SINTAKOTE STEEL PIPELINE SYSTEMS PROJECT EXPERIENCE

Similar documents
Australian Accommodation Monitor Summary. Financial-year performance:

Ross Young Executive Director Water Services Association of Australia

The SBEnrc. Three Research Programs.

Infrastructure Priority List. Infrastructure Priority List Printed as at 28 April

Department of Employment, Economic Development and Innovation. Current Queensland coal infrastructure developments

For personal use only

Australian Statistical Geography Standard (ASGS): Volume 5 - Remoteness Structure

Treasury Circular Industrial Relations NSWTC August 2015

Greg Steinepreis EXECUTIVE SUMMARY. Partner, Perth T

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

Historical Disaster Statistics

GLADSTONE. Australia s premier manufacturing and industrial location

STEVE ABSON SENIOR ASSOCIATE

Listing Rule 3.17 Shareholder Update for the 9 months to 30 September 2012

HALF YEAR REPORT February Leighton Holdings Limited

Shaping the Future of Railway Institute of Railway Technology

CORROSION PREVENTION. Leaders in Corrosion Prevention and Sealing Technology.

Appendix 2. Advertised Call for Submission No Description of catchments and services by catchment

Medicare Local Offices at July 2013 Listed by State/Territory

FUJITSU SERVICE COVERAGE

JOHN McMULLAN CURRICULUM VITAE. EDUCATION: Bachelor of Engineering (Civil) University of Melbourne 1976

Home About us Contact

Australian Program Guide

HY 2016 Results February 2016

FUJITSU SERVICE COVERAGE

Capability. icn.org.au. Chairman s message. ICN puts Australian firms on track for Waratah rail AUTUMN2012

Mildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC

ORGANISATIONS (DEFINITION OF FAMILY COUNSELLOR) DESIGNATION 2012

Is uneven economic growth dividing Australian society? 14 March 2017

MAPPING YOUTH UNEMPLOYMENT HOTSPOTS

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices

Stakeholder Briefing The Bays Precint Urban Transformation Program

IBM ServicePac Location Guide

The Coalition s Policy to Build Melbourne s East West Link

Anthony Wood. Associate tirector. Experience Overview

The Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid

GTO SCENariOS TO 2020

STATISTICAL REPORT. Aviation

INTERIM REVIEW OF AUSTRALIAN CONSTRUCTION MARKET CONDITIONS JULY 2015

The Coalition s Policy

Amalgamated Pest Control Pty Ltd ABN

INVESTOR ROADSHOW MAY/JUNE 2003

STATISTICAL REPORT. Aviation

NEWS RELEASE 8 NOVEMBER Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business

MONADELPHOUS REPORTS FY 2017 SALES AND EARNINGS. Performance Highlights

Gruyere Gold Project Development Update

Regional and Remote Communities. Capability

Nation-wide roll out of Energy Efficient Street Lighting. South West Group/WALGA Climate Change Forum September 2016

Regional Public Sector Employment and Investing Expenditure

clubmini Vic 2018 Calendar v1.0 JANUARY 2018 FEBRUARY D E C 2 9 J A N S C H O O L H O L I D A Y S

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

The ITGI Project Gas Corridor through Turkey, Greece and Italy

Office locations QLD NSW VIC

STATISTICAL REPORT. Aviation. Domestic airline on time performance

professional summary

Personal Helpers and Mentors (PHaMS) and Mental Health Respite: Carer Support, April 2013

STATISTICAL REPORT. Aviation

STATISTICAL REPORT. Aviation

Technical Design Manual

STATISTICAL REPORT. Aviation

Trade services. TradeStart. About TradeStart. TradeStart office locations. For Australians. How Austrade can help. New South Wales

the regional agenda in context

The Cairns Property Market. Presented by Rick Carr Research Director, Herron Todd White 28 July 2015

THE CONSTRUCTION INDUSTRY OUTLOOK

Bankwest First Time Buyer Deposit Report 2016

Tasmania Property Report April 2015

Investor Briefings First-Half FY2016 Financial Results

STATISTICAL REPORT. Aviation. Domestic airline on time performance

CENTRAL AUSTRALIA p239

Tapping in. News about Bulk Liquids Industry Association Inc

QQC LNG Community Committee Monday 6 December 2010 QGC Office, Gladstone

4WD & ADVENTURE SHOW OCTOBER 12-14

HISTORIC PICTURES RELEASED TO THE NATIONAL LIBRARY OF AUSTRALIA

Company Brief, including valuer CV s

Challenge us to find you a better deal. At no cost to you, we help save time and money, without the hassles and headache.

Outlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected

MONADELPHOUS REPORTS HY 2017 REVENUE AND EARNINGS

CEREMONY REPORT STIRLING BRIDGE

Anaesthetic Job Vacancies

CASE STUDY. Changing Places, May Park, Horsham, Victoria. landmarkpro.com.au BRISBANE SYDNEY MELBOURNE ADELAIDE PERTH AUCKLAND

NSW METS LEVERAGING GLOBAL ADVANTAGE SYDNEY 13 MAY 2016

2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining

Anaesthetic Job Vacancies

AUSTRALIAN TRAVEL TIME METRIC 2017 EDITION

Property Flipping Report. Prepared by CoreLogic

Commissioned by Gambling Research Australia for the Ministerial Council on Gambling. A Review of Australian Gambling Research

Presentation to Melbourne Mining Club. 23 April 2015 Mitsui & Co., Ltd.

A trusted and experienced partner

INSTITUTIONAL BANKING. PECC International Roundtable Financing Airport Privatisation in Australia September 2003

History of the weir. Other dams

PIPE Networks Limited 2008 Annual General Meeting

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

Website

Advertised Tenders as at 16 April, 2018

Stayz VIC Melbourne city VIC ocean grove

DOWNPIPE AND FITTINGS. Including Clips, Brackets and Droppers

Pre Trip Contact: Note: To all the phone numbers in Book 2 add the number 4 after the 07.

OPENING UP SOUTH AUSTRALIA S RESERVOIRS PUBLIC ACCESS FOR RECREATION

UNIVERSITY EDUCATION. A Comparative Analysis IN CAIRNS CUMMINGS ECONOMICS. 38 Grafton Street (PO Box 2148) CAIRNS QLD 4870

Watpac advises that the Scheme Resolution was not passed by the requisite majorities of Watpac shareholders, with:

Transcription:

SINTAKOTE STEEL PIPELINE SYSTEMS PROJECT EXPERIENCE Steel Mains and its antecedents have participated in most of the major water supply pipelines constructed in Australia since the early 1900 s. A summary of some of those Steel Mains SINTAKOTE Steel Pipeline Systems projects undertaken in recent years is given below. Principal Project Year/s Length Diameters Variations* Time* (km) (mm) Extensions 1 Woleebee Creek to 2013 120 914/960/ Glebe Weir Pipeline 1067/1404 Project 2 Queensland Curtis 2012/2013 140 406/508/ LNG Project - Water 559/660/ Trunklines 762/960 3 Melbourne Desalination Plant- Transfer Pipeline 4 Adelaide Desalination Plant- Transfer Pipeline 5 Sugarloaf Interconnector Pipeline 2009/2010 84 1930 2009 12 1575 2008/2009 70 1404/1750 6 Wimmera-Mallee Pipeline Project 2007/2008/ 2009 94 711/1016 7 South East 2006/2007/ 334 813/ Queensland 2008 960/1085/ Water Grid 1290/1451 8 Bayswater Power Station 9 Ballarat Link of the Goldfields Superpipe 2008 4 1451 2007/2008 47 800 10 Goulburn to Campaspe Link Superpipe Project 2007 47 1124 Page 1

11 Torrens System Upgrade Project 2007 3.4 1829 12 Liverpool to Ashfield 2006/2007 20 988/1067/ Pipeline 1124 13 Burdekin to Moranbah Pipeline 2006 172 813 14 Kwinana Desalination Connection 2005/2006 23 1200/1400 15 Stag Creek Pipeline 2005 15 800/960 16 Clarence Valley RWSS Stage 1B 2003/2004 16 960 17 Mt Miller Pipeline 2003 17 900 18 Clarence Valley RWSS Stage 1A 2002 35 660 19 Stirling Trunk Main 2000/2001 106 1400 * There were no variations or time extensions attributable to Tyco Water s failure to perform. 1. Project Name: Woleebee Creek to Glebe Weir Pipeline Project Supply of a pressure pipeline from Woleebee Creel to Glebe Weir. 120km of 914/960/1067/1404mm SINTAKOTE RRJ MSCL pipe. April 2013 to September 2013. SunWater to date. Pipe deliveries completed to date on time with no problems. Mr Russell Paton SunWater Tel: (07) 3120 0201 Page 2

