Successfully Completed 6,98,18,064.78 10 Months Successfully Completed 78,98,949.00 5.0 Months Successfully Completed 2,48,71,981.12 4.0 Monts Successfully Completed 2,80,86,008.04 8.0 Months Successfully Completed 1,78,28,748.00 07 Months Successfully Completed 13,49,73,364.75 8.0 Months Successfully Completed 1,46,88,000.00 3.0 Months Successfully Completed 15,55,62,825.50 12 th Months Successfully Completed 3 P age

LIST OF WORK PERFORMED AT HINDUSTAN PETROLEUM CORPORATION LIMITED 2012 2012 2012 2012 2012 BUDGE BUDGE TERMINAL BUDGE BUDGE TERMINAL PAHARPUR LPG PLANT PAHARPUR KHOPOLI BOOSTER PLANT TELEGAON BOOSTER PLANT CIVIL WORK IN TANK FARM AT BUDGE BUDGE Fabrication of Pipeline at Budge Budge Terminal H. P. C. L CIVIL WORK (SHEDS)-PAHARPUR ADDITIONAL FIRE WATER TANK ADDITIONAL FIRE WATER TANK 2013 PARADEEP TERMINAL Oil Storage Tanks Paradeep 2013 SOLAPUR LPG PLANT 2014 AKOLA - MAHARASTRA 2014 EAST ZONE 2014 EAST ZONE 2015 PARADEEP ORISSA 2015 BARAUNI - BIHAR ADDITIONAL FIRE WATER TANK AT SOLAPUR LPG PLANT - MAHARASHTRA CONSTRUCTION OF ABOVE GROUND / UNDER GROUND PETROLEUM STORAGE TANKS, ALLIED PIPELINES & CIVIL WORKS AT HPCL AKOLA NEW IRD Tank Modification under Location of East Zone Foam System under Location of East Zone Painting of Tanks at Paradeep Terminal Fire Water Pipeline Works at Barauni 12000153-OQ-10002 Dated 03/08/2012 12000164-OQ-10002 Dated 14/08/2012 12000200-OQ-12001 Dated 17/10/2012 12000148-OQ-11577 Dated 20/11/2012 12000154-OQ-11577 Dated 11/12/2012 12000305-OQ-10002 Dated 02/01/2013 16,62,42,144.00 09 Months Successfully Completed 10,86,09,074.00 6 th Months Successfully Completed 3,00,56,512.00 06 Months Successfully Completed 47.00,641.18 04 MONTHS Successfully Completed 32,93,091.27 03 Months Successfully Completed 10,12,95,307.00 06 Months Successfully Completed L 1 BY E-TENDER 2,75,80,867.40 07 Months Successfully Completed 14000198-OQ-10002 Date : 22/07/2014 14000174-OQ- 10002/DHP Date: 04/07/2014 14000346-OQ- 10002/KHS Date: 16/10/2014 15000136-OP-11600 Date: 19/10/2015 14000530-OQ- 10002/DHP Date: 11/03/2015 13,59,90,738.00 12 Months Successfully Completed 6,22,92,780.00 03 Months Successfully Completed 8,95,73,050.00 04 Months Successfully Completed 1,40,09,688.00 08 Months Successfully Completed 2,53,83,665.00 05 Months Successfully Completed 4 P age

LIST OF WORK PERFORMED AT HINDUSTAN PETROLEUM CORPORATION LIMITED 2015 5 P age JATNI LPG PLANT ORISSA Firewater Pump House and Assoc Piping works at Jatni LPG Plant 2015 BARAUNI - BIHAR Foam System at Barauni 2015 A.P. & Telangana BUDGE BUDGE WEST BENGAL PANAGARH WEST BENGAL Foam System job under Locations of A.P. & Telangana FO PIPE. WORK AT KOLKATA TERM MS Water Tanks at Panagarh LEH, JAMMU & KASHMIR Tank Fabrication Works PATNA - BIHAR MECH & PIPING WORKS - PATNA JABALPUR MADHYA PRADESH Panagarh LPG Plant West Bengal BUDGE BUDGE WEST BENGAL JABALPUR MADHYA PRADESH CENTRAL FOAM SYSTEM AT JABALPUR Fire Water line works at Panagarh LPG Plant UNDER GROUND TANK AT BUDGE BUDGE TERMINAL, KOLKATA Pipeline & Allied Jobs at Jabalpur 15000413-OQ-12001 & 15000415-OQ- 12001 Date: 14/12/2015 14000495-OQ-10002 Date: 24/02/2015 14000508-OQ- 10002/DHP Date: 02/03/2015 15000463-OS- 14001/BGJ Date: 07/03/ 15000454-OQ- 12001/GM Date: 23/02/ 16000005-OQ-11106 Date: 29/04/ 16000166-OQ-12001 DATED: 29.09. 16000229-OQ- 10002/RAC DATED: 07.10. P.O. NO.: 16000236- OQ-12001/OP DATED: 05.12. P.O. NO.: 16000124- OQ-11600/BR DATED: 25.11. P.O. NO.: 17000036- OQ-10002/DHP DATED: 27.04. 2,44,37,066.00 07 Months Successfully Completed 1,48,23,760.00 04 Months Successfully Completed 9,61,05,249.00 04 Months Successfully Completed 95,40,788.21 01 Month Successfully Completed 2,83,93,810.50 08 Months Successfully Completed 2,90,80,000.00 12 months Successfully Completed 4,62,24,280.72 06 Months In Progress 49,56,743.00 06 Months In Progress 5,36,95,600.62 07 Months In Progress 2,35,86,378.00 04 Months In Progress 5,36,08,381.70 08 Months In Progress

