SH6 Route Security Strategic Study Project Summary

Similar documents
SH73 Route Security Strategic Study Project Summary

Lake Dunstan Trail Project - Geotechnical Review

West Coast Lifelines Vulnerability and Interdependency Assessment Supplement 6: Transportation Lifelines Assets

Regional summary - Wellington

PERTH-ADELAIDE CORRIDOR STRATEGY

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

$745 $10 $41 OVERVIEW

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.

Commissioning Director - Environment

TOURISM IN WESTLAND MARCH 2012

Land Management Summary

NAPAIMUTE TRIBAL SAFETY PLAN Tribal Transportation Program

Submission to. Westland District Council. on the. Draft Long Term Plan Date: 15 June 2018

Traffic Note 32. Use of fluorescent material on traffic signs - guidelines. Date: September Authorisation: Peter Croft, Manager Safer Roads

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

ROTORUA INTEGRATED NETWORK STRATEGY

National Land Transport Programme Southland

Submission to. Christchurch City Council. on the. Draft Long Term Plan Date: 12 April 2018

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

Otorohanga Stopbank Pathway - Project Overview

International Snow Science Workshop

Hydro-Electric Schemes Compliance Report June June 2013

Location reference: Management Area reference: Policy Development Zone: Marazion to Longrock MA19 PDZ8

Hamilton City Council Transport Strategy

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CAA stakeholder engagement Draft airspace modernisation strategy

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

THE WELSH MINISTERS STATEMENT OF REASONS

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe

EXPLANATORY STATEMENT

Submission to. Wairoa District Council. on the. Draft Long Term Plan Date: 26 June 2018

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

The Strategic Commercial and Procurement Manager

SUTTON UNDER WHITESTONECLIFFE PARISH COUNCIL

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

M4 Junctions 3 to 12 Smart motorway

COASTAL CAR PARK CHARGING TRAFFIC REGULATION ORDER FREQUENTLY ASKED QUESTIONS

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A Master Plan is one of the most important documents that can be prepared by an Airport.

Submission to. Palmerston North City Council. on the. Draft Long Term Plan Date: 23 April 2018

PAGE 602

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

VISITOR RISK MANAGEMENT APPLIED TO AVALANCHES IN NEW ZEALAND

Nelson Tasman Cycle Trail Trust Strategic Plan Vision: The Heart of Biking. Purpose. Principles

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

Non-motorized Trail Plan & Proposal. August 8, 2014

Major Scheme Business Case Summary Report for Programme Entry

MORGAN CREEK GREENWAY Final Report APPENDICES

Frequently Asked Questions

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

South of England north-south connectivity

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

2 THE MASTER PLAN 23

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

TOP OF THE SOUTH TOURING ROUTES

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond

33. Coiba National Park and its Special Zone of Marine Protection (Panama) N 1138 rev)

NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT

Manawatu Gorge update 2 December

Wildlife Management from a Regulatory Perspective

Southsea Flooding and Coastal Erosion Risk Management Scheme

STATEMENT OF PROPOSAL

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

Transit s forecasts of expenditure in Waikato for the next 10 years are set out in Table WK1.

1. PROJECT BACKGROUND. June 25, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Draft Strategic Plans for Coillte s eight Business Area Units ( )

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

SPOTLIGHT ON STUDENT ACCOMMODATION FABBY ERNESTA

land transport at a glance

January 19, 2018 Project No C Via

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

Agreement Between the West Somerset Railway PLC and the West Somerset Steam Railway Trust Ltd

US Forest Service Bears Ears Trail - NFST 1144 California Park to Hole in Wall Creek. Good (1) 2 3

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

SOUTH INTERCHANGE AREA

Bear Creek Habitat Improvement Project

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report

Table of figures. Table of contents. Executive summary... i Introduction... 1 Purpose... 1

FOR CONSIDERATION BY The Executive on 30 October Angus Ross, Executive Member for Environment

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

The Collection and Use of Safety Information

Submission to. Waitaki District Council. on the. Draft Long Term Plan Date: 30 April 2018

Bibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Southern Shenandoah Valley Chapter

2. STAKEHOLDER FEEDBACK // What We Heard

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

STRATEGY FOR ADAPTING TO CLIMATE CHANGE

The Traffic Management Act (TMA) 2004 and roadworks; and lane rental under the New Roads and Streetworks Act (1991) in England

ANNUAL REPORT PREPARED BY PETER J FALLA SENIOR MANAGER, PROJECTS & ROADS

BGA Strategy. What is this document for, and how was it developed? Page 1 of 5. BGA Strategy V1 Final October 2017

Broomhill Park - 10 Year Vision Document

Kelly Field at Port San Antonio Airport Master Plan

Transcription:

Ocber 2009 SH6 Route Security Strategic Study Project Summary Managing Route Security from Buller Gorge Haast Pass