2. Project Name: Queensland Curtis LNG Project - Water Trunklines Supply of a pressure pipeline for the QCLNG Upstream Project. 140km of 406/508/559/660/762/960mm SINTAKOTE RRJ MSCL pipe. April 2012 to June 2013. Queensland Gas Company (QGC) Pipe deliveries completed on time with no problems. Henro Van Wyk EPcm Contract Manager) Tel: +61 408 338 682 3. Project Name: Victorian Desalination Project-Transfer Pipeline Supply of a pressure pipeline from Wonthaggi Desalination Plant Wonthaggi to Cardinia Reservoir. 84km of 1930mm SINTAKOTE Ball & Socket Joint MSCL pipe. December 2009 to December 2010. Aquasure Consortium (Thiess, Degremont Capital) to date (May 2011). Pipe deliveries completed on time with no problems. (Suez Environment) and Macquarie Jason Spears (Project Director Aquasure Pipeline Joint Venture) Tel: +61 418 534 483 Page 3

4. Project Name: Adelaide Desalination Plant-Transfer Pipeline Supply of a pressure pipeline from Port Stanvac S.A. to Happy Valley Water Treatment Plant and Reservoir. 12km of 1575mm SINTAJOINT RRJ MSCL pipe. February 2009 to November 2009. SA Water. Pipe deliveries all on time with no problems. Andrew Gambling (Project Director McConnell Dowell-Built Environs Joint Venture) Tel: 0407 046 504 5. Project Name: Sugarloaf Interconnector Pipeline Supply of a pressure pipeline from Eildon Reservoir to Sugarloaf Reservoir. 50km of 1750mm and 20km of 1404mm SINTAKOTE Ball and Socket Joint MSCL pipe. May 2008 to August 2009. Melbourne Water. Pipe deliveries were on or before time with no problems. Rod Clifford (Project Director Sugarloaf Interconnector Project-Melbourne Water) Tel: (03) 92352561 Mob: 0407 884 088 Page 4

6. Project Name: Wimmera-Mallee Pipeline Project Supply of a new pressurised pipeline water supply system to replace the existing channel delivery system. 64km of 1016 outside diameter SINTAJOINT RRJ and Welded steel pipe and 30km of 711 outside diameter SINTAJOINT RRJ and Welded steel pipe. December 2007 to October 2009. Grampians Wimmera-Mallee Water. Pipe deliveries were on time with no problems. Mr Jeff Rigby (Managing Director) GWMWater Tel: (03) 5382 4611 Page 5

7. Project Name: South East Queensland Water Grid The South East Queensland Water Grid consists of the Northern Interconnector Pipeline, the Southern Regional Water Pipeline, the Eastern Interconnector Pipeline and the Western Corridor Recycled Water Scheme. 334km of SINTAKOTE steel pipe in sizes ranging from 800 to 1451 outside diameter. November 2006 to July 2008. The Queensland Government. Tyco Water met all supply deadlines for each of these significant projects. Mr Nigel Deacon Infrastructure Delivery Group Department of Infrastructure and Planning Tel: (07) 3898 0474 8. Project Name: Bayswater Power Station Constructed by Eire Contractors at Bayswater Power Station Muswellbrook in order to supply additional water to the Power Station. Approximately 4km of 1451 outside diameter SINTAJOINT RRJ steel pipe and fittings. Period of 8 weeks from February 2008 to May 2008. Macquarie Generation. All pipe deliveries were on time. Mr Gavin Heydon (Project Manager) Macquarie Generation Mob: 0427 702 204 Page 6

9. Project Name: Ballarat Link of the Goldfields Superpipe Supply of a pressure pipeline from Sandhurst Reservoir (approx. 10km SW of Bendigo) to the White Swan Reservoir (approx. 10km NE of Ballarat). 47km of 800 outside diameter SINTAJOINT RRJ steel pipe. March 2007 to December 2008. Central Highlands Water. Pipe deliveries were on time with no problems. Mr Tony Wright (Project Director) Central Highlands Water Tel: (03) 5320 3100 10. Project Name: Goulburn to Campaspe Link Superpipe Project Supply of a pressure transfer pipeline from the Waranga Western Channel near Colbinabbin to connect with Coliban Water s system at Lake Eppalock. 47km of 1124 outside diameter SINTAJOINT RRJ steel pipe. February 2007 to July 2007. Coliban Water. Pipe deliveries were supplied from Melbourne and Perth on time with no problems. Mr Rick Jackel (Project Director Infrastructure Services) Coliban Water Tel: (03) 5434 1222 Page 7