LIST OF WORK PERFORMED AT HINDUSTAN PETROLEUM CORPORATION LIMITED Panagarh LPG Plant West Bengal Jamshedpur LPG Plant - Jharkhand Ramnagar Lube Plant West Bengal BUDGE BUDGE WEST BENGAL MECHANICAL WORKS AT PANAGARH LPG PLANT Construction of Fire Water Tank- Jamshedpur LPG Plant Construction of MCC Room, DG Yard and transformer yard of Ramnagar Lube Plant Compound Wall at Budge Budge LOI NO.: PUR/NJ/EP&P-LPG DATED: 06.04. P.O. NO.: 16000297- OQ-12001/SPM DATED: 23.02. P.O. NO.: 16000038- OQ-14665/SSU DATED: 06.03. P.O. NO.: 17000032- OQ-10002/DHP DATED: 21.04. 6,02,60,817.68 06 Months In Progress 94,97,971.00 08 Months In Progress 36,91,402.30 05 Months In Progress 1,59,81,217.00 05 Months In Progress FOR: M K ROY & BROS PROJECTS PRIVATE LIMITED 6 P age

LIST OF WORK PERFORMED AT BHARAT PETROLEUM CORPORATION LIMITED 2013 2013 2013 2013 BUDGE BUDGE INSTALLATION BUDGE BDUEG INSTALLATION RAJBANDH WEST BENGAL MANMAD - MAHARASHTRA 2014 PATNA - BIHAR 2014 PATNA - BIHAR 2014 2015 2015 2015 MANMAD - MAHARASHTRA BUDGE BUDGE WEST BENGAL BUDGE BUDGE WEST BENGAL MANMAD - MAHARASHTRA Fabrication & Construction of 02 Nos. Fire Water Tanks (24 M x 11 M) at Budge Budge Installation Fabrication and laying of Fire Fighting Pipeline at Budge Budge Installation Replacement of Primary Roof Drain for Floating Roof Tanks at Rajbandh Augmentation of Fire Fighting System including Civil and Mechanical Jobs at Manmad Installation FR Tank Painting & Reparing job TK-01, 02, 05 at Patna Painting/Repair of T-08 & T- 09 at Patna Providing MV Water Spray System for Pump House and TW Loading Gantry at Manmad Installation. Re-Routing of Product Pipelines at Budge Budge Construction of Product Pump House and Other Civil Works inside Tank Area at Budge Budge Providing Euro-IV Products (MS-IV and HSD-IV) Loading Facility in Tank Wagon Gantry at Manmad 4504301658 Date: 09/10/2013 4504299193 Date: 07/10/2013 4504383453 Date: 16.12.2013 E&P(W).POL.MANM AD.04 Date: 04/10/2013 4504786210 Date: 30/10/2014 4504834906 Date: 10/12/2014 E&P(W).MANMAD. MVS.01 Date: 28/02/2014 4504878258 Date: 12/01/2015 4505261894 Date: 05/10/2015 E&P(W).MANMAD.E 4 Date: 11/03/2015 1,64,36,750.00 242 Days 2,35,96,658.40 242 Days 69,75,720.00 03 Months 3,73,84,917.88 08 Months 76,14,213.75 03 Months 93,47,233.50 2.5 Months 1,81,16,542.18 04 Months 62,02,714.00 04 Months 1,54,84,940.62 08 Months 4,24,81,368.00 07 Months Conted..P/2