STATE HIGHWAY 6 BULLER GORGE TO HAAST PASS ROUTE SECURITY STRATEGY CONSULTATION 1. Introduction State Highway 6 is a Regional State Highway in the National State Highway Strategy, and provides often the only route along the length of the West Coast of the South Island. The route is vital for the economic wellbeing of the West Coast with, in addition local traffic, a number of heavy vehicle movements and a significant and increasing number of urists travelling in ur coaches, camper vans, rental cars and cycles. Route security is crucial as severance, depending on location, can result in deurs of hundreds of kilometres. A significant risk the route security is the continuing threat of coastal erosion and rock fall that have the potential remove large sections of highway. While flooding and river erosion are also threats route security, they are more localised and can often be quickly reinstated. This strategic study has investigated and prioritised the coastal erosion and rock fall risk areas where a forward planning strategy is required. The speed and severity at which coastal erosion and rock fall occur require particular expertise assess the likely extent of the damage both road and or users, and consider the optimum period for timely intervention with capital improvements, or if ongoing maintenance is the most viable solution. 2. Purpose of this Document This document is designed inform you of the Agency s proposed management of the West Coast section of SH 6 for the foreseeable future. The Agency is keen receive your comments on its proposed Strategy before it is formally adopted. Your comments are important and necessary ensure the Agency has addressed areas that cause greatest concern the highway s stakeholders and is your opportunity raise any further issues. 3. Purpose of the Study The SH 6 Study aims identify, investigate and prioritise route security and road user safety issues along the highway from Newman s Slip (Buller) Haast Pass (Westland), including risks from rock falls, slope instability, debris flows, flooding (spbank breaches) and coastal erosion. The output of this study will be a recommended Strategy and Implementation Plan that will detail a practical and affordable management regime of the highway that will range from continuing current practice investigating and developing new projects as they are required. Project Number NZTA 62083 Page 2 Ocber 2009

4. Stakeholder Consultation An initial consultation exercise was completed in May 2008, inviting Stakeholders provide insight of areas or specific sites where they believed hazards pose a significant risk the highway and its users. The particular issues of concern within the feedback is summarised as follows: Coastal erosion threatened sections of SH 6 are of major concern and considered more pressing than flooding issues, with the visual and landscape impact from coastal protection works considered the most significant worry. Future work should be cognisant of sea level rise; A general concern of losing long sections of highway flood events in particular adjacent the spbanks of Waitangitanoa and Waiho; Flooding, erosion and landslip following major Srm events and the reliance on emergency works provisions of the RMA; Visirs using the highway are generally ignorant of the hazards that exist with the result of elevating the risk (consequences) posed by that hazard; and Extended closure of SH 6 would have significant impact on the community and as such is of major concern the Stakeholders. 5. Investigation of Issues At-risk sites have been identified through document and report review, consultation and a drive-over exercise. In tal, twenty three sites have been recognised as potentially problematic, comprising rock fall, landslide, flooding, coastal erosion and debris flow hazards. The sites are shown on the map presented as Figure 1. Each of the sites has been assessed in terms of its geological, environmental and economic issues and their contributions route security with an attempt prioritise sites in terms of seriousness and urgency. The following ten sites are considered the most problematic: Newman s Slip (landslide) Meybille Bay (rock fall) Stilts Bluff (landslide) Rapahoe (coastal erosion and rock fall) Hawks Crag (rock fall) Omoeroa (Fox Hills) (debris flows) Uranium Point (rock fall) Bruce Bay (coastal erosion) Woodpecker Bay (coastal erosion) Diana Falls the Hinge (rock fall/landslide) However, the issues experienced at these sites are typical for their general area. Consequently, this Study has developed a Corridor Management Strategy over an individual site approach, which is considered a more cost effective solution reducing natural hazard risk along the route. Project Number NZTA 62083 Page 3 Ocber 2009

Project Number NZTA 62083 Page 4 Ocber 2009

6. Proposed Corridor Management Plan The section of SH6 covered by this Study has been subdivided in six continuous sub-sections, as shown in Figure 1 and described in Table 1. The table also summarises the typical issues and management Strategy be adopted for each section. The proposed Corridor Management Plan has been developed manage risk along SH6 within the constrained funding that is available and is based on the DNA principle of Detect, Notify, and Action. Detect and Identify risks road users, route security and the environment through improved moniring and surveillance by the Network Consultant and Contracr. Notify risks NZTA Regional Engineer, management and affected Stakeholders as appropriate. Action Plan development including emergency response plans, investigation of highest risk sites, exposure and hazard reduction plans. See Figure 2 for the process be adopted for determining appropriate action. Figure 2: Investigate, Design and Construct Process Route Security Site Normal Activity Unexpected Activity Monir and Record Activity Small Event Activate Emergency Plan (Warnings, Road Closures, Deurs etc.) Major Event Annually Review Moniring Data. Review Risk Profile Remedial Work Under Network Operations Low Cost Option Undertake Initial Road Opening/ Clearing Where Possible Investigate Remedial Options Low or High Cost Higher Cost Options Secure Emergency Funds for Permanent Repair Submit RLTP Submit NLTP Implement Urgent Hazard Reduction Works Prepare Plans for Remedial Works Implement Preplanned Remedial Work New Emergency Work Normal Project Development Project Number NZTA 62083 Page 5 Ocber 2009