11. Project Name: Torrens System Upgrade Project Supply of a pipeline within the Torrens Linear Park, between the Torrens Gorge Weir (off Gorge Road, Athelstone) and Gallery Road Highbury. The sites are located in Adelaide s north-eastern suburbs, South Australia. 3.4km of 1829 outside diameter SINTAJOINT RRJ and Welded steel pipe. May 2007 to September 2007. South Australian Water Corporation. First ever supply of 1800 nominal bore SINTAJOINT RRJ steel pipe into South Australia. Mr Milind Kumar (General Manager Engineering and Projects) SA Water Tel: (08) 8204 1000 12. Project Name: Liverpool to Ashfield Pipeline Recycled water main to provide irrigation to local parks and industry. Also used as a diversion from the George s River sub-main while renewals took place. 20km of 988/1067/1124 outside diameter SINTAKOTE steel pipe and fittings. October 2006 to August 2007. Sydney Water. Tyco Water Services were able to slip line 6km of 980 internal diameter SINTAKOTE steel pipe for this project. Mr Adam Binning (Project Manager) Leighton Contractors Tel: (02) 9414 3922 Page 8

13. Project Name: Burdekin to Moranbah Pipeline Water supply pipeline from Burdekin to Moranbah. 172km of 813 outside diameter SINTAJOINT RRJ and Spherical Slip-In welded joint steel pipe. Over 10 months finishing October 2006. SunWater. Tyco Water was able to supply 5.5km of pipe per week. Mr Tim Donaghy (Senior Project Manager) SunWater Tel: (07) 3120 0196 14. Project Name: Kwinana Desalination Connection Pipework connecting the Desalination plant into the IWSS. 23km of DN1200/DN1400 outside diameter SINTAJOINT RRJ and Spherical Slip-In welded joint steel pipe. October 2005 to March 2006. Western Australia Water Corporation. No project problems, completed on time. Mr Mark Oliver Western Australia Water Corporation Tel: (08) 9420 2420 Page 9

15. Project Name: Stag Creek Pipeline Raw Water supply pipeline for Callide Power Station. 8km of 800 outside diameter and 7km of 960 outside diameter SINTAKOTE steel pipe. April 2005 to July 2005. SunWater. Pipe delivered on time with no issues. Mr Russell Paton SunWater Tel: (07) 3120 0201 Page 10

16. Project Name: Clarence Valley & Coffs Harbour Regional Water Supply Scheme Stage 1B Water supply pipeline for Clarence Valley & Coffs Harbour NSW. 15.6km of 960 outside diameter SINTAKOTE steel pipe. November 2003 to July 2004. Clarence Valley Council. Pipe delivered on time with no issues. Referees: Mr Jim Fear North Coast Water Tel: (02) 6645 3300 Mr David Tarrant Dept. of Commerce Tel: (02) 6648 5901 17. Project Name: Mt Miller Pipeline Gladstone Area Water Board Raw Water supply pipeline. 17km of DN900 SINTAKOTE steel pipe. July 2003 to September 2003. Gladstone Area Water Board. Pipe delivered on time with no issues. Mr Alan Edgerton Tel: (07) 4976 3000 \ Page 11

18. Project Name: Clarence Valley & Coffs Harbour Regional Water Supply Scheme Stage 1A Water supply pipeline from Clarence Valley to Coffs Harbour NSW. 34.5km of 660 outside diameter SINTAKOTE steel pipe. April 2002 to September 2002. Clarence Valley Council. Contract period was only 21 weeks and Tyco Water supplied all pipes within the specified period with no time extensions required. Referees: Mr Jim Fear North Coast Water Tel: (02) 6645 3300 Mr David Tarrant Dept. of Commerce Tel: (02) 6648 5901 19. Project Name: Stirling Trunk Main Water supply pipeline from Stirling Dam to Tamworth Reservoir. 106km of DN1400 SINTAJOINT RRJ and Spherical Slip-In welded joint steel pipe. Over 18 months finishing January 2001. Western Australia Water Corporation. A jointly funded investigation was conducted into the friction effects on buried SINTAKOTE steel pipelines and resulted in a significant reduction in the number of welded joints required for thrust restraint. Mr John Wallis Western Australian Water Corporation Tel: (08) 9420 2420 Page 12

Page 13