Page: 02 LIST OF WORK PERFORMED AT BHARAT PETROLEUM CORPORATION LIMITED BUDGE BUDGE WEST BENGAL BUDGE BUDGE WEST BENGAL Fabrication, Erection of Tanks (A/G and F/R) for revamping of Budge Budge Installation FAB/EREC/COMMISSIONIN G OF 2 X 858 KL ETHANOL & 2 X 1683 KL BIO-DIESEL TANKS AT BUDGE BUDGE 4505508693 Date: 17/03/ LOI NO.: CPO:CSC:16-17:01(E):LOI DATED 20.06. 10,57,15,750.00 12 Months 2,96,99,093.49 08 Months IN PROGRESS IRIMPANAM - KERALA MANMAD - MAHARASHTRA BUDGE BUDGE WEST BENGAL IRIMPANAM - KERALA KARUR INSTALLATION, TAMILNADU MBLR WORKS FOR TANK NO 01A, 02B & 03B AT KARUR TERMINAL, TAMILNADU MBLR RELATED HOT WORKS & REPAIR JOBS IN EXISTING FLOATING ROOF TANK NO.03A AT MANMAD INSTALLATION SUPPLY AND INSTALLATION OF PORTABLE OFFICE CABINS AT BUDGE BUDGE HOT WORK IN ABOVE GROUND TANK 28 & 29 AT IRIMPANAM ETHANOL & BIO-DIESEL TANKAGE AT KARUR INSTALLATION, TAMILNADU LOI No.: CPO:CSC:16-17:24(S):LOI Dated: 02.12. LOI No.: CPO:LOI:1000256596 Dated: 01.07. LOI No.: C/E/BUDGE BUDGE Dated: 22/12/ LOI NO.: CPO:LOI:1000272178 DATED: 10.03. LOI NO.: CPO:LOA:1000277453 DATED: 17.05. 4,19,76,973.50 05 Months IN PROGRESS 2,47,86,824.50 04 Months IN PROGRESS 8,74,500.00 01 Month 3,46,10,830.00 05 Months IN PROGRESS 3,67,14,255.00 06 Months IN PROGRESS For: M K ROY & BROS PROJECTS PRIVATE LIMITED

LIST OF WORK PERFORMED IN THE LAST SEVEN YEARS AT HINDUSTAN COLAS LIMITED 2010 2010 HALDIA (WB) HALDIA (WB) HINCOL HINCOL CIVIL AND MECHANICAL WORKS AT HALDIA CIVIL AND MECHANICAL WORKS FOR STORAGE TANKS AT HALDIA 4500004040 Dated 15/10/2010 4500004057 Dated 19/10/2010 Value of Contract 2,15,06,525.00 06 Months Successfully Completed 1,44,25,260.00 06 Months Successfully Completed FOR: M K ROY & BROS PROJECTS PRIVATE LIMITED

LIST OF WORK PERFORMED IN THE LAST SEVEN YEARS AT BALMER LAWRIE & CO. LIMITED 2011 SILVASSA, D &H 2012 SILVASSA, D &H 2014 MANALI, CHENNAI BALMER LAWRIE & CO. LTD. BALMER LAWRIE & CO. LTD. BALMER LAWRIE & CO. LTD. Supply, Fabrication, Erection, Testing & Commissioning of Storage Tanks at Grease Processing & Lube Oil Blanding Plant at Silvassa D&NH Mechanical Equipment Erection & Piping Work at Grease Processing & Lube Oil Blanding Plant at Silvassa D&NH Mechanical equipment erection and piping work for zero Liquid Discharge Effluent Treatment Plant, Manali Complex, Chennai of Balmer Lawrie & Co. Ltd. P.O. No.: E&P/219/SIL/TANKS/01 DATED 19/05/2011 P.O. No.: E&P/219/SIL/M- 26/MECHANICALERECTIO N DATED 19/05/2011 P.O. No.: E&P/231/ETP/PC/M- 02/WO Dated: 24/10/2014 Value of Contract Completio n 57,79,990.00 06 Months Successfully Completed 46,94,680.00 02 Months Successfully Completed 15,91,116.00 1.5 Months Successfully Completed Contend P/2

Page - 2 LIST OF WORK PERFORMED IN THE LAST SEVEN YEARS AT BALMER LAWRIE & CO. LIMITED KOLKATA, WEST BENGAL BALMER LAWRIE & CO. LTD. Work Order for 'Rasitemsnt of over ground mild steol basil 011slorog8 tanks wllh modification' for Modernisation lautomation of Balmer Lawrio Grease and Lube, 011 Plant, Kolka!a - 700 088 P.O. No.: EP/GLK/240/MECH/MST/03 R/WO Dated: 01.01. Value of Contract Completio n 63,81,209.80 04 Months Successfully Completed FOR: M K ROY & BROS PROJECTS PRIVATE LIMITED FOR: M K ROY & BROS PROJECTS PRIVATE LIMITED