NZ Transport Agency Some of the ways in which hazard and exposure can be reduced comprise the following: Increase driver awareness e.g. through signage. Install more warning signs e.g. No Spping, Rock Fall. Develop early warning systems for drivers and have response plans in place for the various hazard scenarios, including road closures and diversions when warranted. Close off rest areas or lay-bys in areas of increased exposure. Consider traffic management systems remove road users from areas of greatest risk. Where physical works are needed reduce the hazard, this could be in the form of: Improve drainage (rainfall and high ground water most common cause of instability). Preventative maintenance protect the road (engineered solution such as rockfall netting). Realignment of the road away from the hazard. Meybille Bay Uranium Point Fox Hills (Omoeroa) Punakaiki Sites Identified as Potentially At-Risk During the SH 6 Strategic Study Bruce Bay Project Number NZTA 62083 Diana Falls Waiho Spbank Page 6 Hawks Crag Ocber 2009

Table 1: Summary of Corridor Management Name Upper Buller Gorge Lower Buller Gorge Northern Coast Kumara Central Coast Southern Coast Section Description Eight Mile Creek SH69 Jct (Inangahua) SH69 Jct (Inangahua) SH67 Jct (Westport) SH67 Jct (Westport) SH7 Jct (Greymouth) SH7 Jct (Greymouth) Arahura River (Hokitika) Arahura River (Hokitika) Waiho River (Franz Josef) Waiho River (Franz Josef) Haast Pass Summit RP 269/0.00 296/0.00 296/0.00 336/0.00 336/0.00 430/0.00 430/0.00 445/17.55 463/0.00 596/13.33 610/0.00 800/14.34 Length Environment Identified Sites Typical Issue(s) Typical Management (km) 28 Upper river valley. Over steepened valley sides. Highway follows river, cut in valley side. Bush covered Newman s Slip Landslide River erosion Inangahua Whitecliffs Pavement instability Lower river valley. Some steep valley 40 sides with cut embankments. Bush covered. Stitts Bluff Embankment instability Blackwater Creek River erosion Hawks Crag Rockslide Uranium Point Windy Point Embankment instability Woodpecker Bay Coastal erosion Meybille Bay 94 High-level coastal section. Highway Punakaiki mostly on cliff sections. 17 10 Mile Creeks Rapahoe Coastal erosion 32 Lowland coastal and pasture None Pavement performance Lowland coastal and pasture with 142 bush covered foothills in southern section Bush covered foothills crossing several river valleys. Becoming 203 mountainous in the south wards Haast pass Mount Hercules Srmwater management Culvert 62 Srmwater management Waitangitanoa Spbank Flooding Waiho Spbank. Flooding Omoeroa Ranges, Debris Flow Bruce Bay Coastal erosion Breccia Creek Depot Creek Diana Falls The Hinge Rockslide moniring Riverbank and embankment inspections moniring Riverbank and embankment inspections Pavement inspections moniring Coastal erosion moniring Traffic management General and routine maintenance General and routine maintenance Flood moniring and response management moniring Flood and srm management Traffic management Project Number NZTA 62083 Page 7 Ocber 2009

7. Your Views and Feedback We welcome your comments about the draft strategy before it is finalised in late December 2009. Please submit your feedback GHD (see contact details below) by Friday 27 th November 2009. When commenting please provide: Your name; Organisation if appropriate; Daytime and mobile telephone numbers; and Email address. For further information please contact the Consultant Project Co-ordinar in the first instance, or the Transportation Planning Manager (NZTA). Consultant Project Co-ordinar: Mary O Callahan, GHD Ltd Level 4, 148 Vicria Street PO Box 13-468 Christchurch 8013 T: +64 3 364 5503 F: +64 3 377 8575 E: mary.ocallahan@ghd.com Transportation Planning Manager: Michael Blyleven, NZTA NZTA Christchurch Regional Office Level 7, Pacific Brands House 123 Vicria Street PO Box 1479 Christchurch Mail Centre Christchurch 8140 T: +64 3 963 3218 F: +64 3 365 6576 E: michael.blyleven@nzta.govt.nz Project Number NZTA 62083 Page 8 Ocber 2009